If require
If require
If require
If require
If required
Waiting approved
by Consultant
Waiting approved
by Consultant
Waiting approved
by Consultant
Waiting approved
by Consultant
After trial mix at lab. Take sample and test => Submit
Testing and Submit test result (Test at laboratory approved by Consultant)
of trial mix after 28days
Waiting approved
by Consultant
Waiting approved
by Consultant
Waiting approved
by Consultant
Waiting approved
by Consultant
When have test result for trial mix at production line,
Testing and Submit submit test result (Test at laboratory approved by
Consultant) after 28days.
Detail for step submission to Hitachi
Update 07 Jan 2016
No. Item Content of profile need
4 Trial mix
Submit test results of trial mix at
lab and batching plant
Trial mix at production line
5 Trial mix
Submit result of trial mix at
production line
Document for submit
Capacity profile
Trial mix inspection sheet/ bảng theo dõi kiểm tra trial mix
Another document if The Engineer require/ Các yêu cầu
khác từ tư vấn giám sát
Test result of loading test/ Kết quả thí nghiệm tải trọng của
sleeper