Vous êtes sur la page 1sur 6
PROJECT 4: A PROPOSED ONE STOREY RESTO PLAZA Statement of the Problem: ‘A four thousand five hundred (4,500) square meters lot wil be the site for a proposed Resto Plaza. A business woman will be the owner of the proposed project. She wants the project to have 8 — units Each unit wil have an area of 12.5% of the AMBF with the longest dimension stretches to 22 - meters. A terrace will be located in the front of every unit wih an area of thity-seven (37) square meters with least dimension of 4-meters. Each unit will be provided with a comfort room with an area of 20 square meters. Project Site Features: The site is located on a commercial zone area (C-2). The property is a regular inside fot with the shorter side of the lot stretches up to 50-meters in length and is adjacent to a 14-meters wide RROW. The front setback of 20-meters will be provided for parking areas with a 4-meters driveway. Rear and side setbacks of &-meters will be enough for an easy access of the delivery trucks for each rentable units. It will also serves as driveway. The lot uniformly slopes at 1.75% towards the road. The front portion of the lot is facing north. Design Objectives: a. To planidesign the project on a C-2 zoned property. b. To design and maximize space as accordance to the client's needs. Page | 26 g 175% SLOPE ————— ss0000mm 000mm, 22000mm 20000mm z °° a 1 Ios 3 é | 28 <4 8 S32 8 o8 1 AMB 13 se 1 = 628 SOM 1 2 Pa - ae 3 5S : os 1 13 cad i) 1 < g 1 1 1 ' = ow 2025 fam 1 1 1 1 22000mm sonm],——_22000mm 20000 0000 | Page | 27 175% SLOPE 08 UOIDAS ‘EIA TIGL NO Gasva NOVELS LO1-8 “SId 7 0000mm 43000 MONE 3GIM SUBLAIN - PT 3,698 SQ.M. AMBF DUCE WUIDEOOS Page | 28 PROJECT 4: Questions 61-80 61 62 63, 64, 65. 66. 67, 68. 69, Given that the sidewalk is considered as elevation 0.00 meters, how much is the elevation difference from the sidewak to the rear tip of the property? a. 0.85 meters ©. 0.90 meters b. 0.875 meters d, 0, 935 meters Based on the given data, given that the floor area of each unit needs to be tiled. Compute for the number of 600 mm x 600 mm tis to be installed minus the toilet and the terrace floor area, a, 405-410 pieces ©, 570-575 pieces b. 410-415 pieces d. 500-565 pieces What is the minimum setback for the project given the type of commercial use/occupancy, based on table VIIL.3, section 804 on Rule 7 and 8? a. 5m front, 2m sides, 2m rear 4.5m front, 2m sides, 2m rear b. 5m front, 3m sides, 3m rear 6m front, 3m sides, 3m rear Referring on table VIIL3, section 804 of rule 7 and 8, how much is the AMBF of the project? a. 3,698 sq.m. ©. 4,245 sqm b. 1,628 sq.m. 4. 1,887 sqm Based on the given data ofthe project, how much is the AMBF? a. 3,698 sqm ©, 4,245 sqm b. 1,628 sq.m. 4, 1,887 sqm, Based on the given data ofthe project, how much is the percentage of site occupancy? a 36.17% ©. 36.00% b. 40.00% d. 75.00% Based on the given data, given that the toilets floor area needs to be tiled. Compute the range of the number of 300 mm x 300 mm tles to be installed. a, 220-225 pieces ©. 1,775 -1,780 pieces b. 225-230 pieces 4, 1,780-1,785 pieces The terrace needs to be elevated at approximately 150 mm above grade which resulted fo a 150 mm thick slab on ground. How much volume of concrete is needed for each terrace? Given if it requires 18 kilograms of rebars per cubic meters of concrete, how many kilograms of rebars are needed? a, 95 - 100 kilograms ©, 770-780 kilograms b, 100-105 kilograms 4, 780-785 kilograms Based on the acquired building footprint basedigiven on table VII.3, section 804 of rule 7 and 8 setback of the project, if the drainage is aligned to the exterior walls of the structure, how much is the approximate length of open drain canal of the house with a drain line connecting to the front of the lot? Page | 29 70. m1. 72, 73, 74, 75. 76. 77. a, 260~ 265 meters c, 192~195 meters b. 250~ 260 meters d, 197-200 meters Based on the given data, a 1.20 x 2.40 meters ceiling board is to be installed to the ceiling of each unit. How many pieces are needed in range? a. 70-75 pieces ©, 565-570 pieces b, 75-80 pieces 4, 560-565 pieces Based on the acquired building footprint basedigiven on table VIll.2, section 804 of rule 7 and 8, if the walls ofthe structure are aligned on all its sides, how many 1.20 x 2.40 meters ceiling board is to be used if the 1.20-meter roof eaves on all sides will have ceiling? a. 316-318 pieces ©. 317-320 pieces b. 315-317 pieces 4, 320-323 pieces Based on the given data, i the front portion ofthe lot is considered as parking area with a 3 meter wide driveway. Compute forthe number of parking slots a. 115 slots ©. 122slots b. 120slots 4, 125 slots Based on the acquired building footprint basedigiven on table VIIL.3, section 804 of rule 7 and 8, if the walls of the structure are aligned on all its sides, how much in range is the length of the gutter if the roof on the last floor has 1.20-meter roof eaves all around the structure? a, 273-275 meters ©, 268 - 270 meters b, 265-268 meters 4, 270-272 meters Based on the given data of the project, how much is the Maximum Allowable Construction Area (aca)? a 85.87% ©. 60.00% b. 95.00% d. 59.99% Whatis the main topic of rule Vill of Rule 7 and 8? a. Light and Ventilation b. Building Permit Occupancy c. Classification & General Requirements forall Buildings by use of Occupancy d. General Lighting & Artificial Vent What is the main topic of rule VII of Rule 7 and 8? a. Light and Ventilation b. Building Permit Occupancy ¢, Classification & General Requirements for all Buildings by use of Occupancy d. General Lighting & Artficial Vent What is the common term for shallow channel of metal or wood set immediately below and along the eaves of a building fo catch and carry off rainwater? a. Fascia ¢. Plumbing Drain b, Gutter 4, Corbel Page | 30 78. 78, 80. What is the tree that is shallow rooted and is hazardous to plant near the structure? c, Traveler's Tree a, Coconut Tree b. Palm Tree Given the proposed project, slope and orientation, where should ‘Excavation’ for start? Rear part of the building opposite to the road b. Side of the lot ©. Near the road side d Answer not among the choices Given the proposed project, slope and orientation, where should ‘Excavation’ for Basement level start? a. Inthe perimeter walls of each sides b. After establishing the yards required ¢, Righton the property line ofthe lot d. Setback provisions from O.F.B. PROJECT 4 ~ ANSWER KEY 61 62, 63, 64, 66. 66. 67. Orroroo 68. 69, 70, m1 72, 73, 74, cocemaam 75. 76, 71. 78, 79, 80, wr>wo> Page | 31

Vous aimerez peut-être aussi