SITC of 1 MW (2x500 KW) Solar Power Plant at HBCH&RC Mullanpur, Mohali, Punjab
Client: TATA Memorial Centre

PART – B

CHAPTER1 – DETAILED SCOPE OF WORK

Introduction.

The Grid Interactive 1 MW Photo Voltaic Solar Power Plant is to be installed on Car Port Structure
consists of mainly three major components viz. the solar photovoltaic (SPV) modules,
galvanized array mounting MS structure and the solar inverter or power conditioning unit.
The SPV array converts the solar energy into DC electrical energy. The array mounting
structure holds the PV modules in required position and the DC electrical energy is
converted to AC power by the inverter or PCU, which is connected to the utility power grid.
The AC power output of the inverter is fed to the grid panel through isolator & metering
panel. The 415 V, 3-ph AC output of the system shall be synchronized with the Grid and the
power can be exported to the grid depending upon solar power generation and local
consumption. Built in MPPT’s in the inverter maximize the power extracted from modules.
Location details

This proposal is for setting up of 1000KWp (2 set of 500 KWp) total capacity grid interactive
solar photovoltaic power plant on the Car Port Structure of the various configuration at
HBCH&RC, Mullanpur, Mohali, Punjab.
Site conditions

 Height from Sea level :321 meter


 Installation : On Car Port Structure
 Site climatic condition : The climate is classified as warm and temperate.
In winter, there is much more rainfall than in
summer. The climate is considered to be Csa
according to the Köppen
Geiger climate classification. The average annual
temperature is 24.1 °C. In a year, the average
rainfall is 940 mm.(Bidder to confirm)
 Ambient Air Temperature:
a) Maximum 46 °C
b) Minimum 2 °C
c) Maximum relative humidity 33.2 °C

Detailed Scope of Work

The scope of work is "Design, Supply, Installation, Testing and Commissioning of Grid
connected Car roof top Solar Photovoltaic Cell of 1000 KWp (in 02 phases of 500 KWp
each) capacity in Car parks area at Homi Bhabha Cancer Hospital & Research Centre,
Plot No. 01, Medicity, Village Mullanpur, Distt. Mohali, (Punjab).

1. The systems shall be complete with PV modules, inverter, metering, array junction
boxs, LT/HT Panel and interconnecting cabling (AC & DC both), communication interfaces,
protection, monitoring and any other equipment necessary for safe and efficient operation of
the solar plant.

Page 8 of 40
Volume II
SITC of 1 MW (2x500 KW) Solar Power Plant at HBCH&RC Mullanpur, Mohali, Punjab
Client: TATA Memorial Centre

2. The work shall also include interconnection of solar plant with the Grid and DG. Any
other work which may include modification of existing panel, switchgear is also in the scope
of bidder.

3. The civil works includes built up of solar control room etc. works for installation,
commissioning of complete system is also be in scope of supplier/bidder. The electrical
wiring works including adequate LED light fixtures & power receptacles etc electrical works
for installation of complete system for car port area shall also be in the scope of
supplier/bidder.

4. The solar control room should be provided with adequate split type energy efficient
air conditioning system for heat dissipation and adequate furniture for plant staff/ operator.

5. Support structural works for installation of solar modules, inverters, combiner boxes
etc.is also in scope of bidder.

6. The scope of work shall also include comprehensive operation and maintenance of
the solar power plant for five years from the date of commissioning (detailed mentioned in
chapter 3).

7. The scope of work shall also include essential spares necessary for operation,
routine maintenance, breakdown maintenance and testing of equipment supplied for 5 years.
8. Outdoor Junction Boxes, Solar Inverters, SPD, Solar Panel, Bidirectional Energy
Meter, ACDB's, Earthing Pits for Solar Inverters, Outdoor Junction Box etc. is also in scope
of bidder.
9. A suitable number of series string shall be connected in parallel to formulate a series
- parallel array. The PV string & array shall be designed to match the Inverter input
specification.
10. Solar PV module minimum rated power shall be 330Wp.

11. SITC of EV Ports charging station at car parking area (Delta make) Bharat Charger
DC-001-15 KW & DC Wall box 25Kw of one each is also in scope of bidder.
12. SITC of Lightning Arrester system, Earthing System, Weather Monitoring System,
Plant Monitoring System shall also be considered as a part of solar system.
13. Energy yield analysis report to be submitted.
14. Cyclonic wind speed & seismic zone to be considered while designing the system.
15. The guaranteed Energy Generation analysis report shall be submitted.
16. The LT Cables from LT Panel to Solar Panel-1 & Solar Panel-2 shall be provided as
per load requirement and the voltage drop calculation shall be considered as per relevant
standard / CPWD / NBC-2016.
17. Solar Grid controller shall be compatible with existing DG Set Controller at Main LT
Panel for smooth run of Solar System during power failure condition.
18. Performance Ratio, Capacity Utilization Factor & LCOE (Levelized Cost of Electricity)
are important factors to evaluate the photovoltaic power plant performance in all
respects for determining the feasibility to be specified and submitted while designing the
system.
19. PV-SYST simulation Report to be submitted.

Page 9 of 40
Volume II
SITC of 1 MW (2x500 KW) Solar Power Plant at HBCH&RC Mullanpur, Mohali, Punjab
Client: TATA Memorial Centre

20. SITC Fire-fighting system shall be considered as per NFPA/ NBC norms and is also
in the scope of bidder.
21. Net metering policy for energy to be adopted. Adequate number of Bi-directional
energy meter for net metering, energy meter at injection point are also under the scope of
bidder. Energy Meters Shall be microprocessor based conforming to IEC 60687 /IEC 62052-
11/IEC 62053-22 / IS 14697.
22. The solar plant work to be executed in two phases of 500 KWp each.