FOOTING SCHEDULE

L B D l b d

F1 2 150 1 5500 5500 600 - - - 28 T 16 28 T 16

F2 3 150 1 6000 6000 800 - - - 30 T 16 30 T 16

F3 5 150 1 5500 5500 600 - - - 28 T 16 28 T 16

F4 3 150 1 5500 5500 600 - - - 28 T 16 28 T 16

12000 12000 12000 16000 12000 12000 12000 F5 2 150 1 5000 5000 600 - - - 26 T 16 26 T 16

F6 1 150 1 5500 5500 800 - - - 28 T 16 28 T 16

F7 2 150 1 5500 5500 700 - - - 28 T 16 28 T 16

F8 2 150 1 6000 6000 900 - - - 32 T 16 32 T 16

F9 4 150 1 5500 5500 700 - - - 28 T 16 28 T 16


88000
F9A 1 150 2 7575 5500 700 - - - 28 T 16 38 T 16 28 T 12 38 T 12

F10 1 150 1 5500 5500 800 - - - 28 T 16 28 T 16


01 02 03 04 05 06 07 08
F11 3 150 1a 6000 6000 1100 - - - 42 T 16 42 T 16 30 T 10 30 T 10

F12 2 150 1a 6000 6000 1100 - - - 42 T 16 42 T 16 30 T 10 30 T 10

F1 F2 F1 F3 F3 F3 F3 F4 F13 1 150 1 5500 5500 900 - - - 28 T 16 28 T 16

F14 3 150 1 5000 5000 800 - - - 26 T 16 26 T 16

F15 2 150 1 5500 5500 600 - - - 28 T 16 28 T 16


G F16 1 150 1 6000 6000 900 - - - 32 T 16 32 T 16

F17 1 150 2 AS SHOWN 600 - - - T16 -150 C/C T16 -150 C/C T16 -150 C/C T16 -150 C/C

F18 3 150 1 5500 5500 600 - - - 28 T 16 28 T 16

F19 7 150 1 6000 6000 800 - - - 30 T 16 30 T 16


12000

F20 6 150 1 5000 5000 600 - - - 26 T 16 26 T 16

F21 1 150 2 6000 2400 700 - - - 16 T 16 40 T 16 16 T 12 40 T 12

F22 1 150 1 3000 2000 600 - - - 14 T 16 16 T 16


F2 F7 F8 F8 F2 F7 F3
F5 F23 1 150 2 AS SHOWN 900 - - - T16 -150 C/C T16 -150 C/C T16 -150 C/C T16 -150 C/C

F
12000

F19 F10 F11 F12 F12


F9 F6

N.G.L. N.G.L.

LINKS AS PER COLUMN L REINF LINKS AS PER COLUMN L REINF


SCHEDULE SCHEDULE
12000

B REINF B REINF
F21

F19 F19 F11 F11 F19 F13


F9
F14

TYPICAL SECTION THROUGH TYPICAL SECTION THROUGH


D COLUMN AND FOOTING COLUMN AND FOOTING
74600

L REINFORCEMENT L REINFORCEMENT

B REINFORCEMENT

B REINFORCEMENT
(0.85L) (0.85L)
12000

R1. SUHAS 03.07.2019


F23 F22

(0.85B)

(0.85B)
R0. ISSUED AS GOOD FOR CONSTRUCTION SUHAS 09.05.2019

F15 F15 F16 F17 NO. AMENDMENTS BY DATE


F5 F14 F14

C
(TYPE 1) (TYPE 1a)

ARCHITECTURE
12000

F18 F19 F19 F18 F18 F19 CLIENT:


F9 F9
DEPARTMENT OF PLANNING,
AAI, RAJIV GANDHI BHAWAN,
N.G.L. SAFDARJUNG AIRPORT, N DELHI-110003

PROJECT:
B
PROPOSED NEW CIVIL ENCLAVE
AT ADAMPUR AIRPORT
STRUCTURAL CONSULTANT
14600

Consultants & Engineers LLP


VASTECH Consultants & Engineers LLP
Civil & Structural Consulting Engineers
NOTES: Almonte Building, Second Floor, Kharadi,
Pune-411014. INDIA TEL: 8237304545 /
1. FOR GENERAL NOTES REFER TO DWG.VTC393-/GN/01
F4 F20 F20 F20 F20 F20 F20 F4 09766314563
2. THIS DRAWING TO BE READ IN CONJUNCTION WITH THE KEY
PLAN AND ALL OTHER RELEVANT DRAWINGS. e-mail : enquiry@vastechconsultants.com
L REINFORCEMENT
3. BEFORE LAYING OF P.C.C 1:4:8 FOR FOOTING, IT IS NECESSARY
TO ENSURE THE SOIL HAS THE SPECIFIED BEARING CAPACITY. DRAWING TITLE :

B REINFORCEMENT
4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS &
LEVELS ON SITE, & RESOLVE ALL DISCREPANCIES WITH COLUMN & FOOTING LAYOUT PLAN
A ARCHITECT OR STRUCTURAL ENGINEER PRIOR TO
COMMENCEMENT OF WORK. DRAWING INDICATES
NORTH
GENERAL & TYPICAL DWG. NO.: VTC393/FD/01
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN
AND PROVISION OF ADEQUATE SHUTTERING, SCAFFOLDING STATUS GOOD FOR CONSTRUCTION
AND SUPPORTING.
6. GRADE OF CONCRETE ARE M30 (fcu=30 N/mm2). REV. NO. SHEET
DRAWN BY DESIGN BY CHKD BY SCALE DATE
7. REINFORCEMENT SHALL BE TOR STEEL BARS (fy=500 N/mm2)
8. CLEAR COVER TO MAIN REINFORCEMENT IS AS FOLLOW RADHIKA AMEY SUHAS 1:200 09-05-2019 R1 A1

COLUMN & FOOING LAYOUT PLAN (TYPE 2)


FOOTING = 50mm
COLUMN = 40mm THIS DRAWING IS COPYRIGHT