Vous êtes sur la page 1sur 2

DAILY REPORT

Completed By Abdul Malik Contract No. 853

Date 19-09-2019 Day Thursday Shif Night

Start Time 18:00 Finish Time 06:00 Hours Worked 84Hours


per Shif
Weather Temp Max
Location Canary Wharf Station Temp Min

Contract Names Manual Non-Manual


Task Work Area
Forces NH OH NH OH
NCE TBC Electrician Kieran Evans 12
NCE TBC Electrician Andy Welsh 12
NCE TBC Electrician Mark Stubbs 12
NCE TBC Electrician Adam 12
Williams
NCE 281 Electrician Ceri Scoberg 12
NCE TBC Electrician Myles 12
Churcher
NCE 281 Electrician Ben Lloyd 12

Shif Manager Organisation Title


Construction
Leo Moran DESL
Manager

Description of Works Performed Today

Task
Activity Planned Actual Comments
No.

NCE TBC Installation Of Installation Of


1. SWA Cable For SWA Cable For
PAVA Supply PAVA Supply
NCE 281 Electrical Electrical
2. Verification Verification
Works Works

Page 1 of 2
DAILY REPORT
Details of Planned Work Not Carried Out
(Please indicate by means of an asterisk, any item of work carried out as a result of a Change notice, Instruction
etc. - IE 1*)
Delays - Time Lost (Hours) Responsibility
Description No Delays

Cause
Impact
Confirmation
of Delay :
Details of Planned Work Not Carried Out
(Please indicate by means of an asterisk, any item of work carried out as a result of a Change notice, Instruction
etc. - IE 1*)
Delays - Time Lost (Hours) Responsibility
Description
Cause
Impact
Confirmation
of Delay :

Safety & Environmental Incidents, Inspections etc. Undertaken or Witnessed


(Number each item and list to the relevant work item number above)
No. Issue/Concern/Note Action/Issues
None identified
1.

Name Niall Martin Signature Niall Martin Date 17-09-19

Page 2 of 2