REPORTE DE PRUEBAS DE CELDA

HA1-Llegada HA1 33kV,60Hz


HISAC Swift - Timing & Coil Current Test Report
HEADER :
Trigger Option C Date 28-05-18
Sampling Speed (kC) 10 kC Time 12:51:40
Current Range C (A) 10 A Record No. 30
PIR Disable Brk Sr. No. 4315/1501/01
Auxiliary DRY Location SE PARIÑAS
Delay Close 0100 mS Operator XPRO-E S.A.C.
Delay Open 0100 mS Customer GMP
Delay Tco (mS) 0300 mS Air PR. 1.01
Delay Toc (mS) 0300 mS Gas PR. 1.10
Plot Length (mS) 0400 mS Oil PR. 15
Voltage 33kV

GRAPH :

05/06/2018
This report is generated by CPLOT Graphical Analysis Software from SCOPE T&M Pvt. Ltd. Pune, India. Page 1 Of 2
HISAC Swift - Timing & Coil Current Test Report

Results for C Operation :

OPEN TIME (mS) CLOSE TIME (mS)


R(A) R(A) Y(B) Y(B) B(C) B(C) R(A) R(A) Y(B) Y(B) B(C) B(C)
Main PIR Main PIR Main PIR Main PIR Main PIR Main PIR
Time 1 63.6 63.9 63.3 63.5 62
Time 2 64.1 64.3
Time 3
Time 4
Time 5
Time 6
Time 7
Time 8
Time 9
AUXILIARY TIME : DRY
OPEN TIME (mS) CLOSE TIME (mS)
A1 A2 A1 A2
Time 1 62.1 65
Time 2
Time 3
Time 4
Time 5
Time 6
Time 7
Time 8
Time 9
COIL CURRENT(A)
02.35 A
OPEN CLOSE
Pole Mismatch (mS) 1.5

05/06/2018
This report is generated by CPLOT Graphical Analysis Software from SCOPE T&M Pvt. Ltd. Pune, India. Page 2 Of 2
HISAC Swift - Timing & Coil Current Test Report
HEADER :
Trigger Option O Date 28-05-18
Sampling Speed (kC) 10 kC Time 12:56:57
Current Range C (A) 10 A Record No. 31
PIR Disable Brk Sr. No. 4315/1501/01
Auxiliary DRY Location SE PARIÑAS
Delay Close 0100 mS Operator XPRO-E S.A.C.
Delay Open 0100 mS Customer GMP
Delay Tco (mS) 0300 mS Air PR. 1.01
Delay Toc (mS) 0300 mS Gas PR. 1.10
Plot Length (mS) 0400 mS Oil PR. 15
Voltage 33kV

GRAPH :

05/06/2018
This report is generated by CPLOT Graphical Analysis Software from SCOPE T&M Pvt. Ltd. Pune, India. Page 1 Of 2
HISAC Swift - Timing & Coil Current Test Report

Results for O Operation :

OPEN TIME (mS) CLOSE TIME (mS)


R(A) R(A) Y(B) Y(B) B(C) B(C) R(A) R(A) Y(B) Y(B) B(C) B(C)
Main PIR Main PIR Main PIR Main PIR Main PIR Main PIR
Time 1 36.3 36.5 36.6
Time 2
Time 3
Time 4
Time 5
Time 6
Time 7
Time 8
Time 9
AUXILIARY TIME : DRY
OPEN TIME (mS) CLOSE TIME (mS)
A1 A2 A1 A2
Time 1 38.2 41.4
Time 2
Time 3
Time 4
Time 5
Time 6
Time 7
Time 8
Time 9
COIL CURRENT(A)
02.39 A
OPEN CLOSE
Pole Mismatch (mS) 0.3

05/06/2018
This report is generated by CPLOT Graphical Analysis Software from SCOPE T&M Pvt. Ltd. Pune, India. Page 2 Of 2
HISAC Swift - Timing & Coil Current Test Report
HEADER :
Trigger Option CO Date 28-05-18
Sampling Speed (kC) 10 kC Time 13:15:31
Current Range C (A) 10 A Record No. 35
PIR Disable Brk Sr. No. 4315/1501/01
Auxiliary DRY Location SE PARIÑAS
Delay Close 0100 mS Operator XPRO-E S.A.C.
Delay Open 0100 mS Customer GMP
Delay Tco (mS) 0300 mS Air PR. 1.01
Delay Toc (mS) 0300 mS Gas PR. 1.10
Plot Length (mS) 0400 mS Oil PR. 15
Voltage 33kV

GRAPH :

05/06/2018
This report is generated by CPLOT Graphical Analysis Software from SCOPE T&M Pvt. Ltd. Pune, India. Page 1 Of 2
HISAC Swift - Timing & Coil Current Test Report

Results for CO Operation :

OPEN TIME (mS) CLOSE TIME (mS)


R(A) R(A) Y(B) Y(B) B(C) B(C) R(A) R(A) Y(B) Y(B) B(C) B(C)
Main PIR Main PIR Main PIR Main PIR Main PIR Main PIR
Time 1 63.1 63.4 62 62.7 63 61.6
Time 2 336.1 64.3 336.4 63.5 63.9 62.3
Time 3 336.1 64.5
Time 4
Time 5
Time 6
Time 7
Time 8
Time 9
AUXILIARY TIME : DRY
OPEN TIME (mS) CLOSE TIME (mS)
A1 A2 A1 A2
Time 1 61.8 338.4 340.9 64.6
Time 2
Time 3
Time 4
Time 5
Time 6
Time 7
Time 8
Time 9
COIL CURRENT(A) R(A) Y(B) B(C)
02.35 A CO Time (mS) 273.4 273.1 274.8

05/06/2018
This report is generated by CPLOT Graphical Analysis Software from SCOPE T&M Pvt. Ltd. Pune, India. Page 2 Of 2
HISAC Swift - Timing & Coil Current Test Report
HEADER :
Trigger Option OC Date 28-05-18
Sampling Speed (kC) 10 kC Time 13:10:49
Current Range C (A) 10 A Record No. 33
PIR Disable Brk Sr. No. 4315/1501/01
Auxiliary DRY Location SE PARIÑAS
Delay Close 0100 mS Operator XPRO-E S.A.C.
Delay Open 0100 mS Customer GMP
Delay Tco (mS) 0300 mS Air PR. 1.01
Delay Toc (mS) 0300 mS Gas PR. 1.10
Plot Length (mS) 0400 mS Oil PR. 15
Voltage 33kV

GRAPH :

05/06/2018
This report is generated by CPLOT Graphical Analysis Software from SCOPE T&M Pvt. Ltd. Pune, India. Page 1 Of 2
HISAC Swift - Timing & Coil Current Test Report

Results for OC Operation :

OPEN TIME (mS) CLOSE TIME (mS)


R(A) R(A) Y(B) Y(B) B(C) B(C) R(A) R(A) Y(B) Y(B) B(C) B(C)
Main PIR Main PIR Main PIR Main PIR Main PIR Main PIR
Time 1 35.7 35.8 36.1 363.2 363.5 362.1
Time 2 363.6 363.9 362.5 364 364.3 362.9
Time 3 364.8 365
Time 4
Time 5
Time 6
Time 7
Time 8
Time 9
AUXILIARY TIME : DRY
OPEN TIME (mS) CLOSE TIME (mS)
A1 A2 A1 A2
Time 1 361.7 37.8 39.8 365.8
Time 2
Time 3
Time 4
Time 5
Time 6
Time 7
Time 8
Time 9
COIL CURRENT(A)
02.38 A
R(A) Y(B) B(C)
OC Time (mS) 327.5 327.7 326

05/06/2018
This report is generated by CPLOT Graphical Analysis Software from SCOPE T&M Pvt. Ltd. Pune, India. Page 2 Of 2
HISAC Swift - CRM Test Report Report

HEADER :
Trigger Option CRM Date 28-05-18
Brk Sr. No. 4315/1501/01 Time 13:22:26
Customer GMP Location SE PARIÑAS
Operator XPRO-E S.A.C.

Results for CRM Operation :

CONTACT RESISTANCE
R (A) FASE R 23.00 Micro
Y(B) FASE S 21.70 Micro
B (C) FASE T 20.80 Micro

06/06/2018
This report is generated by CPLOT Graphical Analysis Software from SCOPE T&M Pvt. Ltd. Pune, India. Page 1 Of 1
REPORTE DE PRUEBA
DATOS DEL INSTRUMENTO
TIPO : DTR WUHAN HUARING Nºserie :419006
MODELO : HYBC-901 FABRICANTE : WUHAN

AB BC CA
Ratio: Ratio: Ratio:
276.59:1 276.50:1 276.68:1
Vector: Vector: Vector:
12 12 12
Error: Error: Error:
-0.41% -0.44% -0.38%
Tap: 01 Tap: 01 Tap: 01
Current:
0.75 mA 0.81mA 0.78mA

Time: 05-28-2018 13:23:27 Mode: YY

AB BC CA
Ratio: Ratio: Ratio:
276.62:1 276.48:1 276.71:1
Vector: 12 Vector: 12 Vector: 12
Error: Error: Error:
-0.40% -0.45% -0.37%
Tap: 01 Tap: 01 Tap: 01
Current:
0.75mA 0.82mA 0.77mA

Time: 05-28-2018 13:30:40 Mode: YY