Aramco interview questions

1) What is material receiving inspection, brief it


2) What is fitup inspection explain
3) Orifice flange inspection
4) Tell the and brief the hydro test procedure
5) Explain dry lay up inspection
6) what is 4 types of inspection action point found in ITP
7) what are maximum dia allowed in threaded joint in hazardous service
8) the contractor installed the block valve ( gate valve) on inlet and discharge piping of releief valve
with the valve stem direction 45 degree from the top is there any violation or not
9) the contractor os performing hydrotest for stainless steel with the help the fine water provided
by proponent it is acceptable to test stainless steel line with water yes /not why
10) what is Ncr
11) what is schedule q
12) how you will manage the preservation
13) how you will manage the material traceability
14) types of gaskets
15) what is responsibility of Qc material inspection procedure
16) what is MTC
17) what is IAP package
18) if you are going to weld pipe with header how to identify piping specification
19) what are document for hydro test package
20) what do u check during material inspection brief
21) differentiate B 31 codes for pressure testing
22) what is miss alignment for fit-up inspection
23) classification of fittings and gasket’s
24) what is tack length and how many tacks welded on small explain the procedure and consumable
required bore and big bore.
25) Can welding Possible on two dissimilar base metals. Explain the procedure and what
consumable will use
26) Explain the inspection ;points
27) What is piping and pipe line
28) Tell the AMSEB sec standard mostly does a piping engineer referred ‘
29) Explain the post weld heat treatment
30) Responsibility of piping inspector
31) Define the hypostatic test
32) Calibration of relief valves temperature records and pressure gauges
33) What is quality
34) What is quality assurance
35) What is quality control
36) What is INCR when u will raise INCR
37) What is material receiving? Things to be check
38) Name the satip of piping and wht is the codes
39) What are the checklist of piping and refer codes
40) Can u prepare a document for dyrotest ( hydro test procedure)
41) Hydro test of package of piping
42) Preparation of hydro test of package
43) What is weld map
44) Study of drawing , types, and joints size and pipe
45) How many types of material use in pipe
46) What is ansi class
47) Material receiving inspection of pipes
48) What is LBE
49) What is manifold requirement
50) Material preservation ( pipe , valves)
51) What is SIS
52) Torqueing value of 600# and 300# rating flanges
53) Which material test required of sour and non sour services
54) Bending activities
55) How many times raise ncr and what is root Couse analysis
56) What is level of inspection explain
57) Why perform hardness impact test
58) Impact test temperature allow for temperature
59) What is hydro test package content
60) Layup type purpose
61) What is sour and non sour service
62) What is lethal and non letha service
63) Water quality analysis
64) What is punch list
65) Explain responsibility at site and previous job
66) Do u know about ethane and methane gases
67) What is hardness value, impact value and material
68) On alloy material which type of indentor used CS & ss material
69) What I s reinstatement
70) What is torqueing value of SS and CS material and what is procedure for torqueing
71) What Types of liquid and liquid category
72) What is hydro test formula
73) What you will found in MTR
74) What is method of ststment
75) Draw the hydro test set up drawing including manifold, pressure gauge, relief valves and hose
connections.
76) What is ANSI rating and what is class
77) What is API and ANSI,ASTM, ASME, ISO, PQP,ITP..
Mechanical questions

1) Draw auto level check


2) Preservation activities for rotating equipment
3) What is final alignment
4) What is VPCI
5) What are the alignment tolerances
6) Three types of tray
7) What is static and rotating inspection activities