Académique Documents
Professionnel Documents
Culture Documents
AGOSTO 2012
Equator Quito
Guayaquil
Rio Blanco
Cuenca
Pacific Quimsacocha (Iamgold)
Ocean Machala Gaby
FDN (Aurelian)
Mirador (Corriente)
Peru
100 km
Pan American Highway
Metamorphic basement
(Precambrian-Cretaceous)
644
N Río Villa
GABY TAMA
9662000
Rio G
uana
che
PAPA GRANDE
CUY
9661000
TRES DE
MAYO
LEGEND
Hydrothermal Bx (Volcanic clasts)
BELLA
Hydrothermal Bx (Porphyry clasts) RICA
Horblende porphyry
Fault observed
82
Fault - inferrred
Lineament
O C EAN IC
RY
C RUST
HY
RP
J u ra ssic -‐C re ta c e o u s PO RPH YRY
PO
E
ON
E
Z
R
TU
SU
BATHO LITH
Hydrotermal
Hydrotermal Breccia
HydrotermalBreccia
Breccia
Volcanic
VolcanicFlows
Volcanic Flows
Flows
Feldspar
FeldsparPorphyry
Feldspar Porphyry
Porphyry
Hornblende Porphyry
Hornblende Porphyry
HFP
HFP Porphyry
HFPPorphyry
Porphyry
Igneous
IgneousComplex
Igneous Complex
Complex
Pre-1991
Pre-1991
Pre-1991 Minpalca/
Minpalca/15
Minpalca/ 15RC/
15 RC/832m
RC/ 832m
832m
1991
1991
1991 Newmont/
Newmont/11
Newmont/ 11DDH/
11 DDH/2,160m
DDH/ 2,160m
2,160m
1994
1994
1994 Zappa/13
Zappa/13DDH/
Zappa/13 DDH/2,652m
DDH/ 2,652m
2,652m
1994-1997
1994-1997 IMC/
1994-1997 IMC/ 175
IMC/175 RC/
175RC/ 10,635m
RC/10,635m
10,635m
1994-1997
1994-1997 CAMBIOR
CAMBIOR///54
1994-1997 CAMBIOR 54 DDH/
54DDH/ 6,119m
DDH/6,119m
6,119m
1994-1997 IMC/
1994-1997 IMC/ 71
71 DDH/
DDH/ 18,713m
18,713m
2006
2006 IMC/ 41
IMC/ 41 DDH/
DDH/ 10,136m
10,136m
2007
2007 IMC/ 77
IMC/ 77 DDH/
DDH/ 21,536m
21,536m
2008 IMC/ 23 DDH/ 5,650m
15200N
S N
250 m a.s.l
FINE-GRAINED PORPHYRY
HYDROTHERMAL BRECCIA
FELDSPAR PORPHYRY
HORNBLENDE PORPHYRY
CROWDED PORPHYRY
0 200m
ANDESITIC FLOWS
PPG-018 (53.30m)
Hydrothermal Breccia with volcanic and intrusive
clasts in Qtz – Act – Py – Cpy matrix
GABY – PAPA GRANDE PROJECT
Stock work of Py in Mv
PPG-028 (115m)
Stock work and parallel vein of Py in Mv
GABY – PAPA GRANDE PROJECT
Au Free PPG-028 (62.45m)
Au
Under
Negotiation
Gaby Pit Outline
Ponce Enriquez
Papa Grande Deposit
(50% IMZ)
1 km M&I Resource Estimate
1.6 million Oz)
(0.8 million oz) Bella Rica
100,000 Oz Gold/year (veins)
GABY – PAPA GRANDE PROJECT
TOTAL RECURSOS
Resources TONNES GOLD GOLD
(g/t) (oz)
PROYECTO
GABY – PAPA GABY
GRANDE PROJECT PAPAGRANDE
Pits proposed
GABY
PAPAGRANDE
MONITOREO
BIOTICO
• El monitoreo se lo hace en
presencia de la autoridad
ambiental.
• Capacitación a trabajadores.
Ø Protección y Seguridad.
Ø Uso de EPP.
Ø Primeros Auxilios.
Ø Simulacros.
• Entrega de EPP.
• Señalética.
Directa
Indirecta
GOOD
LIVE
COORDINATE interinstitutionally
39
GABY – PAPA GRANDE PROJECT
Management Areas
• EDUCATION
• HEALTH
• CULTURE
• EMPLOYMENT. • INFRASTRUCTURE
• Local production systems.
• AGRICULTURE PROMOTION OF
solidarity funds SOCIAL
• CRAFTS DEVELOPMENT
ECONOMIC
strengthening
COMMUNITY
ENVIRONMENTAL
PROTECTION
• ENVIRONMENTAL RESOURCES
• MANAGEMENT • LEADERSHIP
• ENVIRONMENTAL PROTECTION MANAGEMENT
Environmental Monitoring
ORGANIZATIONAL DEVELOPMENT
40
GABY – PAPA GRANDE PROJECT
Thanks