Wind Load, W
The Windload has been calculated base on Vietnamese standard TCVN-2737: '' Load and effects- Design Standard''
The location of project in the downtown area have some high building over 10m
The standard value of windload stactic component
Wj= Wo. k .c.
Where
k=0.7 Factor k=0.7 of location (downtown area with some high building over 10m)
=1.2 - Realiability coefficient of windload
c=0.6 - Aerodynamic factor
Wo - The velocity pressure (normally)
Wo =90 daN/m2 = 0.90 kN/m2
=> Wj= 0.45 kN/m2
The windload applied on silo
W=Wj. D. H= 16.3 kN
Moment cause by windload at the top of silo slab
M= W. H/2= 98.0 kN.m
II. THE LOADING AT BOTTOM OF SLAB
Fv : Vertical Load (Self weight of silo + Weight of footing + Water load in the silo)
Fh : Horizonal load (Windload to the silo)
M: Moment cause by windload to the silo
1/3
CACULATION FOR SILO SLAB (FOR 1 SILO)
Project: Myanmar-Korea Friendship (Dala) Bridge
Item: Bore pile for Yangon Side
b. Sliding check
Rh: For anti-sliding = k.P; k: factor of friction; k = tan ()
Fh : Horizonal load
Safety factor Fs = Rh / Fh
Nếu Fs > 1.5 : Silo safe about sliding
Conclude : As caculation above, the silo slab stability but for more the safe, need installation steel wire cable for keep
silo and slab. Kindly check detail drawing below.
The consultant will be decide about stability of this silo
2/3
CACULATION FOR SILO SLAB (FOR 1 SILO)
Project: Myanmar-Korea Friendship (Dala) Bridge
Item: Bore pile for Yangon Side
3/3
PROJECT PICTURE
1/7
PROJECT PICTURE
II: LOTTE HOTEL YANGON (DAEWOO AROMA HOTEL)
Location: Pyay Road- Yangon-Myanmar
Time: 8/2014
Client: DongAh Myanmar
2/7
PROJECT PICTURE
III: PYAY TOWER
Location: Pyay Road- Yangon-Myanmar
Time: 5/2015
Owner: Noble Twin Dragon
3/7
PROJECT PICTURE
4/7
PROJECT PICTURE
V: KO KINE FLYOVER
Location: Kabar Aye Pagoda Road- Yangon-Myanmar
Time: 9/2015
Client: Capital Development Ltd
5/7
PROJECT PICTURE
6/7
PROJECT PICTURE
VII: Y-COMPLEX
Location: Shwedagon Pagoda Road- Yangon-Myanmar
Time: 2/2018
Client:Fujita Corporation
7/7