Académique Documents
Professionnel Documents
Culture Documents
LA PALMA
CAMARA DE DISTRIBUCION
EL LIRIO
TANTACHUAL ALTO
14.6224
TOTALES:
Piedra chancada 1/2" - Piedra mediana 4"
24.27 0.15
3/4" (m3) (m3)
Arena gruesa de cerro
24.57
(m3)
Hormigon de cerro (m3) 7.70
Arena fina (m3) 7.23
Piedra redonda 1" - 1/2"
8.93
(m3)
Cemento Portland (bolsas) 463.40
14.5
21.5
TOTALES:
Piedra chancada 1/2" - Piedra mediana 4"
5.39 0.85
3/4" (m3) (m3)
Arena gruesa de cerro Afirmado de cerro
6.21 2.02
(m3) (m3)
Hormigon de cerro (m3) 1.96
Arena fina (m3) 2.76
Piedra redonda 1" - 1/2"
0.44
(m3)
Cemento Portland (bolsas) 105.22
1.917
TOTALES:
Piedra chancada Piedra
1/2" - 3/4" (m3) 6.55 mediana 4"
(m3)
Arena gruesa de
5.16
cerro (m3)
Hormigon de cerro (
0.58
Arena fina (m3) 1.11
Piedra redonda 1" -
1.32
1/2" (m3)
Cemento Portland
89.79
(bolsas)
TOTALES:
Piedra chancada 1/2" - Piedra mediana 4"
13.93 0.66
3/4" (m3) (m3)
Arena gruesa de cerro
16.00
(m3)
Hormigon de cerro (m3)
4.18
Arena fina (m3) 6.41
Piedra redonda 1" - 1/2"
8.93
(m3)
Cemento Portland (bolsas) 285.19
149.47
153.51
66.30
46.09
60.84
7.66
8.27
9.36
6.16
7.44
21.53
22.78
0.73
7.63
7.67
1.50
3.92
3.76
0.78
1.36
4.87
1.25
4.18
10.79
3.15
8.39
2.01
3.37
1.75
0.04