1. RCC (1:1½:3) - 100 Cubic feet

 Cement: 22.40 Bag


 Sand: 42.0 Cubic feet
 3/4“ chips: 84.0 Cubic feet

2. RCC (1:2:4) - 100 Cubic feet

 Cement: 17.50 Bag


 Sand: 44.0 Cubic feet
 3/4“ chips: 88.0 Cubic feet

3. 3” thick brick wall (1:4) - 100 Square feet

 Cement: 1.50 Bag


 Sand: 10.0 Cubic feet
 Brick: 300.0 nos.

4. 5” thick brick wall (1:4) - 100 Square feet

 Cement: 2.0 Bag


 Sand: 11.0 Cubic feet
 Brick: 500.0 nos.

5. 6½” thick brick wall (1:4) - 100 Square feet

 Cement: 2.50 Bag


 Sand: 13.0 Cubic feet
 Brick: 650.0 nos.

2
www.acivilengineer.com
Estimating Cheat Sheet for Building Construction

6. 10” thick brick wall (1:6) - 100 Square feet

 Cement: 4.0 Bag


 Sand: 33.0 Cubic feet
 Brick: 1150.0 nos.

7. Brick flat soling - 100 Square feet

 Sand: 5.0 Cubic feet


 Brick: 300.0 nos.

8. ½” thick Plaster work (1:4) - 100 Square feet

 Cement: 1.0 Bag


 Sand: 5.0 Cubic feet

9. ½” thick Plaster work (1:6) - 100 Square feet

 Cement: 0.75 Bag


 Sand: 6.0 Cubic feet

10. ½” thick Plaster work with NCF (1:4) - 100 Square feet

 Cement: 1.50 Bag


 Sand: 5.0 Cubic feet

11. ¾” thick Plaster work (1:4) - 100 Square feet

 Cement: 1.50 Bag


 Sand: 8.0 Cubic feet

12. ¾” thick Plaster work (1:6) - 100 Square feet

 Cement: 1.0 Bag


 Sand: 8.0 Cubic feet

3
www.acivilengineer.com
Estimating Cheat Sheet for Building Construction

13. ¾” thick Plaster work with NCF (1:6) - 100 Square feet

 Cement: 1.50 Bag


 Sand: 8.0 Cubic feet

14. Door frame fitting – 100 nos


 Cement: 12.0 Bag
 Sand: 30.0 Cubic feet
 Pai chips: 60.0 Cubic feet

15. Cat door frame fitting – 100 nos


 Cement: 1.0 Bag
 Sand: 3.12 Cubic feet
 Pai chips: 6.50 Cubic feet

16. Window grill fitting – 100 sft


 Cement: 0.57 Bag
 Sand: 3.12 Cubic feet
 chips: 2.80 Cubic feet

17. Cement concrete below 3” thick (1:3:6) – 100 SFT


 Cement: 3.0 Bag
 Sand: 11.25 Cubic feet
 Chips: 22.50 Cubic feet

18. Cement concrete below 3” thick (1:2:4) – 100 SFT


 Cement: 4.40 Bag
 Sand: 12.0 Cubic feet
 Chips: 22.50 Cubic feet

19. Cement concrete above 3” thick (1:3:6) – 100 CFT


 Cement: 12.0 Bag
 Sand: 45.0 Cubic feet
 Chips: 90.0 Cubic feet

4
www.acivilengineer.com
Estimating Cheat Sheet for Building Construction

20. Cement concrete above 3” thick (1:2:4) – 100 CFT


 Cement: 17.50 Bag
 Sand: 45.0 Cubic feet
 Chips: 90.0 Cubic feet

21. ½ Patent stone (1:2:4) – 100 SFT


 Cement: 2.25 Bag
 Sand: 6.0 Cubic feet
 Chips: 12.0 Cubic feet

22. ½ Patent stone with NCF* (1:2:4) – 100 SFT


 Cement: 2.70 Bag
 Sand: 6.0 Cubic feet
 Chips: 12.0 Cubic feet

23. 6” hole cutting and fixing – 100 Nos


 Cement: 1.41 Bag
 Sand: 4.0 Cubic feet
 Chips: 12.0 Cubic feet

24. inspection pit (2’ x 2’) – 1 Nos


 Cement: 2.25 Bag
 Sand: 17.0 Cubic feet
 Chips: 8.0 Cubic feet
 Brick: 292 nos

25. inspection pit (2’ x 3’) – 1 Nos


 Cement: 2.70 Bag
 Sand: 17.0 Cubic feet
 Chips: 8.0 Cubic feet
 Brick: 292 nos

5
www.acivilengineer.com
Estimating Cheat Sheet for Building Construction

26. inspection pit (3’ x 3’) – 1 Nos


 Cement: 2.70 Bag
 Sand: 21.0 Cubic feet
 Chips: 10.0 Cubic feet
 Brick: 350 nos

27. Inspection pit (4’ x 4’) – 1 Nos


 Cement: 3.60 Bag
 Sand: 28.0 Cubic feet
 Chips: 13.0 Cubic feet
 Brick: 465 nos

28. Ponding work for slab curing (2” x 2”) – 100 RFT*
 Cement: 0.30 Bag
 Sand: 4.0 Cubic feet

29. Repairing work (1:3) – 100 SFT*


 Cement: 4. 0 Bag
 Sand: 15.0 Cubic feet

30. 1½” thick damp proof course – 100 SFT*


 Cement: 2.75 Bag
 Sand: 5.25 Cubic feet
 Chips: 10.50 Cubic feet

31. Sand filling – 1000 CFT*


 Sand: 1250 Cubic feet

32. Potty making in sunshade – 100 RFT*


 Cement: 3.0 Bag
 Sand: 15.0 Cubic feet

6
www.acivilengineer.com
Estimating Cheat Sheet for Building Construction

33. Steel sink fitting in kitchen – 1 nos


 Cement: 0.20 Bag
 Sand: 0.75 Cubic feet

34. Long pan fitting in toilet – 1 nos


 Cement: 0.20 Bag
 Sand: 0.75 Cubic feet
 Chips: 1.50 cubic feet

35. Bath tub fitting– 1 nos


 Cement: 0. 75 Bag
 Sand: 5.0 Cubic feet
 Chips: 3. 0 cubic feet
 Brick: 70.0 nos

36. Shower tray fitting– 1 nos


 Cement: 0. 75 Bag
 Sand: 1.0 Cubic feet
 Brick: 9.0 nos

***Note***

RFT – Running Feet


Nos – Numbers
CFT – Cubic Feet
SFT – Square Feet