T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 134 of 187
1.0 SCOPE
This procedure covers the Pre commissioning Test for Switchgears
2.0 PURPOSE
This procedure is prepared to carry out various pre- commissioning tests to be conducted in
systematic manner for Switchgears to ensure the healthiness and performance of the
Switchgear.
3.0 PRE-REQUISITES
3.1 SYSTEM REQUIREMENTS
1. Relevant Drawings and layouts.
2. 415 V AC, 3 Ph power supply is available for Testing.
3. All Cables pertaining to switch gear were laid & terminated.
4. Make sure that the Switchgear erected is as per approved drawings & Layouts.
5. Check the Name Plate & Rating Plate Of the Switchgear.
Test Procedure:
The above test is to be conducted at following points.
c) Control Circuit of switchgear Breakers
d) Main Circuit of Switchgear Breakers (pole)
Test Procedure:
The test is done by the following way.
i. Connect the positive terminal of the test kit to one phase.
ii. Short the other two phases to earth.
iii. Connect the earth terminal of the kit to the same earth point.
iv. Supply the rated high voltage to the bus.
v. Note down the reading in annexure – VIII.
LARSEN & TOUBRO LIMITED-ECC DIVISION PROCEDURE NO:
T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 142 of 187
ANNEXURE – I
Details of Switchgear
LOA No. :
Make :
Type: :
Sl. No. :
Year of manufacture:
Operating Voltage:
Feeder details :
Control Voltage:
ANNEXURE – II
Post Installation check list
ANNEXURE – III
Operation Pole
R Y B
Closing Time (msec)
Opening Time (msec)
Close-open Time (msec)
Description Resistance in Ωs
Closing Coil
Trip Coil
LARSEN & TOUBRO LIMITED-ECC DIVISION PROCEDURE NO:
T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 144 of 187
v) Mechanical Checks –
Description Remarks
CB rack in / out operation
CB rack in / out indications
Manual spring charging operation
Spring charged Indication
Manual ON / OFF operation
CB ON / OFF indication
Emergency Trip operation
Power contact alignment with panel contacts
Description Remarks
Spring Charging operation time (Secs)
Test / Service position switch
ON / OFF operation in Local / Remote
Spring charged Indication
CB ON / OFF indication
Lamp Indications
ANNEXURE – IV
Metering / Protection CT Test Report
CT Serial No.
R Ph Y Ph B Ph
Ωs)
(In MΩ
Description R Ph Y Ph B Ph
Primary to Earth
Primary to Secondary Core-1
Primary to Secondary Core-2
Secondary Core-1 to Earth
Secondary Core-2 to Earth
Secondary Core-1 to Core-2
(In Ωs)
Description Terminal Nos. R Ph Y Ph B Ph
Secondary Core-1 1S1-1S2
Secondary Core-2 2S1-2S2
Secondary Core-2
LARSEN & TOUBRO LIMITED-ECC DIVISION PROCEDURE NO:
T&C/T& C P/AIS-GIS/001
TESTING & COMMISSIONING PROCEDURE FOR
SWITCHYARD EQUIPMENTS &SWITHGEARS Page 146 of 187
CT Check List
ANNEXURE – V
PT Test Report
PT Serial No.
R Ph Y Ph B Ph
Ωs)
(In MΩ
Description R Ph Y Ph B Ph
Primary to Earth
Primary to Secondary Core-1
Primary to Secondary Core-2
Secondary Core-1 to Earth
Secondary Core-2 to Earth
Secondary Core-1 to Core-2
Secondary
Core-2
PT Check List
ANNEXURE – VI
a)Phase to earth:
b)Phase to Phase:
ANNEXURE – VII
ANNEXURE – VIII
Circuitry/Operational Checks
B Closing of CB
C Breaker position indication
D Heater in switchgear
E Illumination in switchgear
F Incomer & Bus coupler
Interlock