TERINTEGRASI DI WILAYAH JAKARTA, BOGOR, DEPOK, DAN BEKASI

K E R E TA A P I R I N G A N / L I G H T R A I L T R A N S I T
MINISTRY OF TRANSPORTATION PT ADHI KARYA (Persero) Tbk.

M E T H O D O F S TAT E M E N T
E X T E N T I O N J O I N T AL L S TAT I O N
DAFTAR ISI / TABEL LIST

1. UMUM / GENERAL
1.1 Data Proyek 1.1 Project Data
1.2 Ruang Lingkup Pekerjaan 1.2 Scope Of Work

2. STANDAR PEKERJAAN / STANDARD OF WORK


2.1 Pedoman Standart Pekerjaan 2.1 The work Standard Guidelines
2.2 Toleransi Pengerjaan 2.2 Tolerance Of Work
2.3 Persyaratan Teknis Bahan 2.3 Material Spesification

3. SPESIFIKASI MATERIAL

4. URUTAN KERJA / SQUENCE OF WORK


3.1 Spesifikasi Produk 3.1 Product Spesification
3.2 Pelaksanaan Pekerjaan 3.2 Inprocess Work

5. ALUR PELAKSANAAN PEKERJAAN / FLOWCHART IMPLEMENTATION OF WORK

6. INSPEKSI / INSPECTION

7. SAFETY SIGN

8. LAMPIRAN /ATTACHMENT

7.1 Brosure Material ACP 7.1 Brochure ACP


7.2 Form Cheklist 7.2 Form Cheklist
7.3 Form Dokumentasi 7.3 Form Documentation

9. STRUKTUR ORGANISASI

2
1. UMUM / GENERAL

1.1 Data Proyek / Project Data

Project Name : STASIUN LRT Project Name : STASIUN LRT


Terintegrasi di Wilayah Jakarta, Bogor, Terintegrasi di Wilayah Jakarta, Bogor,
Depok dan Bekasi Depok dan Bekasi
Location : Stasiun Harjamukti & Stasiun Ciracas Location : Harjamukti Station & Ciracas Station

Client : Kementrian Perhubungan Direktorat Jendral Client : Kementrian Perhubungan Direktorat Jendral
Perkeretaapian Perkeretaapian
Design Design
Structure : Arkonin Structure : Arkonin
Architectural : Arkonin Architectural : Arkonin
MEP : Arkonin MEP : Arkonin

Consultant : OCG – Jopriss Consultant : OCG – Jopriss

Contractor : PT. Adhi Karya Contractor : PT. Adhi Karya

1.2 Lingkup Pekerjaan / Scope of Work

• Pemasangan Aluminium Composite Panel & • Installation of Aluminium Composite Panel


Aluminium Louvers & Aluminium Louvers

3
2. STANDAR PEKERJAAN/ STANDARD OF WORK

2.1 Pedoman Standart Pekerjaan/ The work Standard Guidelines

1. Approval Shop Drawing 1. Approval Shop Drawing


2. Approval Material 2. Approval Material

2.2 Toleransi Pengerjaan/ Tolerance Of Work

 Toleransi elevasi = 30 mm  Tolerance for elevation = 30 mm


 Toleransi dimensi Aluminium = 0,5 – 1,0 mm  Tolerance for Aluminium dimention = 0,5 mm - 1,0 mm

2.3 Persyaratan Teknis Bahan/ Material Spesification

• SNI 2847-2013 • Indonesian Standard SNI 2847-2013


• SNI 07-0252-1997 • Indonesian Standard SNI 07-0252-1997
• SNI 03-6429-2000 • Indonesian Standard SNI 03-6429-2000
• SNI 03-2492-2002 • Indonesian Standard SNI 03-2492-2002
• Pd T-07-2005-B • Pd T-07-2005-B

4
3. SPESIFIKASI MATERIAL / MATERIAL SPESIFICATION

3.1 Spesifikasi Produk / The Product Spesification

• ALUMINIUM COMPOAITE PANEL :


- Aluminium Composite Tebal (0,5+3,0+0,5)mm
- Rangka vertical, Aluminium Hollow 38,10 x 38,10mm
- Rangka Horizontal, Aluminium Hollow 19,05 x 38,10mm
- Reinforcement, Aluminium Hollow 19,05 x 38,10mm
- Aluminium Stefeneer
- Bracket, Besi siku 40 x 40mm finish zinchromate
- Fixing Dynabolt & Bolt Nut
• ALUMINIUM LOUVRE :
- Shop Front 4” (44.5 x 101,6 x 1,25)mm Ex.Alexindo, Finish Powder Coating Ex. Jotun
- Aluminium U 10 x 100mm, Finish Powder Coating, Ex. jotun
- Aluminium Louvre Z 4”, Finish Powder coating, Ex. Jotun
- Silicone Sealant DC 688, Ex. Dow Corning

5
4. URUTAN KERJA/ SQUENCE OF WORK

4.1 Pelaksanaan Pekerjaan / The work Standard Guidelines

• Joint Survey dan pengecekan elevasi • Joint Surver then checking the elevation by using water pass.
dengan menggunakan alat waterpass.
• After the survey data is in line with the shop drawings,
• Setelah data survey sudah sesuai shop drawing, marking untuk marking for dividing the bracket and ACP spacing both
pembagian jarak bracket dan rangka ACP baik vertkal maupun vertically and horizontally
horizonta’ • Bracket and Dynabolt installatipn
• Pemasangan bracket dan dynabolt • ACP frame installation according to approved shop
• Pemasangan Rangka ACP sesuai shop drawing yang disetujui . drawings

4.2 Marking Pemasangan Acp 4.3 Check Openinf Pemasangan Kusen Louver

6
5. ALUR PELAKSANAAN PEKERJAAN / FLOWCHART IMPLEMENTATION OF WORK

7
6. INSPEKSI / INSPEKTION

• Cek kesesuaian Dimensi Extention Concrete • Check the suitability of Extention Concrete Dimensions
• Cek Elevasi Concrete • Check Concrete Elevation
• Cek kesesuaian Pembesian. • Check the suitability of Rebar
• Cek Kerapihan Bekisting • Check neatness of formwork
• Cek Kebersihan Area Kerja • Check Work Area Cleanliness

Proses Ceklist/ Checklist Process

8
7. SAFETY / SIGN

• Penegasan akan pemakaian APD (Alat Pelindung • Affirmation of the use of PPE (Personal Protective
Diri) Helm, Sepatu, Rompi. Equipment) Helmet, Shoes, Vest.
• Lokasi kerja yang memang sudah aman. • Work locations that are already safe.
• Mengikuti himbauan/ instruksi K3 dari mainkont. • Follow K3 instructions / instructions from maincon.
• Pemakaian alat dan material sesuai fungsi dan • Use of tools and materials according to their functions
kegunaannya. and uses.

9
8. LAMPIRAN/ ATTACHMENT

8.1 Brosure Material Aluminium Composite Panel

10
8.2 Brosure Material Aluminium Louvre

11
9. STRUKTUR ORGANISASI

12