INCOMING:

Day Date No. Location Type Doc. Ref Doc. Description Out Status Content

06-Sep-19
1 0 PGM UMRTL1-CP1b-0000-PAP-PGM-00265-A PGM - Five week rolling programme (01-Aug-2019 ~ 04-Sep-2019) 13-Aug-19 B & C Schedule
Friday
2 STOH ITP UMRTL1-CP1b-STOH-MEC-ITP-00254-A ITP - for Delivery & Installation Tunnel Ventilation Fan & Trackway Exhaust Fan at OPH 14-Aug-19 C

Total Last Week ##


OUTGONG:
Date No. Location Type Doc. Ref Doc. Description SMZ HITACHI & KINDEN
03-Sep-19 Method Approval Request of flanges for chilled water pipe/
1 0 MAT UMRTL1-CP1b-0000-MEC-MAT-00397-A condenser water pipe/ fire fighting pipe/ FM-200 pipe/plumbing https://shimzgroup.sharepoint.com/:f:/r/teams/HCMCUR/Exchange%
pipe of CP1b Project M:\MRT\06. M&E team\00. M&E DOCUMENT CONTROL\00. DAILY
20data/M%26E%20DOC%20CONTROL/FOR%20SUB-
2 STOH SHD UMRTL1-CP1b-STOH-MEC-SHD-00383-D Shop Drawing of Fire Protection System @ B2FL At OPH IN & OUT\Sep-2019\030919\OUTGOING
CONTRACTOR/Sep-2019/030919?csf=1&e=xcpY9f
3 STOH SHD UMRTL1-CP1b-STOH-MEC-SHD-00887-B SHD - for fire protection system 1F floor plan at OPH
MAT - Alarm valves/ sprinkler for fire fighting system of contract
1 0 MAT UMRTL1-CP1b-0000-MEC-MAT-00194-F
04-Sep-19

package 1b
https://shimzgroup.sharepoint.com/:f:/r/teams/HCMCUR/Exchange%
2 0 MAT UMRTL1-CP1b-0000-MEC-MAT-00233-C
MAT - Submission of material approval request for SUS sink of M:\MRT\06. M&E team\00. M&E DOCUMENT CONTROL\00. DAILY
CP1b project 20data/M%26E%20DOC%20CONTROL/FOR%20SUB-
IN & OUT\Sep-2019\040919\OUTGOING
3 STOH DCN UMRTL1-CP1b-STOH-MEC-DCN-00180-A DCN - Change Ducting Material & Supports - OPH CONTRACTOR/Sep-2019/040919?csf=1&e=sA4rKO
4 STBS DCN UMRTL1-CP1b-STBS-MEC-DCN-00181-A DCN - Change Ducting Material & Supports - BSN
MAT - fire stop for duct, Non-metallic & Metallic pipe includes
1 0 MAT UMRTL1-CP1b-0000-MEC-MAT-00220-E conduit pipe, cooper pipe, cable tray, busway, trunking through
wall & Floor of environmental control system, building automation
05-Sep-19

https://shimzgroup.sharepoint.com/:f:/r/teams/HCMCUR/Exchange%
Material Approval request of indoor Hydrant BOX, Nozzle for M:\MRT\06. M&E team\00. M&E DOCUMENT CONTROL\00. DAILY
2 0 MAT UMRTL1-CP1b-0000-MEC-MAT-00250-D
fighting system of CP1b
20data/M%26E%20DOC%20CONTROL/FOR%20SUB-
IN & OUT\Sep-2019\050919\OUTGOING
CONTRACTOR/Sep-2019/050919?csf=1&e=SHPZAB
MAT - for Submersible Pumps for OPH & BSN (Supplier/
3 STGN MAT UMRTL1-CP1b-STGN-HVA-MAT-00405-A
Manufacture By Kawamoto Corporation)
06-Sep-19

1 STBS FCN UMRTL1-CP1b-STBS-DIC-FCN-00911-B FCN - Changing E&M system combined wall opening at B2F - BSN https://shimzgroup.sharepoint.com/:f:/r/teams/HCMCUR/Exchange%
M:\MRT\06. M&E team\00. M&E DOCUMENT CONTROL\00. DAILY
20data/M%26E%20DOC%20CONTROL/FOR%20SUB-
LAB - of TUV SUD PSB Pte Ltd - Singapore for Low Smoke Zero IN & OUT\Sep-2019\060919\OUTGOING
2 STGN LAB UMRTL1-CP1b-STGN-MTL-LAB-00024-A CONTRACTOR/Sep-2019/060919?csf=1&e=ADBcxV
Halogen Cable Testing & Others

Total Last Week 12