Vous êtes sur la page 1sur 7

International Transaction of Electrical and Computer Engineers System, 2014, Vol. 2, No.

1, 7-13
Available online at http://pubs.sciepub.com/iteces/2/1/2
© Science and Education Publishing
DOI:10.12691/iteces-2-1-2

Last 50 Years of Hydro Energy-a Bibliographic Survey


Atul Rai, Mohit Jain, Anuradha Tomar*

Department of Electrical & Electronics Engineering, Northern India Engineering College, New Delhi, India
*Corresponding author: anuradhatomar@ieee.org

Received December 05, 2013; Revised December 18, 2013; Accepted January 08, 2014
Abstract A study has been done for past 50 years in the field of hydroelectric power generation. The various
features of a hydroelectric plant have been covered. The paper has been divided into various categories like control,
maintenance, program based application, hydroelectric power projects and pumped storage plants. The references
have also been provided as a future reference for the analysis.
Keywords: Hydro energy, bibliographic survey, development
Cite This Article: Atul Rai, Mohit Jain, and nuradha Tomar, “Last 50 years of Hydro Energy–a
Bibliographic Survey.” International Transaction of Electrical and Computer Engineers System 2, no. 1 (2014):
7-13. doi: 10.12691/iteces-2-1-2.

transformer units. One unit can be integrated within a


single numerical multifunctional IED for complete
1. Introduction protection scheme regardless of the application
complexity. Section includes literature about the pumped
Hydro power is the most widely used form of storage hydroelectric power plants.
renewable energy which is clean and reliable with very
good efficiency. It cannot be depleted over time and can
be replenished consistently. The energy in the form of 3. Maintenance
kinetic energy is used to turn the water wheels and is
converted into mechanical energy that turns the turbines in Yitao Chen and Zhaohui Li [3], showed that in order to
rotation and the energy is converted into electrical energy reduce the maintenance cost and the equipment downtime,
by the generator and finally conveyed through the the maintenance strategy for hydro power plants have to
transmission lines. The first section is the pumped storage be progressively changed from time-based maintenance
which is also used for generation by storing water’s (TBM) to condition-based maintenance (CBM). A 3D
potential energy. It is the cheapest way to generate dynamic modelling method consisting of digitized
electricity. Various generating methods are dams, pumped modelling (DM) method for hydroelectric generating unit
storage, run of the river, tide and underground water. The (HGU) is discussed and the distributed physical graphic-
study has included various control and maintenance net modelling method to satisfy the demands of CBM in
techniques, program based applications which are the this paper is also discussed. It gives an introduction to the
computer simulations and algorithms. Some hydropower aim of digitized modelling method, technologies,
projects including the three Gorges dam, Murray executive steps and the foundations. According to the
hydroelectric plant and Ertan hydro plant is described. hydro turbine governing system, the methods and its
executive steps of DM method are particularly described
with an application example of wobble gate main
2. Pumped Storage servomotor. With the introduction of the digitized
modelling method in hydropower plant, it has been seen
A.M. Cochran, D.E. Isles and I.T. Pope [1], pumped that this method in the maintenance field is a great
storage is mostly used and is one of the best methods of advancement in course of device operation, maintenance
developing electrical energy. A 3-stage method is adopted and management.
to determine a practical limit to the proportion of pumped I Kuzle, H Pandzic and S Tesnjak [4], described that the
storage plant so that better use of other energy producing maintenance of the generating facilities is necessary for
plant can be made. The first stage is feasibility assessment. economical and for reliable operation of the power system.
The other two stages involved detailed examination. The Economic aspect which is responsible for revenue and
method is also applicable for small hydraulic plant and is technical aspect, which provides desirable level of
one of the best ways of determining the characteristics of reliability of the power system, has to be confronted and
future pumped storage plants. This method is also very the cheapest solution which complies with the technical
flexible. limitations has to be obtained. The paper discussed the
Z. Gajic, J. Menezes, D. Trisic and M. Citakovic [2], mathematical programming method called Benders
Described the design of an integrated numerical protection decomposition. After the brief description, an application
scheme for two pump storage generator or motor of the Benders decomposition on the three Croatian
8 International Transaction of Electrical and Computer Engineers System

hydroelectric power plants in a row on the River Drava is computing technique based on fuzzy control, neural
carried out. network and genetic algorithm was used in the control of
Fu Chuang, Ye Lu-Qing, Cheng Yuan-Chu, Liu Yong- hydroelectric generating unit system of hydropower plant.
Qian and Iung Benoi [5], showed that for realization of Genetic algorithm is used to optimize the parameters,
integration control, maintenance and technical fuzzy reasoning system is used as controller and the rules
management of a production process automation system, of fuzzy controller is used in the design of controller or
Multi-Agent System (MAS) concept and technology is real time control process. Dynamic model of control
applied in order to analyze automation system components. system based on RBF neural networks was designed to
A MAS-based model is also proposed for an Intelligent appraise the controlling performance of fuzzy controller.
Control-Maintenance-Management System (ICMMS). The genetic algorithm increases optimizing speed and
According to the requests of ICMMS, the operational makes fuzzy controller acquire knowledge effectively.
mechanism and functions of all the member agents of this The algorithm was adopted based on general genetic
model is determined based on the characteristics and basic algorithm and character of control system. Simulation
structure of the CMMA. This proposed model was applied results showed that the designed soft computing
to an ICMMS platform for a hydroelectric Generating optimization control system can well control hydroelectric
Unit. generating unit and its control performance is superior to
F Munteanu and C Nemes [6], three different conventional controller.
maintenance strategies namely first come-first served
(FCFS), relative priority (RP) and total priority (TP) are
presented to practical study from theoretical approach. 5. Control Methods
The results showed how these strategies were useful in
maintenance in reliability calculations and their influence Zhang Jian-Ming and Wang Shu-Qing [14], showed a
on MTTF, system reliability, steady state time interval new neuron model-free control method for hydroelectric
reliability and steady state point availability. generating units. Intrinsic characteristics of generating
unit and the problem with the governing control are
considered. The neuron model free control method with
4. Program Based Application PID turning gain eliminates the influences of time-varying
parameters and the disturbances on control behaviour of
Huang Shyh-Jier [7], showed that an application of the system. The results showed that the new control
genetic based fuzzy systems to hydroelectric generation system has good real time control performance and strong
scheduling is presented and discussed. In this method, learning ability. The transient and robust performances are
with respect to objectives and constraints the fuzzy logic improved.
is implemented. A genetic algorithm was included to Nanhua Luo and Xiaoju Yang [15], showed the
further enhance the process of tuning membership development of advanced control techniques for
functions. By this way, membership mappings for those hydroelectric unit and its application in the hydroelectric
important parameters can be optimally adjusted. It resulted power plant. With the recent development in automatic
in the improvement in computational performance. generation control, this paper emphasizes in the
Through the utility data, this method was tested on application of advanced control like the intelligent control
Taiwan Power System (Taipower). Test results have in the hydroelectric unit control. They have also proposed
demonstrated the feasibility and effectiveness of the the development and direction of control techniques for
proposed approach for the applications. the hydroelectric units. C. Bhurtun and I Jameerbacus [16],
Zhang, Yong-Chuan and D.T. Chiang [8], they showed showed the performance of hydroelectric plant can
the concept of convex dynamic programming. For the deteriorate due to gate limitation caused by large
dynamic programming model of the reservoir dispatch, overshoot and settling time. The problem of saturation in
sufficient condition of convexity was determined. An an isolated hydroelectric generating unit is rectified by
algorithm was proposed based on the convexity property using a fuzzy controller. A fuzzy controller is used to
and was implemented on the Zhexi Hydropower station in improve the performance of the system and effectiveness
China. It resulted in increase of 5.6 % in the annual power is obtained. A linear stable model is developed in order to
output of the Zhexi Hydropower station in China. The study the frequency control problem and the load and the
result of convex dynamic programming was extended to performance of the system is studied when the governor
two other dynamic programming models of hydroelectric controlled gate is subjected to saturation. A fuzzy
power station operation. controller is incorporated in order to improve the
Liu Haiying and Dai Luping [9], showed the fault performance of the system and effectiveness obtained is
diagnosis in the hydroelectric generation a new method shown.
using wavelet packet transform was presented. The
analysis provided a favorable means of high frequency
signals that may exist in the fault signal detection and 6. Hydro Electric Power Projects
identification. Computer simulation showed that this
method was very effective for hydro-generator unit Gongzhi Liu, Zhihe Li, A Fuerst and D Schafer [11],
vibration fault diagnosis. The Three Gorges hydropower project is compared to a
R.H. Liang and Y.Y. Hsu [10], Showed that good traditional structure on the bases of oblique element
controlling performance in control cannot be achieved by design. J.H. Jones [12], The Murray hydroelectric project
the conventional controllers as the hydroelectric is a two unit project with a total rated capacity of 39 MW
generation is difficult and non-linear. An advanced soft located on the Arkansas River is described. The emphasis
International Transaction of Electrical and Computer Engineers System 9

is given on projects electrical features. The two generating [9] Liu Haiying and Dai Luping, “Applications of Wavelet-Packet in
units are of open pit design with horizontal double Fault Analysis of Hydroelectric Sets”, International Conference
on Electrical and Control Engineering (ICECE), 2010.
regulated turbines. Turbines full load speed is 46 RPM. [10] R.H. Liang and Y.Y. Hsu, “Fuzzy linear programming: an
The generators power factor is 0.9 which is rated at 22.77 application to hydroelectric generation scheduling”, IEEE
MW and rated at a voltage of 6.9 kV. The paper discusses Proceedings- Generation, Transmission and Distribution, vol-141,
plants mechanical hydraulic governor, 115 kV issue-6, 1994.
transmission line, black start capability, its mechanical [11] Gongzhi Liu, Zhihe Li, A Fuerst and D Schafer, “Application of
oblique elements to Three Gorges project”, Proceedings of the
systems and the plant, unit and offsite control systems and Fifth International Conference on Electrical Machines and
its electrical system. Systems, vol-1, pages: 116-122, 2001.
Jie Fang Yong and Xue Yusheng [13], the Ertan [12] J.H. Jones, “Design features of the Murray Hydroelectric Project”
Hydroelectric Power Project has a total capacity of 3300 IEEE Transactions on Energy Conversion, vol-4, issue-2, page:
160-165, 1989.
MW. An on line pre decision system (OPS-1) was
[13] Zhang Jian-Ming and Wang Shu-Qing, “A modified neuron
developed and was tested for emergency control. OPS-1 model-free controller with PID turning gains for hydroelectric
follows the measured operating conditions and refreshes generating units”, International Conference on Machine Learning
the look-up decision table based on online stability and Cybernetics, vol-2, pages: 784-787, 2002.
analysis and pre decision making. OPS-1 integrates the [14] Nanhua Luo and Xiaoju Yang, “Application and Development of
Advanced Control Technologies for Hydroelectric Unit”, the Sixth
EEAC technique for stability analysis, integer World Congress on Intelligent Control and Automation, vol-2,
programming for transient stability control, an object pages: 7678-7682, 2006.
oriented processing system for contingency oriented [15] C. Bhurtun and I Jameerbacus, “A fuzzy controller to overcome
parallel computation into distributed devices for saturation non-linearity”, IEEE International Conference on
Computational Cybernetics, pages: 56-57, 2005.
emergency control. It is adaptive to change in operating
[16] Jie Fang Yong and Xue Yusheng, “An on-line pre-decision based
condition and structure evolution of the power system and transient stability control system for the Ertan power system”,
present emergency control system. The control system International Conference on Power System Technology, vol-1,
structure, decision searching algorithm and laboratory test pages: 287-292, 2000.
results are presented in this paper. [17] Garcia, D.J., Loreto, J.L., “Automatic Generation Control of the
Caruachi Hydroelectric Power Plant” Transmission & Distribution
Conference and Exposition: Latin America, 2006. TDC '06. IEEE
/ PES Page(s): 1-6, 2006.
7. Conclusion [18] Aray, A.R., Pedrique, J.L.L., “Distributed Control Implementation
in CVG EDELCA Hydroelectric Power Plants” Transmission &
This paper had tried to sketch a picture of research and Distribution Conference and Exposition: Latin America, 2006.
TDC '06. IEEE / PES Page(s): 1-5, 2006.
developments going on the area of hydro electric power.
[19] Jimenez, D.G., Loreto, J.L., Lujan, J.L., “Description of the
Various fields like pumped storage, maintenance, control Control Center System of the Caruachi Hydroelectric Power
methods, program based applications and hydro related Plant” Transmission & Distribution Conference and Exposition:
projects with reference to hydro power are considered. Latin America, 2006. TDC '06. IEEE / PES Page(s): 1-6, 2006.
Presented paper is based on many research articles papers, [20] Endo, S., Konishi, M., Imabayasi, H., “Water Level Control of
Small-Scale Hydroelectric Power Plant by Deadbeat Control
published from in last 50 years. The citation listed in the Method” Industrial Electronics Society, 2000. IECON 2000. 26th
bibliography provides a representative sample of current Annual Confjerence of the IEEE Page(s): 1123-1128 vol.2, 2000.
engineering thinking. [21] Uemura, N., Yokoyama, T., “Current Control Method Using
Voltage Deadbeat Control for Single Phase Utility Interactive
Inverter” Telecommunications Energy Conference, 2003.
INTELEC '03. The 25th International Page(s): 40-45, 2003.
References [22] Michaud, F., Robert, G., “Flatness-Based Control of an Hydro
Power Plant” MELECON 2010-2010 15th IEEE Mediterranean
[1] A.M. Cochran, D.E. Isles and I.T. Pope, “Development of pumped Electro technical Conference Page(s): 1505-1509, 2010.
storage in a power system”, Proceedings of the Institution of [23] Garcez, J.N., Garcez, A.R., “A Connectionist Approach to Hydro
Electrical Engineers, vol-126, issue-5, 1979. turbine Speed Control Parameters Tuning Using Artificial Neural
[2] Z. Gajic, J. Menezes, D. Trisic and M. Citakovic, “Integrated Network” Circuits and Systems, 1995, Proceedings, Proceedings
protection scheme for pump-storage hydroelectric power plant”, of the 38th Midwest Symposium on Page(s): 641-644 vol.2, 1995.
10th IET International Conference on Developments in Power [24] Kawkabani, B., Nicolet, C., Schwery, A., “Modeling and Control
System Protection. Managing the change, 2010. of Large Salient-Pole Synchronous Hydro Generators and Stability
[3] Yitao Chen and Zhaohui Li, “digitized Modelling Method in Issues in Isolated Production Mode” Electrical Machines Design
Maintenance Field of Hydroelectric Generating Unit”, Information Control and Diagnosis (WEMDCD), 2013 IEEE Workshop on
and Automation, 2006. Page(s): 148-157, 2013.
[4] I Kuzle, H Pandzic and S Tesnjak, “Impact of the Competitive [25] Kumar, R., Shah, S., Shukla, S., “Communication and Control
Environment on the Generating Units Maintenance”, Power Techniques for Hydropower Stations” TENCON 2000.
System Technology and IEEE Power India Conference, 2008. Proceedings Page(s): 319-323 vol.3, 2000.Qiang Lu, Chunxiao
[5] Fu Chuang, Ye Lu-Qing, Cheng Yuan-Chu, Liu Yong-Qian and Sun, Yuangzhang Sun, “Nonlinear Governor Control for Hydro
Iung Benoi, “MAS-based model of intelligent control- turbine Generator Sets” TENCON '93. Proceedings. Computer,
maintenance-management system (ICMMS) and its application”, Communication, Control and Power Engineering. 1993 IEEE
Machine Learning and Cybernetics, vol-1, 2002. Region 10 Conference on Page(s): 38-42 vol.4, 1993.
[6] F Munteanu and C Nemes, “The maintenance strategies influence [27] Jones, Dewi, Mansoor, S, “Predictive Feed forward Control for a
on the reliability of power plant generating units”, Optimization of Hydroelectric Plant” Control Systems Technology, IEEE
Electrical and Electronic Equipment, 2012. Transactions on Volume: 12, Issue: 6 Page(s): 956-965, 2004.
[7] Huang Shyh-Jier, “Application of genetic based fuzzy systems to [28] Luo Nanhua, Yang Xiaoju, Wang Wei, “The Decentralized Robust
hydroelectric generation scheduling”, Energy Conversion, vol-14, Control of Hydroelectric units on AGC Operating Condition”
issue-3, 1999. Control and Decision Conference, 2009. CCDC '09. Chinese
[8] Zhang Yong-Chuan and D.T. Chiang, “Convex Dynamic Page(s): 5823-5828, 2009.
Programming and its Applications to Hydroelectric Energy”, IEEE [29] Kerr, S.Logan, “Automatic Operator for Economy Control
transactions on Power Apparatus and Systems, vol-pas-104, issue- Applied to Hydroelectric Generator Stations” American Institute
8, 1985.
10 International Transaction of Electrical and Computer Engineers System

of Electrical Engineers, Transactions of the Volume: 50, Issue: 1 [48] Unger, D, Spitalny, L, Myrzik, J.M.A., “Voltage Control by Small
Page(s): 129-137. Hydro Power Plants Integrated into a Virtual Power Plant”
[30] Logan, J.T. “Remote Metering and Automatic Load Control” Energytech, 2012 IEEE Page(s): 1-6, 2012.
American Institute of Electrical Engineers, Transactions of the [49] Safaei, A, Roodsari, H.M., Abyaneh, H.A, “Optimal Load
Volume: 55, Issue: 1 Page(s): 40-47. Frequency Control of an Island Small Hydropower Plant” Thermal
[31] Cardell, T.E. Clarke, M.W. Randle, H., “Automatic and Power Plants (CTPP), 2011 Proceedings of the 3rd Conference on
Supervisory Control of Calgary Power Ltd. Hydroelectric System- Page(s): 1-6, 2011.
Operating Experiences [includes discussion]” Power apparatus [50] Sarasua, Jose I., Fraile-Ardanuy, J, Perez, Juan I, Wilhelmi, J.R,
and systems, part iii. transactions of the american institute of Sanchez, Jose A, “Control of a Run Of River Small Hydro Power
electrical engineers Volume: 72, Issue: 2. Plant” Power Engineering, Energy and Electrical Drives, 2007.
[32] Munoz-Hernandez, G.A.M. Jones, Dewi, “MIMO Generalized POWERENG 2007. International Conference on Page(s): 672-677,
Predictive Control for a Hydroelectric Power Station” Energy 2007.
Conversion, IEEE Transactions on Volume: 21, Issue: 4 Page(s): [51] Fraile-Ardanuy, J, Wilhelmi, J.R., Fraile-Mora, J.J.Perez, J.I,
921-929, 2006. “Variable-Speed Hydro Generation: Operational Aspects and
[33] Biao Han, Honggang Fan, Naixiang Chen, “Operation and Control Control” Energy Conversion, IEEE Transactions on Volume: 21,
Of Three-Stage Half-Opened Cascaded Hydropower Station” Issue: 2 Page(s): 569-574, 2006.
Power and Energy Engineering Conference (APPEEC), 2010 [52] Doolla, S, Bhatti, T.S, “Load Frequency Control of an Isolated
Asia-Pacific Page(s): 1-5, 2010. Small-Hydropower Plant With Reduced Dump Load” Power
[34] Belhadji, L. Bacha, S. Roye, D. “Modeling and Control of Systems, IEEE Transactions on Volume: 21, Issue: 4 Page(s):
Variable-Speed Micro-Hydropower Plant Based on Axial-Flow 1912-1919, 2006.
Turbine and Permanent Magnet Synchronous Generator (MHPP- [53] Liacco, T.E.Dy, Mowrey, G, Villena, F, “Advanced Technology
PMSG)” IECON 2011-37th Annual Conference on IEEE for the Control of an Unattended Hydropower Plant” Power
Industrial Electronics Society Page(s): 896-901, 2011. Engineering Review, IEEE Volume: PER-3, Issue: 11 Page(s): 30,
[35] Dang Van Mien, H., Klein, F., “Robust Control for Hydraulic 1983.
Power Plants” Control Applications, 1992., First IEEE [54] Chen Yitao, Li Zhaohui, “Digitized Modeling Method in
Conference on Page(s): 636-641 vol.2, 1992. Maintenance Field of Hydroelectric Generating Unit” Information
[36] Luqing, Ye, Shouping, Wei, Haibo, Xu, Malik, O. P.,Hope, G. S., and Automation, 2006. ICIA 2006. International Conference on
“Variable Structure and Time-Varying Parameter Control for Page(s): 234-239, 2006.
Hydroelectric Generating Unit” Power Engineering Review, IEEE [55] Chuang Fu, Luqing Ye, Yongqian Liu, Ren Yu, Benoit Iung,
Volume: 9, Issue: 9 Page(s): 30, 1989. Yuanchu Cheng, Yuming Zeng, “Predictive maintenance in
[37] Nasser, M., Vergnol, A., Sprooten, J., Robyns, B., “A global intelligent-control-maintenance-management system for
supervision for wind / hydro power plant and storage system hydroelectric generating unit” Energy Conversion, IEEE
connected to AC grid” Power Electronics and Applications, 2009. Transactions on Volume: 19, Issue: 1 Page(s): 179-186, 2004.
EPE '09. 13th European Conference on Page(s): 1-10, 2009. [56] Yumin Zheng, Qijuan Chen, Qunli Li, Youping Li, “Actuality
[38] Cardell, T.E. Clarke, M.W. Randle, H., “Automatic and Analysis of Condition-Based Maintenance Technology for
Supervisory Control of the Calgary Power Ltd. Hydroelectric Hydroelectric Generating Unit” Power and Energy Engineering
System-Some Design Features [includes discussion]” Power Conference (APPEEC), 2010 Asia-Pacific Page(s): 1-3, 2010.
apparatus and systems, part iii. transactions of the American [57] Liu Zhong, Zhou Jian-zhong, Zou Min, “Condition Based
institute of electrical engineers Volume: 72. Maintenance System of Hydroelectric Generating Unit” Industrial
[39] Alves, E.F., Yano, M.L. Hofmann, M., “Integration of Control, Technology, 2006. ICIT 2006. IEEE International Conference on
Protection and Supervisory Systems in Hydro Power Plants-State Page(s): 80-85, 2006.
of Art and Trends” Transmission and Distribution Conference and [58] Robertson, A.S, Standing, R.O , “The Maintenance of
Exposition: Latin America (T & D-LA), 2010 IEEE / PES, Page(s): Hydroelectric Generating Units” American Institute of Electrical
285-289, 2010. Engineers, Transactions of the Volume: 66, Issue: 1 Page(s): 776-
[40] Ramond, G. Dumur, D, Libaux, A., Boucher, P., “Direct Adaptive 782.
Predictive Control of an Hydro-Electric Plant” Control [59] Tagare, D, “Risks, Operation, and Maintenance of Hydroelectric
Applications, 2001. (CCA '01). Proceedings of the 2001 IEEE Generators” Electricity Power Generation: The Changing
International Conference on Page(s): 606-611, 2001. Dimensions Page(s): 15-43.
[41] Rui Jun, Chen Shou-lun, “Optimal Regulation Control System for [60] Kuzle, I, Pandzic, H., Tesnjak, S., “Impact of the Competitive
Cascade Hydropower Stations” Sustainable Power Generation Environment on the Generating Units Maintenance” Power System
and Supply, 2009. SUPERGEN '09. International Conference on Technology and IEEE Power India Conference, 2008.
Page(s): 1-5, 2009. POWERCON 2008. Joint International Conference on Page(s): 1-
[42] Hannett, L.N, Feltes, J.W, Fardanesh, B, Crean, W, “Modeling 4, 2008.
and Control Tuning of a Hydro Station with Units Sharing a [61] Ordean, M, Chiorean, D, Rogoz, I., Lehene, C, Stoian, I., Stancel,
Common Penstock Section” Power Systems, IEEE Transactions E, “SCADA Systems-Support for the Maintenance Management
on Volume: 14, Issue: 4 Page(s): 1407-1414, 1999. of Hydro Power Plants” Automation, Quality and Testing,
[43] Henderson, D, “An Advanced Electronic Load Governor for Robotics, 2006 IEEE International Conference on Page(s): 238-
Control of Micro Hydroelectric Generation” Energy Conversion, 242, 2006.
IEEE Transactions on Volume: 13, Issue: 3 Page(s): 300-304, [62] Munteanu, F, Nemes, C, “The maintenance strategies influence on
1998. the reliability of power plant generating units” Optimization of
[44] Davidson, E.G, “Control Of Hydro-Electric Plant” Generation, Electrical and Electronic Equipment (OPTIM), 2012 13th
Transmission and Distribution, IEE Proceedings C Volume: 133, International Conference on Page(s): 103-108, 2012.
Issue: 3 Page(s): 145-147, 1986. [63] Zhaohui Li, Youzhong Ai, Huixuan Shi, “Optimal Maintenance
[45] Wang Dingyi, Wu Yonggang, “Automatic generation control for Information System of Gezhouba Hydro Power Plant” Power
Gezhouba Erjiang Hydropower Plant” TENCON '93. Proceedings. Engineering Society General Meeting, 2007. IEEE Page(s): 1-5,
Computer, Communication, Control and Power Engineering. 1993 2007.
IEEE Region 10 Conference on, Issue: 0, Page(s): 59-63 vol.5, [64] Changyu Liu, Iung, B, Luqing Ye, Morel, G, “An Innovative
1993. Hydraulic Turbine Governor for Predictive Maintenance of
[46] Beltran, H, Dal Monte, R, Banakar, H, Hoffman, R, Lebeau, M., Hydropower Plant” Decision and Control, 2002, Proceedings of
Schroeder, R, “Highlights Of the GURI Hydroelectric Plant the 41 st IEEE Conference on Page(s): 925-930 vol.1, 2002.
Computer Control System” Computer Applications in Power, [65] Hanke Xu, Jiang Guo, Hongtao Zeng, Zhihuai Xiao, “Study on
IEEE Volume: 1, Issue: 3, Page(s): 4-8, 1988. Distributed Cooperative Maintenance Decision Supporting System
[47] Memisevic, R, Sanderson, P, Choudhury, S, Wong, B.-L.W., for Hydropower Plant” Systems, Man and Cybernetics, 2007. ISIC.
“Work Domain Analysis and Ecological Interface Design for IEEE International Conference on Page(s): 2296-2301, 2007.
Hydropower System Monitoring and Control” Systems, Man and [66] Weijin Jiang, “Research on Predictive Maintenance for
Cybernetics, 2005 IEEE International Conference on Hydropower Plant Based on MAS and NN” Pervasive Computing
Page(s): 3580-3587 Vol. 4, 2005. and Applications, 2008. ICPCA 2008. Third International
Conference on Page(s): 604-609, 2008.
International Transaction of Electrical and Computer Engineers System 11

[67] Pansrisu, S, Premrudeepreechacharn S, “Preventive Maintenance and Its Application” Power and Energy Engineering Conference,
Optimization for Excitation System of Bhumibol Hydro Power 2009. APPEEC 2009. Asia-Pacific Page(s): 1-5, 2009.
Plant” Energy and Sustainable Development: Issues and Strategies [87] Shanglai Gao, Wenbiao Zhao, “Application of a H∞ Optimal
(ESD), 2010 Proceedings of the International Conference on Control Theory to a Hydroelectric Generating Speed System”
Page(s): 1-6, 2010. Industrial Technology, 1994., Proceedings of the IEEE
[68] Hongtao Zeng, Jiang Guo, Zhihuai Xiao, “Integrated Maintenance International Conference on Page(s): 823-826, 1994.
Features of Hydro Generator Excitation System” Industrial [88] Dahlin, E.B, Shen, D.W.C, “Application of Dynamic
Electronics and Applications, 2008. ICIEA 2008. 3 rd IEEE Programming to Optimization of Hydroelectric / Steam Power-
Conference on Page(s): 2250-2253, 2008. System Operation” Electrical Engineers, Proceedings of the
[69] Zhaohui Li, Yitao Chen, Jiang Guo, “Integrated Maintenance Institution of Volume: 112, Issue: 12 Page(s): 2255-2260, 1965.
Features of Hydro Turbine Governors” Power System Technology, [89] Amaya, E.J, Alvares, A.J, “SIMPREBAL: An Expert System for
2002. Proceedings. Power Con 2002. International Conference on Real-Time Fault Diagnosis of Hydro generators Machinery”
Page(s): 1984-1988 vol.3, 2002. Emerging Technologies and Factory Automation (ETFA), 2010
[70] Nordgard, D.E. Heggset, J. Daleng, J, “Using Risk Analyses in a IEEE Conference on Page(s): 1-8, 2010.
Multi Criteria Decision Making Framework for Evaluation of [90] King, D.J, Bradley, D.A, Mansoor, S.P, Jones, D.I.,Aris, F.C,
Hydropower Maintenance Projects” Page(s): 1-7, 2005. Jones, G.R, “Using a Fuzzy Inference System to Control a
[71] Luo Nanhua, Yang Xiaoju, “Application and Development of Pumped Storage Hydro Plant” Fuzzy Systems, 2001. The 10th
Advanced Control Technologies for Hydroelectric Unit” IEEE International Conference on Page(s): 1008-1011 vol.3, 2001.
Intelligent Control and Automation, 2006. WCICA 2006. The [91] Garcia, I.F.G, Lozano, S.R, De La O, O.P.H, “Development of a
Sixth World Congress on Page(s): 7678-7682, 2006. Real Time Simulator to Test Load and Speed Control Systems of
[72] Shyh-Jier Huang, “Application of Genetic Based Fuzzy Systems Hydroelectric Power Plants” Electrical, Communications, and
to Hydroelectric Generation Scheduling” Energy Conversion, Computers, 2009. CONIELECOMP 2009. International
IEEE Chen Tiehua, “Application of Genetic Algorithm on Conference on Page(s): 250-255, 2009.
Hydroelectric Unit Load Optimal Distribution” Power and Energy [92] Leite, P.T, Carneiro, A.A.F.M, Carvalho, A.C.P.L.F, “Energetic
Engineering Conference (APPEEC), 2011 Asia-Pacific Page(s): 1- Operation Planning Using Genetic Algorithms” Power Systems,
4, 2011. IEEE Transactions on Volume: 17, Issue: 1 Page(s): 173-179,
[73] Transactions on Volume: 14, Issue: 3 Page(s): 724-730, 1999. 2002.
[74] Vouligny, L. Hudon, C, Nguyen, D.N, “Design of MIDA, a Web- [93] Villacorta, C.A., Jardini, J.A, Magrini, L.C, “Applying Object-
Based Diagnostic Application for Hydroelectric Generators” Oriented Technology to Project Hydroelectric Power Plant
Computing in the Global Information Technology, 2009. ICCGI SCADA Systems” Power Engineering Society General Meeting,
'09. Fourth International Multi-Conference, Page(s): 98-103, 2009. 2003, IEEE Volume: 2, 2003.
[75] Talas, P, Toom, P.O, Franklin, D.E, Palylyk, R.A, “Application of [94] Rotting, T.A, Gjelsvik, A, “Application of a Dual Dynamic
an On-Line Air-Gap Monitor for Hydroelectric Generator Programming Algorithm to Staircase Linear Programs Arising in
Protection and Problem Diagnosis” Power Engineering Review, Scheduling of Hydro Power Plants” Comp Euro'92. 'Computer
IEEE Volume: PER-7, Issue: 12 Page(s): 27, 1987. Systems and Software Engineering’, Proceedings. Page(s): 53-58,
[76] Zhang, Yong-Chuan, Chiang, D.T, “Convex Dynamic 1992.
Programming and its Applications to Hydroelectric Energy” [95] Zlatanovici, D, Ionescu, F, Herisanu, A, Cicirone, C,
Power Apparatus and Systems, IEEE Transactions on Volume: “Mathematical Model and Software for the Simulation Of the Step
PAS-104, Issue: 8 Page(s): 2035-2039, 1985. Type Perturbation Application on the Hydro generator Automatic
[77] Liu Haiying, Dai Luping, “Applications of Wavelet-Packet in Voltage Regulator Input” Advanced Topics in Electrical
Fault Analysis of Hydroelectric Sets” Electrical and Control Engineering (ATEE), 2013 8th International Symposium on
Engineering (ICECE), 2010 International Conference on Page(s): Page(s): 1-6, 2013.
495-497, 2010. [96] Luna, I, Soares, S, Magalhaes, M.H, Ballini, R, “Stream flow”
[78] Vouligny, L., Hudon, C, Duc Ngoc Nguyen, “Design of MIDA, a Neural Networks, 2005. IJCNN '05. Proceedings. 2005 IEEE
Web-Based Diagnostic Application for Hydroelectric Generators”, International Joint Conference on Page(s): 2631-2636 vol.4, 2005.
Computer Software and Applications Conference, 2009. [97] Shi-Chung Chang, Chen, Chun-Hung, I-Kong Fong, Luh, P.B,
COMPSAC '09. 33rd Annual IEEE International Page(s): 166-171, “Hydroelectric Generation Scheduling with an Effective
2009. Differential Dynamic Programming Algorithm” Power Systems,
[79] Zhang, Yong-Chuan, Chiang, Dalen T, “Convex Dynamic IEEE Transactions on Volume: 5, Issue: 3 Page(s): 737-743, 1990.
Programming and Its Applications to Hydroelectric Energy” [98] Schoffen, H.M, Alexander, S.M., Lavender, J.E, “Computer
Power Engineering Review, IEEE Volume: PER-5, Issue: 8 Directed Control and Automatic Data Processing for a
Page(s): 33, 1985. Hydroelectric Generating System” Power Apparatus and Systems,
[80] Edmonds J.S, Churchill T.L, “Unique Sensor Applications for IEEE Transactions on Volume: PAS-87, Issue: 1 Page(s): 209-217,
Hydroelectric Generator Rotor-Mounted Sensor Scanning 1968.
Technology” Page(s): 73-77, 1996. [99] Shyh-JierHuang, “Enhancement of Hydroelectric Generation
[81] Shu-Qing Wang, Zhao-Hui Li, Zhi-Huai Xiao, Zi-Peng Zhang, Scheduling Using Ant Colony System Based Optimization
“Application of GA-FNN Hybrid Control System for Approaches” Energy Conversion, IEEE Transactions on Volume:
Hydroelectric Generating Units” Machine Learning and 16, Issue: 3 Page(s): 296-301, 2001.
Cybernetics, 2005. Proceedings of 2005 International Conference [100] Zhong Liu, Jianzhong Zhou, Min Zou, Yongchuan
on Page(s): 840-845 Vol.2, 2005. Zhang,Liangliang Zhan, “A New Method for Intelligent Fault
[82] Christensen, G.S, Soliman, S.A, “On the Application of Diagnosis of Hydroelectric Generating Unit” Control and
Functional Analysis to the Optimization of the Production of Automation, 2007. ICCA 2007. IEEE International Conference on
Hydroelectric Power”, Power Systems, IEEE Transactions on Page(s): 1638-1642, 2007.
Volume: 2, Issue: 4 Page(s): 841-846, 1987. [101] Monte, B, Soares, S, “Fuzzy Inference Systems Approach for
[83] Shuqing Wang, Hui Liu, Zipeng Zhang, “Application of Improved Long Term Hydrothermal Scheduling” Power Systems
Neural Network Optimizing PID Control in Hydroelectric Conference and Exposition, 2009. PSCE '09. IEEE / PES Page(s):
Generating Unit” Automation and Logistics, 2009. ICAL '09. 1-7, 2009.
IEEE International Conference on Page(s): 1298-1301, 2009. [102] Junjie Yang, Yifu Jin, “Hierarchy Particle Swarm Optimization
[84] Shuqing Wang, Zipeng Zhang, Liqin Xue, “Application of Soft Algorithm (HPSO) and Its Application in Multi-Objective
Computing in the Control of Hydroelectric Generating Unit” Operation of Hydropower Stations” Intelligent Systems and
Intelligent Systems and Applications, 2009. ISA 2009. Applications (ISA), 2011 3rd International Workshop on Page(s):
International Workshop on Page(s): 1-4, 2009. 1-4, 2011.
[85] Liang, R.-H., Hsu, Y.-Y, “Fuzzy Linear Programming: An [103] Hiyama, T, Oniki, S, Nagashima, H, “Evaluation of Advanced
Application to Hydroelectric Generation Scheduling” Generation, Fuzzy Logic PSS on Analog Network Simulator and Actual
Transmission and Distribution, IEE Proceedings Volume: 141, Installation on Hydro Generators” Energy Conversion, IEEE
Issue: 6 Page(s): 568-574, 1994. Transactions on Volume: 11, Issue: 1, Page(s): 125-131, 1996.
[86] Yitao, C., Li Qing, Fusheng, L, Li Zhaohui, “Digitized [104] Ruey-Hsun Liang, “A Noise Annealing Neural Network for
Hydroelectric Generating Unit Under the Framework of ICMMS Hydroelectric generation Scheduling With Pumped-Storage Units”
12 International Transaction of Electrical and Computer Engineers System

Power Industry Computer Applications, 1999. PICA '99. Power Plants” Electrical Machines and Systems (ICEMS), 2011
Proceedings of the 21st 1999 IEEE International Conference International Conference on Page(s): 1-6, 2011.
Page(s): 171-176, 1999. [124] Endo, S, Konishi, M, Imabayasi, H., “Water Level Control of
[105] Habibollahzadeh, H, Frances, D, Sui, U, “A new generation Small-Scale Hydroelectric power Plant by Deadbeat Control
scheduling program at Ontario Hydro” Power Systems, IEEE Method” Industrial Electronics Society, 2000. IECON 2000. 26th
Transactions on Volume: 5, Issue: 1 Page(s): 65-73, 1990. Annual Conference of the IEEE Page(s): 1123-1128 vol.2, 2000.
[106] WenxianGuo, Hongxiang Wang, “Application of Improved PSO [125] Mettler, J.A, “Hydro Automation. Rocky Reach Hydroelectric
Algorithm to Hydropower Station Optimal Operation” Computer project” Power Engineering Society 1999 Winter Meeting, IEE
Application and System Modeling (ICCASM), 2010 International Page(s): 202-205 vol.1, 1999.
Conference on Page(s): V1-162-V1-165 Papers (13), 2010. [126] Claydon, J.B, “Peace River Hydroelectric Project” Electronics and
[107] Liao Wei, Wang Zhentao, Han Pu, “Application of Wavelet Power Volume: 14, Issue: 10 Page(s): 397-400, 1968.
Packet and Data-Driven in Fault Diagnosis for Hydropower Units” [127] Mithoug, R.E, “Electrical Features of Boundary Hydroelectric
Services Science, Management and Engineering, 2009. SSME '09. Project” Power Apparatus and Systems, IEEE Transactions on
IITA International Conference on Page(s): 178-181, 2009. Volume: PAS-87, Issue: 6 Page(s): 1454-1460, 1968.
[108] Guang-Da Chen, Wei-You Cai, Han-Ke Xu, Mian-Hua Huang, [128] Gurney, J.H, “Control and Protection Design of the Revelstoke
“The Application of Intelligent Integral Realized by Fuzzy Logic Hydroelectric Project” Power Apparatus and Systems, IEEE
for Hydro turbine Governing System” Machine Learning and Transactions on Volume: PAS-104, Issue: 8 Page(s): 1986-1997,
Cybernetics, 2002. Proceedings. 2002 International Conference 1985.
on Page(s): 674-678 vol.2, 2002. [129] Davey, W.G, Gregg, J.A, "Electrical Design of Wells
[109] Stokelj, T, Golob, R, “Application of Neural Networks for Hydro Hydroelectric Project” Power Apparatus and Systems, IEEE
Power Plant Water Inflow Forecasting” Neural Network Transactions on Volume: PAS-87, Issue: 2 Page(s): 558-579.
Applications in Electrical Engineering, 2000. NEUREL 2000. [130] Brockschink, S.R, “Electrical Control Features of the Bonneville
Proceedings of the 5th Seminar on Page(s): 189-193, 2000. Hydroelectric Project” Power Apparatus and Systems, IEEE
[110] Wei Guo, Guohua Fang, Xianfeng Huang, “An Improved Chaotic Transactions on Volume: PAS-101, Issue: 12 Page(s): 4617-4624,
Artificial Fish Swarm Algorithm and its Application in 1982.
Optimizing Cascade Hydropower Stations” Business Management [131] Crellin,E.A, “The Mokelumne hydroelectric project”, Electrical
and Electronic Information (BMEI), 2011 International Engineering Volume: 50, Issue: 9 Page(s): 705-712.
Conference on Volume: 3 Page(s): 217-220, 2011. [132] Verma, R, Samorio, R, “Salient Electrical Design Features of the
[111] Jones, J.H, “Design Features of the Murray Hydroelectric Project” Magat Hydroelectric Project” Power Engineering Review, IEEE
Energy Conversion, IEEE Transactions on Volume: 4, Issue: 2 Volume: PER-7, Issue: 6 Page(s): 35-36, 1987.
Page(s): 160-165, 1989. [133] Paine, J.S, Felton, L.E, “Bulb Turbine / Generators for the Idaho
[112] Liu Gongzhi, Li Zhihe, Fuerst, A, Schafer, D, “Application of Falls Hydroelectric Project” Power Engineering Review, IEEE
Oblique Elements to Three Gorgesproject” Electrical Machines Volume: PER-4, Issue: 9 Page(s): 32, 1984.
and Systems, 2001. ICEMS 2001. Proceedings of the Fifth [134] De Moraes, Julival, Villalba, J. Rodriguez, Salatko, V. F,
International Conference on Page(s): 116-122 vol.1, 2001. “Electrical and Related Design Aspects of ITAIPU Hydroelectric
[113] Yong Jie Fang, Yusheng Xue, “An On-Line Pre-Decision Based Project” Power Engineering Review, IEEE Volume: PER-2, Issue:
Transient Stability Control System for the Ertan Power System” 5 Page(s): 24-25, 1982.
Power System Technology, 2000, Proceedings, POWERCON 2000. [135] Hopkins, R. A, Petersen, H. J, “Tennessee Valley Authority
International Conference on Page(s): 287-292 vol.1, 2000. Hydroelectric Stations—Electrical and Mechanical Design”
[114] Xia Wu, Hong Lin Guan, “Analysis of Impact on the Irrigation at Electrical Engineering Volume: 65, Issue: 12 Page(s): 920-930.
the Irrigated Area along the Yangtze River after the Application of [136] Higgins, N. B,“Safe Harbor Project”, Electrical Engineering
Three Gorges Project” Power and Energy Engineering Conference, Volume: 51, Issue: 9, Page(s): 661.
2009. APPEEC 2009. Asia-Pacific Page(s): 1-5, 2009. [137] Nyabeze, W.R, Chifamba, T, El Missiry, M.M, “Remote Area
[115] Huifang Guo, Zengchuan Dong, Xin Chen, Xixia Ma,Peiyan Power Supply: Nyafaru Micro Hydro Power Plant” AFRICON,
Zhang, “Impact Analysis of Poyang Lake after Three Gorges 1996., IEEE AFRICON 4th Page(s): 1029-1031 vol.2, 1996.
Project's Running by Using ANFIS” Multimedia and Information [138] AbidHyssain, S, “Hydropower for Pakistan: Tarbela Dam” IEE
Technology, 2008. MMIT '08. International Conference on Review Volume: 39, Issue: 3 Page(s): 123-125, 1993.
Page(s): 741-743, 2008.
[139] Thorgerson, T. E, Basilesco, J, “Electrical Features of the Niagara
[116] Perissin, D, Prati, C, Rocca, F, Teng Wang, “PSInSAR Analysis Power Project” Electrical Engineering Volume: 80, Issue: 10
over the Three Gorges Dam and urban areas in China” Urban Page(s): 739-744.
Remote Sensing Event, 2009 Joint Page(s): 1-5, 2009.
[140] Stanley, R.M, Wood, E.D, “The Ohio Falls Hyd roelectric Station
[117] Liang Weiyan, “Power Equipment of the Gigantic Three Gorges at Louisville, Kentucky” American Institute of Electrical
Project” Electrical Machines and Systems, 2001. ICEMS 2001. Engineers, Transactions of the Volume: 50, Issue: 1 Page(s): 370-
Proceedings of the Fifth International Conference on Page(s): 379.
676-678 vol.1, 2001.
[141] Morgan, W. A, George, G. R, Guse, R. C, Hatch, M. F, “The
[118] Soule, G. B, Heikes, T. R, Mitchell, W. B, Schaufelberger, O. E, Mountain Sheep—Pleasant Valley Project” Electrical Engineering
“The Brownlee hydroelectric project”, Electrical Engineering Volume: 76, Issue: 3 Page(s): 223.
Volume: 79, Issue: 3 Page(s): 181.
[142] Conti, J.P, “The Ten Billion Dollar Dam” Power Engineer
[119] Kai-rong Hong, Ling Feng, “Sustainable Equilibrium Evaluation Volume: 20, Issue: 1 Page(s): 23-26, 2006.
on Three Gorges Project” Business Intelligence and Financial
[143] Wilson, Alex, “The Conowingo Hydroelectric Development on
Engineering (BIFE), 2010 Third International Conference on
the Susquehanna River” American Institute of Electrical
Page(s): 251-255, 2010.
Engineers, Transactions of the Volume: 47, Issue: 3 Page(s): 882-
[120] Jiaping Liao, Li He, Xiaohui Yuan, Hui Li, “Application of 889.
Decision Support System to Three Gorges Cascade Hydropower
[144] Newberry, A. P, Sears, George C, “The Rock Island Hydroelectric
Station” Genetic and Evolutionary Computing, 2008. WGEC '08.
Development” Electrical Engineering Volume: 51, Issue: 9
Second International Conference on Page(s): 500-503, 2008.
Page(s): 654-659.
[121] Liping Wang, NianhuaXue, ChangmingJi, “An Economy Risk
[145] Kai Li, Tiong, R.L.K, “Assessment of Financial Feasibility of
Analysis of Installed Capacity Expansion at the Three Gorges
Vietnam Hydro Power Plant” Management and Service Science
Power Plant” Innovation in Technology Management - The Key to
(MASS), 2010 International Conference on Page(s): 1-3, 2010.
Global Leadership. PICMET '97: Portland International
Conference on Management and Technology, 1977. [146] Bindon, F.J.L, “Maentwrog Hydro Station-A Replant” Power
Engineering Journal Volume: 7, Issue: 1 Page(s): 21-28, 1993.
[122] Hernandez, T, Diaz, E, “Risk Analysis in the Rehabilitation of
Hydro Unit at the Guri Plant” Transmission & Distribution [147] Allen, A.E, “Potential for Conventional and Underground
Conference and Exposition: Latin America, 2006. TDC '06. IEEE Pumped-Storage” Power Apparatus and Systems, IEEE
/ PE Page(s): 1-5, 2006. Transactions on Volume: 96, Issue: 3, Part: 1, Page(s): 993-998,
1977.
[123] De, dos Santos Menas, J, van Emmenk, E.L, Aredes, M,
“Maximum Power Point Tracking Applied on Small hydroelectric [148] Iwabuchi, K, Takagi, Y, Konnai, T, Nakahara, Y, Kubota, K,
Ubukata, M, Masaki, K, “Advanced Governor Controller for
Pumped Storage Power Plant and Its Simulation Tool” SICE-
International Transaction of Electrical and Computer Engineers System 13

ICASE, 2006. International Joint Conference Page(s): 6064-6068, Systems, IEEE Transactions on Volume: PAS-92, Issue: 3 Page(s):
2006. 1057-1064, 1973.
[149] Ruey-Hsun Liang, “A Noise Annealing Neural Network for [164] Vinatoru, M., “Level Control of Pumped-Storage Hydro Power
Hydroelectric generation scheduling with Pumped-Storage Units” Plants” Automation, Quality and Testing, Robotics, 2008. AQTR
Power Industry Computer Applications, 1999. PICA '99. 2008. IEEE International Conference on Volume: 2 Page(s): 43-
Proceedings of the 21st 1999 IEEE International Conference 47, 2008.
Page(s): 171-176, 1999. [165] Fulton, A.A, “The Cruachan Pumped-Storage Development”
[150] Malik, K.S, Cory, B.J, “Efficient Algorithm to Optimize the Electronics and Power Volume: 12, Issue: 7 Page(s): 220-224,
Energy Generation by Pumped Storage Units in Probabilistic 1966.
Production Costing” Generation, Transmission and Distribution, [166] Chen Qijuan, Chen Tao, Guo Jiang, Zeng Hongtao,Xiao Zhihuai,
IEE Proceedings-Volume: 143, Issue: 6 Page(s): 546-552, 1996. “Study and Design of Digital Simulation System for Pumped
[151] Schmitt, G. E, “Pumped Storage Installation in Texas” Volume: Storage Hydropower Units” Intelligent Control and Automation
69, Issue: 7, Page(s): 588, 1950. (WCICA), 2012 10th World Congress on Page(s): 3068-3071,
[152] King D.J, Bradley D.A, Mansoor, S.P, Jones D.I., Aris, F.C, Jones, 2012.
G.R, “Using a Fuzzy Inference System to Control a Pumped [167] Pickard, W.F, “The History, Present State, and Future Prospects of
storage Hydro Plant” Fuzzy Systems, 2001. The 10th IEEE Underground Pumped Hydro for Massive Energy Storage”
International Conference on Page(s): 1008-1011 vol.3, 2001. Proceedings of the IEEE Volume: 100, Issue: 2 Page(s): 473-483,
[153] Chapuran Frank J, Juett Donald J, “Pumped Storage Using 2012.
Inclined-Axis Units at Trunman Dam” Power Apparatus and [168] Radil, S, Urazel, B, Gok, E, “Solution to Security Constrained
Systems, IEEE Transactions on Volume: PAS-100, Issue: 5 Pumped-Storage Hydraulic Unit Scheduling Problem by Using
Page(s): 2452-2458, 1981. Modified Subgradient Algorithm Based on Feasible Values”
[154] Kanakasabapathy P, Swarup, K.S, “Evolutionary Tristate PSO for Electrical and Electronics Engineering (ELECO), 2011 7th
Strategic Bidding of Pumped-Storage Hydroelectric Plant”, International Conference on Page(s): I-96-I-100, 2011.
Systems, Man, and Cybernetics, Part C: Applications and Reviews, [169] Kanakasabapathy, P, Swarup, K.S, “Evolutionary Tristate PSO for
IEEE Transactions on Volume: 40, Issue: 4 Page(s): 460-471, Strategic Bidding of Pumped-Storage Hydroelectric Plant”
2010. Systems, Man, and Cybernetics, Part C: Applications and Reviews,
[155] Saiju, R, Koutnik, J, Krueger, K, “Dynamic Analysis of Start-Up IEEE Transactions on Volume: 40, Issue: 4 Page(s): 460-471,
Strategies of AC Excited Double Fed Induction Machine for 2010.
Pumped storage Power Plant”, Power Electronics and [170] Brown, P.G, Otte, G.W, “Electrical Design Considerations in
Applications, 2009. EPE '09. 13th European Conference on Pumped Storage Hydro Plants” Electrical Engineering Volume:
Page(s): 1-8, 2009. 82, Issue: 11, Page(s): 654-660, 1963.
[156] Osburn G.D, Atwater P.L, “Design and Testing of a Back-To- [171] Ruey-Hsun Liang, “A Noise Annealing Neural Network for
Back Starting System for Pumped Storage Hydro generators at Mt. Hydroelectric Generation Scheduling with Pumped-Storage Units”
Elbert Power plant” Energy Conversion, IEEE Transactions on Power Industry Computer Applications, 1999. PICA '99.
Volume: 7, Issue: 2, Page(s): 280-288, 1992. Proceedings of the 21st 1999 IEEE International Conference
[157] Magsaysa G, Schuette T, Fostiak R.J, “Use of a Static Frequency Page(s): 171-176, 1999.
Converter for Rapid Load Response in Pumped-Storage Plants”, [172] Gonzalez, Avelino J, Chidamber, Shyam R, Baldwin, M.S,
Energy Conversion, IEEE Transactions on Volume: 10, Issue: 4 Kilgore, L.A., “Computer Simulation of Semisynchronous Start of
Page(s): 694-699, 1995. Hydroelectric Pumped Storage Units” Power Engineering Review,
[158] Treuer, M, Weissbach, T, Hagenmeyer, V, “Flatness-Based IEEE Volume: PER-3, Issue: 8 Page(s): 49-50, 1983.
Feedforward in a Two-Degree-of-Freedom Control of a Pumped [173] Osburn, G.D, Atwater P.L, “Design and Testing of a Back-To-
Storage Power Plant” Control Systems Technology, IEEE Back Starting System for Pumped Storage Hydro generators at Mt.
Transactions on Volume: 19, Issue: 6, Page(s): 1540-1548, 2011. Elbert Power plant” Energy Conversion, IEEE Transactions on
[159] Nakamura, K, Shigenobu, T, Harada, S, Muraki, T, “A High Head Volume: 7, Issue: 2, Page(s): 280-288, 1992.
Pumped Storage Power Plant Rehabilitation Project” Renewable [174] Hildmann, M, Ulbig, A, Andersson, G, “Electricity Grid in-Feed
Energy Research and Applications (ICRERA), 2012 International from Renewable Sources: A Risk for Pumped-Storage Hydro
Conference on Page(s): 1-6, 2012. Plants?” Energy Market (EEM), 2011 8th International
[160] Robertson, L.M, Burt, L.S, Eastom, F.W, Hubbard, C.W, Brennan, Conference on the European Page(s): 185-190, 2011.
F.L, Fuller, J.F, Johrde, P.S, “Electrical Design and Testing of [175] Ruey-Hsun Liang, “A Noise Annealing Neural Network for
Cabin CreekPumped-Storage Hydroelectric Project” Power Hydroelectric Generation Scheduling with Pumped-Storage Units”
Apparatus and Systems, IEEE Transactions on Volume: PAS-87, Power Systems, IEEE Transactions on Volume: 15, Issue: 3
Issue: 3 Page(s): 844-854, 1968. Page(s): 1008-1013, 2000.
[161] JiaJiangtao, Zhai Qiaozhu, Guan Xiaohong, Wu Hongyu,Li [176] King, D.J, Bradley, D.A, Mansoor, S.P, Jones, D.I., Aris, F.C,
Qinghai, “Optimal Short Term Scheduling of Cascaded Jones, G.R. , “Using a Fuzzy Inference System to Control a
Hydroelectric Chain Plants with Pumped-Storage Units” Page(s): Pumped Storage Hydro Plant” Fuzzy Systems, 2001. The 10th
521-525, 2008. IEEE International Conference on Page(s): 1008-1011 vol.3, 2001.
[162] Miller, D.J, Murray, A.T.L, Marshall, C.C., Argent, G.G.R , [177] Lu, N, Chow, J.H, Desrochers, A.A, “Pumped-Storage Hydro-
“Foyers Pumped-Storage Project” Electrical Engineers, Turbine Bidding Strategies in a Competitive Electricity Market”
Proceedings of the Institution of Volume: 122, Issue: 11, Page(s): Power Engineering Society General Meeting, 2003, IEEE Volume:
1222-1234, 1975. 2, 2003.
[163] Brown, C.B, Tomsic, E.M, “Pumping-Generating Units for the [178] Nanahara, T, Takimoto, A, “A Study on Required Reservoir Size
Grand Coulee Pumping-Generating Plant” Power Apparatus and for Pumped Hydro Storage” Power Systems, IEEE Transactions
on Volume: 9, Issue: 1 Page(s): 318-323, 1994.

Vous aimerez peut-être aussi