Vous êtes sur la page 1sur 1

5.2.

3 Water Resources Development Projects in North Eastern


Region

CWC has a dedicated design unit for East and North Eastern region to
undertake design and consultancy for Multipurpose, irrigation, water supply
and Hydro Electric Projects. The scope of work also includes preparation of
pre-feasibility and detailed project reports for schemes investigated by field
offices of CWC in North East or projects undertaken by Brahmaputra Board,
NEEPCO, State Govt. departments etc. Technical appraisal of PFRs and DPRs
are also being carried out.

At present, there are 9 projects at construction stage for which design


consultancy is being provided by D&R wing of CWC. In addition, there are 16
projects for which Detailed Project Reports (DPR) are under preparation.

Detailed hydrological studies and design works in respect of these


projects are in progress in D&R wing as per the list as given below:

A. Arunachal Pradesh

1. Deopani Multi Purpose Project


2. Jiadhal H.E. Project
3. Nuranang Chu Chu Project
4. Tawang Chu H.E. Project
5. Nyukcharong Chu Project
6. Dibang Multipurpose Project
7. Siang Middle Project

B. Assam
8. Harang Sub-basin Drainage Scheme - Construction Stage
9. Karbi Langpi HE Project - Construction Stage
10. Kulsi Dam Project
11. Lohit Dam Project
12. Pagladia Irrigation Project - Construction Stage

C. Manipur

13. Khuga Multipurpose Project - Construction Stage


14. Thoubal Multipurpose Project - Construction Stage

D. Meghalaya

15. Greater Shillong Water Supply - Construction Stage


Scheme
16. Jadukata Dam Project (Stage-I & II)
17. Myntdu HE Project - Construction Stage

51