LIST OF CONTENT
1 PURPOSE 1
1.1 SCOPE 1
1.2 LANGUAGE 1
1.3 UNITS OF MEASUREMENT 1
2 INPUT DATA 1
2.1 MATERIAL PROPERTIES AND STRENGHTS 1
2.1.1 Structural Steel 1
2.2 DESIGN CONDITION 2
2.2.1 Local Condition 2
2.2.2 Design Condition 2
3 REFERENCE AND STANDARDS 4
3.1 DESIGN 4
3.2 MATERIAL CODES AND STANDARDS 4
4 CALCULATION 5
4.1 STRUCTURAL DESIGN CONCEPT 5
4.1.1 General 5
4.1.2 Outline of PRODUCTION BUILDING 5
4.2 STRUCTURAL MODELING CONCEPT 6
4.2.1 Modeling 9
4.2.2 Three-Dimensional View 9
4.2.3 Frame Numbers 10
4.3 METHOD OF ANALYSIS 8
4.4 ANALYSIS SOFTWARE 8
i
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
4.8.1 General 14
4.8.2 Check of Member Stress Ratio 14
4.8.3 Check of Displacement 24
LIST OF TABLE
Table 1 S t r e s s r a t i o 14
Table 2 Global displacement 24
LIST OF FIGURE
ii
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
1. PURPOSE
1.1. SCOPE
This document covers as Calculation Sheet of P r o d u c t i o n b u i l d i n g o f 5 t h t r a i n e x p a n s i o n
p r o j e c t o f P T . PT. DIACHEMS RESINS INDONESIA
1.2. LANGUAGE
All drawings, calculations and documents shall be written in English.
2. INPUT DATA
A36, or equivalent
B Bolts
1
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
1. Site Location
The site is located at BALARAJA - INDONESIA
SS=0.730g and mapped MCER spectral response acceleration at 1-second period shall be S1= 0.319g from
Figure 9 and Figure 10 of SNI 1726-2012respectively.
2
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
3
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
4
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
4. CALCULATION
4.1.1 General
The structural of Production Building consist of Steel Frame for the superstructure.The Longitudinal and Transverse
Frames are Ordinary Moment Framing (OMF) System.
5
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
6
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
7
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
8
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
Self-weight of dead load will be calculated by software. The unit weights of materials and
construction are:
3
Steel structure : 7850 kg/m
9
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
10
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
SS=0.730g and mapped MCER spectral response acceleration at 1-second period shall be S1= 0.319g from
Figure 9 and Figure 10 of SNI 1726-2012respectively.
Seismic load applied on direction as :
Seismic on + X direction : X = +1 and Y = -0.3
Seismic on + Y direction : Y = +100 % and X = -0.3
Seismic on - X direction : X = -1 and Y = -0,3
Seismic on - Y direction : Y = -1 and X = - 0.3
11
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
12
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
Fig 4.9 Plot of seismic load X+ Fig 4.10 Plot of seismic load Y+
Fig 4.9 Plot of seismic load X- Fig 4.10 Plot of seismic load Y-
13
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
4.8.1 General
After getting the stresses for each structure element induced by various loads. the most critical stress
resulting from the load combinations shall be used for the design for each member of the structure in
accordance with the relevant codes.
Structural members stress ratio is shown on figure below to assure the structure able to bearing load
combination. the steel stress ratio should be less than 0.75
14
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
15
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
-
O 0.19 0.0 126 167 151 101 101
A36 25310.5 9 0 1.03 0 1 1 1
K 2 67 55 05 86 24 24
83
WF WF
250x125x6 250x125x6
O 288 627
139 2 0 /9, H /9, H 6 1.5 1.5 1.5 1.5 1 1 0 0 0
K 6 .58
250x125x6 250x125x6
/9 /9
-
O 0.17 0.0 126 167 151 101 101
A36 25310.5 6 0 0.93 0 1 1 1
K 3 62 55 05 86 24 24
51
WF WF
250x125x6 250x125x6
O 439 820
140 2 0 /9, H /9, H 10 1.5 1.5 1.5 1.5 1 1 0 0 0
K 9.5 .43
250x125x6 250x125x6
/9 /9
O 0.26 0.0 1.42 126 167 151 101 101
A36 25310.5 10 0 0 1 1 1
K 3 83 545 55 05 86 24 24
O WF600x40 WF600x40 0. 954 261 100 409 863
141 4 0 9 4.5 4.5 4.5 4.5 1
K 0x13x20 0x13x20 85 .93 8.8 23 .88 .98
- -
O 0.75 0.0 11.7 0. 130 167 189 101 101
A36 25310.5 9 25.9 15.2 1 1
K 8 85 77 85 01 05 83 24 24
45 72
O WF600x40 WF600x40 0. 633 226 685 268 861
142 4 0 6 4.5 4.5 4.5 4.5 1
K 0x13x20 0x13x20 85 .67 4.6 1.1 .66 .42
-
O 0.54 0.0 13.2 8.05 0. 130 167 189 101 101
A36 25310.5 6 17.2 1 1
K 5 85 069 043 85 01 05 83 24 24
16
O WF600x40 WF600x40 0. 159 114 999 342 481
143 4 0 6 5.5 5.5 5.5 5.5 1
K 0x13x20 0x13x20 85 1.1 .67 7.1 .31 .95
- -
O 0.66 0.0 0.66 0. 123 151 189 101 101
A36 25310.5 6 43.2 11.7 1 1
K 3 48 873 85 12 86 83 24 24
29 47
H H
O 924 360
144 11 0 588x300x1 588x300x1 4 1.5 1.5 1.5 1.5 1 1 0 0 0
K 3.9 7.4
2/20 2/20
O 0.55 0.3 37.1 126 167 151 101 101
A36 25310.5 4 0 0 1 1 1
K 3 56 014 55 05 86 24 24
H H
O 629 222
145 11 0 588x300x1 588x300x1 4 2.3 2.3 2.3 2.3 1 1 0 0 0
K 7.6 0.8
2/20 2/20
O 0.37 0.2 25.2 126 167 151 101 101
A36 25310.5 4 0 0 1 1 1
K 7 19 759 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 334 753
146 2 0 /9, H /9, H 4 2.25 2.25 2.25 2.25 1 1 0 0 0
K 9.4 .16
250x125x6 250x125x6
/9 /9
O 0.22 0.0 1.08 126 151 151 101 101
A36 25310.5 4 0 0 1 1 1
K 1 74 521 55 86 86 24 24
O WF600x40 WF600x40 0. 209 116 111 424 487
147 4 0 6 5.5 5.5 5.5 5.5 1
K 0x13x20 0x13x20 85 4.1 8.9 20 .13 .78
- -
O 0.80 0.0 6.81 0. 123 151 189 101 101
A36 25310.5 6 56.8 13.0 1 1
K 1 48 696 85 12 86 83 24 24
94 67
WF WF
250x125x6 250x125x6
O 386 741
148 2 0 /9, H /9, H 4 2.25 2.25 2.25 2.25 1 1 0 0 0
K 6.2 .19
250x125x6 250x125x6
/9 /9
O 0.25 0.0 1.25 126 151 151 101 101
A36 25310.5 4 0 0 1 1 1
K 5 73 265 55 86 86 24 24
H H
O 876 229
149 10 0 600x200x1 600x200x1 5 1.2 1.2 1.2 1.2 1 1 0 0 0
K 7.5 3.9
1/17 1/17
16
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
-
O 0.52 0.2 126 167 151 101 101
A36 25310.5 5 0 22.6 0 1 1 1
K 5 27 55 05 86 24 24
79
H H
O 329 195
150 11 0 588x300x1 588x300x1 1 1.4 1.4 1.4 1.4 1 1 0 0 0
K 1 5
2/20 2/20
O 0.19 0.2 13.2 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 9 05 087 55 05 86 24 24
H H
O 618 131
151 10 0 600x200x1 600x200x1 2 1.4 1.4 1.4 1.4 1 1 0 0 0
K 2.8 6
1/17 1/17
-
O 0.1 126 167 151 101 101
0.37 A36 25310.5 2 0 15.9 0 1 1 1
K 3 55 05 86 24 24
93
H H
O 307 113
152 10 0 600x200x1 600x200x1 2 1 1 1 1 1 1 0 0 0
K 6.5 1.2
1/17 1/17
-
O 0.18 0.1 126 167 151 101 101
A36 25310.5 2 0 7.95 0 1 1 1
K 4 12 55 05 86 24 24
8
WF WF
250x125x6 250x125x6
O 594 155
177 2 0 /9, H /9, H 1 2.25 2.25 2.25 2.25 1 1 0 0 0
K 3.6 8.8
250x125x6 250x125x6
/9 /9
O 0.39 0.1 1.92 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 54 574 55 86 86 24 24
WF WF
250x125x6 250x125x6
O 678 173
178 2 0 /9, H /9, H 1 2.25 2.25 2.25 2.25 1 1 0 0 0
K 3.3 4.5
250x125x6 250x125x6
/9 /9
O 0.44 0.1 2.19 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 71 779 55 86 86 24 24
WF WF
250x125x6 250x125x6
O 598 163
179 2 0 /9, H /9, H 1 2.25 2.25 2.25 2.25 1 1 0 0 0
K 5.4 4.2
250x125x6 250x125x6
/9 /9
O 0.39 0.1 1.93 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 61 926 55 86 86 24 24
WF WF
250x125x6 250x125x6
O 319 883
180 2 0 /9, H /9, H 8 1.5 1.5 1.5 1.5 1 1 0 0 0
K 2.9 .06
250x125x6 250x125x6
/9 /9
-
O 0.19 0.0 126 167 151 101 101
A36 25310.5 8 0 1.03 0 1 1 1
K 1 87 55 05 86 24 24
45
WF WF
300x150x6. 300x150x6.
O 277 719
181 3 0 5/9, H 5/9, H 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K 7.6 .54
300x150x6. 300x150x6.
5/9 5/9
O 0.16 0.1 1.33 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 18 509 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 145 323
182 2 0 /9, H /9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 4.3 .33
250x125x6 250x125x6
/9 /9
O 0.08 0.0 0.47 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 6 121 55 05 86 24 24
17
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
H H
O 703 216
183 10 0 600x200x1 600x200x1 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K 0.2 9.8
1/17 1/17
O 0.42 0.2 18.1 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 34 848 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 423 105
184 2 0 /9, H /9, H 12 1.5 1.5 1.5 1.5 1 1 0 0 0
K 0.3 4.1
250x125x6 250x125x6
/9 /9
-
O 0.25 0.1 126 167 151 101 101
A36 25310.5 12 0 1.37 0 1 1 1
K 3 04 55 05 86 24 24
06
H H
O 668 187
185 10 0 600x200x1 600x200x1 1 1.4 1.4 1.4 1.4 1 1 0 0 0
K 1.4 8.1
1/17 1/17
O 0.2 17.2 126 167 151 101 101
0.4 A36 25310.5 1 0 0 1 1 1
K 09 825 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 191 214
186 2 0 /9, H /9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 6.4 .92
250x125x6 250x125x6
/9 /9
-
O 0.11 0.0 126 167 151 101 101
A36 25310.5 1 0 0.62 0 1 1 1
K 5 85 55 05 86 24 24
09
WF WF
250x125x6 250x125x6
O 125 45.
187 2 0 /9, H /9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 5.7 039
250x125x6 250x125x6
/9 /9
-
O 0.07 0.0 126 167 151 101 101
A36 25310.5 1 0 0.40 0 1 1 1
K 5 54 55 05 86 24 24
68
H H
O 508 691
188 11 0 588x300x1 588x300x1 1 3 3 3 3 1 1 0 0 0
K 5.5 .32
2/20 2/20
-
O 0.30 0.0 126 167 151 101 101
A36 25310.5 1 0 20.4 0 1 1 1
K 4 92 55 05 86 24 24
11
H H
O 508 188
189 11 0 588x300x1 588x300x1 1 1.05 1.05 1.05 1.05 1 1 0 0 0
K 6 0
2/20 2/20
-
O 0.30 0.1 126 167 151 101 101
A36 25310.5 1 0 20.4 0 1 1 1
K 4 93 55 05 86 24 24
13
H H
O 687 247
190 11 0 588x300x1 588x300x1 8 1.95 1.95 1.95 1.95 1 1 0 0 0
K 1.4 6.7
2/20 2/20
O 0.41 0.2 27.5 126 167 151 101 101
A36 25310.5 8 0 0 1 1 1
K 1 45 789 55 05 86 24 24
H H
O 479 126
191 10 0 600x200x1 600x200x1 9 1.7 1.7 1.7 1.7 1 1 0 0 0
K 2.4 0
1/17 1/17
O 0.28 0.1 12.3 126 167 151 101 101
A36 25310.5 9 0 0 1 1 1
K 7 5 963 55 05 86 24 24
H H
O 545 134
192 10 0 600x200x1 600x200x1 5 1.3 1.3 1.3 1.3 1 1 0 0 0
K 5.7 7
1/17 1/17
O 0.32 0.1 14.1 126 167 151 101 101
A36 25310.5 5 0 0 1 1 1
K 7 48 122 55 05 86 24 24
H H
O 891 237
193 10 0 600x200x1 600x200x1 9 1.2 1.2 1.2 1.2 1 1 0 0 0
K 5.8 2.1
1/17 1/17
18
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
-
O 0.53 0.2 126 167 151 101 101
A36 25310.5 9 0 23.0 0 1 1 1
K 4 34 55 05 86 24 24
62
WF WF
300x150x6. 300x150x6.
O 537 108
194 3 0 5/9, H 5/9, H 1 1.3 1.3 1.3 1.3 1 1 0 0 0
K 3.5 .79
300x150x6. 300x150x6.
5/9 5/9
O 0.32 0.0 2.58 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 53 286 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 413 586
195 3 0 5/9, H 5/9, H 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K 1.8 .07
300x150x6. 300x150x6.
5/9 5/9
O 0.24 0.1 1.98 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 12 602 55 05 86 24 24
H H
O 907 293
196 11 0 588x300x1 588x300x1 8 1.95 1.95 1.95 1.95 1 1 0 0 0
K 2.1 2.2
2/20 2/20
O 0.54 0.2 36.4 126 167 151 101 101
A36 25310.5 8 0 0 1 1 1
K 3 9 118 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 679 211
197 2 0 /9, H /9, H 1 1.95 1.95 1.95 1.95 1 1 0 0 0
K 9.7 1
250x125x6 250x125x6
/9 /9
O 0.44 0.2 2.20 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 09 309 55 86 86 24 24
WF WF
250x125x6 250x125x6
O 596 183
198 2 0 /9, H /9, H 1 1.95 1.95 1.95 1.95 1 1 0 0 0
K 2.2 5.3
250x125x6 250x125x6
/9 /9
O 0.39 0.1 1.93 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 81 176 55 86 86 24 24
H H
O 102 335
199 10 0 600x200x1 600x200x1 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 42 .79
1/17 1/17
O 0.61 0.0 26.4 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 36 934 55 05 86 24 24
H H
O 715 145
200 10 0 600x200x1 600x200x1 1 0.2 0.2 0.2 0.2 1 1 0 0 0
K 2.5 6
1/17 1/17
O 0.42 0.1 18.5 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 45 012 55 05 86 24 24
H H
O 553 190
201 11 0 588x300x1 588x300x1 1 1.05 1.05 1.05 1.05 1 1 0 0 0
K 9.1 2.2
2/20 2/20
-
O 0.33 126 167 151 101 101
0.2 A36 25310.5 1 0 22.2 0 1 1 1
K 2 55 05 86 24 24
32
WF WF
250x125x6 250x125x6
O 443 613
202 2 0 /9, H /9, H 1 1.05 1.05 1.05 1.05 1 1 0 0 0
K 6.6 .57
250x125x6 250x125x6
/9 /9
-
O 0.26 0.1 126 167 151 101 101
A36 25310.5 1 0 1.43 0 1 1 1
K 6 14 55 05 86 24 24
74
WF WF
250x125x6 250x125x6
O 332
203 2 0 /9, H /9, H 1 1.05 1.05 1.05 1.05 1 1 0 0 0 391
K 1.8
250x125x6 250x125x6
/9 /9
19
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
-
O 0.19 0.0 126 167 151 101 101
A36 25310.5 1 0 1.07 0 1 1 1
K 9 92 55 05 86 24 24
63
H H
O 908 163
204 10 0 600x200x1 600x200x1 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 8.2 .65
1/17 1/17
O 0.54 0.0 23.5 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 19 082 55 05 86 24 24
H H
O 656 126
205 10 0 600x200x1 600x200x1 1 0.2 0.2 0.2 0.2 1 1 0 0 0
K 1.1 6.5
1/17 1/17
O 0.39 0.1 16.9 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 26 713 55 05 86 24 24
H H
O 554 778
206 11 0 588x300x1 588x300x1 1 3 3 3 3 1 1 0 0 0
K 0 .9
2/20 2/20
-
O 0.33 0.1 126 167 151 101 101
A36 25310.5 1 0 22.2 0 1 1 1
K 2 31 55 05 86 24 24
35
H H
O 635 121
209 10 0 600x200x1 600x200x1 6 1.2 1.2 1.2 1.2 1 1 0 0 0
K 9.5 2.5
1/17 1/17
-
O 0.38 0.1 126 167 151 101 101
A36 25310.5 6 0 16.4 0 1 1 1
K 1 2 55 05 86 24 24
5
H H
O 345 100
210 10 0 600x200x1 600x200x1 2 1.3 1.3 1.3 1.3 1 1 0 0 0
K 7.9 9.8
1/17 1/17
O 0.20 8.94 126 167 151 101 101
0.1 A36 25310.5 2 0 0 1 1 1
K 7 443 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 600 178
211 2 0 /9, H /9, H 1 1.95 1.95 1.95 1.95 1 1 0 0 0
K 1.8 4.8
250x125x6 250x125x6
/9 /9
O 0.39 0.1 1.94 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 76 458 55 86 86 24 24
WF WF
250x125x6 250x125x6
O 265 322
212 2 0 /9, H /9, H 5 1.05 1.05 1.05 1.05 1 1 0 0 0
K 8.4 .51
250x125x6 250x125x6
/9 /9
-
O 0.15 0.0 126 167 151 101 101
A36 25310.5 5 0 0.86 0 1 1 1
K 9 74 55 05 86 24 24
13
WF WF
250x125x6 250x125x6
O 955 23.
213 2 0 /9, H /9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K .36 48
250x125x6 250x125x6
/9 /9
-
O 0.05 0.0 126 167 151 101 101
A36 25310.5 1 0 0.30 0 1 1 1
K 7 43 55 05 86 24 24
95
H H
O 231 816
214 10 0 600x200x1 600x200x1 6 0.9 0.9 0.9 0.9 1 1 0 0 0
K 0.5 .39
1/17 1/17
O 0.13 0.0 5.97 126 167 151 101 101
A36 25310.5 6 0 0 1 1 1
K 8 83 646 55 05 86 24 24
H H
O 910 722
215 10 0 600x200x1 600x200x1 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 9.5 .4
1/17 1/17
O 0.54 0.0 23.5 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 76 632 55 05 86 24 24
O WF WF 442 134
216 6 0 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 450x200x9 450x200x9 1.4 0.2
20
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
/14, H /14, H
450x200x9 450x200x9
/14 /14
-
O 0.26 0.1 126 167 151 101 101
A36 25310.5 1 0 6.58 0 1 1 1
K 5 55 55 05 86 24 24
3
WF WF
450x200x9 450x200x9
O 541 121
217 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 4.3 1.5
450x200x9 450x200x9
/14 /14
-
O 0.32 0.1 126 167 151 101 101
A36 25310.5 1 0 8.06 0 1 1 1
K 4 46 55 05 86 24 24
13
WF WF
250x125x6 250x125x6
O 714 166
218 2 0 /9, H /9, H 1 2.25 2.25 2.25 2.25 1 1 0 0 0
K 9.1 0.3
250x125x6 250x125x6
/9 /9
O 0.47 0.1 2.31 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 64 629 55 86 86 24 24
WF WF
250x125x6 250x125x6
O 355 11.
219 2 0 /9, H /9, H 1 2.25 2.25 2.25 2.25 1 1 0 0 0
K 8 658
250x125x6 250x125x6
/9 /9
-
O 0.23 0.1 126 151 151 101 101
A36 25310.5 1 0 1.15 0 1 1 1
K 4 09 55 86 86 24 24
28
WF WF
250x125x6 250x125x6
O 753 179
220 2 0 /9, H /9, H 1 2.25 2.25 2.25 2.25 1 1 0 0 0
K 3.1 7.1
250x125x6 250x125x6
/9 /9
O 0.49 0.1 2.44 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 78 073 55 86 86 24 24
H H
O 488 234
221 11 0 588x300x1 588x300x1 1 1 1 1 1 1 1 0 0 0
K 7.3 8.7
2/20 2/20
O 0.29 0.2 19.6 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 47 157 55 05 86 24 24
H H
O 605 163
222 11 0 588x300x1 588x300x1 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 3.5 4.4
2/20 2/20
-
O 0.36 0.1 126 167 151 101 101
A36 25310.5 1 0 24.2 0 1 1 1
K 2 75 55 05 86 24 24
96
WF WF
450x200x9 450x200x9
O 366 107
223 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 5.9 4.6
450x200x9 450x200x9
/14 /14
-
O 0.21 0.1 126 167 151 101 101
A36 25310.5 1 0 5.45 0 1 1 1
K 9 29 55 05 86 24 24
82
WF WF
450x200x9 450x200x9
O 388 112
224 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 8.9 5.8
450x200x9 450x200x9
/14 /14
-
O 0.23 0.1 126 167 151 101 101
A36 25310.5 1 0 5.79 0 1 1 1
K 3 38 55 05 86 24 24
02
21
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
H H
O 347 368
225 11 0 588x300x1 588x300x1 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 2.6 .69
2/20 2/20
O 0.20 0.0 13.9 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 51 374 55 05 86 24 24
H H
O 345 602
226 11 0 588x300x1 588x300x1 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 2.1 .38
2/20 2/20
O 0.20 0.0 13.8 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 75 554 55 05 86 24 24
H H
O 241 209
227 11 0 588x300x1 588x300x1 1 1 1 1 1 1 1 0 0 0
K 1.7 8
2/20 2/20
O 0.2 9.67 126 167 151 101 101
0.18 A36 25310.5 1 0 0 1 1 1
K 19 946 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 158 216
230 6 0 /14, H /14, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 5.8 9.9
450x200x9 450x200x9
/14 /14
O 0.09 0.2 2.36 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 14 102 55 05 86 24 24
H H
O 450 242
231 11 0 588x300x1 588x300x1 1 0.25 0.25 0.25 0.25 1 1 0 0 0
K 1.8 6.3
2/20 2/20
O 0.26 0.2 18.0 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 9 41 686 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 166 226
232 6 0 /14, H /14, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 6.8 6.5
450x200x9 450x200x9
/14 /14
O 0.2 2.48 126 167 151 101 101
0.1 A36 25310.5 1 0 0 1 1 1
K 24 163 55 05 86 24 24
H H
O 695 798
233 11 0 588x300x1 588x300x1 1 0.6 0.6 0.6 0.6 1 1 0 0 0
K 3.5 .11
2/20 2/20
O 0.41 0.0 27.9 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 86 084 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 291 888
234 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 3.9 .66
450x200x9 450x200x9
/14 /14
O 0.17 0.1 4.33 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 04 846 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 128 5.8
235 2 0 /9, H /9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 1.4 48
250x125x6 250x125x6
/9 /9
O 0.07 0.0 0.41 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 55 517 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 270 28.
236 3 0 5/9, H 5/9, H 1 1 1 1 1 1 1 0 0 0
K .64 817
300x150x6. 300x150x6.
5/9 5/9
O 0.01 0.0 0.13 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 22 009 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 572 521
237 3 0 5/9, H 5/9, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 3.8 .97
300x150x6. 300x150x6.
5/9 5/9
22
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
23
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
450x200x9 450x200x9
/14 /14
-
O 0.14 0.0 126 167 151 101 101
A36 25310.5 1 0 3.64 0 1 1 1
K 7 72 55 05 86 24 24
65
WF WF
300x150x6. 300x150x6.
O 201 441
250 3 0 5/9, H 5/9, H 1 1 1 1 1 1 1 0 0 0
K 9.8 .11
300x150x6. 300x150x6.
5/9 5/9
O 0.12 0.0 0.97 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 72 083 55 05 86 24 24
H H
O 627 150
256 11 0 588x300x1 588x300x1 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 4.9 8.1
2/20 2/20
-
O 0.37 0.1 126 167 151 101 101
A36 25310.5 1 0 25.1 0 1 1 1
K 6 79 55 05 86 24 24
85
H H
O 277 675
257 10 0 600x200x1 600x200x1 1 1 1 1 1 1 1 0 0 0
K 5.6 .09
1/17 1/17
O 0.16 0.0 7.17 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 72 966 55 05 86 24 24
H H
O 277 357
258 10 0 600x200x1 600x200x1 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K 6.1 .9
1/17 1/17
O 0.16 0.0 7.18 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 4 085 55 05 86 24 24
H H
O 310 107
259 10 0 600x200x1 600x200x1 6 1.25 1.25 1.25 1.25 1 1 0 0 0
K 4.6 7.7
1/17 1/17
-
O 0.18 0.1 126 167 151 101 101
A36 25310.5 6 0 8.03 0 1 1 1
K 6 06 55 05 86 24 24
06
H H
O 607 167
263 11 0 588x300x1 588x300x1 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 7 0.9
2/20 2/20
O 0.36 0.1 24.3 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 69 905 55 05 86 24 24
H H
O 522 202
264 11 0 588x300x1 588x300x1 8 2 2 2 2 1 1 0 0 0
K 3.1 3.5
2/20 2/20
O 0.31 20.9 126 167 151 101 101
0.2 A36 25310.5 8 0 0 1 1 1
K 3 633 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 399 760
265 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 5.8 .59
450x200x9 450x200x9
/14 /14
-
O 0.23 0.1 126 167 151 101 101
A36 25310.5 1 0 5.94 0 1 1 1
K 9 02 55 05 86 24 24
93
H H
O 715 258
266 11 0 588x300x1 588x300x1 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 4.2 .13
2/20 2/20
O 0.42 0.0 28.7 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 27 141 55 05 86 24 24
H H
O 523 166
267 11 0 588x300x1 588x300x1 1 0.25 0.25 0.25 0.25 1 1 0 0 0
K 5 0.4
2/20 2/20
O 0.31 0.1 21.0 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 66 113 55 05 86 24 24
WF WF
O 434 847
269 3 0 300x150x6. 300x150x6. 1 0.6 0.6 0.6 0.6 1 1 0 0 0
K 4.8 .07
5/9, H 5/9, H
24
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
300x150x6. 300x150x6.
5/9 5/9
O 0.0 2.08 126 167 151 101 101
0.26 A36 25310.5 1 0 0 1 1 1
K 98 839 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 270 90.
270 3 0 5/9, H 5/9, H 1 1 1 1 1 1 1 0 0 0
K 7.6 946
300x150x6. 300x150x6.
5/9 5/9
O 0.16 0.0 1.30 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 37 146 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 293 1.4
271 6 0 /14, H /14, H 1 0.8 0.8 0.8 0.8 1 1 0 0 0
K 8.2 114
450x200x9 450x200x9
/14 /14
O 0.17 0.0 4.37 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 04 464 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 291 889
272 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 5.7 .54
450x200x9 450x200x9
/14 /14
O 0.17 0.1 4.34 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 05 108 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 424 97.
273 6 0 /14, H /14, H 1 0.8 0.8 0.8 0.8 1 1 0 0 0
K 3.9 475
450x200x9 450x200x9
/14 /14
-
O 0.25 0.0 126 167 151 101 101
A36 25310.5 1 0 6.31 0 1 1 1
K 4 27 55 05 86 24 24
87
WF WF
450x200x9 450x200x9
O 424 785
274 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 1.6 .83
450x200x9 450x200x9
/14 /14
-
O 0.25 0.1 126 167 151 101 101
A36 25310.5 1 0 6.31 0 1 1 1
K 4 12 55 05 86 24 24
52
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 218 994
275 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 8.4 .8
400x200x8 400x200x8
/13 /13
O 0.13 0.1 2.59 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 06 327 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 401 100
276 6 0 /14, H /14, H 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 0.4 .38
450x200x9 450x200x9
/14 /14
-
O 0.0 126 167 151 101 101
0.24 A36 25310.5 1 0 5.97 0 1 1 1
K 11 55 05 86 24 24
1
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 220 990
277 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 0.5 .12
400x200x8 400x200x8
/13 /13
O 0.13 0.1 2.60 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 06 758 55 05 86 24 24
25
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
H H
O 716 274
278 11 0 588x300x1 588x300x1 1 0.8 0.8 0.8 0.8 1 1 0 0 0
K 8.3 .44
2/20 2/20
O 0.42 0.0 28.7 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 9 41 708 55 05 86 24 24
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 222 979
279 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 0.4 .79
400x200x8 400x200x8
/13 /13
O 0.13 0.1 2.63 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 07 112 55 05 86 24 24
H H
O 668 899
280 11 0 588x300x1 588x300x1 1 0.85 0.85 0.85 0.85 1 1 0 0 0
K 2.2 .85
2/20 2/20
O 0.1 26.8 126 167 151 101 101
0.4 A36 25310.5 1 0 0 1 1 1
K 01 198 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 390 193
281 6 0 /14, H /14, H 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 0.3 .09
450x200x9 450x200x9
/14 /14
-
O 0.23 0.0 126 167 151 101 101
A36 25310.5 1 0 5.80 0 1 1 1
K 3 23 55 05 86 24 24
71
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 221 993
282 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 0.5 .2
400x200x8 400x200x8
/13 /13
O 0.13 0.1 2.61 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 06 941 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 544 161
289 3 0 5/9, H 5/9, H 1 1.7 1.7 1.7 1.7 1 1 0 0 0
K 6.6 .47
300x150x6. 300x150x6.
5/9 5/9
O 0.32 0.0 2.61 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 86 799 55 05 86 24 24
H H
O 804 198
290 10 0 600x200x1 600x200x1 1 0.2 0.2 0.2 0.2 1 1 0 0 0
K 7.4 7.3
1/17 1/17
O 0.48 0.1 20.8 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 97 16 55 05 86 24 24
H H
O 102 716
291 10 0 600x200x1 600x200x1 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 97 .98
1/17 1/17
O 0.61 0.0 26.6 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 87 357 55 05 86 24 24
H H
O 815 933
292 10 0 600x200x1 600x200x1 1 0.6 0.6 0.6 0.6 1 1 0 0 0
K 5.8 .42
1/17 1/17
O 0.48 0.0 21.0 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 98 964 55 05 86 24 24
H H
O 640 243
293 10 0 600x200x1 600x200x1 1 1 1 1 1 1 1 0 0 0
K 7.3 4.4
1/17 1/17
O 0.38 0.2 16.5 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 55 735 55 05 86 24 24
H H
O 591 224
294 10 0 600x200x1 600x200x1 1 1 1 1 1 1 1 0 0 0
K 2.5 3.6
1/17 1/17
O 0.35 0.2 15.2 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 36 937 55 05 86 24 24
26
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
WF WF
450x200x9 450x200x9
O 446 6.1
295 6 0 /14, H /14, H 1 0.8 0.8 0.8 0.8 1 1 0 0 0
K 0.5 612
450x200x9 450x200x9
/14 /14
-
O 0.26 0.0 126 167 151 101 101
A36 25310.5 1 0 6.64 0 1 1 1
K 7 08 55 05 86 24 24
12
WF WF
450x200x9 450x200x9
O 541 119
296 6 0 /14, H /14, H 1 0.8 0.8 0.8 0.8 1 1 0 0 0
K 5.9 .26
450x200x9 450x200x9
/14 /14
-
O 0.32 0.0 126 167 151 101 101
A36 25310.5 1 0 8.06 0 1 1 1
K 4 27 55 05 86 24 24
37
WF WF
450x200x9 450x200x9
O 441 134
297 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 3.6 2.1
450x200x9 450x200x9
/14 /14
-
O 0.26 0.1 126 167 151 101 101
A36 25310.5 1 0 6.57 0 1 1 1
K 4 56 55 05 86 24 24
14
WF WF
450x200x9 450x200x9
O 505 152
298 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 7 8.6
450x200x9 450x200x9
/14 /14
-
O 0.30 0.1 126 167 151 101 101
A36 25310.5 1 0 7.52 0 1 1 1
K 3 77 55 05 86 24 24
94
H H
O 103 81.
299 10 0 600x200x1 600x200x1 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 07 161
1/17 1/17
O 0.61 0.0 26.6 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 09 607 55 05 86 24 24
H H
O 987 112
300 10 0 600x200x1 600x200x1 1 0.9 0.9 0.9 0.9 1 1 0 0 0
K 8.3 4.1
1/17 1/17
O 0.59 0.1 25.5 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 23 519 55 05 86 24 24
H H
O 888 947
301 10 0 600x200x1 600x200x1 1 0.9 0.9 0.9 0.9 1 1 0 0 0
K 7.1 .7
1/17 1/17
O 0.53 0.1 22.9 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 06 88 55 05 86 24 24
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 329 150
302 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 0.2 7.2
400x200x8 400x200x8
/13 /13
O 0.19 0.1 3.89 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 57 884 55 05 86 24 24
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 329 152
303 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 2.8 2.3
400x200x8 400x200x8
/13 /13
O 0.19 0.1 3.90 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 57 194 55 05 86 24 24
WF WF
O 1.55 1.55 1.55 1.55 331 153
304 5 0 400x200x8 400x200x8 1 1 1 0 0 0
K 563 563 563 563 4.3 1.1
/13, H /13, H
27
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
400x200x8 400x200x8
/13 /13
O 0.19 0.1 3.92 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 58 744 55 05 86 24 24
H H
O 913 39.
305 10 0 600x200x1 600x200x1 1 0.4 0.4 0.4 0.4 1 1 0 0 0
K 9.9 115
1/17 1/17
O 0.54 0.0 23.6 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 06 42 55 05 86 24 24
WF WF
400x200x8 400x200x8
O 1.55 1.55 1.55 1.55 332 149
306 5 0 /13, H /13, H 1 1 1 0 0 0
K 563 563 563 563 2.9 2.1
400x200x8 400x200x8
/13 /13
O 0.19 0.1 3.93 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 9 59 762 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 849 363
307 1 0 5/8, H 5/8, H 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K .3 .78
200x100x5. 200x100x5.
5/8 5/8
-
O 0.05 0.0 126 167 151 101 101
A36 25310.5 1 0 0.15 0 1 1 1
K 1 36 55 05 86 24 24
63
WF WF
200x100x5. 200x100x5.
O 848 487
308 1 0 5/8, H 5/8, H 1 1.7 1.7 1.7 1.7 1 1 0 0 0
K .18 .6
200x100x5. 200x100x5.
5/8 5/8
-
O 0.05 0.0 126 151 151 101 101
A36 25310.5 1 0 0.15 0 1 1 1
K 6 48 55 86 86 24 24
61
WF WF
200x100x5. 200x100x5.
O 825 340
309 1 0 5/8, H 5/8, H 1 1.3 1.3 1.3 1.3 1 1 0 0 0
K .24 .9
200x100x5. 200x100x5.
5/8 5/8
-
O 0.05 0.0 126 151 151 101 101
A36 25310.5 1 0 0.15 0 1 1 1
K 4 34 55 86 86 24 24
18
WF WF
200x100x5. 200x100x5.
O 405
310 1 0 5/8, H 5/8, H 1 1.2 1.2 1.2 1.2 1 1 0 0 0 302
K .96
200x100x5. 200x100x5.
5/8 5/8
-
O 0.02 0.0 126 167 151 101 101
A36 25310.5 1 0 0.07 0 1 1 1
K 4 3 55 05 86 24 24
47
WF WF
200x100x5. 200x100x5.
O 175 90.
311 1 0 5/8, H 5/8, H 1 1.95 1.95 1.95 1.95 1 1 0 0 0
K 0.2 062
200x100x5. 200x100x5.
5/8 5/8
O 0.11 0.0 0.32 126 151 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 68 204 55 86 86 24 24
WF WF
200x100x5. 200x100x5.
O 311 519
312 1 0 5/8, H 5/8, H 1 1.05 1.05 1.05 1.05 1 1 0 0 0
K 9 .18
200x100x5. 200x100x5.
5/8 5/8
-
O 0.18 0.0 126 167 151 101 101
A36 25310.5 1 0 0.57 0 1 1 1
K 7 51 55 05 86 24 24
39
O WF WF 322 112
313 1 0 1 3 3 3 3 1 1 0 0 0
K 200x100x5. 200x100x5. 2.5 9.9
28
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
5/8, H 5/8, H
200x100x5. 200x100x5.
5/8 5/8
-
O 0.28 0.1 126 112 151 101 101
A36 25310.5 1 0 0.59 0 1 1 1
K 6 12 55 49 86 24 24
29
WF WF
200x100x5. 200x100x5.
O 322 739
314 1 0 5/8, H 5/8, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 4.1 .26
200x100x5. 200x100x5.
5/8 5/8
-
O 0.21 0.0 126 151 151 101 101
A36 25310.5 1 0 0.59 0 1 1 1
K 2 73 55 86 86 24 24
32
WF WF
200x100x5. 200x100x5.
O 747 421
315 1 0 5/8, H 5/8, H 1 1.4 1.4 1.4 1.4 1 1 0 0 0
K .97 .06
200x100x5. 200x100x5.
5/8 5/8
-
O 0.04 0.0 126 151 151 101 101
A36 25310.5 1 0 0.13 0 1 1 1
K 9 42 55 86 86 24 24
76
WF WF
200x100x5. 200x100x5.
O 746 381
316 1 0 5/8, H 5/8, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K .91 .14
200x100x5. 200x100x5.
5/8 5/8
-
O 0.04 0.0 126 151 151 101 101
A36 25310.5 1 0 0.13 0 1 1 1
K 9 38 55 86 86 24 24
74
WF WF
200x100x5. 200x100x5.
O 733 403
317 1 0 5/8, H 5/8, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K .06 .29
200x100x5. 200x100x5.
5/8 5/8
-
O 0.04 0.0 126 151 151 101 101
A36 25310.5 1 0 0.13 0 1 1 1
K 8 4 55 86 86 24 24
49
WF WF
200x100x5. 200x100x5.
O 521 259
318 1 0 5/8, H 5/8, H 1 1 1 1 1 1 1 0 0 0
K .56 .41
200x100x5. 200x100x5.
5/8 5/8
-
O 0.03 0.0 126 167 151 101 101
A36 25310.5 1 0 0.09 0 1 1 1
K 1 26 55 05 86 24 24
6
WF WF
200x100x5. 200x100x5.
O 165 765
319 1 0 5/8, H 5/8, H 1 2 2 2 2 1 1 0 0 0
K 0.4 .82
200x100x5. 200x100x5.
5/8 5/8
-
O 0.10 0.0 126 151 151 101 101
A36 25310.5 1 0 0.30 0 1 1 1
K 9 76 55 86 86 24 24
37
WF WF
200x100x5. 200x100x5.
O 164 535
320 1 0 5/8, H 5/8, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 7.4 .37
200x100x5. 200x100x5.
5/8 5/8
-
O 0.10 0.0 126 151 151 101 101
A36 25310.5 1 0 0.30 0 1 1 1
K 8 53 55 86 86 24 24
31
WF WF
O 251 208
321 1 0 200x100x5. 200x100x5. 1 0.2 0.2 0.2 0.2 1 1 0 0 0
K .8 .11
5/8, H 5/8, H
29
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
200x100x5. 200x100x5.
5/8 5/8
-
O 0.01 0.0 126 167 151 101 101
A36 25310.5 1 0 0.04 0 1 1 1
K 5 21 55 05 86 24 24
63
WF WF
200x100x5. 200x100x5.
O 226 941
322 1 0 5/8, H 5/8, H 1 2.3 2.3 2.3 2.3 1 1 0 0 0
K 6 .46
200x100x5. 200x100x5.
5/8 5/8
-
O 0.15 0.0 126 146 151 101 101
A36 25310.5 1 0 0.41 0 1 1 1
K 4 93 55 73 86 24 24
7
WF WF
300x150x6. 300x150x6.
O 874 363
323 3 0 5/9, H 5/9, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K .17 .8
300x150x6. 300x150x6.
5/9 5/9
O 0.05 0.0 0.42 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 47 018 55 05 86 24 24
H H
O 491 122
324 11 0 588x300x1 588x300x1 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 4.3 3.8
2/20 2/20
-
O 0.29 0.1 126 167 151 101 101
A36 25310.5 1 0 19.7 0 1 1 1
K 4 23 55 05 86 24 24
24
WF WF
450x200x9 450x200x9
O 264 555
325 6 0 /14, H /14, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 8.6 .48
450x200x9 450x200x9
/14 /14
-
O 0.15 0.0 126 167 151 101 101
A36 25310.5 1 0 3.94 0 1 1 1
K 9 7 55 05 86 24 24
34
H H
O 513 114
326 11 0 588x300x1 588x300x1 1 0.1 0.1 0.1 0.1 1 1 0 0 0
K 0.9 9.9
2/20 2/20
-
O 0.30 0.1 126 167 151 101 101
A36 25310.5 1 0 20.5 0 1 1 1
K 7 14 55 05 86 24 24
93
WF WF
450x200x9 450x200x9
O 178 862
327 6 0 /14, H /14, H 1 0.1 0.1 0.1 0.1 1 1 0 0 0
K 5 .57
450x200x9 450x200x9
/14 /14
-
O 0.10 0.0 126 167 151 101 101
A36 25310.5 1 0 2.65 0 1 1 1
K 7 87 55 05 86 24 24
77
H H
O 604 101
328 11 0 588x300x1 588x300x1 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 8.4 7.7
2/20 2/20
-
O 0.36 0.1 126 167 151 101 101
A36 25310.5 1 0 24.2 0 1 1 1
K 2 02 55 05 86 24 24
76
WF WF
450x200x9 450x200x9
O 153 104
329 6 0 /14, H /14, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 9.8 8.1
450x200x9 450x200x9
/14 /14
-
O 0.09 0.1 126 167 151 101 101
A36 25310.5 1 0 2.29 0 1 1 1
K 2 1 55 05 86 24 24
26
WF WF
O 898 13.
330 3 0 300x150x6. 300x150x6. 1 0.25 0.25 0.25 0.25 1 1 0 0 0
K .6 486
5/9, H 5/9, H
30
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
300x150x6. 300x150x6.
5/9 5/9
O 0.05 0.0 0.43 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 05 193 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 899 383
331 3 0 5/9, H 5/9, H 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K .09 .9
300x150x6. 300x150x6.
5/9 5/9
O 0.05 0.0 0.43 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 4 49 216 55 05 86 24 24
H H
O 344 252
332 11 0 588x300x1 588x300x1 1 0.25 0.25 0.25 0.25 1 1 0 0 0
K 0.8 2.4
2/20 2/20
O 0.20 0.2 13.8 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 52 1 55 05 86 24 24
H H
O 231 260
333 11 0 588x300x1 588x300x1 1 0.5 0.5 0.5 0.5 1 1 0 0 0
K 8.8 8.7
2/20 2/20
O 0.13 0.2 9.30 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 9 62 688 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 0.70 0.70 0.70 0.70 755 352
334 2 0 /9, H /9, H 1 1 1 0 0 0
K 711 711 711 711 .11 .94
250x125x6 250x125x6
/9 /9
O 0.04 0.0 0.24 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 44 466 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 0.70 0.70 0.70 0.70 643 372
335 2 0 /9, H /9, H 1 1 1 0 0 0
K 711 711 711 711 .99 .47
250x125x6 250x125x6
/9 /9
O 0.03 0.0 0.20 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 9 42 865 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 0.70 0.70 0.70 0.70 783 305
336 2 0 /9, H /9, H 1 1 1 0 0 0
K 711 711 711 711 .35 .99
250x125x6 250x125x6
/9 /9
O 0.04 0.0 0.25 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 48 381 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 0.70 0.70 0.70 0.70 605 504
337 2 0 /9, H /9, H 1 1 1 0 0 0
K 711 711 711 711 .73 .84
250x125x6 250x125x6
/9 /9
O 0.03 0.0 0.19 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 53 626 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 333 185
338 6 0 /14, H /14, H 1 1.1 1.1 1.1 1.1 1 1 0 0 0
K 2.3 .7
450x200x9 450x200x9
/14 /14
-
O 0.19 0.0 126 167 151 101 101
A36 25310.5 1 0 4.96 0 1 1 1
K 9 35 55 05 86 24 24
14
H H
O 254 504
339 10 0 600x200x1 600x200x1 2 0.95 0.95 0.95 0.95 1 1 0 0 0
K 1.8 .05
1/17 1/17
O 0.15 0.0 6.57 126 167 151 101 101
A36 25310.5 2 0 0 1 1 1
K 2 51 486 55 05 86 24 24
WF WF
O 0.07 0.07 0.07 0.07 462 105
340 1 0 200x100x5. 200x100x5. 1 1 1 0 0 0
K 3 3 3 3 .75 3.8
5/8, H 5/8, H
31
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
200x100x5. 200x100x5.
5/8 5/8
O 0.02 0.1 0.08 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 04 515 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 248 641
341 6 0 /14, H /14, H 1 0.25 0.25 0.25 0.25 1 1 0 0 0
K 1.3 .68
450x200x9 450x200x9
/14 /14
-
O 0.14 0.0 126 167 151 101 101
A36 25310.5 1 0 3.69 0 1 1 1
K 9 65 55 05 86 24 24
44
WF WF
300x150x6. 300x150x6.
O 454 48.
342 3 0 5/9, H 5/9, H 1 1.55 1.55 1.55 1.55 1 1 0 0 0
K 3.6 616
300x150x6. 300x150x6.
5/9 5/9
O 0.27 0.0 2.18 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 2 72 395 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 0.42 0.42 0.42 0.42 268 102
343 1 0 5/8, H 5/8, H 1 1 1 0 0 0
K 6 6 6 6 8.1 4.2
200x100x5. 200x100x5.
5/8 5/8
O 0.16 0.1 0.49 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 07 461 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 469 274
344 1 0 5/8, H 5/8, H 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K 4.7 .67
200x100x5. 200x100x5.
5/8 5/8
O 0.28 0.0 0.86 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 1 66 383 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 0.56 0.56 0.56 0.56 313 921
345 1 0 5/8, H 5/8, H 1 1 1 0 0 0
K 603 603 603 603 9.9 .55
200x100x5. 200x100x5.
5/8 5/8
O 0.18 0.1 0.57 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 01 774 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 277 137
346 1 0 5/8, H 5/8, H 1 1.2 1.2 1.2 1.2 1 1 0 0 0
K 0.5 .96
200x100x5. 200x100x5.
5/8 5/8
O 0.16 0.0 0.50 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 68 977 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 0.42 0.42 0.42 0.42 184 722
347 1 0 5/8, H 5/8, H 1 1 1 0 0 0
K 406 406 406 406 4.2 .87
200x100x5. 200x100x5.
5/8 5/8
O 0.0 0.33 126 167 151 101 101
0.11 A36 25310.5 1 0 0 1 1 1
K 77 933 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 1.20 1.20 1.20 1.20 126 346
348 1 0 5/8, H 5/8, H 1 1 1 0 0 0
K 208 208 208 208 9.9 .15
200x100x5. 200x100x5.
5/8 5/8
O 0.07 0.0 0.23 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 36 366 55 05 86 24 24
WF WF
O 1.20 1.20 1.20 1.20 127 346
349 1 0 200x100x5. 200x100x5. 1 1 1 0 0 0
K 208 208 208 208 3.3 .87
5/8, H 5/8, H
32
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
200x100x5. 200x100x5.
5/8 5/8
O 0.07 0.0 0.23 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 36 429 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 985 565
350 2 0 /9, H /9, H 4 1.5 1.5 1.5 1.5 1 1 0 0 0
K .59 .18
250x125x6 250x125x6
/9 /9
O 0.05 0.0 0.31 126 167 151 101 101
A36 25310.5 4 0 0 1 1 1
K 9 56 933 55 05 86 24 24
WF WF
450x200x9 450x200x9
O 643 109
353 6 0 /14, H /14, H 1 0.2 0.2 0.2 0.2 1 1 0 0 0
K .54 1.7
450x200x9 450x200x9
/14 /14
-
O 0.03 0.1 126 167 151 101 101
A36 25310.5 1 0 0.95 0 1 1 1
K 9 1 55 05 86 24 24
82
WF WF
250x125x6 250x125x6
O 161 171
355 2 0 /9, H /9, H 1 0.2 0.2 0.2 0.2 1 1 0 0 0
K 8.2 6.6
250x125x6 250x125x6
/9 /9
-
O 0.09 0.1 126 167 151 101 101
A36 25310.5 1 0 0.52 0 1 1 1
K 7 74 55 05 86 24 24
43
WF WF
300x150x6. 300x150x6.
O 282 468
356 3 0 5/9, H 5/9, H 2 1 1 1 1 1 1 0 0 0
K 4.2 .93
300x150x6. 300x150x6.
5/9 5/9
O 0.16 0.0 1.35 126 167 151 101 101
A36 25310.5 2 0 0 1 1 1
K 9 9 752 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 573 111
358 3 0 5/9, H 5/9, H 1 1 1 1 1 1 1 0 0 0
K 2.5 0.3
300x150x6. 300x150x6.
5/9 5/9
O 0.34 0.1 2.75 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 3 61 543 55 05 86 24 24
WF WF
200x100x5. 200x100x5.
O 226 603
359 1 0 5/8, H 5/8, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K 1.4 .58
200x100x5. 200x100x5.
5/8 5/8
-
O 0.14 0.0 126 151 151 101 101
A36 25310.5 1 0 0.41 0 1 1 1
K 9 6 55 86 86 24 24
61
H H
O 627 110
360 11 0 588x300x1 588x300x1 1 1.7 1.7 1.7 1.7 1 1 0 0 0
K 1.3 3.1
2/20 2/20
O 0.37 0.1 25.1 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 5 32 704 55 05 86 24 24
H H
O 0. 279 106 323 132 234
361 12 0 200x200x8 200x200x8 9 2.2 2.2 2.2 2.2 1
K 85 .62 9.5 1.9 .52 .81
/12 /12
-
O 0.25 0.0 0.50 0.51 0. 132 167 189 101 101
A36 25310.5 9 1.77 1 1
K 5 23 481 711 85 73 05 83 24 24
64
H H
O 0. 259 469 236 95. 183
362 12 0 200x200x8 200x200x8 2 2.2 2.2 2.2 2.2 1
K 85 .87 .38 7 729 .16
/12 /12
33
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
- -
O 0.17 0.0 0.22 0. 132 167 189 101 101
A36 25310.5 2 1.65 0.37 1 1
K 2 18 155 85 73 05 83 24 24
1 87
H H
O 0. 124 357 185 47. 187
363 12 0 200x200x8 200x200x8 5 2.2 2.2 2.2 2.2 1
K 85 .07 .68 4.3 206 .03
/12 /12
-
O 0.12 0.0 0.16 0.29 0. 132 167 189 101 101
A36 25310.5 5 0.78 1 1
K 8 18 882 668 85 73 05 83 24 24
82
H H
O 0. 242 124 222 53. 275
364 12 0 200x200x8 200x200x8 2 2.2 2.2 2.2 2.2 1
K 85 .77 .51 7 377 .36
/12 /12
-
O 0.14 0.0 0.05 0.35 0. 132 167 189 101 101
A36 25310.5 2 1.54 1 1
K 3 27 877 632 85 73 05 83 24 24
23
WF WF
300x150x6. 300x150x6.
O 927
365 3 0 5/9, H 5/9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0 540
K .76
300x150x6. 300x150x6.
5/9 5/9
O 0.05 0.0 0.44 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 6 53 594 55 05 86 24 24
WF WF
300x150x6. 300x150x6.
O 869 523
366 3 0 5/9, H 5/9, H 6 1.5 1.5 1.5 1.5 1 1 0 0 0
K .03 .13
300x150x6. 300x150x6.
5/9 5/9
-
O 0.05 0.0 126 167 151 101 101
A36 25310.5 6 0 0.41 0 1 1 1
K 2 52 55 05 86 24 24
77
WF WF
300x150x6. 300x150x6.
O 864 498
367 3 0 5/9, H 5/9, H 8 1.5 1.5 1.5 1.5 1 1 0 0 0
K .22 .67
300x150x6. 300x150x6.
5/9 5/9
-
O 0.05 0.0 126 167 151 101 101
A36 25310.5 8 0 0.41 0 1 1 1
K 2 49 55 05 86 24 24
54
WF WF
300x150x6. 300x150x6.
O 578 411
368 3 0 5/9, H 5/9, H 1 1.5 1.5 1.5 1.5 1 1 0 0 0
K .25 .02
300x150x6. 300x150x6.
5/9 5/9
O 0.03 0.0 0.27 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 7 43 795 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 213 511
369 2 0 /9, H /9, H 1 1.25 1.25 1.25 1.25 1 1 0 0 0
K 8.5 .45
250x125x6 250x125x6
/9 /9
O 0.12 0.0 0.69 126 167 151 101 101
A36 25310.5 1 0 0 1 1 1
K 8 88 288 55 05 86 24 24
WF WF
250x125x6 250x125x6
O 609 670
370 2 1 /9, H /9, H 8 1.5 1.5 1.5 1.5 1 1 0 0 0
K 8.1 .83
250x125x6 250x125x6
/9 /9
-
O 0.36 0.1 126 167 151 101 101
A36 25310.5 8 0 1.97 0 1 1 1
K 5 31 55 05 86 24 24
58
H H
O 235 161
371 11 0 588x300x1 588x300x1 1 1.3 1.3 1.3 1.3 1 1 0 0 0
K 9.7 6.2
2/20 2/20
34
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
-
O 0.14 0.1 126 167 151 101 101
A36 25310.5 1 0 9.47 0 1 1 1
K 1 71 55 05 86 24 24
11
WF WF
450x200x9 450x200x9
O 307 36.
372 6 0 /14, H /14, H 1 1.3 1.3 1.3 1.3 1 1 0 0 0
K 6.8 104
450x200x9 450x200x9
/14 /14
-
O 0.18 0.0 126 167 151 101 101
A36 25310.5 1 0 4.58 0 1 1 1
K 4 31 55 05 86 24 24
1
H H
O 650 239
373 11 0 588x300x1 588x300x1 8 2 2 2 2 1 1 0 0 0
K 2.8 9.2
2/20 2/20
O 0.38 0.2 26.0 126 167 151 101 101
A36 25310.5 8 0 0 1 1 1
K 9 37 996 55 05 86 24 24
H H
O 329 928
374 10 0 600x200x1 600x200x1 6 0.6 0.6 0.6 0.6 1 1 0 0 0
K 7.3 .3
1/17 1/17
O 0.19 0.0 8.52 126 167 151 101 101
A36 25310.5 6 0 0 1 1 1
K 7 92 914 55 05 86 24 24
35
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
Table 2. Displacement
RX RY RZ
Node Load DX (mm) DY (mm) DZ (mm) ([rad]) ([rad]) ([rad])
87 sLCB5 5.080354 24.691429 0 0.000636 0.000376 -0.000831
88 sLCB5 2.89751 16.259867 0 0.00075 0.0004 -0.000476
89 sLCB5 5.080354 18.459804 0 0.000607 -0.00061 -0.000831
90 sLCB5 2.89751 12.686809 0 0.000729 0.000068 -0.000476
95 sLCB5 3.834029 24.691429 -0.776507 0.00035 0.000696 -0.000831
96 sLCB5 2.182899 16.259867 -0.559634 -0.00049 0.000682 -0.000476
97 sLCB5 3.834029 18.459804 -0.661161 0.000146 -0.000252 -0.000831
98 sLCB5 2.182899 12.686809 -0.494424 -0.000595 -0.000016 -0.000476
99 sLCB5 0 0 0 0 0 0
100 sLCB5 3.834029 26.560916 0 0.000092 0.0004 -0.000831
101 sLCB5 0 0 0 0 0 0
102 sLCB5 2.182899 17.331784 0 0.000029 0.000246 -0.000476
103 sLCB5 -0.65274 24.691429 -0.550366 -0.001109 0.000402 -0.000831
104 sLCB5 -0.389703 16.259867 -0.382185 -0.001765 0.000228 -0.000476
105 sLCB5 -0.65274 18.459804 -0.412322 -0.000827 -0.000475 -0.000831
106 sLCB5 -0.389703 12.686809 -0.29829 -0.001022 -0.000399 -0.000476
107 sLCB5 0 0 0 0 0 0
108 sLCB5 -0.65274 26.560916 0 -0.000016 0.00034 -0.000831
109 sLCB5 0 0 0 0 0 0
110 sLCB5 -0.389703 17.331784 0 -0.000056 0.000333 -0.000476
111 sLCB5 1.61121 16.259867 -1.071931 0.000553 0.001403 -0.000476
112 sLCB5 1.61121 17.331784 0 0.000056 0.000482 -0.000476
115 sLCB5 0.181987 16.259867 -1.999378 -0.000798 0.001336 -0.000476
116 sLCB5 0.181987 17.331784 0 0.000015 0.001072 -0.000476
117 sLCB5 2.182899 15.330872 -2.868667 0.001945 0.000921 -0.000476
118 sLCB5 2.89751 15.330872 0 0.002005 -0.000257 -0.000476
119 sLCB5 -0.389703 15.330872 -2.217322 -0.002706 0.000854 -0.000476
120 sLCB5 2.182899 14.830644 -3.732215 0.00214 0.000342 -0.000476
121 sLCB5 2.89751 14.830644 0 0.002721 0.000453 -0.000476
122 sLCB5 -0.389703 14.830644 -3.120593 -0.002369 0.000419 -0.000476
123 sLCB5 2.182899 13.401421 -1.990853 0.001849 -0.00093 -0.000476
124 sLCB5 2.89751 13.401421 0 0.001243 -0.000433 -0.000476
125 sLCB5 -0.389703 13.401421 -1.901381 -0.002017 -0.000881 -0.000476
129 sLCB5 1.61121 15.330872 -5.198689 0.001665 0.001568 -0.000476
130 sLCB5 0.99188 14.830644 -7.637541 0.000144 -0.000257 -0.000476
131 sLCB5 1.61121 14.830644 -6.339591 0.001592 0.000916 -0.000476
132 sLCB5 0.99188 13.401421 -5.595017 0.000243 -0.001226 -0.000476
134 sLCB5 0.181987 15.330872 -5.254028 -0.001935 0.001101 -0.000476
135 sLCB5 0.181987 14.830644 -6.002943 -0.001806 0.000572 -0.000476
148 sLCB5 -0.65274 21.783337 -3.526529 -0.001682 0.000129 -0.000831
36
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
37
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
38
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT
4..9.1 Connection of
39
Pt. Mitra Andalas Teknika , Consultant