Vous êtes sur la page 1sur 24

Schlumberger

REDA Maximus Overview


Schlumberger Private
Standard ESP Installation
Handling of each Piece
of Equipment will 1 – Shimming
r e
require approximately 30 q u i
1 – Pump Pump – 1 hour
min each
l R e2 – Attach intake
w l
2i- Intake !
30 min
–p
P d U 3 – Service
Schlumberger Private

E S il
3 - Protector
u Protector – 1 hr
a si c to B
6 – Tape in 6 - Potheads
B 4 – Service
Pothead
A – 30 MLE ur 4 - Motor Motor - 1 Hr
min h o 5 – Attached
7 5 - Gauge Gauge – 30 min
JL/DN
2/25/2009
Maximus
A project called Maximus was
initiated to determine if the
equipment could be be improved
Schlumberger Private

so that service time could be


reduced

JL/DN
2/25/2009
Schlumberger Private

Motor

2/25/2009
JL/DN
Maxi-Lock* Plug-in Pothead
Pothead Engineered Specifically for MAXIMUS
motor

 Engineer IN – Ease of Installation, High Reliability

X Engineer OUT – Service Quality Problems


Schlumberger Private

• Plug-in face pressure equalized with motor after


engagement
• O-ring groove in pothead instead of pothole
• Direct soldering of terminal to motor leads
• 22kv breakdown twice of old design
JL/DN
2/25/2009
Maximus Radial Bearings
• All motor and protector radial
Polymer Lined Bushing
bearings
• PTFE Polymer Lined metal bushing
• Hardened, polished metal shaft
sleeve
• High load and temperature capacity
• Eliminates metal wear debris in
motor oil
Schlumberger Private

• Withstands poorer lubrication after


oil deterioration
Hardened Shaft Sleeve • SLK keyed rotor bearings

SLK keyed rotor bearing


JL/DN
2/25/2009
Maximus Motor
Factory Filled
One of the main servicing
time on a motor is the
filling of the motor with oil.
The Maximus motor is
Schlumberger Private

prefilled in the factory to


eliminate that.
Leads for
connection to
other motor or
PSI unit.

JL/DN
2/25/2009
REDA Maximus Motors
• Features
Plug-in pothead
Factory-filled motor
• Benefits
No oil Servicing at well site - Reduces
Installation time -> faster production
No FCE tape-in splicing - Reduces
Installation time -> faster production
Schlumberger Private

More tolerant to field assembly in


severe weather - High reliability and
longer run life

JL/DN
2/25/2009
Ship Motor with the Gauge

Maximus Motor
with Gauge as
Schlumberger Private

part of the
motor

JL/DN
2/25/2009
Review of Protector
Design was
considered
very good, only
assembly time
was considered
Schlumberger Private

JL/DN
2/25/2009
Service Quality Enhancement
Schlumberger Private

JL/DN
2/25/2009
Maximus
Protector Factory
Filled
Compensating Shipping Cap
On head of factory filled units
Rubber bag partially filled with oil
Compensates for storage
Schlumberger Private

temperature
No loss of oil
No sucking in air

JL/DN
2/25/2009
Maxi-Joint / Equimax Connection
System
Schlumberger Private

Conventional Protector Base Maximus Protector Base


JL/DN
2/25/2009
Maxi-Joint / Equimax Connection
System

Upper unit sealed with


shaft seal and oil
communication valve

Lower unit filled to top


Schlumberger Private

with oil, coupling


submerged

JL/DN
2/25/2009
Maxi-Joint / Equimax Connection System

Shaft engages coupling


Schlumberger Private

Oil begins to overflow

JL/DN
2/25/2009
Maxi-Joint / Equimax Connection System

Joint fully engaged


Oil communication
valve opened
Schlumberger Private

JL/DN
2/25/2009
Factory-Filled Maximus Motors and
Protectors
•- Always filled with the right oil……….Just Plug &
Play
Schlumberger Private

JL/DN
2/25/2009
Standard Protector, Motor, Gauge

Protector
Could
anything be
done to
Motor
further
Schlumberger Private

improve this
Gauge part of the
ESP system?
JL/DN
2/25/2009
The ProMotor
• Integrate 3 components
into 1
Protector • Easier and faster
installation
• Factory-filled
• New Stator Winding
Design
Motor
• New SLK DP4 bearings
• ARZ Protector Top
Schlumberger Private

Bearing
• Medium TDH and
Medium HP
Gauge
• Gas Handling Capabilities
ProMotor • More solids resistant
• Tandem motors
Conventional
JL/DN System
2/25/2009
Pump

Again design
Schlumberger Private

was considered
very good, only
the time
required to
shim was
considered
JL/DN
2/25/2009
Schlumberger Private

2/25/2009
JL/DN
Standard ESP Installation

i ll
P w 1 – Pump
E S s t o
as ic ou r
A B 7 h
ir e p! 2 - Intake
e qu ld U
R B u i
Schlumberger Private

3 - Protector
6 - Pothead
MLE 4 - Motor

5 - Gauge
JL/DN
2/25/2009
Maximus ESP Installation

ill
P w
E S t o 1 – Pump/
us r s Intake
x i m h o u
a 2
A M quire Up!
Re Build
Schlumberger Private

3 - Plug in
2 - ProMotor
Pothead

JL/DN
2/25/2009
Schlumberger Private

QUESTIONS ?

JL/DN
2/25/2009

Vous aimerez peut-être aussi