Proposed Two-Storey Residential Building with Roofdeck

I. Concreting Works II. Rebar Works


PRICE LIST PRICE LIST
MATERIAL PRICE MATERIAL
₱ 203.00

REINFORCEM
LAFARGE REPUBLIC PORTLAND PLUS 40KG /bag 10 mm

ENT BARS
WASHED SAND ₱ 600.00 /m³ 12 mm
CRUSHED GRAVEL 1" ₱ 850.00 /m³ 16 mm

Concreting of Column Footing #16 G.I. WIRE

CONCRETE MIXTURE
Total Volume of Column Footing (m³) 5.4 REINFORCEMENT BARS FOR COLUMN FOOTI

CLASS A
WIDTH 1.5 Total Length for of RSB for Column
DIMENSIONS

LENGTH 1.5 Footing (m)


HEIGHT/THICKNESS 0.2
LENGTH 3.3

DIMENSIONS
NUMBER OF CF 12
CEMENT ALONG (B) 1.5
40 kg./bag Portland TOTAL COST ALONG (L) 1.5
48.6 Cement
MATERIAL COST LABOR COST
₱ 12825.54 NUMBER OF FOOTING (F1)

16 mmØ x 6m REINFORCEMENT STEEL B


₱ 9865.8 ₱ 2959.74 ₱ 2375.1 /m³
105.6 pcs
SAND
TOTAL COST MATERIAL COST
2.7 m³ of Washed Sand
LABOR COST
₱ 2106
MATERIAL COST LABOR COST COST ₱ 19219.2
#16 G.I. WIRE
₱ 1620 ₱ 486 ₱ 390 /m³
NUMBER OF INTERSECTIONS
GRAVEL NUMBER OF FOOTING
m³ of Crushed TOTAL COST LENGTH OF TIE WIRE
5.4 Gravel 1"
₱ 5967 302.4 meters
MATERIAL COST LABOR COST
MATERIAL COST
₱ 4590 ₱ 1377 ₱ 1105 /m³
LABOR COST

Concreting of Column TOTAL COST

₱ 593.3886792453
CONCRETE MIXTURE

Total Volume of Column (m³) 11.56


REINFORCEMENT BARS FOR COLUMN FOOTI
CLASS A

WIDTH 0.25
DIMENSIONS

LENGTH 0.4 Total Length for of RSB for Column


HEIGHT/THICKNESS 6.8 Footing (m)
NUMBER OF COLUMN 17
LENGTH 3.3
DIMENSIONS

CEMENT
DIMENSIONS
40 kg./bag Portland TOTAL COST ALONG (B) 1.5
104.04 Cement ALONG (L) 1.5
MATERIAL COST LABOR COST
₱ 27456.156
NUMBER OF FOOTING (F1)
₱ 21120.12 ₱ 6336.036 ₱ 2375.1 /m³
16 mmØ x 6m REINFORCEMENT STEEL B
SAND
9.9 pcs
TOTAL COST
5.78 m³ of Washed Sand
MATERIAL COST
₱ 4508.4
MATERIAL COST LABOR COST LABOR COST
COST ₱ 68.25
₱ 3468 ₱ 1040.4 ₱ 390 /m³
#16 G.I. WIRE
GRAVEL NUMBER OF INTERSECTIONS
m³ of Crushed TOTAL COST NUMBER OF FOOTING
11.56 Gravel 1" LENGTH OF TIE WIRE
₱ 12773.8
MATERIAL COST LABOR COST
24.3 meters
₱ 9826 ₱ 2947.8 ₱ 1105 /m³
MATERIAL COST

Concreting of Wall Footing LABOR COST

TOTAL COST
MIXTURE CLASS A

Total Volume of Wall Footing (m³) 4.4925



CONCRETE

47.6830188679
0.5
DIMENSIONS

WIDTH
REINFORCEMENT BARS FOR COLUMN (C
THICKNESS 0.15
LENGTH OF WF1 59.9
Total Length for of RSB for Column (m)
CEMENT
TOTAL COST
DIMENSIONS

40 kg./bag Portland
40.4325 Cement
LENGTH OF COLUMN
₱ 10670.13675
MATERIAL COST LABOR COST NUMBER OF RSB/COLUMN
NUMBER OF COLUMN
₱ 8207.7975 ₱ 2462.33925 ₱ 2375.1 /m³
16 mmØ x 6m REINFORCEMENT STEEL B

SAND 119.68 pcs


TOTAL COST
2.24625 m³ of Washed Sand
MATERIAL COST
₱ 1752.075
MATERIAL COST LABOR COST LABOR COST
COST ₱ 68.25
₱ 1347.75 ₱ 404.325 ₱ 390 /m³
#16 G.I. WIRE
GRAVEL NUMBER OF LATERAL TIES
m³ of Crushed TOTAL COST NUMBER OF RSB
4.4925 Gravel 1" NUMBER OF COLUMN
₱ 4964.2125
MATERIAL COST LABOR COST LENGTH OF TIE WIRE

₱ 3818.625 ₱ 1145.5875 ₱ 1105 /m³ 1180.8 meters


₱ 3818.625 ₱ 1145.5875 ₱ 1105 /m³ 1180.8 meters

Concreting of Beam MATERIAL COST


LABOR COST
Total Volume of Beam (m³) 16.9425

CONCRETE MIXTURE
TOTAL COST
WIDTH 0.5 ₱ 766.6681465039

CLASS A
DIMENSIONS

THICKNESS 0.15
REINFORCEMENT BARS FOR COLUMN (C
LENGTH OF BEAMS 225.9
LENGTH OF FTB-1 34.95
Total Length for of RSB for Column (m)
LENGTH OF RCB-1 190.95

DIMENSIONS
CEMENT
LENGTH OF COLUMN
40 kg./bag Portland TOTAL COST
152.4825 Cement NUMBER OF RSB/COLUMN
MATERIAL COST LABOR COST
₱ 40240.13175
NUMBER OF COLUMN
16 mmØ x 6m REINFORCEMENT STEEL B
₱ 30953.9475 ₱ 9286.18425 ₱ 80480.2635 /m³
9.97 pcs
SAND
TOTAL COST MATERIAL COST
8.47125 m³ of Washed Sand
LABOR COST
₱ 6607.575
MATERIAL COST LABOR COST COST ₱ 68.25
LENGTH OF COLUMN LATERAL TIES
₱ 5082.75 ₱ 1524.825 ₱ 13215.15 /m³
(m)
GRAVEL PERIMETER OF COLUMN
m³ of Crushed TOTAL COST NUMBER OF COLUMN
16.9425 Gravel 1" NUMBER OF LATERAL TIES
MATERIAL COST LABOR COST
₱ 18721.4625
NUMBER 11
SPACING 0.1
₱ 14401.125 ₱ 4320.3375 ₱ 37442.925 /m³
REMAINING LENGTH 5.7
Concreting of Slab (GF) 0.2
SPACING
10 mmØ x 6m REINFORCEMENT STEEL B
MIXTURE CLASS A

Total Volume of Slab (m³) 14.3445


CONCRETE

166.12 pcs
0.15
DIMENSIONS

THICKNESS
MATERIAL COST
TOTAL AREA 95.63
LABOR COST
CEMENT COST ₱ 27.0833333333
40 kg./bag Portland TOTAL COST #16 G.I. WIRE
86.067 Cement NUMBER OF LATERAL TIES
MATERIAL COST LABOR COST
₱ 22713.0813
NUMBER OF RSB
NUMBER OF COLUMN
₱ 17471.601 ₱ 5241.4803 ₱ 1583.4 /m³
LENGTH OF TIE WIRE
SAND
98.4 meters
TOTAL COST
7.17225 m³ of Washed Sand
MATERIAL COST
₱ 5594.355
MATERIAL COST LABOR COST LABOR COST
TOTAL COST
₱ 4303.35 ₱ 1291.005 ₱ 390 /m³
₱ 63.8890122087
GRAVEL
REINFORCEMENT BARS FOR WALL FOOT
m³ of Crushed TOTAL COST
14.3445 Gravel 1"
MATERIAL COST LABOR COST
₱ 15850.6725 Total Length of RSB for Wall Footing (m)
NUMBER OF RSB
₱ 12192.825 ₱ 3657.8475 ₱ 1105 /m³
LENGTH OF WALL FOOTING

DIMENSIONS
Concreting of Slab (2F and RD)
Total Length of Hoop Bars (m)

MIXTURE CLASS
Total Volume of Slab (m³) 35.23545

CONCRETE
SPACING OF HOOP BARS
DIMENSIONS

THICKNESS 0.15 WIDTH OF HOOP BARS

A
12 mmØ x 6m REINFORCEMENT STEEL B
TOTAL AREA 234.903
32.95 pcs
CEMENT
40 kg./bag Portland TOTAL COST MATERIAL COST
317.11905 Cement LABOR COST
₱ 83687.717295
MATERIAL COST LABOR COST COST ₱ 41.6
10 mmØ x 6m REINFORCEMENT STEEL B
₱ 64375.16715 ₱ 19312.55015 ₱ 2375.1 /m³
18.49 pcs
SAND
TOTAL COST MATERIAL COST
17.617725 m³ of Washed Sand
LABOR COST
MATERIAL COST LABOR COST
₱ 13741.8255
COST ₱ 27.0833333333
#16 G.I. WIRE
₱ 10570.635 ₱ 3171.1905 ₱ 390 /m³
NUMBER OF HOOP BARS
GRAVEL NUMBER OF RSB
m³ of Crushed TOTAL COST LENGTH OF TIE WIRE
35.23545 Gravel 1"
MATERIAL COST LABOR COST
₱ 38935.17225 180.6 meters

MATERIAL COST
₱ 29950.1325 ₱ 8985.03975 ₱ 1105 /m³
LABOR COST

Concreting of Stairs TOTAL COST

₱ 13.3116199956
CONCRETE MIXTURE

Total Volume of Column (m³) 0.9


REINFORCEMENT BARS FOR CONCRETE BEAM
CLASS A

WIDTH 1.5
DIMENSIONS

LENGTH 0.2 Total Length of RSB for FTB-1


HEIGHT/THICKNESS 0.2 NUMBER OF RSB
DIMENSIONS

NUMBER OF STEPS 15 TOP BARS


CEMENT BOTTOM BARS
40 kg./bag Portland TOTAL COST TOTAL LENGTH OF FTB-1
8.1 Cement 12 mmØ x 6m REINFORCEMENT STEEL B
MATERIAL COST LABOR COST
₱ 2137.59
41.94 pcs
41.94 pcs
₱ 1644.3 ₱ 493.29 ₱ 2375.1 /m³
MATERIAL COST
SAND LABOR COST
TOTAL COST COST ₱ 41.6
0.45 m³ of Washed Sand
₱ 351 Total Length of Stirrups for FTB-1
MATERIAL COST LABOR COST
PERIMETER OF FTB-1
₱ 270 ₱ 81 ₱ 390 /m³
10 mmØ x 6m REINFORCEMENT STEEL B
GRAVEL
61.16 pcs
m³ of Crushed TOTAL COST
0.9 Gravel 1" MATERIAL COST
₱ 994.5
MATERIAL COST LABOR COST LABOR COST
COST ₱ 284.375
₱ 765 ₱ 229.5 ₱ 1105 /m³
#16 G.I. WIRE
NUMBER OF STIRRUPS
NUMBER OF RSB
LENGTH OF TIE WIRE
550.4625 meters

MATERIAL COST
LABOR COST
TOTAL COST
₱ 810.1146226415
REINFORCEMENT BARS FOR CONCRETE BEAM
Total Length of RSB for RCB-1
WEB BARS
DIMENSIONS

TOP BARS
BOTTOM BARS
TOTAL LENGTH OF RCB-1
16 mmØ x 6m REINFORCEMENT STEEL B

305.52 pcs

MATERIAL COST
LABOR COST
COST ₱ 68.25
Total Length of Stirrups for RCB-1
PERIMETER OF RCB-1
10 mmØ x 6m REINFORCEMENT STEEL B

334.16 pcs

MATERIAL COST
LABOR COST
COST ₱ 284.375
#16 G.I. WIRE
NUMBER OF STIRRUPS
NUMBER OF RSB
LENGTH OF TIE WIRE
4009.95 meters
MATERIAL COST
LABOR COST
TOTAL COST
₱ 92.7169811321
REINFORCEMENT FOR GROUND FLOOR S

Total Length of RSB for GF Slab


A 7.05 m SPACING
B 13.5 m 0.15
LENGTH OF RSB
ALONG A
ALONG B
12 mmØ x 6m REINFORCEMENT STEEL B

257.91 pcs

MATERIAL COST
LABOR COST
COST ₱ 14.7377142857
#16 G.I. WIRE
NUMBER OR INTERSECTIONS
LENGTH OF TIE WIRE

1310.4 meters
MATERIAL COST
LABOR COST
TOTAL COST
₱ 1.3245283019
REINFORCEMENT FOR 2F AND RD SLAB

Total Length of 12mmØ RSB


NUMBER OF STEEL BARS
AREA
12 mmØ x 6m REINFORCEMENT STEEL B

144.74 pcs

MATERIAL COST
LABOR COST
COST ₱ 133.9936
Total Length of 10mmØ RSB
NUMBER OF STEEL BARS
AREA
10 mmØ x 6m REINFORCEMENT STEEL B

144.74 pcs

MATERIAL COST
LABOR COST
COST ₱ 87.2354166667
#16 G.I. WIRE
NUMBER OR INTERSECTIONS
LENGTH OF TIE WIRE

80.886 meters
MATERIAL COST
LABOR COST
TOTAL COST
₱ 1.3245283019
III. Masonry Works
PRICE LIST PRICE LIST
PRICE MATERIAL PRICE
₱ 125.00 /pc CONCRETE HOLLOW BLOCK 5" THK ₱ 9.00 /pc
₱ 192.00 /pc CONCRETE HOLLOW BLOCK 4" THK ₱ 8.00 /pc
₱ 315.00 /pc LAFARGE REPUBLIC PORTLAND PLUS 40KG ₱ 203.00 /bag

₱ 180.00 /kg WASHED SAND 600.00 /m³



CRUSHED GRAVEL 1" ₱ 850.00 /m³
RS FOR COLUMN FOOTING (F1)
CONCRETE HOLLOW BLOCKS FOR WALL (EXTERIOR)
REINFORCEMENT STEEL BAR

633.6
Total Area of Exterior Walls (m²) 167.929
16 mmØ x 6m

NUMBER OF RSB
GROUND FLOOR 85.3155
9 SECOND FLOOR 82.6135
7
CONCRETE HOLLOW BLOCK 5" THK 2099.1125 pcs.
12
CEMENT MORTAR (CLASS C)
EINFORCEMENT STEEL BAR CEMENT 1601.62 bag
TOTAL COST SAND 177.17 m³
₱ 43243.2 PLASTERING @ 12mm THK (CLASS B)
₱ 33264 AREA OF WALLS (TWO SIDES) 335.86 m²
₱ 9979.2 CEMENT 48.36 bag
19219.2 /m SAND 4.03 m³
16 G.I. WIRE TOTAL COST ₱ 601323.43
63 MATERIAL COST LABOR COST
16 CHB 5" THK ₱ 18892.0125 ₱ 5667.60375
0.3 m CEMENT ₱ 334947.2371 ₱ 100484.17112055
SAND ₱ 108717.23 ₱ 32615.17038
5.71 kg.
CHB 5" THK ₱ 146.25 /m²
₱ 1027.0188679245 CEMENT ₱ 2592.94945 /m²
₱ 308.1056603774 SAND ₱ 841.62 /m²

₱ 1335.1245283019
CONCRETE HOLLOW BLOCKS FOR WALL (INTERIOR)
792453 /m²

RS FOR COLUMN FOOTING (F2) Total Area of Interior Walls (m²) 150.005

GROUND FLOOR 65.2


REINFORCEMENT STEEL BAR

59.4
SECOND FLOOR 84.805
16 mmØ x 6m

NUMBER OF RSB CONCRETE HOLLOW BLOCK 4" THK 1875.0625 pcs.


REINFORCEMENT STEEL BAR
16 mmØ x 6m
9 CEMENT MORTAR (CLASS C)
9 CEMENT 1430.67 bag
SAND 158.26 m³
1
PLASTERING @ 8mm THK (CLASS B)
EINFORCEMENT STEEL BAR AREA OF WALLS (TWO SIDES) 300.01 m²
TOTAL COST CEMENT 28.80 bag
₱ 4054.05 SAND 2.40 m³
₱ 3118.5 TOTAL COST ₱ 529966.92
₱ 935.55 MATERIAL COST LABOR COST
68.25 /m CHB 5" THK ₱ 15000.5 ₱ 4500.15
16 G.I. WIRE CEMENT ₱ 296273.1504 ₱ 88881.94513275
81 SAND ₱ 96393.21 ₱ 28917.9639
1 CHB 5" THK ₱ 130 /m²
0.3 m CEMENT ₱ 2567.61505 /m²
SAND ₱ 835.38 /m²
0.46 kg.
Total Length of RSB for Vertical Bars 405.1375 m
₱ 82.5283018868

₱ 24.758490566 TOTAL WIDTH OF WALLS 107.77 m

₱ 107.2867924528 SPACING 0.8 m


88679 /m² LENGTH 3.00 m
12 mmØ x 6m REINFORCEMENT STEEL BAR
NT BARS FOR COLUMN (C1)
TOTAL COST
67.5229166667 pcs.

REINFORCEMENT STEEL

16853.72
718.08
MATERIAL COST LABOR COST
16 mmØ x 6m

₱ 12964.4 ₱ 3889.32
BAR

6.8 COST ₱ 156.3860072376 /m


6
Total Length of RSB for Horizontal Bars 53.885 m
16
EINFORCEMENT STEEL BAR HEIGHT OF WALL 3

TOTAL COST WIDTH 107.77


₱ 49008.96 10 mmØ x 6m REINFORCEMENT STEEL BAR
₱ 37699.2 TOTAL COST
8.98 pcs
₱ 11309.76 ₱ 1459.3854166667
68.25 /m MATERIAL COST ₱ 1122.6041666667
16 G.I. WIRE LABOR COST ₱ 336.78125
41 COST ₱ 27.0833333333 /m
6
16
0.3 /m

22.28 kg.
22.28 kg.

₱ 4010.2641509434

₱ 1203.079245283
₱ 5213.3433962264
465039 /m

NT BARS FOR COLUMN (C2)

59.84
REINFORCEMENT
16 mmØ x 6m
STEEL BAR

6.8
8
1
EINFORCEMENT STEEL BAR
TOTAL COST
₱ 4084.08
₱ 3141.6
₱ 942.48
68.25 /m

996.71

1.3 m
17
40.5
TOTAL NUMBER OF
LATERAL TIES

41

EINFORCEMENT STEEL BAR


TOTAL COST
₱ 26994.2291666667
₱ 20764.7916666667
₱ 6229.4375
27.0833333333 /m
16 G.I. WIRE
41
8
1
0.3 /m
1.86 kg.

₱ 334.1886792453
₱ 100.2566037736
₱ 434.4452830189
22087 /m
T BARS FOR WALL FOOTING

REINFORCEMENT STEEL BARS


197.67
3 12 mmØ and 10 mmØ
59.9

110.92

0.3
0.5
EINFORCEMENT STEEL BAR
TOTAL COST
₱ 8223.072
₱ 6325.44
₱ 1897.632
41.6 /m
EINFORCEMENT STEEL BAR
TOTAL COST
₱ 3003.9930555556
₱ 2310.7638888889
₱ 693.2291666667
27.0833333333 /m
16 G.I. WIRE
200.67
3
0.3 m
3.41 kg.

₱ 613.358490566
₱ 184.0075471698

₱ 797.3660377358

99956 /m

RS FOR CONCRETE BEAM (FTB-1)

251.64 m
6
3
3
34.95 m
EINFORCEMENT STEEL BAR
TOTAL COST
₱ 10468.224
₱ 8052.48
₱ 2415.744
41.6 /m

366.975

1.2 m
EINFORCEMENT STEEL BAR
TOTAL COST
₱ 9938.90625
₱ 7645.3125
₱ 2293.59375
284.375 /m
16 G.I. WIRE
305.8125
6
0.3
10.39 kg.

₱ 1869.4952830189
₱ 560.8485849057
₱ 2430.3438679245
226415 /m
RS FOR CONCRETE BEAM (RCB-1)
1833.12 m
2
3
3
190.95 m
EINFORCEMENT STEEL BAR
TOTAL COST
₱ 125110.44
₱ 96238.8
₱ 28871.64
68.25 /m
2005.0
1.2 m
EINFORCEMENT STEEL BAR
TOTAL COST
₱ 54301.40625
₱ 41770.3125
₱ 12531.09375
284.375 /m
16 G.I. WIRE
1670.8125
8
0.3
75.66 kg.

₱ 13618.6981132075
₱ 4085.6094339623
₱ 17704.3075471698
11321 /m
T FOR GROUND FLOOR SLAB

1547.46
SPACING ALONG A 48
m
ALONG B 91
1289.55 m
648 m
641.55 m
EINFORCEMENT STEEL BAR
TOTAL COST
₱ 64374.336
₱ 49518.72
₱ 14855.616
14.7377142857 /m
16 G.I. WIRE
4368
0.3 m
24.72 kg.

₱ 4450.4150943396
₱ 1335.1245283019
₱ 5785.5396226415
83019 /m
ENT FOR 2F AND RD SLAB

868.45
3.221 m
269.62 m²
EINFORCEMENT STEEL BAR
TOTAL COST
₱ 36127.354432
₱ 27790.27264
₱ 8337.081792
133.9936 /m
868.45
3.221 m
269.62 m²
EINFORCEMENT STEEL BAR
TOTAL COST
₱ 23520.4130416667
₱ 18092.6254166667
₱ 5427.787625
87.2354166667 /m
16 G.I. WIRE
269.62
0.3 m
1.53 kg.

₱ 274.7071698113
₱ 82.4121509434
₱ 357.1193207547
83019 /m²
III. Formworks
PRICE LIST
MATERIAL PRICE
Form Lumber 2" x 3" x 12' Coco Lumber ₱ 132.00 /pc
Form Lumber 2" x 2" x 12' Coco Lumber ₱ 88.00 /pc
1/2"x4'x8' Ordinary Plywood ₱ 320.00 /pc

FORMS FOR COLUMN

SIDES OF THE COLUMN 0.65 m


SHORTER SIDE 0.25 m
LONGER SIDE 0.4 m
LATERAL PERIMETER OF THE 1.5 m
COLUMN
COLUMN HEIGHT 6.8
m
NUMBER OF COLUMNS 17
TOTAL AREA 173.4 m²
1/2"x4'x8' Ordinary Plywood 17.7780511811 pcs

TOTAL COST ₱ 7395.67


MATERIAL COST ₱ 5688.98
LABOR COST ₱ 1706.69
₱ 42.651 /m²
WOOD FRAME OF COLUMNS
Form Lumber 2" x 2" x 12' Coco
pcs

43.956
Lumber
TOTAL COST ₱ 5028.59
MATERIAL COST ₱ 3868.15
LABOR COST ₱ 1160.44
₱ 29.000 /m²
SCAFFOLDING FOR COLUMNS
bd. Ft. bd. Ft. bd. Ft. bd. Ft.

HORIZONTAL BRACES 2427.6

VERTICAL BRACES 809.2

DIAGONAL BRACES 1352.52

Form Lumber 2" x 2" x 12' Coco 2540.310


Lumber
TOTAL COST ₱ 290611.46
MATERIAL COST ₱ 223547.28
LABOR COST ₱ 67064.18
₱ 1675.960 /m²

bd. Ft.
Form Lumber 2" x 3" x 12' Coco 67.433
Lumber
TOTAL COST ₱ 11571.56
MATERIAL COST ₱ 8901.20
LABOR COST ₱ 2670.36
₱ 66.733 /m²
FORMS FOR BEAM
PERIMETER OF TWO SIDES FORM 0.95 m
TWO SIDE FORMS 0.25 m
BOTTOM FORM 0.35 m
LENGTH OF BEAM 225.9 m
TOTAL AREA 214.605 m²

1/2"x4'x8' Ordinary Plywood 22.003 pcs

TOTAL COST ₱ 9153.10


MATERIAL COST ₱ 7040.85

LABOR COST 2112.25



₱ 42.651 /m²
WOOD FRAME OF COLUMNS
bd. Ft.

Form Lumber 2" x 3" x 12' Coco 68.942


Lumber
TOTAL COST ₱ 11830.38
MATERIAL COST ₱ 9100.29
LABOR COST ₱ 2730.09
₱ 55.126 /m²
SCAFFOLDING FOR COLUMNS
bd. Ft. bd. Ft.

HORIZONTAL BRACES 88.4775

VERTICAL BRACES 112.95

Form Lumber 2" x 2" x 12' Coco


pcs

88.478
Lumber
TOTAL COST ₱ 10121.83
MATERIAL COST ₱ 7786.02
LABOR COST ₱ 2335.81
₱ 47.165 /m²
bd. Ft.

Form Lumber 2" x 3" x 12' Coco 112.950


Lumber
TOTAL COST ₱ 19382.22
MATERIAL COST ₱ 14909.40
LABOR COST ₱ 4472.82
₱ 90.316 /m²
TWO STOREY RESIDENTIAL BUILDING WITH ROOFD

BILL OF MATERIALS
I.D. NO DESCRIPTION UNIT QTY UNIT COST
MATERIAL
GENERAL REQUIREMENTS
Mobilization/Temporary Structures, Utilities
lot 1.00 30,000.00
and Services/Demobilization/Permits
Sub-total
1.00 Earthworks
1.01 Clearing and Grubbing sq.m 140.00 0.00
1.02 Structural Excavation cu.m 75.80 0.00
1.03 Backfilling and Compaction cu.m 50.00 150.00
1.04 Gravel Bedding G-1 cu.m 5.00 850.00
1.05 Select Fill cu.m 13.00 150.00
1.06 Soil Poisoning sq.m 140.00 50.00
Sub-Total

2.00 Concreting Works


Column Footing
2.01 Portland Cement bag 48.60 203.00
2.02 Crushed Gravel 1" cu.m 5.40 850.00
2.03 Washed Sand cu.m 2.70 600.00
Wall Footing
2.01 Portland Cement bag 40 203.00
2.02 Crushed Gravel 1" cu.m 2.25 850.00
2.03 Washed Sand cu.m 4.5 600.00
Column
2.01 Portland Cement bag 105.00 203.00
2.02 Crushed Gravel 3/4"" cu.m 11.56 850.00
2.03 Washed Sand cu.m 5.78 600.00
Beams
2.01 Portland Cement bag 153.00 203.00
2.02 Crushed Gravel 3/4"" cu.m 16.94 850.00
2.03 Washed Sand cu.m 8.47 600.00
Slab on Grade
2.01 Portland Cement bag 417.00 203.00
2.02 Crushed Gravel 1" cu.m 50.85 850.00
2.03 Washed Sand cu.m 25.40 600.00
Stairs
2.01 Portland Cement bag 8.00 203.00
2.02 Crushed Gravel 1" cu.m 0.90 850.00
2.03 Washed Sand cu.m 0.45 600.00
Sub-total

3.00 Rebar Works


Footings
Column Footings
3.01 16 mm pc 164.00 315.00
3.02 #16 G.I. Wire kg 4.28 180.00
Wall Footings
3.01 12 mm pc 33.00 192.00
3.02 10 mm pc 18.50 125.00
3.03 #16 G.I. Wire kg 3.41 180.00
Column
3.01 16 mm pc 130.00 315.00
3.02 10 mm pc 167.00 125.00
3.03 #16 G.I. Wire kg 24.14 180.00
Roof beams & Tie beams
3.01 16 mm pc 306.00 315.00
3.02 12 mm pc 41.94 192.00
3.03 10 mm pc 395.00 125.00
3.04 #16 G.I. Wire kg 86 180.00
Slabs
3.01 12 mm pc 403.00 192.00
3.02 10 mm pc 144.74 125.00
3.03 #16 G.I. Wire kg 26.25 180.00
Sub-total
4.00 Forms and Scaffoldings
Column form
4.01 Good lumber ( 2" x 2" x 12') pc 44.00 88.00
4.02 Plywood Ordinary, 1/4" x 4" x 8' pc 18.00 320.00
4.03 CWN, Assorted kg 30.00 80.00
Column & Roof beam Scaffolding
4.01 Vertical Support ( 2" x 3" x 12' Good lumber) pc 180.38 132.00
Horizontal Support (2" x 2" x 12' Good lumber) pc 209.67 88.00
Diagonal braces (2" x 2" x 12' Good lumber) pc 112.71 88.00
4.02 CWN, Assorted kg 35.00 80.00
Beam form
4.01 Good lumber ( 2" x 2" x 12') pc 69.00 88.00
4.02 Plywood Ordinary, 1/4" x 4" x 8' pc 22.00 320.00
4.03 CWN, Assorted kg 30.00 80.00
Sub-total
5.00 Masonry Works
Masonry wall
5.01 CHB 5" THK pcs. 2,100.00 9.00
5.02 CHB 4" THK pcs. 1,875.00 8.00
5.03 Portland Cement bag 3,032.00 203.00
5.04 Washed Sand cu.m 275.43 600.00
5.05 12mm x 6m RSB pc 76.50 192.00
5.06 #61 G.I. Tie wire kg 20.00 180.00
Plastering
5.01 Portland Cement bag 77.16 203.00
5.02 Washed Sand cu.m 56.32 600.00
Sub-total
6.00 Doors And Windows
D-1, Double swing panel door with 2" x 6" wooden frame &
6.01 set 1 10,800.00
2" x 6" wooden door jamb
D-2, Panel door with 2" x 6" wooden frame
6.02 set 5 4,500.00
& 2" x 6" wooden door jamb
D-3, Panel door with 2" x 6" wooden frame
6.03 set 3 2,495.00
& 2" x 6" wooden door jamb
W-1, 12mm thk. bronze glass on powder coated
6.04 set 1 8,700.00
aluminum frame
W-2, 6mm thk. bronze glass on powder
6.05 set 9 7,500.00
coated aluminum frame
W-3, 6mm thk. bronze glass on powder coated
6.07 set 6 7,000.00
aluminum frame with open back, screen & lock accs.
W-4, 6mm thk. bronze glass on powder coated
6.08 set 7 5,625.00
aluminum frame with open back, screen & lock accs.
W-5, 6mm thk. bronze glass on powder coated
6.09 set 2 5,500.00
aluminum frame with open back, screen & lock accs.
W-6, 6mm thk. bronze glass on powder coated
6.1 set 5 4,200.00
aluminum frame with open back, screen & lock accs.
W-7, 12mm thk. bronze glass on powder coated
6.12 set 1 3,145.00
aluminum frame
W-8, 6mm thk. bronze glass on powder coated
6.13 set 1 3,000.00
aluminum frame with open back, screen & lock accs.
Sub-total
7.00 Electrical Works
Roughing-ins
7.01 Electrical Conduit uPVC, 15mmØ pc 50.00 58.00
7.02 RSC 60mmØ pc 11.00 1,000.00
Entrance Cap 60mm dia.
7.03 pc 11.00 80.00
Junction Box , 4" x 4" G.I
7.04 pc 34.00 20.00
Utility Box, 2" x 4" x G.I
7.05 pc 12.00 20.00
Grounding Rod, 2.4m x 16mm dia.
7.06 pc 14.00 200.00
Wires and Fixtures
3.5 mm2 THW wire , Stranded
7.01 box 12.00 3,750.00
Duplex C.O. with Plate
7.02 pc 14.00 108.00
3 Way Switch With Plate
7.03 pc 4.00 250.00
40 watts Flourescent Lamp
7.04 pc 10.00 150.00
Single Switch with Plate
7.05 pc 10.00 68.00
2-Gang Switch with Plate
7.06 pc 13.00 108.00
7.07 Incandescent Bulb 50W set 14.00 40.00
7.08 Panel Box, Flush Type, 4 Branches set 3.00 320.00
7.09 Circuit Breaker, 20A 2P set 4.00 350.00
7.10 Main Circuit Breaker, 175A 2P set 1.00 3,000.00
7.11 Electrical Tape pc 35.00 25.00
Sub-total
8.00 Plumbing Works
8.01 Water Closet 1.6gpf with Accessories set 4.00 4,500.00
8.02 Kitchen Sink set 2.00 600.00
8.03 Faucet , Hose Bibb , Brass 3/4"Ø pc 7.00 250.00
8.04 G.I Coupling, 3/4"Ø pc 11.00 17.00
8.05 G.I Tee, 3/4"Ø pc 11.00 17.00
8.06 G.I. Pipe 3/4" Sch.40 pc 13.00 370.00
8.07 G.I. Elbow 90° x 3/4"Ø pc 8.00 17.00
8.08 Gate Valve , 3/4"dia. pc 5.00 360.00
8.09 Check Valve , 3/4"dia. pc 12.00 300.00
8.10 S.S. Floor Drain 4' x 4" pc 4.00 200.00
Sub-total
9.00 Sanitary works
9.01 uPVC Sanitary Pipe 4"Ø x 10' pc 11.00 525.00
9.02 uPVC Wye 4" x 4" pc 11.00 160.00
9.03 uPVC Wye 4" x 2" pc 14.00 97.00
9.04 uPVC Sanitary Pipe 2"Ø pc 14.00 205.00
9.05 uPVC P-TRAP 2"Ø pc 11.00 50.00
9.06 uPVC P-TRAP 4"Ø pc 17.00 110.00
9.07 uPVC Elbow 45° x 4 "Ø pc 8.00 97.00
9.08 uPVC Cleanout 4" diameter pc 5.00 110.00
9.09 PVC Cement can 6.00 120.00
Sub-total
10.00 Painting Works
Concrete surfaces sq.m 646.52
10.01 Neutralizer qrt 8.62 130.00
10.02 Latex, Flat gal 21.55 450.00
10.03 Latex, Semi Gloss gal 22.00 440.00
10.04 Acri Color qrt 4.20 123.00
Sub-total
11.00 TileWorks
Wall
11.01 Unglazed Wall Tiles 20cm x 30cm T&B pc 168.00 40.00
11.02 Unglazed Wall Tiles 20cm x 20cm KITCHEN pc 45.00 32.00
11.03 Tile Trim 6mm. pc 21.00 50.00
11.04 Lining 2" X 20cm (T&B and KITCHEN) pc 54.00 25.00
11.05 Tile Adhesive 25kg/bag bag 8.00 270.00
11.06 Tile Grout 5 kg/bag bag 8.00 165.00
Flooring sq.m 431.39
Glazed Floor Tiles 20cmx 20cm
11.01 pc 15,530.00 13.00
(INTERIOR )
11.02 Tile Adhesive 25kg/bag bag 134.00 270.00
11.03 Tile Grout 5 kg/bag bag 134.00 185.00
Sub-total

TOTAL BUILDING COST (LABOR AND MATERIAL)

PRICE FOR BIDDING

LABOR AND MATERIALS


NG WITH ROOFDECK

LS
UNIT COST TOTAL COST GRAND TOTAL I.D. NO
LABOR MATERIAL LABOR

9,000.00 30,000.00 9,000.00 39,000.00


39,000.00
1.00
50.00 0.00 7,000.00 7,000.00 1.01
250.00 0.00 18,950.00 18,950.00 1.02
50.00 7,500.00 2,500.00 10,000.00 1.03
255.00 4,250.00 1,275.00 5,525.00 1.04
45.00 1,950.00 585.00 2,535.00 1.05
15.00 7,000.00 2,100.00 9,100.00 1.06
53,110.00

2.00

66.00 9,865.80 3,207.60 13,073.40 2.01


255.00 4,590.00 1,377.00 5,967.00 2.02
180.00 1,620.00 486.00 2,106.00 2.03

66.00 8,120.00 2,640.00 10,760.00 2.01


255.00 1,912.50 573.75 2,486.25 2.02
180.00 2,700.00 810.00 3,510.00 2.03

66.00 21,315.00 6,930.00 28,245.00 2.01


255.00 9,826.00 2,947.80 12,773.80 2.02
180.00 3,468.00 1,040.40 4,508.40 2.03

66.00 31,059.00 10,098.00 41,157.00 2.01


255.00 14,399.00 4,319.70 18,718.70 2.02
180.00 5,082.00 1,524.60 6,606.60 2.03

66.00 84,651.00 27,522.00 112,173.00 2.01


255.00 43,225.90 12,967.77 56,193.67 2.02
180.00 15,240.60 4,572.18 19,812.78 2.03

66.00 1,624.00 528.00 2,152.00 2.01


255.00 765.00 229.50 994.50 2.02
180.00 270.00 81.00 351.00 2.03
303,686.45

3.00

10.00 51,660.00 1,640.00 53,300.00 3.01


10.00 770.40 42.80 813.20 3.02

10.00 6,336.00 330.00 6,666.00 3.01


10.00 2,312.50 185.00 2,497.50 3.02
10.00 613.80 34.10 647.90
3.01
10.50 40,950.00 1,365.00 42,315.00 3.02
10.00 20,875.00 1,670.00 22,545.00 3.03
10.00 4,345.20 241.40 4,586.60

10.50 96,390.00 3,213.00 99,603.00 3.01


10.00 8,052.48 419.40 8,471.88 3.02
10.00 49,375.00 3,950.00 53,325.00 3.03
10.00 15,480.00 860.00 16,340.00
3.01
10.00 77,376.00 4,030.00 81,406.00 3.02
10.00 18,092.50 1,447.40 19,539.90 3.03
10.00 4,725.00 262.50 4,987.50
417,044.48
3.01
3.02
26.40 3,872.00 1,161.60 5,033.60 3.03
96.00 5,760.00 1,728.00 7,488.00
24.00 2,400.00 720.00 3,120.00 3.01
3.02
39.60 23,810.16 7,143.05 30,953.21 3.03
26.40 18,450.96 5,535.29 23,986.25
26.40 9,918.48 2,975.54 12,894.02
24.00 2,800.00 840.00 3,640.00 3.01
3.02
26.40 6,072.00 1,821.60 7,893.60
96.00 7,040.00 2,112.00 9,152.00 3.01
24.00 2,400.00 720.00 3,120.00 3.02
107,280.68 3.03

4.00
2.55 18,900.00 5,355.00 24,255.00
2.55 15,000.00 4,781.25 19,781.25 4.01
57.00 615,496.00 172,824.00 788,320.00 4.02
168.00 165,258.00 46,272.24 211,530.24 4.03
9.60 14,688.00 734.40 15,422.40
19.50 3,600.00 390.00 3,990.00 4.01

54.00 15,663.48 4,166.64 19,830.12


168.00 33,792.00 9,461.76 43,253.76 4.02
1,236,783.45
4.01
3,240.00 10,800.00 3,240.00 14,040.00 4.02

1,350.00 22,500.00 6,750.00 29,250.00 4.03

748.50 7,485.00 2,245.50 9,730.50

2,610.00 8,700.00 2,610.00 11,310.00 5.00

2,250.00 67,500.00 20,250.00 87,750.00

2,100.00 42,000.00 12,600.00 54,600.00 5.01

1,687.50 39,375.00 11,812.50 51,187.50 5.02

1,650.00 11,000.00 3,300.00 14,300.00 5.03

1,260.00 21,000.00 6,300.00 27,300.00 5.04

943.50 3,145.00 943.50 4,088.50 5.05

900.00 3,000.00 900.00 3,900.00 5.06


307,456.50
5.01
5.02
14.50 2,900.00 725.00 3,625.00
250.00 11,000.00 2,750.00 13,750.00 6.00
1,100.00 6.01
20.00 880.00 220.00
850.00 6.02
5.00 680.00 170.00
300.00 6.03
5.00 240.00 60.00
3,500.00 6.04
50.00 2,800.00 700.00
6.05
56,250.00 6.07
937.50 45,000.00 11,250.00
1,890.00 6.08
27.00 1,512.00 378.00
1,250.00 6.09
62.50 1,000.00 250.00
1,875.00 6.1
37.50 1,500.00 375.00
850.00 6.12
17.00 680.00 170.00
1,755.00 6.13
27.00 1,404.00 351.00
10.00 560.00 140.00 700.00
80.00 960.00 240.00 1,200.00 7.00
87.50 1,400.00 350.00 1,750.00
750.00 3,000.00 750.00 3,750.00 7.01
6.25 875.00 218.75 1,093.75 7.02
95,488.75 7.03
7.04
1,125.00 18,000.00 4,500.00 22,500.00 7.05
150.00 1,200.00 300.00 1,500.00 7.06
62.50 1,750.00 437.50 2,187.50
4.25 187.00 46.75 233.75 7.01
4.25 187.00 46.75 233.75 7.02
92.50 4,810.00 1,202.50 6,012.50 7.03
4.25 136.00 34.00 170.00 7.04
90.00 1,800.00 450.00 2,250.00 7.05
75.00 3,600.00 900.00 4,500.00 7.06
50.00 800.00 200.00 1,000.00 7.07
40,587.50 7.08
7.09
131.25 5,775.00 1,443.75 7,218.75 7.10
40.00 1,760.00 440.00 2,200.00 7.11
24.25 1,358.00 339.50 1,697.50
51.25 2,870.00 717.50 3,587.50 8.00
12.50 550.00 137.50 687.50 8.01
27.50 1,870.00 467.50 2,337.50 8.02
24.25 776.00 194.00 970.00 8.03
27.50 550.00 137.50 687.50 8.04
30.00 720.00 180.00 900.00 8.05
20,286.25 8.06
8.07
8.08
32.50 1,120.60 280.15 1,400.75 8.09
112.50 9,697.50 2,424.38 12,121.88 8.10
110.00 9,680.00 2,420.00 12,100.00
30.75 516.60 129.15 645.75 9.00
26,268.38 9.01
9.02
9.03
10.00 6,720.00 1,680.00 8,400.00 9.04
8.00 1,440.00 360.00 1,800.00 9.05
12.50 1,050.00 262.50 1,312.50 9.06
6.25 1,350.00 337.50 1,687.50 9.07
67.50 2,160.00 540.00 2,700.00 9.08
41.25 1,320.00 330.00 1,650.00 9.09

10.00
3.25 201,890.00 50,472.50 252,362.50
67.50 36,180.00 9,045.00 45,225.00 10.01
46.25 24,790.00 6,197.50 30,987.50 10.02
346,125.00 10.03
10.04
AL) 2,993,117.44
11.00
G
11.01
31506.50 /m²
11.02
11.03
11.04
11.05
11.06

11.01

11.02
11.03
TWO STOREY RESIDENTIAL BUILDING WITH ROOFDECK
DETAILED ESTIMATES
COST (MATERIALS AND LABOR AND LABOR ONLY)
DESCRIPTION COST

GENERAL REQUIREMENTS
MATERIALS AND LABOR
Mobilization/Temporary Structures, Utilities
and Services/Demobilization/Permits
Php 278.57

Earthworks Php 379.36


Clearing and Grubbing Php 50.00
Structural Excavation Php 135.36
Backfilling and Compaction Php 71.43
Gravel Bedding G-1 Php 39.46
Select Fill Php 18.11
Soil Poisoning Php 65.00

Concreting Works Php 63,257.24


Concreting of Column Footing (F1) Php 3,916.00
Portland Cement Php 2,421.00
Crushed Gravel 1" Php 1,105.00
Washed Sand Php 390.00
Concreting of Wall Footing (WF1) Php 3,103.01
Portland Cement Php 1,992.59
Crushed Gravel 1" Php 460.42
Washed Sand Php 650.00
Column (C1 & C2) Php 8,430.96
Portland Cement Php 5,230.56
Crushed Gravel 3/4"" Php 2,365.52
Washed Sand Php 834.89
Beams (FTB-1, RCB-1 & RFB-1) Php 12,311.54
Portland Cement Php 7,621.67
Crushed Gravel 3/4"" Php 3,466.43
Washed Sand Php 1,223.44
Slab on Grade (S-1) Php 34,848.05
Portland Cement Php 20,772.78
Crushed Gravel 1" Php 10,406.24
Washed Sand Php 3,669.03
Stairs Php 647.69
Portland Cement Php 398.52
Crushed Gravel 1" Php 184.17
Washed Sand Php 65.00
Rebar Works Php 8,162.37
Reinforcing Steel Bars in Footings Php 3,582.52
Column Footing (C1F1) Php 1,651.05
16 mm Php 1,601.60
#16 G.I. Wire Php 49.45
Column Footing (C2F1) Php 1,849.48
16 mm Php 1,801.80
#16 G.I. Wire Php 47.68
Wall Footings Php 81.99
12 mm Php 41.60
10 mm Php 27.08
#16 G.I. Wire Php 13.31
Reinforcing Steel Bars in Column Php 1,629.87
Column (C1F1) Php 731.87
16 mm Php 450.45
10 mm Php 233.51
#16 G.I. Wire Php 47.91
Column (C2F1) Php 898.00
16 mm Php 600.60
10 mm Php 233.51
#16 G.I. Wire Php 63.89
Reinforcing Steel Bars in Roof Beams Php 1,686.46
FTB-1 Php 653.88
12 mm Php 300.00
10 mm Php 284.35
#16 G.I. Wire Php 69.53
RCB-1 and RFB-2 Php 1,032.58
16 mm Php 655.20
10 mm Php 284.38
#16 G.I. Wire Php 93.00
Reinforcing Steel Bars in Slabs Php 1,263.52
Ground Floor Slab Php 738.52
12 mm Php 677.62
#16 G.I. Wire Php 60.90
S-1 Php 525.00
12 mm Php 275.13
10 mm Php 174.87
#16 G.I. Wire Php 75.00

Installation of Forms and Scaffoldings Php 15,776.57


Column form Php 2,300.24
Good lumber ( 2" x 2" x 12') Php 740.24
Plywood Ordinary, 1/4" x 4" x 8' Php 1,101.18
CWN, Assorted Php 458.82
Column & Roof beam Scaffolding Php 10,510.81
Vertical Support ( 2" x 3" x 12' Good lumber) Php 4,551.94
Horizontal Support (2" x 2" x 12' Good lumber) Php 3,527.39
Diagonal braces (2" x 2" x 12' Good lumber) Php 1,896.18
CWN, Assorted Php 535.29
Beam form Php 2,965.53
Good lumber ( 2" x 2" x 12') Php 1,160.82
Plywood Ordinary, 1/4" x 4" x 8' Php 1,345.88

CWN, Assorted Php 458.82

Masonry Works Php 3,690.59

Masonry wall Php 3,491.59

CHB 5" THK Php 144.38

CHB 4" THK Php 131.88

Portland Cement Php 2,486.81

Washed Sand Php 667.29

12mm x 6m RSB Php 48.65

#61 G.I. Tie wire Php 12.59


Plastering Php 199.00
Portland Cement Php 62.56
Washed Sand Php 136.45

Installation of Doors And Windows Php 3,236.38


D-1, Double swing panel door with 2" x 6" wooden frame & 2" x 6" wooden
door jamb
Php 147.79
D-2, Panel door with 2" x 6" wooden frame
& 2" x 6" wooden door jamb
Php 307.89
D-3, Panel door with 2" x 6" wooden frame
& 2" x 6" wooden door jamb
Php 102.43
W-1, 12mm thk. bronze glass on powder coated
Php 119.05
aluminum frame
W-2, 6mm thk. bronze glass on powder
coated aluminum frame
Php 923.68
W-3, 6mm thk. bronze glass on powder coated
Php 574.74
aluminum frame with open back, screen & lock accs.
W-4, 6mm thk. bronze glass on powder coated
aluminum frame with open back, screen & lock accs.
Php 538.82
W-5, 6mm thk. bronze glass on powder coated
aluminum frame with open back, screen & lock accs.
Php 150.53
W-6, 6mm thk. bronze glass on powder coated
aluminum frame with open back, screen & lock accs.
Php 287.37
W-7, 12mm thk. bronze glass on powder coated
aluminum frame
Php 43.04
W-8, 6mm thk. bronze glass on powder coated
Php 41.05
aluminum frame with open back, screen & lock accs.

Electrical Works Php 1,005.14


Installation of Roughing-ins Php 243.42
Electrical Conduit uPVC, 15mmØ Php 38.16
RSC 60mmØ Php 144.74
Entrance Cap 60mm dia. Php 11.58
Junction Box , 4" x 4" G.I Php 8.95
Utility Box, 2" x 4" x G.I Php 3.16
Grounding Rod, 2.4m x 16mm dia. Php 36.84
Wires and Fixtures Php 761.72
3.5 mm2 THW wire , Stranded Php 592.11
Duplex C.O. with Plate Php 19.89
3 Way Switch With Plate Php 13.16
40 watts Flourescent Lamp Php 19.74
Single Switch with Plate Php 8.95
2-Gang Switch with Plate Php 18.47
Incandescent Bulb 50W Php 7.37
Panel Box, Flush Type, 4 Branches Php 12.63
Circuit Breaker, 20A 2P Php 18.42
Main Circuit Breaker, 175A 2P Php 39.47
Electrical Tape Php 11.51

Plumbing Works Php 427.24


Water Closet 1.6gpf with Accessories Php 236.84
Kitchen Sink Php 15.79
Faucet , Hose Bibb , Brass 3/4"Ø Php 23.03
G.I Coupling, 3/4"Ø Php 2.46
G.I Tee, 3/4"Ø Php 2.46
G.I. Pipe 3/4" Sch.40 Php 63.29
G.I. Elbow 90° x 3/4"Ø Php 1.79
Gate Valve , 3/4"dia. Php 23.68
Check Valve , 3/4"dia. Php 47.37
S.S. Floor Drain 4' x 4" Php 10.53
Sanitary works Php 213.54
uPVC Sanitary Pipe 4"Ø x 10' Php 75.99
uPVC Wye 4" x 4" Php 23.16
uPVC Wye 4" x 2" Php 17.87
uPVC Sanitary Pipe 2"Ø Php 37.76
uPVC P-TRAP 2"Ø Php 7.24
uPVC P-TRAP 4"Ø Php 24.61
uPVC Elbow 45° x 4 "Ø Php 10.21
uPVC Cleanout 4" diameter Php 7.24
PVC Cement Php 9.47

Painting Works
Php 87.56
Concrete surfaces
Neutralizer Php 4.67
Latex, Flat Php 40.41
Latex, Semi Gloss Php 40.33
Acri Color Php 2.15

TileWorks Php 3,643.42


Wall Php 184.74
Unglazed Wall Tiles 20cm x 30cm T&B Php 88.42
Unglazed Wall Tiles 20cm x 20cm KITCHEN Php 18.95
Tile Trim 6mm. Php 13.82
Lining 2" X 20cm (T&B and KITCHEN) Php 17.76
Tile Adhesive 25kg/bag Php 28.42
Tile Grout 5 kg/bag Php 17.37
Flooring Php 3,458.68
Glazed Floor Tiles 20cmx 20cm
Php 2,656.45
(INTERIOR )
Tile Adhesive 25kg/bag Php 476.05
Tile Grout 5 kg/bag Php 326.18
WITH ROOFDECK

LABOR ONLY)
COST

S AND LABOR LABOR


per m² Php 64.29 per m²

per m² Php 231.50 per m²


per m² Php 50.00 per m²
per m² Php 135.36 per m²
per m² Php 17.86 per m²
per m² Php 9.11 per m²
per m² Php 4.18 per m²
per m² Php 15.00 per m²

per m³ Php 15,393.39 per m³


per m³ Php 1,174.00 per m³
per m³ Php 594.00 per m³
per m³ Php 255.00 per m³
per m³ Php 90.00 per m³
per m³ Php 745.14 per m³
per m³ Php 488.89 per m³
per m³ Php 106.25 per m³
per m³ Php 150.00 per m³
per m³ Php 2,021.89 per m³
per m³ Php 1,283.33 per m³
per m³ Php 545.89 per m³
per m³ Php 192.67 per m³
per m³ Php 2,952.28 per m³
per m³ Php 1,870.00 per m³
per m³ Php 799.94 per m³
per m³ Php 282.33 per m³
per m³ Php 8,344.81 per m³
per m³ Php 5,096.67 per m³
per m³ Php 2,401.44 per m³
per m³ Php 846.70 per m³
per m³ Php 155.28 per m³
per m³ Php 97.78 per m³
per m³ Php 42.50 per m³
per m³ Php 15.00 per m³
per m² Php 2,448.71 per m²
per m² Php 1,074.76 per m²
per m² Php 495.32 per m²
per m² Php 480.48 per m²
per m² Php 14.84 per m²
per m² Php 554.84 per m²
per m² Php 540.54 per m²
per m² Php 14.30 per m²
per m Php 24.60 per m²
per m Php 12.48 per m
per m Php 8.12 per m
per m Php 3.99 per m
per m Php 488.96 per m
per m Php 219.56 per m
per m Php 135.14 per m
per m Php 70.05 per m
per m Php 14.37 per m
per m Php 269.40 per m
per m Php 180.18 per m
per m Php 70.05 per m
per m Php 19.17 per m
per m Php 505.94 per m
per m Php 196.16 per m
per m Php 90.00 per m
per m Php 85.31 per m
per m Php 20.86 per m
per m Php 309.77 per m
per m Php 196.56 per m
per m Php 85.31 per m
per m Php 27.90 per m
per m² Php 379.06 per m²
per m² Php 221.56 per m²
per m² Php 203.29 per m²
per m² Php 18.27 per m²
per m² Php 157.50 per m²
per m² Php 82.54 per m²
per m² Php 52.46 per m²
per m² Php 22.50 per m²

per m Php 4,732.97 per m


per m Php 690.07 per m
per m Php 222.07 per m
per m Php 330.35 per m
per m Php 137.65 per m
per m Php 3,153.24 per m
per m Php 1,365.58 per m
per m Php 1,058.22 per m
per m Php 568.85 per m
per m Php 160.59 per m
per m Php 889.66 per m
per m Php 348.25 per m
per m Php 403.76 per m

per m Php 137.65 per m

per m² Php 1,107.18 per m²

per m² Php 1,047.48 per m²

per m² Php 43.31 per m²

per m² Php 39.56 per m²

per m² Php 746.04 per m²

per m² Php 200.19 per m²

per m² Php 14.60 per m²

per m² Php 3.78 per m²


per m² Php 59.70 per m²
per m² Php 18.77 per m²
per m² Php 40.93 per m²

per m² Php 970.92 per m²


per m² Php 44.34 per m²

per m² Php 92.37 per m²

per m² Php 30.73 per m²

per m² Php 35.72 per m²

per m² Php 277.11 per m²


per m² Php 172.42 per m²

per m² Php 161.64 per m²

per m² Php 45.16 per m²

per m² Php 86.21 per m²

per m² Php 12.91 per m²

per m² Php 12.32 per m²

per m² Php 301.54 per m²


per m² Php 73.03 per m²
per m² Php 11.45 per m²
per m² Php 43.42 per m²
per m² Php 3.47 per m²
per m² Php 2.68 per m²
per m² Php 0.95 per m²
per m² Php 11.05 per m²
per m² Php 228.52 per m²
per m² Php 177.63 per m²
per m² Php 5.97 per m²
per m² Php 3.95 per m²
per m² Php 5.92 per m²
per m² Php 2.68 per m²
per m² Php 5.54 per m²
per m² Php 2.21 per m²
per m² Php 3.79 per m²
per m² Php 5.53 per m²
per m² Php 11.84 per m²
per m² Php 3.45 per m²

per m² Php 128.17 per m²


per m² Php 71.05 per m²
per m² Php 4.74 per m²
per m² Php 6.91 per m²
per m² Php 0.74 per m²
per m² Php 0.74 per m²
per m² Php 18.99 per m²
per m² Php 0.54 per m²
per m² Php 7.11 per m²
per m² Php 14.21 per m²
per m² Php 3.16 per m²
per m² Php 64.06 per m²
per m² Php 22.80 per m²
per m² Php 6.95 per m²
per m² Php 5.36 per m²
per m² Php 11.33 per m²
per m² Php 2.17 per m²
per m² Php 7.38 per m²
per m² Php 3.06 per m²
per m² Php 2.17 per m²
per m² Php 2.84 per m²

per m² Php 26.27 per m²

per m² Php 1.40 per m²


per m² Php 12.12 per m²
per m² Php 12.10 per m²
per m² Php 0.65 per m²

per m² Php 1,093.03 per m²


per m² Php 55.42 per m²
per m² Php 26.53 per m²
per m² Php 5.68 per m²
per m² Php 4.14 per m²
per m² Php 5.33 per m²
per m² Php 8.53 per m²
per m² Php 5.21 per m²
per m² Php 1,037.61 per m²
per m² Php 796.93 per m²
per m² Php 142.82 per m²
per m² Php 97.86 per m²