AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE AA

Milestones Mil

Contractual Milestone Co
MY202CM0000100 Notice To Proceed 0 Notice To Proceed
MY202CM0000101 Commencement Date 0 Commencement Date
MY202CM0000102 Project Contractual Finish Date 0 Pro
Construction Milestone Construc
MY202CS0000100 Start : Mobilization Works 0 Start : Mobilization Works
MY202CS0000101 Start : Construction Works 0 Start : Construction Works
MY202CS0000103 Finish : Shoring Works - Key Milestone 1 0 Finish : Shoring Works - Key Milestone 1
MY202CS0000102 Finish : Mobilization Works 0 Finish : Mobilization Works
MY202CS0000104 Finish : Foundation Piles - Key Milestone 2 0 Finish : Foundation Piles - Key Milestone 2
MY202CS0000105 Finish : Ground Floor Structural Works - Key Milestone 3 0 Finish : Ground Floor Structural Works - Key Milestone 3
MY202CS0000106 Finish: Roof Slab Structural Works - Key Milestone 4 0 Finish: Roof Slab Structural Works - Key Milestone 4
MY202CS0000107 Power On 0 Power O

Preconstruction Pre

Mobilization & General Requirements


Requirem Mo
MY202MG0000107 Receiving All Contract Data from Client 1 Receiving All Contract Data from Client
MY202MG0000101 Site Exploration 4 Site Exploration
MY202MG0000105 Site Hoarding and Fence 30 Site Hoarding and Fence
MY202MG0000109 Sign Boards 30 Sign Boards
MY202MG0000104 Temporary Works (access, drainage & sewage disposal) 46 Temporary Works (access, drainage & sewage disposal)
MY202MG0000102 Clearance and Temporary Connections 47 Clearance and Temporary Connections
MY202MG0000100 Mobilization 48 Mobilization
MY202MG0000108 Construct & install Employer's, Project Manager's, Cost... 48 Construct & install Employer's, Project Manager's, Cost Consultant Facilities
MY202MG0000106 Construct & install Engineer's Facilities 48 Construct & install Engineer's Facilities
MY202MG0000111 Construct & install Contractor's Facilities 48 Construct & install Contractor's Facilities
MY202MG0000103 Recurring Preliminaries 8 Re
MY202MG0000110 Establishment of Construction Plant 34 Establishment of Construction Plant
MY202MG0000120 Erection of Tower Cranes (initial) 30 Erection of Tower Cranes (initial)
MY202MG0000140 Erection of Temporary Hoist 4 Erection of Temporary Hoist
MY202MG0000150 Dismantling of Temporary Hoist 4 Dismantling of Temporary Hoist
MY202MG0000130 Dismantling of Tower Cranes 4 Dismantling of Tower C

Engineering and Procurement Engineering and Procure

Subcontractors Submital and Approval


Ap Subcontractors Submital and Approval

Civil Civil
Submittal Submittal
MY202EGSUB100 Shoring works S/C submittal 8 Shoring works S/C submittal
MY202EGSUB101 Concrete & Rebar Supplier submittal 7 Concrete & Rebar Supplier submittal
MY202EGSUB102 Concrete Pile S/C submittal 7 Concrete Pile S/C submittal
MY202EGSUB105 Waterproofing S/C submittal 7 Waterproofing S/C submittal
MY202EGSUB106 Post Tension Concrete S/C submittal 7 Post Tension Concrete S/C submittal
MY202EGSUB110 Sidewalks, curbs & pavers S/C submittal 7 Sidewalks, curbs & pavers S/C submittal
MY202EGSUB107 Block masonry S/C & Material submittal 7 Block masonry S/C & Material submittal
MY202EGSUB108 Metal work & ballustrading S/C submittal 7 Metal work & ballustrading S/C submittal
Approval Approval

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
1 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202EGSUB111 Shoring works S/C approval 7 Shoring works S/C approval
MY202EGSUB112 Concrete & Rebar Supplier approval 4 Concrete & Rebar Supplier approval
MY202EGSUB113 Concrete Pile S/C approval 4 Concrete Pile S/C approval
MY202EGSUB116 Waterproofing S/C approval 4 Waterproofing S/C approval
MY202EGSUB117 Post Tension Concrete S/C approval 4 Post Tension Concrete S/C approval
MY202EGSUB121 Sidewalks, curbs & pavers S/C approval 4 Sidewalks, curbs & pavers S/C approval
MY202EGSUB118 Block masonry S/C & Material approval 4 Block masonry S/C & Material approval
MY202EGSUB119 Metal work & ballustrading S/C approval 4 Metal work & ballustrading S/C approval
Finalization Finalization
MY202EGSUB122 Shoring works S/C awarding of contract 7 Shoring works S/C awarding of contract
MY202EGSUB123 Concrete & Rebar Supplier awarding of contract 7 Concrete & Rebar Supplier awarding of contract
MY202EGSUB124 Concrete Pile S/C awarding of contract 7 Concrete Pile S/C awarding of contract
MY202EGSUB127 Waterproofing S/C awarding of contract 7 Waterproofing S/C awarding of contract
MY202EGSUB128 Post Tension Concrete S/C awarding of contract 7 Post Tension Concrete S/C awarding of contract
MY202EGSUB132 Sidewalks, curbs & pavers S/C awarding of contract 7 Sidewalks, curbs & pavers S/C awarding of contract
MY202EGSUB129 Block masonry S/C & Material awarding of contract 7 Block masonry S/C & Material awarding of contract
MY202EGSUB130 Metal work & ballustrading S/C awarding of contract 7 Metal work & ballustrading S/C awarding of contract
Architectural Architectural
Submittal Submittal
MY202EGSUB138 Tile S/C submittal 7 Tile S/C submittal
MY202EGSUB133 Wood Doors & Frames S/C submittal 7 Wood Doors & Frames S/C submittal
MY202EGSUB134 Plaster S/C submittal 7 Plaster S/C submittal
MY202EGSUB141 False Ceiling S/C submittal 7 False Ceiling S/C submittal
MY202EGSUB135 Painting S/C submittal 7 Painting S/C submittal
MY202EGSUB143 Aluminum windows, doors & glass S/C submittal 7 Aluminum windows, doors & glass S/C submittal
MY202EGSUB500 Finish hardware (Ironmongery) S/C submittal 7 Finish hardware (Ironmongery) S/C submittal
MY202EGSUB142 Finish Carpentry (Joinery) S/C submittal 7 Finish Carpentry (Joinery) S/C submittal
MY202EGSUB136 Metal Doors & Frames S/C submittal 7 Metal Doors & Frames S/C submittal
Approval Approval
MY202EGSUB150 Tile S/C approval 4 Tile S/C approval
MY202EGSUB145 Wood Doors & Frames S/C approval 4 Wood Doors & Frames S/C approval
MY202EGSUB146 Plaster S/C approval 4 Plaster S/C approval
MY202EGSUB153 False Ceiling S/C approval 4 False Ceiling S/C approval
MY202EGSUB147 Painting S/C approval 4 Painting S/C approval
MY202EGSUB155 Aluminum windows, doors & glass S/C approval 4 Aluminum windows, doors & glass S/C approval
MY202EGSUB154 Finish hardware (Ironmongery) S/C approval 4 Finish hardware (Ironmongery) S/C approval
MY202EGSUB152 Finish Carpentry (Joinery) S/C approval 4 Finish Carpentry (Joinery) S/C approval
MY202EGSUB148 Metal Doors & Frames S/C approval 4 Metal Doors & Frames S/C approval
Finalization Finalization
MY202EGSUB502 Tile S/C awarding of contract 7 Tile S/C awarding of contract
MY202EGSUB157 Wood Doors & Frames S/C awarding of contract 7 Wood Doors & Frames S/C awarding of contract
MY202EGSUB158 Plaster S/C awarding of contract 7 Plaster S/C awarding of contract
MY202EGSUB165 False Ceiling S/C awarding of contract 7 False Ceiling S/C awarding of contract
MY202EGSUB159 Painting S/C awarding of contract 7 Painting S/C awarding of contract
MY202EGSUB167 Aluminum windows, doors & glass S/C awarding of con... 7 Aluminum windows, doors & glass S/C awarding of contract
MY202EGSUB166 Finish hardware (Ironmongery) S/C awarding of contract 7 Finish hardware (Ironmongery) S/C awarding of contract
MY202EGSUB162 Finish Carpentry (Joinery) S/C awarding of contract 7 Finish Carpentry (Joinery) S/C awarding of contract

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
2 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202EGSUB160 Metal Doors & Frames S/C awarding of contract 7 Metal Doors & Frames S/C awarding of contract
Mechanical Mechanical
Submittal Submittal
MY202EGSUB169 HVAC S/C Submittal 7 HVAC S/C Submittal
MY202EGSUB170 Gas Works S/C Submittal 7 Gas Works S/C Submittal
Approval Approval
MY202EGSUB171 HVAC S/C Approval 2 HVAC S/C Approval
MY202EGSUB172 Gas Works S/C Approval 4 Gas Works S/C Approval
Finalization Finalization
MY202EGSUB173 HVAC S/C awarding of contract 7 HVAC S/C awarding of contract
MY202EGSUB174 Gas Works S/C awarding of contract 2 Gas Works S/C awarding of contract
Electrical Electrical
Submittal Submittal
MY202EGSUB175 Electrical Work S/C Submittal 7 Electrical Work S/C Submittal
Approval Approval
MY202EGSUB176 Electrical Work S/C Approval 2 Electrical Work S/C Approval
Finalization Finalization
MY202EGSUB177 Electrical Work S/C awarding of contract 7 Electrical Work S/C awarding of contract
Plumbing, Drainage & Fire Fighting
Fig Plumbing, Drainage & Fire Fighting
Submittal Submittal
MY202EGSUB178 Fire Fighting Works S/C Submittal 7 Fire Fighting Works S/C Submittal
MY202EGSUB179 Plumbing & Drainage S/C Submittal 7 Plumbing & Drainage S/C Submittal
Approval Approval
MY202EGSUB181 Fire Fighting Works S/C Approval 2 Fire Fighting Works S/C Approval
MY202EGSUB182 Plumbing & Drainage S/C Approval 2 Plumbing & Drainage S/C Approval
Finalization Finalization
MY202EGSUB184 Fire Fighting Works S/C awarding of contract 7 Fire Fighting Works S/C awarding of contract
MY202EGSUB185 Plumbing & Drainage S/C awarding of contract 4 Plumbing & Drainage S/C awarding of contract
Elevations Work Elevations Work
Submittal Submittal
MY202EGSUB188 Glass & Glazing S/C submittal 7 Glass & Glazing S/C submittal
MY202EGSUB187 Facade System S/C submittal 7 Facade System S/C submittal
Approval Approval
MY202EGSUB190 Glass & Glazing S/C approval 4 Glass & Glazing S/C approval
MY202EGSUB189 Facade System S/C approval 4 Facade System S/C approval
Finalization Finalization
MY202EGSUB192 Glass & Glazing S/C awarding of contract 7 Glass & Glazing S/C awarding of contract
MY202EGSUB191 Facade System S/C awarding of contract 7 Facade System S/C awarding of contract
Special Construction & Conveying
Conve System Special Construction & Conveying System
Submittal Submittal
MY202EGSUB194 Elevator Works S/C Submittal 7 Elevator Works S/C Submittal
MY202EGSUB195 Refuse Chute S/C submittal 7 Refuse Chute S/C submittal
MY202EGSUB193 Parking Equipment Gate Arm S/C submittal 7 Parking Equipment Gate Arm S/C submittal
Approval Approval
MY202EGSUB197 Elevator Works S/C approval 4 Elevator Works S/C approval
MY202EGSUB198 Refuse Chute S/C approval 4 Refuse Chute S/C approval
MY202EGSUB196 Parking Equipment Gate Arm S/C approval 4 Parking Equipment Gate Arm S/C approval

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
3 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Finalization Finalization
MY202EGSUB200 Elevator Works S/C awarding of contract 7 Elevator Works S/C awarding of contract
MY202EGSUB201 Refuse Chute S/C awarding of contract 7 Refuse Chute S/C awarding of contract
MY202EGSUB199 Parking Equipment Gate Arm S/C awarding of contract 7 Parking Equipment Gate Arm S/C awarding of contract
Landscaping Landscaping
Submittal Submittal
MY202EGSUB202 Landscaping S/C submittal 7 Landscaping S/C submittal
Approval Approval
MY202EGSUB203 Landscaping S/C approval 4 Landscaping S/C approval
Finalization Finalization
MY202EGSUB204 Landscaping S/C awarding of contract 7 Landscaping S/C awarding of contract
Method Statements Submital and Approval Method Statements Submital and Approval

Civil Civil
Submittal Submittal
MY202EGMST102 Excavation & Backfill M.S. submittal 7 Excavation & Backfill M.S. submittal
MY202EGMST101 Concrete Piles M.S. submittal 7 Concrete Piles M.S. submittal
MY202EGMST103 Waterproofing M.S. submittal 7 Waterproofing M.S. submittal
MY202EGSUB104 Epoxy finish M.S. submittal 7 Epoxy finish M.S. submittal
MY202EGMST105 Aluminum Windows, Doors & Curtain Wall M.S. submittal 7 Aluminum Windows, Doors & Curtain Wall M.S. submittal
Approval Approval
MY202EGMST107 Excavation & Backfill M.S. approval 4 Excavation & Backfill M.S. approval
MY202EGMST108 Concrete Piles M.S. approval 4 Concrete Piles M.S. approval
MY202EGMST110 Waterproofing M.S. approval 4 Waterproofing M.S. approval
MY202EGMST111 Epoxy finish M.S. approval 4 Epoxy finish M.S. approval
MY202EGMST112 Aluminum Windows, Doors & Curtain Wall M.S. approval 4 Aluminum Windows, Doors & Curtain Wall M.S. approval
Architectural Architectural
Submittal Submittal
MY202EGMST115 Wall Finishes M.S. submittal 7 Wall Finishes M.S. submittal
MY202EGMST116 Floor Finishes M.S. submittal 7 Floor Finishes M.S. submittal
MY202EGMST118 Roof Water Proofing M.S. submittal 4 Roof Water Proofing M.S. submittal
MY202EGMST114 Plastering and Painting M.S. submittal 7 Plastering and Painting M.S. submittal
MY202EGMST117 Ceiling Finishes M.S. submittal 6 Ceiling Finishes M.S. submittal
Approval Approval
MY202EGMST120 Wall Finishes M.S. approval 4 Wall Finishes M.S. approval
MY202EGMST121 Floor Finishes M.S. approval 4 Floor Finishes M.S. approval
MY202EGMST119 Plastering and Painting M.S. approval 4 Plastering and Painting M.S. approval
MY202EGMST123 Roof Water Proofing M.S. approval 4 Roof Water Proofing M.S. approval
MY202EGMST122 Ceiling Finishes M.S. approval 4 Ceiling Finishes M.S. approval
Mechanical Mechanical
Submittal Submittal
MY202EGMST124 Duct work M.S. submittal 7 Duct work M.S. submittal
MY202EGMST125 Chilled water pipe & valves M.S. submittal 7 Chilled water pipe & valves M.S. submittal
MY202EGMST126 A/C Chillers, pumps, FAHU's, AHU's & FCU's M.S. sub... 7 A/C Chillers, pumps, FAHU's, AHU's & FCU's M.S. submittal
MY202EGMST128 HVAC Testing & Commissioning M.S. submittal 7 HVAC Testing & Commissioning M.S. submittal
Approval Approval
MY202EGMST129 Duct work M.S. approval 4 Duct work M.S. approval
MY202EGMST130 Chilled water pipe & valves M.S. approval 4 Chilled water pipe & valves M.S. approval

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
4 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202EGMST131 A/C Chillers, pumps, FAHU's, AHU's & FCU's M.S. app... 4 A/C Chillers, pumps, FAHU's, AHU's & FCU's M.S. approval
MY202EGMST133 HVAC Testing & Commissioning M.S. approval 4 HVAC Testing & Commissioning M.S. approval
Electrical Electrical
Submittal Submittal
MY202EGMST135 Electrical Power System M.S. submittal 7 Electrical Power System M.S. submittal
MY202EGMST137 Fire Alarm System M.S. Submittal 7 Fire Alarm System M.S. Submittal
MY202EGMST141 Electrical Testing & Commissioning M.S. submittal 7 Electrical Testing & Commissioning M.S. submittal
MY202EGMST159 Fire Alarm System Testing & Commissioning M.S. sub... 7 Fire Alarm System Testing & Commissioning M.S. submittal
Approval Approval
MY202EGMST143 Electrical Power System M.S. approval 4 Electrical Power System M.S. approval
MY202EGMST145 Fire Alarm System M.S. approval 4 Fire Alarm System M.S. approval
MY202EGMST149 Electrical Testing & Commissioning M.S. approval 4 Electrical Testing & Commissioning M.S. approval
MY202EGMST169 Fire Alarm System Testing & Commissioning M.S. appr... 4 Fire Alarm System Testing & Commissioning M.S. approval
Plumbing, Drainage & Fire Fighting
Fig Plumbing, Drainage & Fire Fighting
Submittal Submittal
MY202EGMST151 Fire Fighting Works M.S. submittal 7 Fire Fighting Works M.S. submittal
MY202EGMST150 Plumbing Work M.S. submittal 7 Plumbing Work M.S. submittal
MY202EGMST152 Plumbing & FF Testing & Commissioning M.S. submittal 7 Plumbing & FF Testing & Commissioning M.S. submittal
Approval Approval
MY202EGMST156 Fire Fighting Works M.S. approval 4 Fire Fighting Works M.S. approval
MY202EGMST155 Plumbing Work M.S. approval 4 Plumbing Work M.S. approval
MY202EGMST157 Plumbing & FF Testing & Commissioning M.S. approval 4 Plumbing & FF Testing & Commissioning M.S. approval
Elevations Work Elevations Work
Submittal Submittal
MY202EGMST160 Elevations Work Method of Statement submittal 7 Elevations Work Method of Statement submittal
Approval Approval
MY202EGMST161 Elevations Work Method of Statement approval 4 Elevations Work Method of Statement approval
Special Construction & Conveying
Conve System Special Construction & Conveying System
Submittal Submittal
MY202EGMST163 Elevator works M.S. Submittal 7 Elevator works M.S. Submittal
MY202EGMST164 Refuse Chute M.S. submittal 7 Refuse Chute M.S. submittal
MY202EGMST162 Parking Equipment Gate Arm M.S. submittal 7 Parking Equipment Gate Arm M.S. submittal
Approval Approval
MY202EGMST166 Elevator works M.S. approval 4 Elevator works M.S. approval
MY202EGMST167 Refuse Chute M.S. approval 4 Refuse Chute M.S. approval
MY202EGMST165 Parking Equipment Gate Arm M.S. approval 4 Parking Equipment Gate Arm M.S. approval
Shop Drawings Submittal and Approval
Ap Shop Drawings Submittal and Appr

Civil Civil
Submittal Submittal
MY202EGDWG101 Shoring works S/D submittal 5 Shoring works S/D submittal
MY202EGDWG100 Excavation & Perimeter S/D submittal 7 Excavation & Perimeter S/D submittal
MY202EGDWG103 Foundation S/D submittal 4 Foundation S/D submittal
MY202EGDWG102 Concrete Piles S/D Submittal 7 Concrete Piles S/D Submittal
MY202EGDWG112 Waterproofing S/D submittal 4 Waterproofing S/D submittal
MY202EGDWG106 Post Tension Concrete Design DWG submittal 30 Post Tension Concrete Design DWG submittal
MY202EGDWG108 Substructure BL1 S/D submittal 4 Substructure BL1 S/D submittal
MY202EGDWG111 Sidewalks, curbs & pavers S/D submittal 4 Sidewalks, curbs & pavers S/D submittal

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
5 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202EGDWG109 Superstructure GF S/D submittal 4 Superstructure GF S/D submittal
MY202EGDWG110 Superstructure 1F-28F S/D submittal 0 Superstructure 1F-28F S/D submittal
MY202EGDWG114 Superstructure Roof S/D submittal 4 Superstructure Roof S/D submittal
Approval Approval
MY202EGDWG117 Shoring works S/D approval 4 Shoring works S/D approval
MY202EGDWG116 Excavation & Perimeter S/D approval 4 Excavation & Perimeter S/D approval
MY202EGDWG118 Concrete Piles S/D approval 4 Concrete Piles S/D approval
MY202EGDWG119 Foundation S/D approval 4 Foundation S/D approval
MY202EGDWG128 Waterproofing S/D approval 4 Waterproofing S/D approval
MY202EGDWG124 Substructure BL1 S/D approval 4 Substructure BL1 S/D approval
MY202EGDWG127 Sidewalks, curbs & pavers S/D approval 4 Sidewalks, curbs & pavers S/D approval
MY202EGDWG122 Post Tension Concrete Design DWG approval 4 Post Tension Concrete Design DWG approval
MY202EGDWG125 Superstructure GF S/D approval 4 Superstructure GF S/D approval
MY202EGDWG126 Superstructure 1F-28F S/D approval 0 Superstructure 1F-28F S/D approval
MY202EGDWG130 Superstructure Roof S/D approval 4 Superstructure Roof S/D approval
Architectural Architectural
Submittal Submittal
MY202EGDWG132 Concrete Block Masonry, Basements & GF S/D submittal 4 Concrete Block Masonry, Basements & GF S/D submittal
MY202EGDWG133 Wooden Doors & Frames S/D submittal 30 Wooden Doors & Frames S/D submittal
MY202EGDWG161 Washroom accessories S/D approval 30 Washroom accessories S/D approval
MY202EGDWG138 Concrete Block Masonry, 1F-RF S/D submittal 0 Concrete Block Masonry, 1F-RF S/D submittal
MY202EGDWG140 Finish Carpentry (Joinery) S/D submittal 30 Finish Carpentry (Joinery) S/D submittal
MY202EGDWG137 False ceiling S/D submittal 4 False ceiling S/D submittal
MY202EGDWG139 Ironmongery S/D submittal 30 Ironmongery S/D submittal
MY202EGDWG135 Metal Doors & Frames S/D submittal 30 Metal Doors & Frames S/D submittal
MY202EGDWG141 Metal work & balustrading S/D submittal 30 Metal work & balustrading S/D submittal
Approval Approval
MY202EGDWG142 Concrete Block Masonry, Basements & GF S/D approval 4 Concrete Block Masonry, Basements & GF S/D approval
MY202EGDWG148 Concrete Block Masonry, 1F-RF S/D approval 0 Concrete Block Masonry, 1F-RF S/D approval
MY202EGDWG143 Wooden Doors & Frames S/D approval 4 Wooden Doors & Frames S/D approval
MY202EGDWG146 Washroom accessories S/D approval 4 Washroom accessories S/D approval
MY202EGDWG150 Finish Carpentry (Joinery) S/D approval 4 Finish Carpentry (Joinery) S/D approval
MY202EGDWG147 False ceiling S/D approval 4 False ceiling S/D approval
MY202EGDWG149 Ironmongery S/D approval 4 Ironmongery S/D approval
MY202EGDWG145 Metal Doors & Frames S/D approval 4 Metal Doors & Frames S/D approval
MY202EGDWG151 Metal work & balustrading S/D approval 4 Metal work & balustrading S/D approval
Mechanical Mechanical
Submittal Submittal
MY202EGDWG153 Air Condition Layouts Submittal 4 Air Condition Layouts Submittal
MY202EGDWG152 Natural Gas Layouts Submittal 4 Natural Gas Layouts Submittal
Approval Approval
MY202EGDWG155 Air Condition Layouts Approval 4 Air Condition Layouts Approval
MY202EGDWG154 Natural Gas Layouts Approval 4 Natural Gas Layouts Approval
Electrical Electrical
Submittal Submittal
MY202EGDWG157 Lighting System Layouts Submittal 4 Lighting System Layouts Submittal
MY202EGDWG158 Power System Layouts Submittal 4 Power System Layouts Submittal

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
6 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202EGDWG159 Fire Alarm / Voice Evacuation Layouts Submittal 4 Fire Alarm / Voice Evacuation Layouts Submittal
MY202EGDWG160 Telephone & Data System Layouts Submittal 4 Telephone & Data System Layouts Submittal
MY202EGDWG503 CCTV System Layouts Submittal 4 CCTV System Layouts Submittal
MY202EGDWG162 Emergency Lighting System Layouts Submittal 4 Emergency Lighting System Layouts Submittal
Approval Approval
MY202EGDWG164 Lighting System Layouts Approval 4 Lighting System Layouts Approval
MY202EGDWG165 Power System Layouts Approval 4 Power System Layouts Approval
MY202EGDWG166 Fire Alarm / Voice Evacuation Layouts Approval 4 Fire Alarm / Voice Evacuation Layouts Approval
MY202EGDWG167 Telephone & Data System Layouts Approval 4 Telephone & Data System Layouts Approval
MY202EGDWG168 CCTV System Layouts Approval 4 CCTV System Layouts Approval
MY202EGDWG169 Emergency Lighting System Layouts Approval 4 Emergency Lighting System Layouts Approval
Plumbing, Drainage & Fire Fighting
Fig Plumbing, Drainage & Fire Fighting
Submittal Submittal
MY202EGDWG171 Drainage System Layouts Submittal 4 Drainage System Layouts Submittal
MY202EGDWG172 Water System Layouts Submittal 4 Water System Layouts Submittal
MY202EGDWG173 Fire Fighting System Layouts Submittal 4 Fire Fighting System Layouts Submittal
Approval Approval
MY202EGDWG175 Drainage System Layouts Approval 4 Drainage System Layouts Approval
MY202EGDWG176 Water System Layouts Approval 4 Water System Layouts Approval
MY202EGDWG177 Fire Fighting System Layouts Approval 4 Fire Fighting System Layouts Approval
Elevations Work Elevations Work
Submittal Submittal
MY202EGDWG178 Glass & glazing S/D submittal 30 Glass & glazing S/D submittal
Approval Approval
MY202EGDWG180 Glass & glazing S/D approval 4 Glass & glazing S/D approval
Special Construction & Conveying
Conve System Special Construction & Conveying System
Submittal Submittal
MY202EGDWG184 Lift S/D submittal 30 Lift S/D submittal
MY202EGDWG185 Refuse Chute S/D submittal 30 Refuse Chute S/D submittal
MY202EGDWG183 Parking Gate Arm S/D submittal 30 Parking Gate Arm S/D submittal
MY202EGDWG182 Window Washing Equipment S/D submittal 7 Window Washing Equipment S/D submittal
Approval Approval
MY202EGDWG188 Lift S/D approval 4 Lift S/D approval
MY202EGDWG189 Refuse Chute S/D approval 4 Refuse Chute S/D approval
MY202EGDWG187 Parking Gate Arm S/D approval 4 Parking Gate Arm S/D approval
MY202EGDWG186 Window Washing Equipment S/D approval 4 Window Washing Equipment S/D approval
Landscaping Landscaping
Submittal Submittal
MY202EGDWG190 Landscaping S/D Submittal 4 Landscaping S/D Submittal
Approval Approval
MY202EGDWG191 Landscaping S/D Approval 4 Landscaping S/D Approval
Shop Drawing Approval by Municipality
Mu Shop Drawing Approval by Municipality
MY202EGDWG513 Shoring works S/D approval (Municipality) Shoring works S/D approval (Municipality)
Materials Submittal and Approval Materials Submittal and Approval

Civil Civil
Submittal Submittal
MY202EGMAT100 Shoring works mat'l submittal 7 Shoring works mat'l submittal

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
7 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202EGMAT101 Concrete Mixed Design Submittal for Concrete Piles 7 Concrete Mixed Design Submittal for Concrete Piles
MY202EGMAT105 Concrete Mixed Design submittal 7 Concrete Mixed Design submittal
MY202EGMAT106 Waterproofing mat'l submittal 7 Waterproofing mat'l submittal
MY202EGMAT108 Interlocking tiles & kerbstone submittal 7 Interlocking tiles & kerbstone submittal
MY202EGMAT104 Thermal insulation mat'l submittal 7 Thermal insulation mat'l submittal
Approval Approval
MY202EGMAT109 Shoring works mat'l approval 4 Shoring works mat'l approval
MY202EGMAT110 Concrete Mixed Design of Concrete Piles approval 4 Concrete Mixed Design of Concrete Piles approval
MY202EGMAT114 Concrete Mixed Design approval 4 Concrete Mixed Design approval
MY202EGMAT115 Waterproofing mat'l approval 4 Waterproofing mat'l approval
MY202EGMAT117 Interlocking tiles & kerbstone mat'l approval 4 Interlocking tiles & kerbstone mat'l approval
MY202EGMAT113 Thermal insulation mat'l approval 4 Thermal insulation mat'l approval
Architectural Architectural
Submittal Submittal
MY202EGMAT166 Tile material submittal 7 Tile material submittal
MY202EGMAT176 Stainless steel cladding submittal 7 Stainless steel cladding submittal
MY202EGMAT118 Masonry material submittal 7 Masonry material submittal
MY202EGMAT145 Aluminum louver submittal 7 Aluminum louver submittal
MY202EGMAT189 Epoxy coating submittal 7 Epoxy coating submittal
MY202EGMAT121 Wooden Doors & Frame mat'l submittal 7 Wooden Doors & Frame mat'l submittal
MY202EGMAT122 False Ceiling mat'l submittal 7 False Ceiling mat'l submittal
MY202EGMAT120 Traffic Accessories mat'l submittal 7 Traffic Accessories mat'l submittal
MY202EGMAT133 Vanity Top mat'l submittal 7 Vanity Top mat'l submittal
MY202EGMAT123 Painting mat'l submittal 7 Painting mat'l submittal
MY202EGMAT126 Aluminum Windows, Doors & Glass mat'l submittal 7 Aluminum Windows, Doors & Glass mat'l submittal
MY202EGMAT132 Kitchen Cabinet & Wardrobes mat'l submittal 7 Kitchen Cabinet & Wardrobes mat'l submittal
MY202EGMAT130 Ironmongery mat'l submittal 7 Ironmongery mat'l submittal
MY202EGMAT165 Access ladder submittal 7 Access ladder submittal
MY202EGMAT136 Roof Tiles mat'l submittal 7 Roof Tiles mat'l submittal
MY202EGMAT131 Kitchen Counter Top mat'l submittal 7 Kitchen Counter Top mat'l submittal
MY202EGMAT124 Staircase Handrail mat'l submittal 7 Staircase Handrail mat'l submittal
MY202EGMAT185 Counter desk material submittal 7 Counter desk material submittal
MY202EGMAT134 Threshold mat'l submittal 7 Threshold mat'l submittal
MY202EGMAT135 Mirror mat'l submittal 7 Mirror mat'l submittal
MY202EGMAT129 Room Signage mat'l submittal 7 Room Signage mat'l submittal
Approval Approval
MY202EGMAT158 Tile material approval 4 Tile material approval
MY202EGMAT168 Stainless steel cladding approval 4 Stainless steel cladding approval
MY202EGMAT138 Masonry material approval 4 Masonry material approval
MY202EGMAT159 Aluminum louver approval 4 Aluminum louver approval
MY202EGMAT199 Epoxy coating approval 4 Epoxy coating approval
MY202EGMAT141 Wooden Doors & Frame mat'l approval 4 Wooden Doors & Frame mat'l approval
MY202EGMAT142 False Ceiling mat'l approval 4 False Ceiling mat'l approval
MY202EGMAT140 Traffic Accessories mat'l approval 4 Traffic Accessories mat'l approval
MY202EGMAT153 Vanity Top mat'l approval 4 Vanity Top mat'l approval
MY202EGMAT143 Painting mat'l approval 4 Painting mat'l approval
MY202EGMAT146 Aluminum Windows, Doors & Glass mat'l approval 4 Aluminum Windows, Doors & Glass mat'l approval

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
8 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202EGMAT152 Kitchen Cabinet & Wardrobes mat'l approval 4 Kitchen Cabinet & Wardrobes mat'l approval
MY202EGMAT150 Ironmongery mat'l approval 4 Ironmongery mat'l approval
MY202EGMAT169 Access ladder approval 4 Access ladder approval
MY202EGMAT156 Roof Tiles mat'l approval 4 Roof Tiles mat'l approval
MY202EGMAT151 Kitchen Counter Top mat'l approval 4 Kitchen Counter Top mat'l approval
MY202EGMAT144 Staircase Handrail mat'l approval 4 Staircase Handrail mat'l approval
MY202EGMAT209 Counter desk material approval 4 Counter desk material approval
MY202EGMAT154 Threshold mat'l approval 4 Threshold mat'l approval
MY202EGMAT155 Mirror mat'l approval 4 Mirror mat'l approval
MY202EGMAT149 Room Signage mat'l approval 4 Room Signage mat'l approval
Mechanical Mechanical
Submittal Submittal
MY202EGMAT504 HVAC Works mat'l submittal 7 HVAC Works mat'l submittal
MY202EGMAT160 Fan Coil Units mat'l submittal 7 Fan Coil Units mat'l submittal
MY202EGMAT505 Natural Gas Works mat'l submittal 7 Natural Gas Works mat'l submittal
MY202EGMAT161 Chillers mat'l submittal 7 Chillers mat'l submittal
MY202EGMAT162 FAHU mat'l submittal 7 FAHU mat'l submittal
MY202EGMAT163 Chilled Water Pump mat'l submittal 7 Chilled Water Pump mat'l submittal
Approval Approval
MY202EGMAT164 HVAC Works mat'l approval 4 HVAC Works mat'l approval
MY202EGMAT506 Fan Coil Units mat'l approval 4 Fan Coil Units mat'l approval
MY202EGMAT509 Natural Gas Works mat'l approval 4 Natural Gas Works mat'l approval
MY202EGMAT167 Chillers mat'l approval 4 Chillers mat'l approval
MY202EGMAT507 FAHU mat'l approval 4 FAHU mat'l approval
MY202EGMAT508 Chilled Water Pump mat'l approval 4 Chilled Water Pump mat'l approval
Electrical Electrical
Submittal Submittal
MY202EGMAT171 Electrical materials submittal 7 Electrical materials submittal
MY202EGMAT174 Telecommunication mat'l submittal 7 Telecommunication mat'l submittal
MY202EGMAT178 TV System mat'l submittal 7 TV System mat'l submittal
MY202EGMAT173 CCTV System mat'l submittal 7 CCTV System mat'l submittal
MY202EGMAT180 SMART Home System mat'l submittal 7 SMART Home System mat'l submittal
MY202EGMAT170 MDB's, SMDB's, MCC's, DB's, ATS, etc. mat'l submittal 7 MDB's, SMDB's, MCC's, DB's, ATS, etc. mat'l submittal
MY202EGMAT177 BMS mat'l submittal 7 BMS mat'l submittal
MY202EGMAT512 Intercom mat'l submittal 7 Intercom mat'l submittal
MY202EGMAT510 Power Bus Bar mat'l submittal 7 Power Bus Bar mat'l submittal
MY202EGMAT511 Fire Alarm mat'l submittal 7 Fire Alarm mat'l submittal
MY202EGMAT181 Generator mat'l submittal 7 Generator mat'l submittal
MY202EGMAT172 Lighting Fixtures and Fittings mat'l submittal 7 Lighting Fixtures and Fittings mat'l submittal
Approval Approval
MY202EGMAT183 Electrical materials approval 4 Electrical materials approval
MY202EGMAT186 Telecommunication mat'l approval 4 Telecommunication mat'l approval
MY202EGMAT190 TV System mat'l approval 4 TV System mat'l approval
MY202EGMAT513 CCTV System mat'l approval 4 CCTV System mat'l approval
MY202EGMAT192 SMART Home System mat'l approval 4 SMART Home System mat'l approval
MY202EGMAT182 MDB's, SMDB's, MCC's, DB's, ATS, etc. mat'l approval 4 MDB's, SMDB's, MCC's, DB's, ATS, etc. mat'l approval
MY202EGMAT514 BMS mat'l approval 4 BMS mat'l approval

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
9 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202EGMAT191 Intercom mat'l approval 4 Intercom mat'l approval
MY202EGMAT188 Power Bus Bar mat'l approval 4 Power Bus Bar mat'l approval
MY202EGMAT187 Fire Alarm mat'l approval 4 Fire Alarm mat'l approval
MY202EGMAT193 Generator mat'l approval 4 Generator mat'l approval
MY202EGMAT184 Lighting Fixtures and Fittings mat'l approval 4 Lighting Fixtures and Fittings mat'l approval
Plumbing, Drainage & Fire Fighting
Fig Plumbing, Drainage & Fire Fighting
Submittal Submittal
MY202EGMAT195 Fire Fighting mat'l submittal 7 Fire Fighting mat'l submittal
MY202EGMAT194 Plumbing & Drainage mat'l submittal 7 Plumbing & Drainage mat'l submittal
MY202EGMAT198 Fire Fighting Pump Set mat'l submittal 7 Fire Fighting Pump Set mat'l submittal
MY202EGMAT515 Plumbing Pump Set mat'l submittal 7 Plumbing Pump Set mat'l submittal
MY202EGMAT196 Water Heater mat'l submittal 7 Water Heater mat'l submittal
MY202EGMAT197 Sanitary Wares mat'l submittal 7 Sanitary Wares mat'l submittal
Approval Approval
MY202EGMAT201 Fire Fighting mat'l approval 4 Fire Fighting mat'l approval
MY202EGMAT200 Plumbing & Drainage mat'l approval 4 Plumbing & Drainage mat'l approval
MY202EGMAT204 Fire Fighting Pump Set mat'l approval 4 Fire Fighting Pump Set mat'l approval
MY202EGMAT205 Plumbing Pump Set mat'l approval 4 Plumbing Pump Set mat'l approval
MY202EGMAT202 Water Heater mat'l approval 4 Water Heater mat'l approval
MY202EGMAT203 Sanitary Wares mat'l approval 4 Sanitary Wares mat'l approval
Elevations Work Elevations Work
Submittal Submittal
MY202EGMAT206 Glass & glazing mat'l submittal 7 Glass & glazing mat'l submittal
MY202EGMAT208 External tile mat'l submittal 7 External tile mat'l submittal
MY202EGMAT207 Balcony balustrading mat'l submittal 7 Balcony balustrading mat'l submittal
Approval Approval
MY202EGMAT210 Glass & glazing mat'l approval 4 Glass & glazing mat'l approval
MY202EGMAT212 External tile mat'l approval 4 External tile mat'l approval
MY202EGMAT211 Balcony balustrading mat'l approval 4 Balcony balustrading mat'l approval
Special Construction & Conveying
Conve System Special Construction & Conveying System
Submittal Submittal
MY202EGMAT213 Lift mat'l submittal 7 Lift mat'l submittal
MY202EGMAT214 Garbage Chute mat'l submittal 7 Garbage Chute mat'l submittal
MY202EGMAT215 Parking equipment gate arm mat'l submittal 7 Parking equipment gate arm mat'l submittal
Approval Approval
MY202EGMAT216 Lift mat'l approval 4 Lift mat'l approval
MY202EGMAT217 Garbage Chute mat'l approval 4 Garbage Chute mat'l approval
MY202EGMAT218 Parking equipment gate arm mat'l approval 4 Parking equipment gate arm mat'l approval
Landscaping Landscaping
Submittal Submittal
MY202EGMAT219 Aluminium Decorative Screen mat'l submittal 7 Aluminium Decorative Screen mat'l submittal
Approval Approval
MY202EGMAT220 Aluminium Decorative Screen mat'l approval 4 Aluminium Decorative Screen mat'l approval
Procurement Procurement

Civil Civil
Order Order
MY202PRORD100 Issue P.O. for Shoring Works materials 6 Issue P.O. for Shoring Works materials

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
10 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202PRORD103 Issue P.O. for Structural work materials 6 Issue P.O. for Structural work materials
MY202PRORD113 Issue P.O. for Interlocking tiles & kerbstone materials 6 Issue P.O. for Interlocking tiles & kerbstone materials
Delivery Delivery
MY202PRORD104 Delivery of Shoring Works materials 7 Delivery of Shoring Works materials
MY202PRORD107 Delivery of Structural work materials 2 Delivery of Structural work materials
MY202PRORD114 Delivery of Interlocking tiles & kerbstone materials 1 Delivery of Interlocking tiles & kerbstone materials
Architectural Architectural
Order Order
MY202PRORD147 Issue P.O. for Waterproofing Materials 6 Issue P.O. for Waterproofing Materials
MY202PRORD127 Issue P.O. for Stainless steel cladding 6 Issue P.O. for Stainless steel cladding
MY202PRORD117 Issue P.O. for Metal Work Items (landscaping) 6 Issue P.O. for Metal Work Items (landscaping)
MY202PRORD109 Issue P.O. for Block Works 6 Issue P.O. for Block Works
MY202PRORD157 Issue P.O. for Aluminum louver 6 Issue P.O. for Aluminum louver
MY202PRORD128 Issue P.O. for Epoxy paint 6 Issue P.O. for Epoxy paint
MY202PRORD108 Issue P.O. for Thermal Insulation 6 Issue P.O. for Thermal Insulation
MY202PRORD110 Issue P.O. for Wooden Works 6 Issue P.O. for Wooden Works
MY202PRORD112 Issue P.O. for False Ceiling 6 Issue P.O. for False Ceiling
MY202PRORD111 Issue P.O. for Painting Items 6 Issue P.O. for Painting Items
MY202PRORD137 Issue P.O. for Door Ironmongeries 6 Issue P.O. for Door Ironmongeries
MY202PRORD167 Issue P.O. for Access ladder 6 Issue P.O. for Access ladder
MY202PRORD517 Issue P.O. for Staircase Handrail 6 Issue P.O. for Staircase Handrail
MY202PRORD138 Issue P.O. for Counter desk material 6 Issue P.O. for Counter desk material
MY202PRORD115 Issue P.O. for Threshold 6 Issue P.O. for Threshold
MY202PRORD116 Issue P.O. for Mirror 6 Issue P.O. for Mirror
MY202PRORD516 Issue P.O. for Room Signage 6 Issue P.O. for Room Signage
Delivery Delivery
MY202PRORD148 Delivery of Waterproofing Materials 2 Delivery of Waterproofing Materials
MY202PRORD519 Delivery of Stainless steel cladding 2 Delivery of Stainless steel cladding
MY202PRORD521 Delivery of Metal Work Items (landscaping) 2 Delivery of Metal Work Items (landscaping)
MY202PRORD119 Delivery of Block Works 2 Delivery of Block Works
MY202PRORD158 Delivery of Aluminum louver 2 Delivery of Aluminum louver
MY202PRORD188 Delivery of Epoxy paint 2 Delivery of Epoxy paint
MY202PRORD518 Delivery of Thermal Insulation 2 Delivery of Thermal Insulation
MY202PRORD120 Delivery of Wooden Works 2 Delivery of Wooden Works
MY202PRORD122 Delivery of False Ceiling 2 Delivery of False Ceiling
MY202PRORD121 Delivery of Painting Items 2 Delivery of Painting Items
MY202PRORD520 Delivery of Door Ironmongeries 2 Delivery of Door Ironmongeries
MY202PRORD168 Delivery of Access ladder 2 Delivery of Access ladder
MY202PRORD123 Delivery of Staircase Handrail 2 Delivery of Staircase Handrail
MY202PRORD198 Delivery of Counter desk material 2 Delivery of Counter desk material
MY202PRORD125 Delivery of Threshold 2 Delivery of Threshold
MY202PRORD126 Delivery of Mirror 2 Delivery of Mirror
MY202PRORD124 Delivery of Room Signage 2 Delivery of Room Signage
Mechanical Mechanical
Order Order
MY202PRORD522 Issue P.O. for HVAC Duct & pipes 6 Issue P.O. for HVAC Duct & pipes
MY202PRORD129 Issue P.O. for AC grills, diffusers, hangers & supports 6 Issue P.O. for AC grills, diffusers, hangers & supports

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
11 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202PRORD130 Issue P.O. for Natural Gas pipes 6 Issue P.O. for Natural Gas pipes
MY202PRORD131 Issue P.O. for NG valves, meters & Gas detector 6 Issue P.O. for NG valves, meters & Gas detector
Delivery Delivery
MY202PRORD133 Delivery of AC grills, diffusers, hangers & supports 30 Delivery of AC grills, diffusers, hangers & supports
MY202PRORD132 Delivery of HVAC Duct & pipes 40 Delivery of HVAC Duct & pipes
MY202PRORD134 Delivery of Natural Gas pipes 25 Delivery of Natural Gas pipes
MY202PRORD135 Delivery of NG valves, meters & Gas detector 25 Delivery of NG valves, meters & Gas detector
Electrical Electrical
Order Order
MY202PRORD136 Issue P.O. for wiring & cabling 6 Issue P.O. for wiring & cabling
MY202PRORD524 Issue P.O. for switches, sockets, cable tray, central bat... 6 Issue P.O. for switches, sockets, cable tray, central battery cables
MY202PRORD150 Issue P.O. for Telecommunication mat'l 6 Issue P.O. for Telecommunication mat'l
MY202PRORD160 Issue P.O. for TV System mat'l 6 Issue P.O. for TV System mat'l
MY202PRORD140 Issue P.O. for CCTV devices 6 Issue P.O. for CCTV devices
MY202PRORD170 Issue P.O. for SMART Home System mat'l 6 Issue P.O. for SMART Home System mat'l
MY202PRORD141 Issue P.O. for BMS devices 6 Issue P.O. for BMS devices
MY202PRORD149 Issue P.O. for Intercom mat'l 6 Issue P.O. for Intercom mat'l
MY202PRORD139 Issue P.O. for sounders, flashers, fire alarm detector, etc. 6 Issue P.O. for sounders, flashers, fire alarm detector, etc.
MY202PRORD523 Issue P.O. for lighting fixtures & fittings materials 6 Issue P.O. for lighting fixtures & fittings materials
MY202PRORD180 Issue P.O. for Parking equipment gate arm 6 Issue P.O. for Parking equipment gate arm
Delivery Delivery
MY202PRORD143 Delivery of switches, sockets, cable tray, central battery... 30 Delivery of switches, sockets, cable tray, central battery cables
MY202PRORD142 Delivery of wiring & cabling 45 Delivery of wiring & cabling
MY202PRORD156 Delivery of Telecommunication mat'l 30 Delivery of Telecommunication mat'l
MY202PRORD166 Delivery of TV System mat'l 30 Delivery of TV System mat'l
MY202PRORD146 Delivery of CCTV devices 30 Delivery of CCTV devices
MY202PRORD186 Delivery of SMART Home System mat'l 30 Delivery of SMART Home System mat'l
MY202PRORD525 Delivery of BMS devices 25 Delivery of BMS devices
MY202PRORD176 Delivery of Intercom mat'l 30 Delivery of Intercom mat'l
MY202PRORD145 Delivery of sounders, flashers, fire alarm detector, etc. 30 Delivery of sounders, flashers, fire alarm detector, etc.
MY202PRORD144 Delivery of lighting fixtures & fittings materials 30 Delivery of lighting fixtures & fittings materials
MY202PRORD196 Delivery of Parking equipment gate arm 25 Delivery of Parking equipment gate arm
Plumbing, Drainage & Fire Fighting
Fig Plumbing, Drainage & Fire Fighting
Order Order
MY202PRORD800 Issue P.O. for fire fighting pipes 6 Issue P.O. for fire fighting pipes
MY202PRORD801 Issue P.O. for FF valves & accessories, sprinkler & hos... 6 Issue P.O. for FF valves & accessories, sprinkler & hose reel
MY202PRORD802 Issue P.O. for plumbing & drainage pipes & water supp... 6 Issue P.O. for plumbing & drainage pipes & water supply valves
Delivery Delivery
MY202PRORD153 Delivery of fire fighting pipes 25 Delivery of fire fighting pipes
MY202PRORD152 Delivery of FF valves & accessories, sprinkler & hose reel 45 Delivery of FF valves & accessories, sprinkler & hose reel
MY202PRORD151 Delivery of plumbing & drainage pipes & water supply v... 30 Delivery of plumbing & drainage pipes & water supply valves
Elevations Work Elevations Work
Order Order
MY202PRORD154 Issue P.O. for Aluminium Glazing Items 6 Issue P.O. for Aluminium Glazing Items
MY202PRORD165 Issue P.O. for External ceramic tile 6 Issue P.O. for External ceramic tile
MY202PRORD155 Issue P.O. for Handrail Balconies 6 Issue P.O. for Handrail Balconies
Delivery Delivery

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
12 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202PRORD806 Delivery of Aluminium Glazing Items 50 Delivery of Aluminium Glazing Items
MY202PRORD807 Delivery of External ceramic tile 60 Delivery of External ceramic tile
MY202PRORD805 Delivery of Handrail Balconies 40 Delivery of Handrail Balconies
Long Lead Items Long Lead Items
Civil & Architectural Civil & Architectural
Order Order
MY202PRORD0159 Issue P.O. for Tiles 6 Issue P.O. for Tiles
MY202PRORD0161 Issue P.O. for Wooden Door Frame & Leaf 6 Issue P.O. for Wooden Door Frame & Leaf
MY202PRORD0160 Issue P.O. for Traffic Accessories 6 Issue P.O. for Traffic Accessories
MY202PRORD0165 Issue P.O. for Vanity Top 6 Issue P.O. for Vanity Top
MY202PRORD0162 Issue P.O. for Aluminum Doors, Windows & Glass 6 Issue P.O. for Aluminum Doors, Windows & Glass
MY202PRORD0164 Issue P.O. for Kitchen Cabinet & Wardrobes 6 Issue P.O. for Kitchen Cabinet & Wardrobes
MY202PRORD0158 Issue P.O. for Window Cleaning System 6 Issue P.O. for Window Cleaning System
MY202PRORD0167 Issue P.O. for Roof Tiles 6 Issue P.O. for Roof Tiles
MY202PRORD0163 Issue P.O. for Kitchen Counter Top 6 Issue P.O. for Kitchen Counter Top
Delivery Delivery
MY202PRORD0169 Delivery of Tiles 2 Delivery of Tiles
MY202PRORD0171 Delivery of Wooden Door Frame & Leaf 60 Delivery of Wooden Door Frame & Leaf
MY202PRORD0170 Delivery of Traffic Accessories 60 Delivery of Traffic Accessories
MY202PRORD0175 Delivery of Vanity Top 60 Delivery of Vanity Top
MY202PRORD0172 Delivery of Aluminum Doors, Windows & Glass 60 Delivery of Aluminum Doors, Windows & Glass
MY202PRORD0174 Delivery of Kitchen Cabinet & Wardrobes 60 Delivery of Kitchen Cabinet & Wardrobes
MY202PRORD0168 Delivery of Window Cleaning System 90 Delivery of Window Cleaning System
MY202PRORD0177 Delivery of Roof Tiles 60 Delivery of Roof Tiles
MY202PRORD0173 Delivery of Kitchen Counter Top 60 Delivery of Kitchen Counter Top
Mechanical Mechanical
Order Order
MY202PRORD821 Issue P.O for FCU 6 Issue P.O for FCU
MY202PRORD820 Issue P.O. for Chillers 6 Issue P.O. for Chillers
MY202PRORD179 Issue P.O. for FAHU 6 Issue P.O. for FAHU
MY202PRORD181 Issue P.O. for Chilled Water Pumps 6 Issue P.O. for Chilled Water Pumps
Delivery Delivery
MY202PRORD184 Delivery of FCU 90 Delivery of FCU
MY202PRORD182 Delivery of Chillers 2 Delivery of Chillers
MY202PRORD183 Delivery of FAHU 0 Delivery of FAHU
MY202PRORD185 Delivery of Chilled Water Pumps 90 Delivery of Chilled Water Pumps
Electrical Electrical
Order Order
MY202PRORD810 Issue P.O. for MDB's, SMDB's, MCC's, DB's, ATS, etc. 6 Issue P.O. for MDB's, SMDB's, MCC's, DB's, ATS, etc.
MY202PRORD187 Issue P.O. for Power Bus Bar 6 Issue P.O. for Power Bus Bar
MY202PRORD811 Issue P.O. for Generator 6 Issue P.O. for Generator
Delivery Delivery
MY202PRORD189 Delivery of MDB's, SMDB's, MCC's, DB's, ATS, etc. 2 Delivery of MDB's, SMDB's, MCC's, DB's, ATS, etc.
MY202PRORD190 Delivery of Power Bus Bar 0 Delivery of Power Bus Bar
MY202PRORD191 Delivery of Generator 2 Delivery of Generator
Plumbing, Drainage & Fire Fighting
Fightin Plumbing, Drainage & Fire Fighting
Order Order

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
13 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202PRORD194 Issue P.O. for Fire Fighting Pump Set 6 Issue P.O. for Fire Fighting Pump Set
MY202PRORD195 Issue P.O. for Plumbing Pump Set 6 Issue P.O. for Plumbing Pump Set
MY202PRORD192 Issue P.O. for Water Heater 6 Issue P.O. for Water Heater
MY202PRORD193 Issue P.O. for Sanitary Wares 6 Issue P.O. for Sanitary Wares
Delivery Delivery
MY202PRORD812 Delivery of Fire Fighting Pump Set 90 Delivery of Fire Fighting Pump Set
MY202PRORD199 Delivery of Plumbing Pump Set 90 Delivery of Plumbing Pump Set
MY202PRORD813 Delivery of Water Heater 90 Delivery of Water Heater
MY202PRORD197 Delivery of Sanitary Wares 90 Delivery of Sanitary Wares
Special Construction & Conveying
Conveyin System Special Construction & Conveying System
Order Order
MY202PRORD200 Issue P.O. for Lift materials (Service & Passenger Lift) 6 Issue P.O. for Lift materials (Service & Passenger Lift)
MY202PRORD201 Issue P.O. for Garbage Chute 6 Issue P.O. for Garbage Chute
Delivery Delivery
MY202PRORD202 Delivery of Lift materials (Service & Passenger Lift) 8 Delivery of Lift materials (Service & Passenger Lift)
MY202PRORD203 Delivery Garbage Chute 60 Delivery Garbage Chute
Authorities Required Approvals Authorities Required Approvals

Etisalat Shop Drawing Approval


Approv Etisalat Shop Drawing Approval
MY202EGAUT0100 Approval :Telephone Shop Drawing by ETISALAT 60 Approval :Telephone Shop Drawing by ETISALAT
ADDC Shop Drawing Approval ADDC Shop Drawing Approval
MY202EGAUT0101 Power Shop Drawing Approval by ADDC 60 Power Shop Drawing Approval by ADDC
CIVIL DEFENCE Shop Drawing Approval CIVIL DEFENCE Shop Drawing Approval
MY202EGAUT0102 Fire Fighting Shop Drawing Approval by Civil Defense 60 Fire Fighting Shop Drawing Approval by Civil Defense
MY202EGAUT0103 NG Shop Drawing Approval by Authority 60 NG Shop Drawing Approval by Authority
ADSSC Shop Drawing Approval ADSSC Shop Drawing Approval
MY202EGAUT0104 Drainage & Water Supply Shop Drawing Approval by A... 60 Drainage & Water Supply Shop Drawing Approval by ADSSC
Other items Submittal and Approval
Appro Other items Submittal and Approval

Instruction to Proceed Instruction to Proceed


MY202EGOIS0170 Instruction to proceed w/ SMATV System 30 Instruction to proceed w/ SMATV System
MY202EGOIS0168 Instruction to proceed w/ BMU System / Window washi... 30 Instruction to proceed w/ BMU System / Window washing equipment
MY202EGOIS0169 Instruction to proceed w/ Audio Entry, Security & Acces... 30 Instruction to proceed w/ Audio Entry, Security & Access Control System
MY202EGOIS0171 Instruction to proceed w/ Sundry works related to exter... 30 Instruction to proceed w/ Sundry works related to external facade
Submittals Submittals
MY202EGOIS0172 BMU System / Window washing equipment Submittals 2 BMU System / Window washing equipment Submittals
MY202EGOIS0174 SMATV System Submittals 2 SMATV System Submittals
MY202EGOIS0173 Audio Entry, Security & Access Control System Submitt... 2 Audio Entry, Security & Access Control System Submittals
MY202EGOIS0175 Sundry works related to external facade Submittals 2 Sundry works related to external facade Submittals
Approval from Consultant & Client
C Approval from Consultant & Client
MY202EGOIS0176 BMU System / Window washing equipment Approval 7 BMU System / Window washing equipment Approval
MY202EGOIS0178 SMATV System Approval 7 SMATV System Approval
MY202EGOIS0177 Audio Entry, Security & Access Control System Approval 7 Audio Entry, Security & Access Control System Approval
MY202EGOIS0179 Sundry works related to external facade Approval 7 Sundry works related to external facade Approval
As-built Drawings As-built Drawings

Structural Structural
Submittal Submittal
MY202EGABD0100 Submit Structural As-built drawings 60 Submit Structural As-built drawin

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
14 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Approval Approval
MY202EGABD0101 Approval of Structural As-built drawings 24 Approval of Structural As
Architectural Architectural
Submittal Submittal
MY202EGABD0102 Submit Architectural As-built drawings 60 Submit Architectural As-built drawings
Approval Approval
MY202EGABD0103 Approval of Architectural As-built drawings 24 Approval of Architectural As-built drawing
Mechanical Mechanical
Submittal Submittal
MY202EGABD0104 Submit HVAC As-built drawings 60 Submit HVAC As-built drawings
Approval Approval
MY202EGABD0105 Approval of HVAC As-built drawings 24 Approval of HVAC As-built drawings
Electrical Electrical
Submittal Submittal
MY202EGABD0106 Submit Electrical As-built drawings 60 Submit Electrical As-built drawings
Approval Approval
MY202EGABD0107 Approval of Electrical As-built drawings 24 Approval of Electrical As-built drawings
Plumbing, Drainage & Fire Fighting
Fig Plumbing, Drainage & Fire Fighting
Submittal Submittal
MY202EGABD0108 Submit Plumbing, Drainage & Fire Fighting As-built dra... 60 Submit Plumbing, Drainage & Fire Fighting As-b
Approval Approval
MY202EGABD0109 Approval of Plumbing, Drainage & Fire Fighting As-built... 24 Approval of Plumbing, Drainage & Fire F

Construction Constru

Site Preparation and Earthworks Site Preparation and Earthworks

Shoring Works Shoring Works


MY202CNENW00100 Excavation - First Stage 0 Excavation - First Stage
MY202CNENW00101 Installation of H-beam & Concrete Panel 5 Installation of H-beam & Concrete Panel
Piling Works Piling Works
MY202CNENW00102 Excavation - Second stage 5 Excavation - Second stage
MY202CNENW00103 Preliminary piling work 1 Preliminary piling work
MY202CNENW00104 Construction of Main Piles work 3 Construction of Main Piles work
MY202CNENW00106 Static Load Test 5 Static Load Test
MY202CNENW00105 Dynamic Test 3 Dynamic Test
MY202CNENW00107 Pile cutting 4 Pile cutting
MY202CNENW00108 Pile head treatment 4 Pile head treatment
MY202CNENW00109 Integration Test 3 Integration Test
Foundation Works Foundation Works
MY202CNENW00119 Excavation for Pile Caps 5 Excavation for Pile Caps
MY202CNENW00121 Pile Cap blinding 5 Pile Cap blinding
MY202CNENW00122 Block works 5 Block works
MY202CNENW00118 Pilecap Waterproofing 5 Pilecap Waterproofing
MY202CNENW00123 Protection screed 5 Protection screed
MY202CNENW00110 Pile Cap (reinforcement & pouring) 5 Pile Cap (reinforcement & pouring)
MY202CNENW00111 pilecap_bitumen 5 pilecap_bitumen
MY202CNENW00112 backfilling_first stage 5 backfilling_first stage
MY202CNENW00113 tie beam blinding 5 tie beam blinding

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
15 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CNENW00114 tie beam (reinforcement & pouring) 5 tie beam (reinforcement & pouring)
MY202CNENW00115 neck & column (reinforcement & pouring) 5 neck & column (reinforcement & pouring)
MY202CNENW00116 tie beam_bitumen 5 tie beam_bitumen
MY202CNENW00117 neck & column_bitumen 5 neck & column_bitumen
MY202CNENW00500 backfinlling & compacting 5 backfinlling & compacting
MY202CNENW00124 Raft Foundation Blinding 0 Raft Foundation Blinding
MY202CNENW00129 Raft Foundation shutterung & reinforcement & pouring 0 Raft Foundation shutterung & reinforcement & pouring
Substructure Substructure

Basement Level 1 Basement Level 1


Structural Structural
Reinforcement Reinforcement
MY202CNSTRB1100 Column & wall reinforcement - BL1 3 Column & wall reinforcement - BL1
MY202CNSTRB1101 Retaining wall reinforcement - BL1 3 Retaining wall reinforcement - BL1
MY202CNSTRB1102 Core Wall reinforcement - BL1 3 Core Wall reinforcement - BL1
MY202CNSTRB1103 Reinforcement for Ramp - BL1 4 Reinforcement for Ramp - BL1
MY202CNSTRB1104 Reinforcement for Stairs - BL1 4 Reinforcement for Stairs - BL1
MY202CNSTRB1105 RC Beams & Slab reinforcement - GF 5 RC Beams & Slab reinforcement - GF
Shuttering & Formworks Shuttering & Formworks
MY202CNSTRB1106 Column & wall shuttering - BL1 2 Column & wall shuttering - BL1
MY202CNSTRB1107 Retaining wall shuttering - BL1 2 Retaining wall shuttering - BL1
MY202CNSTRB1108 Core Wall shuttering - BL1 2 Core Wall shuttering - BL1
MY202CNSTRB1109 Shuttering for Stairs - BL1 2 Shuttering for Stairs - BL1
MY202CNSTRB1110 Shuttering fro Ramp - BL1 2 Shuttering fro Ramp - BL1
MY202CNSTRB1111 RC Beams & Slab shuttering - GF 4 RC Beams & Slab shuttering - GF
Concrete Casting Concrete Casting
MY202CNSTRB1112 Column & wall Casting - BL1 1 Column & wall Casting - BL1
MY202CNSTRB1113 Retaining wall Casting - BL1 1 Retaining wall Casting - BL1
MY202CNSTRB1114 Core Wall Casting - BL1 1 Core Wall Casting - BL1
MY202CNSTRB1117 RC Beams & Slab Casting - GF 1 RC Beams & Slab Casting - GF
MY202CNSTRB1115 Casting for the Stairs - BL1 1 Casting for the Stairs - BL1
MY202CNSTRB1116 Concrete Casting for Ramp - BL1 1 Concrete Casting for Ramp - BL1
Architectural Architectural
Masonry Masonry
MY202CNARCB1100 Blockworks 4 Blockworks
MY202CNARCB1101 Plastering Wall 4 Plastering Wall
MY202CNARCB1102 Stair Screeding Finishes 7 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CNARCB1103 Wooden Door Sub Frame 4 Wooden Door Sub Frame
MY202CNARCB1104 Metal Door Frame 7 Metal Door Frame
MY202CNARCB1106 Wooden Door Architrave 7 Wooden Door Architrave
MY202CNARCB1105 Wooden Door Main Frame 9 Wooden Door Main Frame
MY202CNARCB1107 Metal Door 7 Metal Door
MY202CNARCB1108 Door leafs & Ironmongrey 7 Door leafs & Ironmongrey
Floor Finish Floor Finish
MY202CNARCB1109 Screeding works 0 Screeding works
MY202CNARCB1152 Marble Threshold 7 Marble Threshold
MY202CNARCB1132 Precast Kerbstone 9 Precast Kerbstone

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
16 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CNARCB1162 Skirting works 9 Skirting works
MY202CNARCB1110 Floor Tile Finish - Lobby & Corridor 5 Floor Tile Finish - Lobby & Corridor
MY202CNARCB1142 Interlocking tiles 9 Interlocking tiles
MY202CNARCB1112 Traffic coating 9 Traffic coating
MY202CNARCB1111 Epoxy Floor Painting 2 Epoxy Floor Painting
Wall Finish Wall Finish
MY202CNARCB1113 Basecoat Painting 0 Basecoat Painting
MY202CNARCB1114 Wall Tile - Lobby & Corridor 9 Wall Tile - Lobby & Corridor
MY202CNARCB1115 First Coat Painting 5 First Coat Painting
MY202CNARCB1127 Stainless Steel Cladding 9 Stainless Steel Cladding
MY202CNARCB1116 Epoxy Wall Painting 2 Epoxy Wall Painting
MY202CNARCB1117 Final Coat Painting 2 Final Coat Painting
Ceiling Finish Ceiling Finish
MY202CNARCB1118 Anti-carbonation Paint for Ceiling 0 Anti-carbonation Paint for Ceiling
MY202CNARCB1119 False Ceiling Grid 2 False Ceiling Grid
MY202CNARCB1120 False Ceiling Board/Tiles 2 False Ceiling Board/Tiles
Accessories Accessories
MY202CNARCB1121 Staircase Handrail 2 Staircase Handrail
MY202CNARCB1122 Precast Wheel Stopper 9 Precast Wheel Stopper
MY202CNARCB1136 Aluminum Louvers 2 Aluminum Louvers
MY202CNARCB1126 Corner Guard 9 Corner Guard
MY202CNARCB1125 Traffic Signage 9 Traffic Signage
MY202CNARCB1124 Room Signage 9 Room Signage
MY202CNARCB1123 Speed Hump 9 Speed Hump
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CNMECB1100 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CNMECB1102 Chilled Water Pipes 0 Chilled Water Pipes
MY202CNMECB1101 Duct installation 0 Duct installation
MY202CNMECB1113 Car Park Supply Fan Installation 0 Car Park Supply Fan Installation
MY202CNMECB1103 FCU installation 7 FCU installation
Final Fix Final Fix
MY202CNMECB1104 Grills & Diffuser installation 3 Grills & Diffuser installation
MY202CNMECB1114 Louvre Installation 3 Louvre Installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CNMECB1105 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CNPLMB1100 Sleeve in Concrete Slab 4 Sleeve in Concrete Slab
MY202CNPLMB1101 Plumbing & Drainage hangers & supports 5 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CNPLMB1103 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CNPLMB1104 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CNPLMB1105 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
MY202CNPLMB1106 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
17 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Final Fix Final Fix
MY202CNPLMB1107 Water Supply Valves 4 Water Supply Valves
MY202CNPLMB1117 Drain Fixture Installation 3 Drain Fixture Installation
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CNPLMB1108 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CNPLMB1109 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CNFFSB1100 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CNFFSB1101 Fire Fighting Piping - (Riser) 7 Fire Fighting Piping - (Riser)
MY202CNFFSB1102 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CNFFSB1103 Fixing of FF Valves & accessories 4 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CNFFSB1104 Sprinkler 3 Sprinkler
MY202CNFFSB1105 Hose Reel 3 Hose Reel
MY202CNFFSB1106 Fire Extinguisher 1 Fire Extinguisher
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CNFFSB1107 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CNB1EE1X100 Electrical Sleeve 4 Electrical Sleeve
MY202CNB1EE1X101 Power Conduit works - Vertical 4 Power Conduit works - Vertical
2nd Fix 2nd Fix
MY202CNB1EE2X102 DB's enclosure 7 DB's enclosure
MY202CNB1EE2X103 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CNB1EEFX105 SMDB(sub Main Distribution Board) 7 SMDB(sub Main Distribution Board)
MY202CNB1EEFX107 DB (Distribution Board) 7 DB (Distribution Board)
MY202CNB1EEFX104 Wiring Accessories & Isolator 7 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CNB1EW1X110 Lighting Conduit works - Vertical 4 Lighting Conduit works - Vertical
MY202CNB1EW1X111 Wiring Hangers & Supports 5 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CNB1EW2X112 Cable Tray Fixing 5 Cable Tray Fixing
MY202CNB1EW2X113 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CNB1EWFX114 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CNB1EWFX116 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CNB1ET1X119 Telephone Conduit works - Vertical 4 Telephone Conduit works - Vertical
MY202CNB1ET1X120 Electrical hangers and supports 5 Electrical hangers and supports
2nd Fix 2nd Fix
MY202CNB1ET2X121 Cable Tray fixing 5 Cable Tray fixing

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
18 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CNB1ET2X122 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CNB1ETFX123 Telephone / Data Outlet 4 Telephone / Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CNB1EL1X126 Emergency Lighting Conduit works - Wall 4 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CNB1EL2X127 Emergency Lighting Cabling and Wiring & DB Enclosure 4 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CNB1ELFX129 Emergency Lighting 5 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CNB1EC1X132 CCTV System Conduit works - Vertical 4 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CNB1EC2X133 CCTV System Cabling and Wiring 4 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CNB1ECFX134 CCTV System Camera 4 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CNB1EF2X137 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CNB1EF2X139 Modules 3 Modules
Final Fix Final Fix
MY202CNB1EFFX140 Fire Alarm Detector 4 Fire Alarm Detector
MY202CNB1EFFX141 Sounder, Flashers & Speakers 4 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CNB1EB1X144 BMS Conduit works - Vertical 4 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CNB1EB2X145 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CNB1EB2X146 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CNB1EBFX147 BMS Devices 3 BMS Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CNB1EELP140 Lightning protection accessories 2 Lightning protection accessories
MY202CNB1EELP150 PVC Copper cable for earth network 2 PVC Copper cable for earth network
Snagging and Desnagging Snagging and Desnagging
MY202CNB1SNAG100 Snagging and De-Snagging 7 Snagging and De-Snagging
Superstructure Superstructur

Ground Floor Ground Floor


Structural Structural
Reinforcement Reinforcement
MY202CNGFSTR100 Columns, Walls & Water tanks Reinforcement - GF 3 Columns, Walls & Water tanks Reinforcement - GF
MY202CNGFSTR101 Core Wall reinforcement - GF 3 Core Wall reinforcement - GF
MY202CNGFSTR102 Beam & Slab reinforcement - FL1 3 Beam & Slab reinforcement - FL1
MY202CNGFSTR103 Reinforcement for Stairs - GF 2 Reinforcement for Stairs - GF
Shuttering & Formworks Shuttering & Formworks
MY202CNGFSTR104 Columns, Walls & Water tanks shuttering - GF 2 Columns, Walls & Water tanks shuttering - GF

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
19 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CNGFSTR105 Core Wall shuttering - GF 2 Core Wall shuttering - GF
MY202CNGFSTR106 Beam & Slab shuttering - FL1 2 Beam & Slab shuttering - FL1
MY202CNGFSTR107 Shuttering for Stairs - GF 2 Shuttering for Stairs - GF
Concrete Casting Concrete Casting
MY202CNGFSTR108 Columns, Walls & Water tanks concrete casting - GF 1 Columns, Walls & Water tanks concrete casting - GF
MY202CNGFSTR109 Core Wall concrete casting - GF 1 Core Wall concrete casting - GF
MY202CNGFSTR110 Beam & Slab concrete casting- FL1 1 Beam & Slab concrete casting- FL1
MY202CNGFSTR111 Casting for the Stairs - GF 1 Casting for the Stairs - GF
Architectural Architectural
Masonry Masonry
MY202CNGFARC100 Blockworks 0 Blockworks
MY202CNGFARC102 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CNGFARC101 Plastering - wall & ceiling (Unit) 2 Plastering - wall & ceiling (Unit)
MY202CNGFARC103 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CNGFARC104 Wooden Door Sub Frame 8 Wooden Door Sub Frame
MY202CNGFARC106 Aluminum Window Frame 7 Aluminum Window Frame
MY202CNGFARC105 Aluminum Door Frame 8 Aluminum Door Frame
MY202CNGFARC108 Aluminum Door 4 Aluminum Door
MY202CNGFARC109 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CNGFARC107 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CNGFARC110 Wooden Door Architrave 4 Wooden Door Architrave
MY202CNGFARC111 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CNGFARC113 Screeding works 4 Screeding works
MY202CNGFARC114 Threshold 3 Threshold
MY202CNGFARC115 Skirting works 5 Skirting works
MY202CNGFARC116 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CNGFARC117 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CNGFARC112 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CNGFARC118 Epoxy for Floor 4 Epoxy for Floor
MY202CNGFARC158 Concrete Kerb Stone 6 Concrete Kerb Stone
MY202CNGFARC148 Interlocking paving 0 Interlocking paving
Wet Area Waterproofing Wet Area Waterproofing
MY202CNGFARC119 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CNGFARC120 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CNGFARC121 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CNGFARC122 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CNGFARC123 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CNGFARC124 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CNGFARC125 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CNGFARC147 Wood Veneer Panelling 5 Wood Veneer Panelling
MY202CNGFARC157 Stainless Steel Cladding 5 Stainless Steel Cladding
MY202CNGFARC167 Mirror Panelling 5 Mirror Panelling
MY202CNGFARC126 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CNGFARC127 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
20 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Ceiling Finish Ceiling Finish
MY202CNGFARC128 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CNGFARC143 Wood Veneer Panelling 5 Wood Veneer Panelling
MY202CNGFARC131 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CNGFARC130 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CNGFARC133 False Ceiling Board/Tiles (Corridor) 8 False Ceiling Board/Tiles (Corridor)
MY202CNGFARC132 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CNGFARC129 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work
MY202CNGFARC134 Aluminum Louvers 4 Aluminum Louvers
MY202CNGFARC135 Glass Partitions 5 Glass Partitions
MY202CNGFARC150 Access Ladder 2 Access Ladder
MY202CNGFARC138 Staircase Handrail 4 Staircase Handrail
MY202CNGFARC160 Glass Balustrade 3 Glass Balustrade
MY202CNGFARC139 Mirror 4 Mirror
MY202CNGFARC140 Room and Lift signage 2 Room and Lift signage
MY202CNGFARC137 Counter desks 3 Counter desks
MY202CNGFARC136 Gate Barrier / Parking gate arm 2 Gate Barrier / Parking gate
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CNGFAC1X100 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CNGFAC2X102 Chilled Water Pipes 0 Chilled Water Pipes
MY202CNGFAC2X101 Duct installation 0 Duct installation
MY202CNGFAC2X103 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CNGFAC2X104 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CNGFAC2X105 FCU installation 5 FCU installation
MY202CNGFAC2X115 Fan Installation (SPF) 0 Fan Installation (SPF)
Final Fix Final Fix
MY202CNGFACFX116 Louvre Installation 3 Louvre Installation
MY202CNGFACFX106 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CNGFACTC107 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CNGFNG2X100 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CNGFNG2X101 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
MY202CNGFNG2X111 Ventilation Pipes (underground) 4 Ventilation Pipes (underground)
Final Fix Final Fix
MY202CNGFNGFX102 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CNGFNGTC103 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CNGFPD1X100 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CNGFPD1X101 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
21 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
2nd Fix 2nd Fix
MY202CNGFPD2X103 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CNGFPD2X104 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CNGFPD2X105 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CNGFPD2X106 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
MY202CNGFPD2X112 Rain Water Piping 8 Rain Water Piping
MY202CNGFPD2X142 City Water Connection 5 City Water Connection
MY202CNGFPD2X113 Manhole Connection 5 Manhole Connection
MY202CNGFPD2X132 Booster Pump Set installation 4 Booster Pump Set installation
Final Fix Final Fix
MY202CNGFPDFX121 Drain Fixture Installation 3 Drain Fixture Installation
MY202CNGFPDFX107 Water Heater 3 Water Heater
MY202CNGFPDFX108 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CNGFPDFX109 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CNGFPDTC112 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CNGFPDTC113 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CNGFFF1X100 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CNGFFF2X101 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CNGFFF2X102 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CNGFFF2X103 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
MY202CNGFFF2X111 Fire Fighting Breeching Inlet Installation 4 Fire Fighting Breeching Inlet Installation
MY202CNGFFF2X113 Fire Fighting Pump Set Installation 5 Fire Fighting Pump Set Installation
MY202CNGFFF2X121 Clean Agent System Installation 3 Clean Agent System Installation
Final Fix Final Fix
MY202CNGFFFFX105 Hose Reel 4 Hose Reel
MY202CNGFFFFX106 Fire Extinguisher 1 Fire Extinguisher
MY202CNGFFFFX104 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CNGFFFTC107 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CNGFEP1X109 Electrical Sleeve 3 Electrical Sleeve
MY202CNGFEP1X110 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CNGFEP1X111 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CNGFEP2X112 DB's enclosure 7 DB's enclosure
MY202CNGFEP2X113 Cable tray & trunkings 4 Cable tray & trunkings
MY202CNGFEP2X114 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CNGFEPFX115 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CNGFEPFX117 CB(Capacitor Board) & DB (Distribution Board) 4 CB(Capacitor Board) & DB (Distribution Board)
MY202CNGFEPFX118 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
22 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CNGFEPFX116 MDB(Main Distribution Board) 4 MDB(Main Distribution Board)
Wiring Devices Wiring Devices
First Fix First Fix
MY202CNGFEW1X100 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CNGFEW1X101 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CNGFEW2X102 Cable Tray Fixing 7 Cable Tray Fixing
MY202CNGFEW2X103 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CNGFEWFX104 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CNGFEWFX106 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CNGFET1X121 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CNGFET1X122 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CNGFET2X123 Cable Tray fixing 4 Cable Tray fixing
MY202CNGFET2X124 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CNGFETFX125 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CNGFEL1X128 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CNGFEL2X129 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CNGFELFX131 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CNGFEC1X134 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CNGFEC2X135 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CNGFECFX136 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evac
2nd Fix 2nd Fix
MY202CNGFEF1X139 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CNGFEF1X141 Modules 3 Modules
MY202CNGFEF1X140 Fire Alarm Control Panel 4 Fire Alarm Control Pane
Final Fix Final Fix
MY202CNGFEF2X142 Fire Alarm Detector 2 Fire Alarm Detector
MY202CNGFEF2X143 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CNGFEB1X146 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
MY202CNGFEB1X156 BMS Conduit works - Horizontal 6 BMS Conduit works - Horizontal
2nd Fix 2nd Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
23 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CNGFEB2X147 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CNGFEB2X148 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CNGFEBFX149 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CNGFEV1X152 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CNGFEV2X153 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CNGFEVFX154 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CNGFEI1X157 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CNGFEI2X158 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CNGFEIFX159 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CNGFEI1X162 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CNGFEI2X163 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CNGFEIFX164 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CNGFEELP160 Clearing earth pits 2 Clearing earth pits
MY202CNGFEELP170 PVC Earth cable networks 8 PVC Earth cable networks
Generator Room Generator Room
MY202CNGFEGEN167 Generator, Meter, Sensor, Switches - GF 2 Generator, Meter, Sensor, Switches - GF
Substation Substation
MY202CNGFESUB168 MDB's, SMDB's, MCC's, DB's, ATS 2 MDB's, SMDB's, MCC's, DB's, ATS
MY202CNGFESUB169 Power Bus Bar Tap Off 2 Power Bus Bar Tap Off
Clearance Clearance
MY202CNGFCLER170 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CNGFSNAG171 Snagging and De-Snagging 7 Snagging and De-Snagging
Floor Level 1 Floor Level 1
Structural Structural
Reinforcement Reinforcement
MY202CN01STR100 Columns & Walls Reinforcement - FL1 2 Columns & Walls Reinforcement - FL1
MY202CN01STR101 Core Wall reinforcement - FL1 2 Core Wall reinforcement - FL1
MY202CN01STR102 Beam & Slab reinforcement - FL2 2 Beam & Slab reinforcement - FL2
MY202CN01STR103 Reinforcement for Stairs - FL1 2 Reinforcement for Stairs - FL1
Shuttering & Formworks Shuttering & Formworks
MY202CN01STR104 Columns & Walls shuttering - FL1 2 Columns & Walls shuttering - FL1
MY202CN01STR105 Core Wall shuttering - FL1 2 Core Wall shuttering - FL1

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
24 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN01STR106 Beam & Slab shuttering - FL2 2 Beam & Slab shuttering - FL2
MY202CN01STR107 Shuttering for Stairs - FL1 2 Shuttering for Stairs - FL1
Concrete Casting Concrete Casting
MY202CN01STR108 Columns & Walls concrete casting - FL1 1 Columns & Walls concrete casting - FL1
MY202CN01STR109 Core Wall concrete casting - FL1 1 Core Wall concrete casting - FL1
MY202CN01STR110 Beam & Slab concrete casting- FL2 1 Beam & Slab concrete casting- FL2
MY202CN01STR111 Casting for the Stairs - FL1 1 Casting for the Stairs - FL1
Architectural Architectural
Masonry Masonry
MY202CN01ARC113 Blockworks 8 Blockworks
MY202CN01ARC115 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN01ARC114 Plastering - wall & ceiling (Unit) 2 Plastering - wall & ceiling (Unit)
MY202CN01ARC116 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN01ARC117 Wooden Door Sub Frame 8 Wooden Door Sub Frame
MY202CN01ARC119 Aluminum Window Frame 7 Aluminum Window Frame
MY202CN01ARC118 Aluminum Door Frame 8 Aluminum Door Frame
MY202CN01ARC121 Aluminum Door 4 Aluminum Door
MY202CN01ARC122 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN01ARC120 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN01ARC123 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN01ARC124 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN01ARC126 Screeding works 4 Screeding works
MY202CN01ARC127 Threshold 3 Threshold
MY202CN01ARC129 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN01ARC128 Skirting works 5 Skirting works
MY202CN01ARC130 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN01ARC125 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN01ARC131 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN01ARC132 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN01ARC133 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN01ARC134 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN01ARC135 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN01ARC136 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN01ARC137 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN01ARC138 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN01ARC139 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN01ARC140 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN01ARC141 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN01ARC144 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN01ARC143 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN01ARC146 False Ceiling Board/Tiles (Corridor) 8 False Ceiling Board/Tiles (Corridor)
MY202CN01ARC145 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
25 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN01ARC142 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN01ARC147 Aluminum Louvers 4 Aluminum Louvers
MY202CN01ARC148 Glass Partitions 5 Glass Partitions
MY202CN01ARC149 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN01ARC150 Wardrobe 6 Wardrobe
MY202CN01ARC152 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN01ARC151 Balcony Handrail 7 Balcony Handrail
MY202CN01ARC153 Staircase Handrail 4 Staircase Handrail
MY202CN01ARC154 Mirror 4 Mirror
MY202CN01ARC155 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN01AC1X100 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN01AC2X102 Chilled Water Pipes 0 Chilled Water Pipes
MY202CN01AC2X101 Duct installation 0 Duct installation
MY202CN01AC2X103 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN01AC2X104 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN01AC2X105 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN01ACFX106 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN01ACTC107 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN01NG2X100 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN01NG2X101 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN01NGFX102 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN01NGTC103 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN01PD1X100 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN01PD1X101 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN01PD2X102 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN01PD2X103 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN01PD2X104 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN01PD2X105 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN01PD2X106 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN01PDFX119 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN01PDFX107 Water Heater 3 Water Heater
MY202CN01PDFX108 Water Supply Valve, Tap 3 Water Supply Valve, Tap

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
26 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN01PDFX109 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN01PDTC110 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN01PDTC111 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN01FF1X100 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN01FF2X101 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN01FF2X102 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN01FF2X103 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN01FF3X104 Sprinkler 4 Sprinkler
MY202CN01FF3X105 Hose Reel 4 Hose Reel
MY202CN01FF3X106 Fire Extinguisher 1 Fire Extinguisher
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN01FFTC107 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN01EP1X100 Electrical Sleeve 3 Electrical Sleeve
MY202CN01EP1X101 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN01EP1X102 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN01EP2X103 DB's enclosure 7 DB's enclosure
MY202CN01EP2X104 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN01EP2X105 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN01EPFX106 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN01EPFX108 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN01EPFX109 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN01EW1X112 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN01EW1X113 Wiring Hangers & supports 4 Wiring Hangers & supports
2nd Fix 2nd Fix
MY202CN01EW2X114 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN01EW2X115 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN01EWFX116 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN01EWFX118 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN01ET1X121 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN01ET1X122 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN01ET2X123 Cable Tray fixing 4 Cable Tray fixing

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
27 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN01ET2X124 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN01ETFX125 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN01EL1X128 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN01EL2X129 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN01ELFX131 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN01EC1X134 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN01EC2X135 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN01ECFX136 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN01EF2X139 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN01EF2X141 Modules 3 Modules
Final Fix Final Fix
MY202CN01EFFX142 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN01EFFX143 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN01EB1X146 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN01EB2X147 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN01EB2X148 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN01EBFX149 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN01EV1X152 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN01EV2X153 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN01EVFX154 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN01EI1X157 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN01EI2X158 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN01EIFX159 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
28 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
First Fix First Fix
MY202CN01ES1X162 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN01ES2X163 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN01ESFX164 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN01EELP190 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN01CLER100 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN01SNAG100 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 2 Floor Level 2
Structural Structural
Reinforcement Reinforcement
MY202CN02STR100 Columns & Walls Reinforcement - FL2 2 Columns & Walls Reinforcement - FL2
MY202CN02STR101 Core Wall reinforcement - FL2 2 Core Wall reinforcement - FL2
MY202CN02STR102 Beam & Slab reinforcement - FL3 2 Beam & Slab reinforcement - FL3
MY202CN02STR103 Reinforcement for Stairs - FL2 2 Reinforcement for Stairs - FL2
Shuttering & Formworks Shuttering & Formworks
MY202CN02STR104 Columns & Walls shuttering - FL2 2 Columns & Walls shuttering - FL2
MY202CN02STR105 Core Wall shuttering - FL2 2 Core Wall shuttering - FL2
MY202CN02STR106 Beam & Slab shuttering - FL3 2 Beam & Slab shuttering - FL3
MY202CN02STR107 Shuttering for Stairs - FL2 2 Shuttering for Stairs - FL2
Concrete Casting Concrete Casting
MY202CN02STR108 Columns & Walls concrete casting - FL2 1 Columns & Walls concrete casting - FL2
MY202CN02STR109 Core Wall concrete casting - FL2 1 Core Wall concrete casting - FL2
MY202CN02STR110 Beam & Slab concrete casting- FL3 1 Beam & Slab concrete casting- FL3
MY202CN02STR111 Casting for the Stairs - FL2 1 Casting for the Stairs - FL2
Architectural Architectural
Masonry Masonry
MY202CN02ARC113 Blockworks 8 Blockworks
MY202CN02ARC115 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN02ARC114 Plastering - wall & ceiling (Unit) 2 Plastering - wall & ceiling (Unit)
MY202CN02ARC116 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN02ARC117 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN02ARC118 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN02ARC119 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN02ARC121 Aluminum Door 4 Aluminum Door
MY202CN02ARC122 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN02ARC120 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN02ARC123 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN02ARC124 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN02ARC126 Screeding works 4 Screeding works
MY202CN02ARC127 Threshold 3 Threshold

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
29 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN02ARC129 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN02ARC128 Skirting works 5 Skirting works
MY202CN02ARC130 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN02ARC125 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN02ARC131 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN02ARC132 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN02ARC133 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN02ARC135 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN02ARC134 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN02ARC136 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN02ARC137 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN02ARC138 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN02ARC139 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN02ARC140 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN02ARC141 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN02ARC144 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN02ARC143 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN02ARC146 False Ceiling Board/Tiles (Corridor) 8 False Ceiling Board/Tiles (Corridor)
MY202CN02ARC145 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN02ARC142 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN02ARC147 Aluminum Louvers 4 Aluminum Louvers
MY202CN02ARC148 Glass Partitions 5 Glass Partitions
MY202CN02ARC149 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN02ARC150 Wardrobe 6 Wardrobe
MY202CN02ARC152 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN02ARC151 Balcony Handrail 7 Balcony Handrail
MY202CN02ARC153 Staircase Handrail 4 Staircase Handrail
MY202CN02ARC154 Mirror 4 Mirror
MY202CN02ARC155 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN02AC1X100 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN02AC2X102 Chilled Water Pipes 0 Chilled Water Pipes
MY202CN02AC2X101 Duct installation 0 Duct installation
MY202CN02AC2X103 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN02AC2X104 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN02AC2X105 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN02ACFX106 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN02ACTC107 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
30 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN02NG2X100 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN02NG2X101 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN02NGFX102 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN02NGTC103 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN02PD1X100 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN02PD1X101 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN02PD2X102 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN02PD2X103 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN02PD2X104 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN02PD2X105 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN02PD2X106 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN02PDFX119 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN02PDFX107 Water Heater 3 Water Heater
MY202CN02PDFX108 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN02PDFX109 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN02PDTC110 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN02PDTC111 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN02FF1X100 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN02FF2X101 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN02FF2X102 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN02FF2X103 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN02FF3X104 Sprinkler 4 Sprinkler
MY202CN02FF3X105 Hose Reel 4 Hose Reel
MY202CN02FF3X106 Fire Extinguisher 1 Fire Extinguisher
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN02FFTC107 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN02EP1X100 Electrical Sleeve 3 Electrical Sleeve
MY202CN02EP1X101 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN02EP1X102 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN02EP2X103 DB's enclosure 7 DB's enclosure

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
31 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN02EP2X104 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN02EP2X105 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN02EPFX106 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN02EPFX108 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN02EPFX109 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN02EW1X112 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN02EW1X113 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN02EW2X114 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN02EW2X115 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN02EWFX116 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN02EWFX118 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN02ET1X121 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN02ET1X122 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN02ET2X123 Cable Tray fixing 4 Cable Tray fixing
MY202CN02ET2X124 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN02ETFX125 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN02EL1X128 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN02EL2X129 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN02ELFX131 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN02EC1X134 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN02EC2X135 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN02ECFX136 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN02EF2X139 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN02EF2X141 Modules 3 Modules
Final Fix Final Fix
MY202CN02EFFX142 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN02EFFX143 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
32 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
First Fix First Fix
MY202CN02EB1X146 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN02EB2X147 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN02EB2X148 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN02EBFX149 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN02EV1X152 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN02EV2X153 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN02EVFX154 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN02EI1X157 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN02EI2X158 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN02EIFX159 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN02ES1X162 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN02ES2X163 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN02ESFX164 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN02EELP210 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN02CLER100 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN02SNAG100 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 3 Floor Level 3
Structural Structural
Reinforcement Reinforcement
MY202CN03STR100 Columns & Walls Reinforcement - FL3 1 Columns & Walls Reinforcement - FL3
MY202CN03STR101 Core Wall reinforcement - FL3 1 Core Wall reinforcement - FL3
MY202CN03STR102 Beam & Slab reinforcement - FL4 2 Beam & Slab reinforcement - FL4
MY202CN03STR103 Reinforcement for Stairs - FL3 2 Reinforcement for Stairs - FL3
Shuttering & Formworks Shuttering & Formworks
MY202CN03STR104 Columns & Walls shuttering - FL3 1 Columns & Walls shuttering - FL3
MY202CN03STR105 Core Wall shuttering - FL3 1 Core Wall shuttering - FL3
MY202CN03STR106 Beam & Slab shuttering - FL4 2 Beam & Slab shuttering - FL4
MY202CN03STR107 Shuttering for Stairs - FL3 2 Shuttering for Stairs - FL3
Concrete Casting Concrete Casting

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
33 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN03STR108 Columns & Walls concrete casting - FL3 1 Columns & Walls concrete casting - FL3
MY202CN03STR109 Core Wall concrete casting - FL3 1 Core Wall concrete casting - FL3
MY202CN03STR110 Beam & Slab concrete casting- FL4 1 Beam & Slab concrete casting- FL4
MY202CN03STR111 Casting for the Stairs - FL3 1 Casting for the Stairs - FL3
Architectural Architectural
Masonry Masonry
MY202CN03ARC113 Blockworks 8 Blockworks
MY202CN03ARC115 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN03ARC114 Plastering - wall & ceiling (Unit) 2 Plastering - wall & ceiling (Unit)
MY202CN03ARC116 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN03ARC117 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN03ARC118 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN03ARC119 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN03ARC121 Aluminum Door 4 Aluminum Door
MY202CN03ARC122 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN03ARC120 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN03ARC123 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN03ARC124 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN03ARC126 Screeding works 4 Screeding works
MY202CN03ARC127 Threshold 3 Threshold
MY202CN03ARC129 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN03ARC128 Skirting works 5 Skirting works
MY202CN03ARC130 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN03ARC125 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN03ARC131 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN03ARC132 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN03ARC133 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN03ARC135 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN03ARC134 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN03ARC136 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN03ARC137 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN03ARC138 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN03ARC139 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN03ARC140 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN03ARC141 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN03ARC144 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN03ARC143 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN03ARC146 False Ceiling Board/Tiles (Corridor) 8 False Ceiling Board/Tiles (Corridor)
MY202CN03ARC145 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN03ARC142 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN03ARC147 Aluminum Louvers 4 Aluminum Louvers

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
34 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN03ARC148 Glass Partitions 5 Glass Partitions
MY202CN03ARC149 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN03ARC150 Wardrobe 6 Wardrobe
MY202CN03ARC152 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN03ARC151 Balcony Handrail 7 Balcony Handrail
MY202CN03ARC153 Staircase Handrail 4 Staircase Handrail
MY202CN03ARC154 Mirror 4 Mirror
MY202CN03ARC155 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN03AC1X100 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN03AC2X102 Chilled Water Pipes 0 Chilled Water Pipes
MY202CN03AC2X101 Duct installation 0 Duct installation
MY202CN03AC2X103 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN03AC2X104 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN03AC2X105 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN03ACFX106 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN03ACTC107 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN03NG2X100 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN03NG2X101 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN03NGFX102 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN03NGTC103 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN03PD1X100 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN03PD1X101 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN03PD2X102 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN03PD2X103 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN03PD2X104 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN03PD2X105 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN03PD2X106 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN03PDFX117 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN03PDFX107 Water Heater 3 Water Heater
MY202CN03PDFX108 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN03PDFX109 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN03PDTC110 Drainage Pipe Testing 2 Drainage Pipe Testing

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
35 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN03PDTC111 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN03FF1X100 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN03FF2X101 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN03FF2X102 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN03FF2X103 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN03FF3X104 Sprinkler 4 Sprinkler
MY202CN03FF3X105 Hose Reel 4 Hose Reel
MY202CN03FF3X106 Fire Extinguisher 1 Fire Extinguisher
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN03FFTC107 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN03EP1X100 Electrical Sleeve 3 Electrical Sleeve
MY202CN03EP1X101 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN03EP1X102 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN03EP2X103 DB's enclosure 7 DB's enclosure
MY202CN03EP2X104 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN03EP2X105 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN03EPFX106 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN03EPFX108 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN03EPFX109 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN03EW1X112 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN03EW1X113 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN03EW2X114 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN03EW2X115 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN03EWFX116 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN03EWFX118 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN03ET1X121 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN03ET1X122 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN03ET2X123 Cable Tray fixing 4 Cable Tray fixing
MY202CN03ET2X124 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN03ETFX125 Telephone/ Data Outlet 4 Telephone/ Data Outlet

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
36 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN03EL1X128 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN03EL2X129 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN03ELFX131 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN03EC1X134 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN03EC2X135 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN03ECFX136 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN03EF2X139 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN03EF2X141 Modules 3 Modules
Final Fix Final Fix
MY202CN03EFFX142 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN03EFFX143 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN03EB1X146 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN03EB2X147 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN03EB2X148 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN03EBFX149 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN03EV1X152 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN03EV2X153 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN03EVFX154 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN03EI1X157 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN03EI2X158 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN03EIFX159 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN03ES1X162 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
37 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN03ES2X163 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN03ESFX164 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN03EELP230 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN03CLER100 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN03SNAG100 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 4 Floor Level 4
Structural Structural
Reinforcement Reinforcement
MY202CN04STR100 Columns & Walls Reinforcement - FL4 1 Columns & Walls Reinforcement - FL4
MY202CN04STR101 Core Wall reinforcement - FL4 1 Core Wall reinforcement - FL4
MY202CN04STR102 Beam & Slab reinforcement - FL5 2 Beam & Slab reinforcement - FL5
MY202CN04STR103 Reinforcement for Stairs - FL4 2 Reinforcement for Stairs - FL4
Shuttering & Formworks Shuttering & Formworks
MY202CN04STR104 Columns & Walls shuttering - FL4 1 Columns & Walls shuttering - FL4
MY202CN04STR105 Core Wall shuttering - FL4 1 Core Wall shuttering - FL4
MY202CN04STR106 Beam & Slab shuttering - FL5 2 Beam & Slab shuttering - FL5
MY202CN04STR107 Shuttering for Stairs - FL4 2 Shuttering for Stairs - FL4
Concrete Casting Concrete Casting
MY202CN04STR108 Columns & Walls concrete casting - FL4 1 Columns & Walls concrete casting - FL4
MY202CN04STR109 Core Wall concrete casting - FL4 1 Core Wall concrete casting - FL4
MY202CN04STR110 Beam & Slab concrete casting- FL5 1 Beam & Slab concrete casting- FL5
MY202CN04STR111 Casting for the Stairs - FL4 1 Casting for the Stairs - FL4
Architectural Architectural
Masonry Masonry
MY202CN04ARC113 Blockworks 8 Blockworks
MY202CN04ARC115 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN04ARC114 Plastering - wall & ceiling (Unit) 2 Plastering - wall & ceiling (Unit)
MY202CN04ARC116 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN04ARC117 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN04ARC118 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN04ARC119 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN04ARC121 Aluminum Door 4 Aluminum Door
MY202CN04ARC122 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN04ARC120 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN04ARC123 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN04ARC124 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN04ARC126 Screeding works 4 Screeding works
MY202CN04ARC127 Threshold 3 Threshold
MY202CN04ARC129 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN04ARC125 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN04ARC128 Skirting works 5 Skirting works

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
38 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN04ARC130 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN04ARC131 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN04ARC132 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN04ARC133 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN04ARC135 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN04ARC134 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN04ARC136 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN04ARC137 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN04ARC138 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN04ARC139 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN04ARC140 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN04ARC141 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN04ARC144 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN04ARC143 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN04ARC146 False Ceiling Board/Tiles (Corridor) 8 False Ceiling Board/Tiles (Corridor)
MY202CN04ARC145 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN04ARC142 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN04ARC147 Aluminum Louvers 4 Aluminum Louvers
MY202CN04ARC148 Glass Partitions 5 Glass Partitions
MY202CN04ARC149 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN04ARC150 Wardrobe 6 Wardrobe
MY202CN04ARC152 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN04ARC151 Balcony Handrail 7 Balcony Handrail
MY202CN04ARC153 Staircase Handrail 4 Staircase Handrail
MY202CN04ARC154 Mirror 4 Mirror
MY202CN04ARC155 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN04AC1X100 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN04AC2X102 Chilled Water Pipes 0 Chilled Water Pipes
MY202CN04AC2X101 Duct installation 0 Duct installation
MY202CN04AC2X103 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN04AC2X104 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN04AC2X105 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN04ACFX106 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN04ACTC107 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN04NG2X100 NG Pipes (Riser) 3 NG Pipes (Riser)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
39 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN04NG2X101 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN04NGFX102 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN04NGTC103 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN04PD1X100 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN04PD1X101 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN04PD2X102 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN04PD2X103 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN04PD2X104 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN04PD2X105 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN04PD2X106 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN04PDFX117 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN04PDFX107 Water Heater 3 Water Heater
MY202CN04PDFX108 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN04PDFX109 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN04PDTC110 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN04PDTC111 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN04FF1X100 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN04FF2X101 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN04FF2X102 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN04FF2X103 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN04FF3X105 Hose Reel 4 Hose Reel
MY202CN04FF3X106 Fire Extinguisher 1 Fire Extinguisher
MY202CN04FF3X104 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN04FFTC107 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN04EP1X100 Electrical Sleeve 3 Electrical Sleeve
MY202CN04EP1X101 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN04EP1X102 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN04EP2X103 DB's enclosure 7 DB's enclosure
MY202CN04EP2X104 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN04EP2X105 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
40 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN04EPFX106 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN04EPFX108 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN04EPFX109 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN04EW1X112 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN04EW1X113 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN04EW2X114 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN04EW2X115 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN04EWFX116 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN04EWFX118 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN04ET1X121 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN04ET1X122 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN04ET2X123 Cable Tray fixing 4 Cable Tray fixing
MY202CN04ET2X124 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN04ETFX125 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN04EL1X128 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN04EL2X129 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN04ELFX131 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN04EC1X134 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN04EC2X135 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN04ECFX136 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN04EF2X139 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN04EF2X141 Modules 3 Modules
Final Fix Final Fix
MY202CN04EFFX142 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN04EFFX143 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN04EB1X146 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
41 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN04EB2X147 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN04EB2X148 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN04EBFX149 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN04EV1X152 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN04EV2X153 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN04EVFX154 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN04EI1X157 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN04EI2X158 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN04EIFX159 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN04ES1X162 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN04ES2X163 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN04ESFX164 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN04EELP250 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN04CLER100 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN04SNAG100 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 5 Floor Level 5
Structural Structural
Reinforcement Reinforcement
MY202CN05STR100 Columns & Walls Reinforcement - FL5 1 Columns & Walls Reinforcement - FL5
MY202CN05STR101 Core Wall reinforcement - FL5 1 Core Wall reinforcement - FL5
MY202CN05STR102 Beam & Slab reinforcement - FL6 2 Beam & Slab reinforcement - FL6
MY202CN05STR103 Reinforcement for Stairs - FL5 2 Reinforcement for Stairs - FL5
Shuttering & Formworks Shuttering & Formworks
MY202CN05STR104 Columns & Walls shuttering - FL5 1 Columns & Walls shuttering - FL5
MY202CN05STR105 Core Wall shuttering - FL5 1 Core Wall shuttering - FL5
MY202CN05STR106 Beam & Slab shuttering - FL6 2 Beam & Slab shuttering - FL6
MY202CN05STR107 Shuttering for Stairs - FL5 2 Shuttering for Stairs - FL5
Concrete Casting Concrete Casting
MY202CN05STR108 Columns & Walls concrete casting - FL5 1 Columns & Walls concrete casting - FL5
MY202CN05STR109 Core Wall concrete casting - FL5 1 Core Wall concrete casting - FL5
MY202CN05STR110 Beam & Slab concrete casting- FL6 1 Beam & Slab concrete casting- FL6

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
42 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN05STR111 Casting for the Stairs - FL5 1 Casting for the Stairs - FL5
Architectural Architectural
Masonry Masonry
MY202CN05ARC113 Blockworks 8 Blockworks
MY202CN05ARC115 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN05ARC114 Plastering - wall & ceiling (Unit) 2 Plastering - wall & ceiling (Unit)
MY202CN05ARC116 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN05ARC117 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN05ARC118 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN05ARC119 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN05ARC121 Aluminum Door 4 Aluminum Door
MY202CN05ARC122 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN05ARC120 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN05ARC123 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN05ARC124 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN05ARC126 Screeding works 4 Screeding works
MY202CN05ARC127 Threshold 3 Threshold
MY202CN05ARC129 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN05ARC125 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN05ARC128 Skirting works 5 Skirting works
MY202CN05ARC130 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN05ARC131 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN05ARC132 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN05ARC133 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN05ARC136 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN05ARC135 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN05ARC134 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN05ARC137 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN05ARC138 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN05ARC139 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN05ARC140 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN05ARC141 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN05ARC144 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN05ARC143 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN05ARC146 False Ceiling Board/Tiles (Corridor) 8 False Ceiling Board/Tiles (Corridor)
MY202CN05ARC145 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN05ARC142 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN05ARC147 Aluminum Louvers 4 Aluminum Louvers
MY202CN05ARC148 Glass Partitions 5 Glass Partitions
MY202CN05ARC149 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN05ARC150 Wardrobe 6 Wardrobe

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
43 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN05ARC152 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN05ARC151 Balcony Handrail 7 Balcony Handrail
MY202CN05ARC153 Staircase Handrail 4 Staircase Handrail
MY202CN05ARC154 Mirror 4 Mirror
MY202CN05ARC155 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN05AC1X100 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN05AC2X102 Chilled Water Pipes 0 Chilled Water Pipes
MY202CN05AC2X101 Duct installation 0 Duct installation
MY202CN05AC2X103 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN05AC2X104 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN05AC2X105 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN05ACFX106 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN05ACTC107 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN05NG2X100 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN05NG2X101 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN05NGFX102 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN05NGTC103 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN05PD1X100 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN05PD1X101 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN05PD2X102 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN05PD2X103 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN05PD2X104 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN05PD2X105 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN05PD2X106 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN05PDFX117 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN05PDFX107 Water Heater 3 Water Heater
MY202CN05PDFX108 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN05PDFX109 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN05PDTC110 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN05PDTC111 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
44 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN05FF1X100 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN05FF2X101 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN05FF2X102 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN05FF2X103 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN05FF3X105 Hose Reel 4 Hose Reel
MY202CN05FF3X106 Fire Extinguisher 1 Fire Extinguisher
MY202CN05FF3X104 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN05FFTC107 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN05EP1X100 Electrical Sleeve 3 Electrical Sleeve
MY202CN05EP1X101 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN05EP1X102 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN05EP2X103 DB's enclosure 7 DB's enclosure
MY202CN05EP2X104 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN05EP2X105 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN05EPFX106 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN05EPFX108 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN05EPFX109 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN05EW1X112 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN05EW1X113 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN05EW2X114 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN05EW2X115 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN05EWFX116 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN05EWFX118 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN05ET1X121 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN05ET1X122 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN05ET2X123 Cable Tray fixing 4 Cable Tray fixing
MY202CN05ET2X124 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN05ETFX125 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN05EL1X128 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
45 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
2nd Fix 2nd Fix
MY202CN05EL2X129 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN05ELFX131 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN05EC1X134 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN05EC2X135 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN05ECFX136 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN05EF2X139 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN05EF2X141 Modules 3 Modules
Final Fix Final Fix
MY202CN05EFFX142 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN05EFFX143 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN05EB1X146 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN05EB2X147 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN05EB2X148 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN05EBFX149 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN05EV1X152 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN05EV2X153 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN05EVFX154 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN05EI1X157 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN05EI2X158 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN05EIFX159 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN05ES1X162 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN05ES2X163 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN05ESFX164 Smart Home System Devices 4 Smart Home System Devices

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
46 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN05EELP270 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN05CLER100 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN05SNAG100 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 6 Floor Level 6
Structural Structural
Reinforcement Reinforcement
MY202CN06STR100 Columns & Walls Reinforcement - FL6 1 Columns & Walls Reinforcement - FL6
MY202CN06STR101 Core Wall reinforcement - FL6 1 Core Wall reinforcement - FL6
MY202CN06STR102 Beam & Slab reinforcement - FL7 2 Beam & Slab reinforcement - FL7
MY202CN06STR103 Reinforcement for Stairs - FL6 2 Reinforcement for Stairs - FL6
Shuttering & Formworks Shuttering & Formworks
MY202CN06STR104 Columns & Walls shuttering - FL6 1 Columns & Walls shuttering - FL6
MY202CN06STR105 Core Wall shuttering - FL6 1 Core Wall shuttering - FL6
MY202CN06STR106 Beam & Slab shuttering - FL7 2 Beam & Slab shuttering - FL7
MY202CN06STR107 Shuttering for Stairs - FL6 2 Shuttering for Stairs - FL6
Concrete Casting Concrete Casting
MY202CN06STR110 Beam & Slab concrete casting- FL7 1 Beam & Slab concrete casting- FL7
MY202CN06STR108 Columns & Walls concrete casting - FL6 1 Columns & Walls concrete casting - FL6
MY202CN06STR109 Core Wall concrete casting - FL6 1 Core Wall concrete casting - FL6
MY202CN06STR111 Casting for the Stairs - FL6 1 Casting for the Stairs - FL6
Architectural Architectural
Masonry Masonry
MY202CN06ARC113 Blockworks 8 Blockworks
MY202CN06ARC115 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN06ARC114 Plastering - wall & ceiling (Unit) 2 Plastering - wall & ceiling (Unit)
MY202CN06ARC116 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN06ARC117 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN06ARC118 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN06ARC119 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN06ARC121 Aluminum Door 4 Aluminum Door
MY202CN06ARC122 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN06ARC120 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN06ARC123 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN06ARC124 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN06ARC126 Screeding works 4 Screeding works
MY202CN06ARC127 Threshold 3 Threshold
MY202CN06ARC129 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN06ARC125 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN06ARC128 Skirting works 5 Skirting works
MY202CN06ARC130 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN06ARC131 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
47 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN06ARC132 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN06ARC133 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN06ARC136 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN06ARC135 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN06ARC134 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN06ARC137 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN06ARC138 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN06ARC139 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN06ARC140 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN06ARC141 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN06ARC144 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN06ARC143 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN06ARC146 False Ceiling Board/Tiles (Corridor) 8 False Ceiling Board/Tiles (Corridor)
MY202CN06ARC145 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN06ARC142 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN06ARC147 Aluminum Louvers 4 Aluminum Louvers
MY202CN06ARC148 Glass Partitions 5 Glass Partitions
MY202CN06ARC149 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN06ARC150 Wardrobe 6 Wardrobe
MY202CN06ARC151 Balcony Handrail 7 Balcony Handrail
MY202CN06ARC152 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN06ARC153 Staircase Handrail 4 Staircase Handrail
MY202CN06ARC154 Mirror 4 Mirror
MY202CN06ARC155 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN06AC1X100 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN06AC2X102 Chilled Water Pipes 0 Chilled Water Pipes
MY202CN06AC2X101 Duct installation 0 Duct installation
MY202CN06AC2X103 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN06AC2X104 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN06AC2X105 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN06ACFX106 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN06ACTC107 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN06NG2X100 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN06NG2X101 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN06NGFX102 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
48 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Pressure Testing of NG Pressure Testing of NG
MY202CN06NGTC103 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN06PD1X100 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN06PD1X101 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN06PD2X102 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN06PD2X103 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN06PD2X104 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN06PD2X105 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN06PD2X106 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN06PDFX117 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN06PDFX107 Water Heater 3 Water Heater
MY202CN06PDFX108 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN06PDFX109 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN06PDTC110 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN06PDTC111 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN06FF1X100 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN06FF2X101 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN06FF2X102 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN06FF2X103 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN06FF3X105 Hose Reel 4 Hose Reel
MY202CN06FF3X106 Fire Extinguisher 1 Fire Extinguisher
MY202CN06FF3X104 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN06FFTC107 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN06EP1X100 Electrical Sleeve 3 Electrical Sleeve
MY202CN06EP1X101 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN06EP1X102 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN06EP2X103 DB's enclosure 7 DB's enclosure
MY202CN06EP2X104 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN06EP2X105 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN06EPFX106 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN06EPFX108 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN06EPFX109 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
49 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN06EW1X112 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN06EW1X113 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN06EW2X114 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN06EW2X115 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN06EWFX116 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN06EWFX118 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN06ET1X121 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN06ET1X122 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN06ET2X123 Cable Tray fixing 4 Cable Tray fixing
MY202CN06ET2X124 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN06ETFX125 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN06EL1X128 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN06EL2X129 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN06ELFX131 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN06EC1X134 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN06EC2X135 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN06ECFX136 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN06EF2X139 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN06EF2X141 Modules 3 Modules
Final Fix Final Fix
MY202CN06EFFX142 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN06EFFX143 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN06EB1X146 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN06EB2X147 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN06EB2X148 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
50 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN06EBFX149 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN06EV1X152 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN06EV2X153 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN06EVFX154 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN06EI1X157 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN06EI2X158 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN06EIFX159 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN06ES1X162 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN06ES2X163 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN06ESFX164 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN06EELP290 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN06CLER100 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN06SNAG100 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 7 Floor Level 7
Structural Structural
Reinforcement Reinforcement
MY202CN07STR100 Columns & Walls Reinforcement - FL7 1 Columns & Walls Reinforcement - FL7
MY202CN07STR101 Core Wall reinforcement - FL7 1 Core Wall reinforcement - FL7
MY202CN07STR102 Beam & Slab reinforcement - FL8 2 Beam & Slab reinforcement - FL8
MY202CN07STR103 Reinforcement for Stairs - FL7 2 Reinforcement for Stairs - FL7
Shuttering & Formworks Shuttering & Formworks
MY202CN07STR104 Columns & Walls shuttering - FL7 1 Columns & Walls shuttering - FL7
MY202CN07STR105 Core Wall shuttering - FL7 1 Core Wall shuttering - FL7
MY202CN07STR106 Beam & Slab shuttering - FL8 2 Beam & Slab shuttering - FL8
MY202CN07STR107 Shuttering for Stairs - FL7 2 Shuttering for Stairs - FL7
Concrete Casting Concrete Casting
MY202CN07STR108 Columns & Walls concrete casting - FL7 1 Columns & Walls concrete casting - FL7
MY202CN07STR109 Core Wall concrete casting - FL7 1 Core Wall concrete casting - FL7
MY202CN07STR110 Beam & Slab concrete casting- FL8 1 Beam & Slab concrete casting- FL8
MY202CN07STR111 Casting for the Stairs - FL7 1 Casting for the Stairs - FL7
Architectural Architectural
Masonry Masonry

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
51 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN07ARC113 Blockworks 8 Blockworks
MY202CN07ARC115 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN07ARC114 Plastering - wall & ceiling (Unit) 2 Plastering - wall & ceiling (Unit)
MY202CN07ARC116 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN07ARC117 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN07ARC118 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN07ARC119 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN07ARC121 Aluminum Door 4 Aluminum Door
MY202CN07ARC122 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN07ARC120 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN07ARC123 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN07ARC124 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN07ARC126 Screeding works 4 Screeding works
MY202CN07ARC127 Threshold 3 Threshold
MY202CN07ARC125 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN07ARC129 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN07ARC128 Skirting works 5 Skirting works
MY202CN07ARC130 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN07ARC131 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN07ARC132 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN07ARC133 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN07ARC136 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN07ARC135 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN07ARC134 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN07ARC137 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN07ARC138 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN07ARC139 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN07ARC140 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN07ARC141 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN07ARC144 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN07ARC143 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN07ARC146 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (Corridor)
MY202CN07ARC145 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN07ARC142 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN07ARC147 Aluminum Louvers 4 Aluminum Louvers
MY202CN07ARC148 Glass Partitions 5 Glass Partitions
MY202CN07ARC149 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN07ARC150 Wardrobe 6 Wardrobe
MY202CN07ARC151 Balcony Handrail 7 Balcony Handrail
MY202CN07ARC152 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN07ARC153 Staircase Handrail 4 Staircase Handrail

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
52 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN07ARC154 Mirror 4 Mirror
MY202CN07ARC155 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN07AC1X100 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN07AC2X102 Chilled Water Pipes 0 Chilled Water Pipes
MY202CN07AC2X101 Duct installation 0 Duct installation
MY202CN07AC2X103 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN07AC2X104 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN07AC2X105 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN07ACFX106 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN07ACTC107 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN07NG2X100 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN07NG2X101 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN07NGFX102 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN07NGTC103 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN07PD1X100 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN07PD1X101 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN07PD2X102 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN07PD2X103 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN07PD2X104 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN07PD2X105 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN07PD2X106 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN07PDFX107 Water Heater 3 Water Heater
MY202CN07PDFX108 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN07PDFX117 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN07PDFX109 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN07PDTC110 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN07PDTC111 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN07FF1X100 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN07FF2X101 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
53 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN07FF2X102 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN07FF2X103 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN07FF3X105 Hose Reel 4 Hose Reel
MY202CN07FF3X106 Fire Extinguisher 1 Fire Extinguisher
MY202CN07FF3X104 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN07FFTC107 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN07EP1X100 Electrical Sleeve 3 Electrical Sleeve
MY202CN07EP1X101 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN07EP1X102 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN07EP2X103 DB's enclosure 7 DB's enclosure
MY202CN07EP2X104 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN07EP2X105 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN07EPFX106 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN07EPFX108 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN07EPFX109 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN07EW1X112 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN07EW1X113 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN07EW2X114 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN07EW2X115 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN07EWFX116 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN07EWFX118 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN07ET1X121 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN07ET1X122 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN07ET2X123 Cable Tray fixing 4 Cable Tray fixing
MY202CN07ET2X124 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN07ETFX125 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN07EL1X128 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN07EL2X129 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
54 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN07ELFX131 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN07EC1X134 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN07EC2X135 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN07ECFX136 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN07EF2X139 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN07EF2X141 Modules 3 Modules
Final Fix Final Fix
MY202CN07EFFX142 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN07EFFX143 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN07EB1X146 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN07EB2X147 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN07EB2X148 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN07EBFX149 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN07EV1X152 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN07EV2X153 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN07EVFX154 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN07EI1X157 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN07EI2X158 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN07EIFX159 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN07ES1X162 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN07ES2X163 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN07ESFX164 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN07EELP310 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
55 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN07CLER100 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN07SNAG100 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 8 Floor Level 8
Structural Structural
Reinforcement Reinforcement
MY202CN08STR100 Columns & Walls Reinforcement - FL8 1 Columns & Walls Reinforcement - FL8
MY202CN08STR101 Core Wall reinforcement - FL8 1 Core Wall reinforcement - FL8
MY202CN08STR102 Beam & Slab reinforcement - FL9 2 Beam & Slab reinforcement - FL9
MY202CN08STR103 Reinforcement for Stairs - FL8 2 Reinforcement for Stairs - FL8
Shuttering & Formworks Shuttering & Formworks
MY202CN08STR104 Columns & Walls shuttering - FL8 1 Columns & Walls shuttering - FL8
MY202CN08STR105 Core Wall shuttering - FL8 1 Core Wall shuttering - FL8
MY202CN08STR106 Beam & Slab shuttering - FL9 2 Beam & Slab shuttering - FL9
MY202CN08STR107 Shuttering for Stairs - FL8 2 Shuttering for Stairs - FL8
Concrete Casting Concrete Casting
MY202CN08STR108 Columns & Walls concrete casting - FL8 1 Columns & Walls concrete casting - FL8
MY202CN08STR109 Core Wall concrete casting - FL8 1 Core Wall concrete casting - FL8
MY202CN08STR110 Beam & Slab concrete casting- FL9 1 Beam & Slab concrete casting- FL9
MY202CN08STR111 Casting for the Stairs - FL8 1 Casting for the Stairs - FL8
Architectural Architectural
Masonry Masonry
MY202CN08ARC113 Blockworks 8 Blockworks
MY202CN08ARC115 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN08ARC114 Plastering - wall & ceiling (Unit) 2 Plastering - wall & ceiling (Unit)
MY202CN08ARC116 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN08ARC117 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN08ARC118 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN08ARC119 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN08ARC121 Aluminum Door 4 Aluminum Door
MY202CN08ARC122 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN08ARC120 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN08ARC123 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN08ARC124 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN08ARC126 Screeding works 4 Screeding works
MY202CN08ARC125 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN08ARC127 Threshold 3 Threshold
MY202CN08ARC129 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN08ARC128 Skirting works 5 Skirting works
MY202CN08ARC130 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN08ARC131 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN08ARC132 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN08ARC133 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
56 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN08ARC136 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN08ARC135 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN08ARC134 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN08ARC137 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN08ARC138 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN08ARC139 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN08ARC140 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN08ARC141 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN08ARC144 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN08ARC143 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN08ARC146 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (Corridor)
MY202CN08ARC145 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN08ARC142 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN08ARC147 Aluminum Louvers 4 Aluminum Louvers
MY202CN08ARC148 Glass Partitions 5 Glass Partitions
MY202CN08ARC149 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN08ARC150 Wardrobe 6 Wardrobe
MY202CN08ARC151 Balcony Handrail 7 Balcony Handrail
MY202CN08ARC152 Vanity Unit / Pantry top / Cistern top 7 Vanity Unit / Pantry top / Cistern top
MY202CN08ARC153 Staircase Handrail 4 Staircase Handrail
MY202CN08ARC154 Mirror 4 Mirror
MY202CN08ARC155 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN08AC1X100 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN08AC2X102 Chilled Water Pipes 0 Chilled Water Pipes
MY202CN08AC2X101 Duct installation 0 Duct installation
MY202CN08AC2X103 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN08AC2X104 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN08AC2X105 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN08ACFX106 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN08ACTC107 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN08NG2X100 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN08NG2X101 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN08NGFX102 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN08NGTC103 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
57 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
First Fix First Fix
MY202CN08PD1X100 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN08PD1X101 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN08PD2X102 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN08PD2X103 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN08PD2X104 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN08PD2X105 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN08PD2X106 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN08PDFX107 Water Heater 3 Water Heater
MY202CN08PDFX108 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN08PDFX117 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN08PDFX109 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN08PDTC110 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN08PDTC111 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN08FF1X100 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN08FF2X101 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN08FF2X102 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN08FF2X103 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN08FF3X105 Hose Reel 4 Hose Reel
MY202CN08FF3X106 Fire Extinguisher 1 Fire Extinguisher
MY202CN08FF3X104 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN08FFTC107 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN08EP1X100 Electrical Sleeve 3 Electrical Sleeve
MY202CN08EP1X101 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN08EP1X102 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN08EP2X103 DB's enclosure 7 DB's enclosure
MY202CN08EP2X104 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN08EP2X105 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN08EPFX106 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN08EPFX108 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN08EPFX109 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN08EW1X112 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
58 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN08EW1X113 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN08EW2X114 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN08EW2X115 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN08EWFX116 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN08EWFX118 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN08ET1X121 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN08ET1X122 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN08ET2X123 Cable Tray fixing 4 Cable Tray fixing
MY202CN08ET2X124 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN08ETFX125 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN08EL1X128 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN08EL2X129 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN08ELFX131 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN08EC1X134 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN08EC2X135 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN08ECFX136 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN08EF2X139 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN08EF2X141 Modules 3 Modules
Final Fix Final Fix
MY202CN08EFFX142 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN08EFFX143 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN08EB1X146 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN08EB2X147 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN08EB2X148 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN08EBFX149 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
59 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN08EV1X152 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN08EV2X153 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN08EVFX154 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN08EI1X157 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN08EI2X158 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN08EIFX159 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN08ES1X162 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN08ES2X163 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN08ESFX164 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN08EELP330 PVC Earth cable networks 6 PVC Earth cable networks
MY202CN08EELP340 Lightning protection system copper tape 6 Lightning protection system copper tape
Clearance Clearance
MY202CN08CLER100 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN08SNAG100 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 9 Floor Level 9
Structural Structural
Reinforcement Reinforcement
MY202CN09STR100 Columns & Walls Reinforcement - FL9 1 Columns & Walls Reinforcement - FL9
MY202CN09STR101 Core Wall reinforcement - FL9 1 Core Wall reinforcement - FL9
MY202CN09STR102 Beam & Slab reinforcement - FL10 2 Beam & Slab reinforcement - FL10
MY202CN09STR103 Reinforcement for Stairs - FL9 2 Reinforcement for Stairs - FL9
Shuttering & Formworks Shuttering & Formworks
MY202CN09STR104 Columns & Walls shuttering - FL9 1 Columns & Walls shuttering - FL9
MY202CN09STR105 Core Wall shuttering - FL9 1 Core Wall shuttering - FL9
MY202CN09STR106 Beam & Slab shuttering - FL10 2 Beam & Slab shuttering - FL10
MY202CN09STR107 Shuttering for Stairs - FL9 2 Shuttering for Stairs - FL9
Concrete Casting Concrete Casting
MY202CN09STR108 Columns & Walls concrete casting - FL9 1 Columns & Walls concrete casting - FL9
MY202CN09STR109 Core Wall concrete casting - FL9 1 Core Wall concrete casting - FL9
MY202CN09STR110 Beam & Slab concrete casting- FL10 1 Beam & Slab concrete casting- FL10
MY202CN09STR111 Casting for the Stairs - FL9 1 Casting for the Stairs - FL9
Architectural Architectural
Masonry Masonry
MY202CN09ARC113 Blockworks 8 Blockworks
MY202CN09ARC115 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
60 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN09ARC114 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN09ARC116 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN09ARC117 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN09ARC118 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN09ARC119 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN09ARC121 Aluminum Door 4 Aluminum Door
MY202CN09ARC122 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN09ARC120 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN09ARC123 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN09ARC124 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN09ARC126 Screeding works 4 Screeding works
MY202CN09ARC125 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN09ARC127 Threshold 3 Threshold
MY202CN09ARC129 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN09ARC128 Skirting works 5 Skirting works
MY202CN09ARC130 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN09ARC131 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN09ARC132 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN09ARC133 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN09ARC136 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN09ARC135 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN09ARC134 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN09ARC137 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN09ARC138 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN09ARC139 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN09ARC140 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN09ARC141 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN09ARC144 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN09ARC143 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN09ARC146 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (Corridor)
MY202CN09ARC145 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN09ARC142 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN09ARC147 Aluminum Louvers 4 Aluminum Louvers
MY202CN09ARC148 Glass Partitions 5 Glass Partitions
MY202CN09ARC149 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN09ARC150 Wardrobe 6 Wardrobe
MY202CN09ARC152 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN09ARC151 Balcony Handrail 7 Balcony Handrail
MY202CN09ARC153 Staircase Handrail 4 Staircase Handrail
MY202CN09ARC154 Mirror 4 Mirror
MY202CN09ARC155 Room and Lift signage 2 Room and Lift signage

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
61 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN09AC1X100 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN09AC2X101 Duct installation 0 Duct installation
MY202CN09AC2X102 Chilled Water Pipes 9 Chilled Water Pipes
MY202CN09AC2X103 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN09AC2X104 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN09AC2X105 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN09ACFX106 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN09ACTC107 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN09NG2X100 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN09NG2X101 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN09NGFX102 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN09NGTC103 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN09PD1X100 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN09PD1X101 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN09PD2X102 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN09PD2X103 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN09PD2X104 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN09PD2X105 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN09PD2X106 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN09PDFX107 Water Heater 3 Water Heater
MY202CN09PDFX108 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN09PDFX117 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN09PDFX109 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN09PDTC110 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN09PDTC111 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN09FF1X100 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN09FF2X101 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN09FF2X102 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN09FF2X103 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
62 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Final Fix Final Fix
MY202CN09FF3X105 Hose Reel 4 Hose Reel
MY202CN09FF3X106 Fire Extinguisher 1 Fire Extinguisher
MY202CN09FF3X104 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN09FFTC107 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN09EP1X100 Electrical Sleeve 3 Electrical Sleeve
MY202CN09EP1X101 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN09EP1X102 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN09EP2X103 DB's enclosure 7 DB's enclosure
MY202CN09EP2X104 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN09EP2X105 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN09EPFX106 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN09EPFX108 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN09EPFX109 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN09EW1X112 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN09EW1X113 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN09EW2X114 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN09EW2X115 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN09EWFX116 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN09EWFX118 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN09ET1X121 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN09ET1X122 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN09ET2X123 Cable Tray fixing 4 Cable Tray fixing
MY202CN09ET2X124 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN09ETFX125 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN09EL1X128 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN09EL2X129 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN09ELFX131 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
63 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
First Fix First Fix
MY202CN09EC1X134 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN09EC2X135 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN09ECFX136 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN09EF2X139 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN09EF2X141 Modules 3 Modules
Final Fix Final Fix
MY202CN09EFFX142 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN09EFFX143 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN09EB1X146 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN09EB2X147 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN09EB2X148 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN09EBFX149 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN09EV1X152 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN09EV2X153 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN09EVFX154 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN09EI1X157 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN09EI2X158 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN09EIFX159 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN09ES1X162 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN09ES2X163 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN09ESFX164 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN09EELP350 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN09CLER100 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
64 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN09SNAG100 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 10 Floor Level 10
Structural Structural
Reinforcement Reinforcement
MY202CN10STR100 Columns & Walls Reinforcement - FL10 1 Columns & Walls Reinforcement - FL10
MY202CN10STR101 Core Wall reinforcement - FL10 1 Core Wall reinforcement - FL10
MY202CN10STR102 Beam & Slab reinforcement - FL11 2 Beam & Slab reinforcement - FL11
MY202CN10STR103 Reinforcement for Stairs - FL10 2 Reinforcement for Stairs - FL10
Shuttering & Formworks Shuttering & Formworks
MY202CN10STR104 Columns & Walls shuttering - FL10 1 Columns & Walls shuttering - FL10
MY202CN10STR105 Core Wall shuttering - FL10 1 Core Wall shuttering - FL10
MY202CN10STR106 Beam & Slab shuttering - FL11 2 Beam & Slab shuttering - FL11
MY202CN10STR107 Shuttering for Stairs - FL10 2 Shuttering for Stairs - FL10
Concrete Casting Concrete Casting
MY202CN10STR108 Columns & Walls concrete casting - FL10 1 Columns & Walls concrete casting - FL10
MY202CN10STR109 Core Wall concrete casting - FL10 1 Core Wall concrete casting - FL10
MY202CN10STR110 Beam & Slab concrete casting- FL11 1 Beam & Slab concrete casting- FL11
MY202CN10STR111 Casting for the Stairs - FL10 1 Casting for the Stairs - FL10
Architectural Architectural
Masonry Masonry
MY202CN10ARC113 Blockworks 8 Blockworks
MY202CN10ARC115 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN10ARC114 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN10ARC116 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN10ARC117 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN10ARC118 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN10ARC119 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN10ARC121 Aluminum Door 4 Aluminum Door
MY202CN10ARC122 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN10ARC120 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN10ARC123 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN10ARC124 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN10ARC125 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN10ARC126 Screeding works 4 Screeding works
MY202CN10ARC127 Threshold 3 Threshold
MY202CN10ARC129 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN10ARC128 Skirting works 5 Skirting works
MY202CN10ARC130 Floor Tile Finish (Dry Area) 7 Floor Tile Finish (Dry Area)
MY202CN10ARC131 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN10ARC132 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN10ARC133 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN10ARC136 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN10ARC135 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
65 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN10ARC134 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN10ARC138 First Coat Paint (Corridor) 6 First Coat Paint (Corridor)
MY202CN10ARC137 First Coat Paint (Unit) 6 First Coat Paint (Unit)
MY202CN10ARC139 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN10ARC140 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN10ARC141 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN10ARC144 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN10ARC143 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN10ARC146 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (Corridor)
MY202CN10ARC145 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN10ARC142 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN10ARC147 Aluminum Louvers 4 Aluminum Louvers
MY202CN10ARC148 Glass Partitions 5 Glass Partitions
MY202CN10ARC149 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN10ARC150 Wardrobe 6 Wardrobe
MY202CN10ARC152 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN10ARC151 Balcony Handrail 7 Balcony Handrail
MY202CN10ARC153 Staircase Handrail 4 Staircase Handrail
MY202CN10ARC154 Mirror 4 Mirror
MY202CN10ARC155 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN10AC1X100 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN10AC2X101 Duct installation 0 Duct installation
MY202CN10AC2X102 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN10AC2X103 CHW, Duct Equipments Insulation 6 CHW, Duct Equipments Insulation
MY202CN10AC2X104 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN10AC2X105 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN10ACFX106 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN10ACTC107 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN10NG2X100 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN10NG2X101 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN10NGFX102 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN10NGTC103 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN10PD1X100 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
66 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN10PD1X101 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN10PD2X102 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN10PD2X103 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN10PD2X104 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN10PD2X105 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN10PD2X106 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN10PDFX107 Water Heater 3 Water Heater
MY202CN10PDFX108 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN10PDFX117 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN10PDFX109 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN10PDTC110 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN10PDTC111 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN10FF1X100 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN10FF2X101 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN10FF2X102 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN10FF2X103 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN10FF3X105 Hose Reel 4 Hose Reel
MY202CN10FF3X106 Fire Extinguisher 1 Fire Extinguisher
MY202CN10FF3X104 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN10FFTC107 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN10EP1X100 Electrical Sleeve 3 Electrical Sleeve
MY202CN10EP1X101 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN10EP1X102 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN10EP2X103 DB's enclosure 7 DB's enclosure
MY202CN10EP2X104 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN10EP2X105 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN10EPFX106 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN10EPFX108 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN10EPFX109 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN10EW1X112 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN10EW1X113 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
67 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN10EW2X114 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN10EW2X115 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN10EWFX116 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN10EWFX118 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN10ET1X121 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN10ET1X122 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN10ET2X123 Cable Tray fixing 4 Cable Tray fixing
MY202CN10ET2X124 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN10ETFX125 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN10EL1X128 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN10EL2X129 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN10ELFX131 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN10EC1X134 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN10EC2X135 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN10ECFX136 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN10EF2X139 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN10EF2X141 Modules 3 Modules
Final Fix Final Fix
MY202CN10EFFX142 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN10EFFX143 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN10EB1X146 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN10EB2X147 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN10EB2X148 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN10EBFX149 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN10EV1X152 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
68 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN10EV2X153 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN10EVFX154 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN10EI1X157 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN10EI2X158 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN10EIFX159 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN10ES1X162 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN10ES2X163 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN10ESFX164 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CNB10EELP370 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN10CLER100 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN10SNAG100 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 11 Floor Level 11
Structural Structural
Reinforcement Reinforcement
MY202CN11STR211 Columns & Walls Reinforcement - FL11 1 Columns & Walls Reinforcement - FL11
MY202CN11STR221 Core Wall reinforcement - FL11 1 Core Wall reinforcement - FL11
MY202CN11STR201 Beam & Slab reinforcement - FL12 2 Beam & Slab reinforcement - FL12
MY202CN11STR231 Reinforcement for Stairs - FL11 2 Reinforcement for Stairs - FL11
Shuttering & Formworks Shuttering & Formworks
MY202CN11STR171 Columns & Walls shuttering - FL11 1 Columns & Walls shuttering - FL11
MY202CN11STR181 Core Wall shuttering - FL11 1 Core Wall shuttering - FL11
MY202CN11STR161 Beam & Slab shuttering - FL12 2 Beam & Slab shuttering - FL12
MY202CN11STR191 Shuttering for Stairs - FL11 2 Shuttering for Stairs - FL11
Concrete Casting Concrete Casting
MY202CN11STR131 Columns & Walls concrete casting - FL11 1 Columns & Walls concrete casting - FL11
MY202CN11STR141 Core Wall concrete casting - FL11 1 Core Wall concrete casting - FL11
MY202CN11STR121 Beam & Slab concrete casting- FL12 1 Beam & Slab concrete casting- FL12
MY202CN11STR151 Casting for the Stairs - FL11 1 Casting for the Stairs - FL11
Architectural Architectural
Masonry Masonry
MY202CN11ARC475 Blockworks 8 Blockworks
MY202CN11ARC505 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN11ARC485 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN11ARC495 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
69 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN11ARC515 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN11ARC525 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN11ARC535 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN11ARC565 Aluminum Door 4 Aluminum Door
MY202CN11ARC555 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN11ARC545 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN11ARC585 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN11ARC575 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN11ARC165 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN11ARC185 Screeding works 4 Screeding works
MY202CN11ARC175 Threshold 3 Threshold
MY202CN11ARC205 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN11ARC195 Skirting works 5 Skirting works
MY202CN11ARC215 Floor Tile Finish (Dry Area) 7 Floor Tile Finish (Dry Area)
MY202CN11ARC225 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN11ARC235 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN11ARC285 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN11ARC275 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN11ARC315 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN11ARC245 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN11ARC295 First Coat Paint (Corridor) 6 First Coat Paint (Corridor)
MY202CN11ARC255 First Coat Paint (Unit) 6 First Coat Paint (Unit)
MY202CN11ARC265 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN11ARC305 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN11ARC325 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN11ARC345 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN11ARC365 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN11ARC355 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (Corridor)
MY202CN11ARC335 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN11ARC375 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN11ARC445 Aluminum Louvers 4 Aluminum Louvers
MY202CN11ARC455 Glass Partitions 5 Glass Partitions
MY202CN11ARC395 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN11ARC405 Wardrobe 6 Wardrobe
MY202CN11ARC385 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN11ARC435 Balcony Handrail 7 Balcony Handrail
MY202CN11ARC425 Staircase Handrail 4 Staircase Handrail
MY202CN11ARC415 Mirror 4 Mirror
MY202CN11ARC465 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
70 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN11AC1X110 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN11AC2X115 Duct installation 0 Duct installation
MY202CN11AC2X135 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN11AC2X145 CHW, Duct Equipments Insulation 6 CHW, Duct Equipments Insulation
MY202CN11AC2X155 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN11AC2X125 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN11ACFX116 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN11ACTC117 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN11NG2X111 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN11NG2X121 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN11NGFX112 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN11NGTC113 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN11PD1X111 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN11PD1X121 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN11PD2X136 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN11PD2X146 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN11PD2X156 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN11PD2X116 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN11PD2X126 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN11PDFX127 Water Heater 3 Water Heater
MY202CN11PDFX147 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN11PDFX157 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN11PDFX137 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN11PDTC121 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN11PDTC131 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN11FF1X110 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN11FF2X113 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN11FF2X123 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN11FF2X133 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN11FF3X126 Hose Reel 4 Hose Reel
MY202CN11FF3X136 Fire Extinguisher 1 Fire Extinguisher

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
71 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN11FF3X116 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN11FFTC117 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN11EP1X112 Electrical Sleeve 3 Electrical Sleeve
MY202CN11EP1X122 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN11EP1X132 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN11EP2X125 DB's enclosure 7 DB's enclosure
MY202CN11EP2X135 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN11EP2X115 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN11EPFX119 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN11EPFX129 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN11EPFX139 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN11EW1X123 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN11EW1X133 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN11EW2X135 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN11EW2X125 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN11EWFX128 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN11EWFX138 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN11ET1X132 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN11ET1X142 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN11ET2X144 Cable Tray fixing 4 Cable Tray fixing
MY202CN11ET2X134 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN11ETFX135 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN11EL1X138 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN11EL2X139 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN11ELFX141 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN11EC1X144 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
72 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN11EC2X145 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN11ECFX146 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN11EF2X151 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN11EF2X161 Modules 3 Modules
Final Fix Final Fix
MY202CN11EFFX153 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN11EFFX163 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN11EB1X156 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN11EB2X158 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN11EB2X168 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN11EBFX159 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN11EV1X162 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN11EV2X163 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN11EVFX164 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN11EI1X167 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN11EI2X168 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN11EIFX169 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN11ES1X172 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN11ES2X173 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN11ESFX174 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN11EELP380 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN11CLER110 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN11SNAG110 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 12 Floor Level 12
Structural Structural

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
73 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Reinforcement Reinforcement
MY202CN12STR331 Columns & Walls Reinforcement - FL12 1 Columns & Walls Reinforcement - FL12
MY202CN12STR341 Core Wall reinforcement - FL12 1 Core Wall reinforcement - FL12
MY202CN12STR321 Beam & Slab reinforcement - FL13 2 Beam & Slab reinforcement - FL13
MY202CN12STR351 Reinforcement for Stairs - FL12 2 Reinforcement for Stairs - FL12
Shuttering & Formworks Shuttering & Formworks
MY202CN12STR291 Columns & Walls shuttering - FL12 1 Columns & Walls shuttering - FL12
MY202CN12STR301 Core Wall shuttering - FL12 1 Core Wall shuttering - FL12
MY202CN12STR281 Beam & Slab shuttering - FL13 2 Beam & Slab shuttering - FL13
MY202CN12STR311 Shuttering for Stairs - FL12 2 Shuttering for Stairs - FL12
Concrete Casting Concrete Casting
MY202CN12STR251 Columns & Walls concrete casting - FL12 1 Columns & Walls concrete casting - FL12
MY202CN12STR261 Core Wall concrete casting - FL12 1 Core Wall concrete casting - FL12
MY202CN12STR241 Beam & Slab concrete casting- FL13 1 Beam & Slab concrete casting- FL13
MY202CN12STR271 Casting for the Stairs - FL12 1 Casting for the Stairs - FL12
Architectural Architectural
Masonry Masonry
MY202CN12ARC905 Blockworks 8 Blockworks
MY202CN12ARC935 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN12ARC915 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN12ARC925 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN12ARC945 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN12ARC955 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN12ARC965 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN12ARC995 Aluminum Door 4 Aluminum Door
MY202CN12ARC985 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN12ARC975 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN2ARC1015 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN2ARC1005 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN12ARC595 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN12ARC615 Screeding works 4 Screeding works
MY202CN12ARC605 Threshold 3 Threshold
MY202CN12ARC635 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN12ARC625 Skirting works 5 Skirting works
MY202CN12ARC645 Floor Tile Finish (Dry Area) 7 Floor Tile Finish (Dry Area)
MY202CN12ARC655 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN12ARC665 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN12ARC715 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN12ARC705 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN12ARC745 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN12ARC675 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN12ARC725 First Coat Paint (Corridor) 6 First Coat Paint (Corridor)
MY202CN12ARC685 First Coat Paint (Unit) 6 First Coat Paint (Unit)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
74 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN12ARC695 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN12ARC735 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN12ARC755 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN12ARC775 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN12ARC795 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN12ARC785 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (Corridor)
MY202CN12ARC765 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN12ARC805 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN12ARC875 Aluminum Louvers 4 Aluminum Louvers
MY202CN12ARC885 Glass Partitions 5 Glass Partitions
MY202CN12ARC825 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN12ARC835 Wardrobe 6 Wardrobe
MY202CN12ARC815 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN12ARC865 Balcony Handrail 7 Balcony Handrail
MY202CN12ARC855 Staircase Handrail 4 Staircase Handrail
MY202CN12ARC845 Mirror 4 Mirror
MY202CN12ARC895 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN12AC1X120 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN12AC2X165 Duct installation 0 Duct installation
MY202CN12AC2X185 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN12AC2X195 CHW, Duct Equipments Insulation 6 CHW, Duct Equipments Insulation
MY202CN12AC2X205 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN12AC2X175 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN12ACFX126 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN12ACTC127 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN12NG2X131 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN12NG2X141 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN12NGFX122 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN12NGTC123 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN12PD1X131 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN12PD1X141 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN12PD2X186 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
75 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN12PD2X196 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN12PD2X206 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN12PD2X166 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN12PD2X176 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN12PDFX167 Water Heater 3 Water Heater
MY202CN12PDFX187 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN12PDFX197 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN12PDFX177 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN12PDTC141 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN12PDTC151 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN12FF1X120 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN12FF2X143 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN12FF2X153 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN12FF2X163 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN12FF3X156 Hose Reel 4 Hose Reel
MY202CN12FF3X166 Fire Extinguisher 1 Fire Extinguisher
MY202CN12FF3X146 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN12FFTC127 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN12EP1X142 Electrical Sleeve 3 Electrical Sleeve
MY202CN12EP1X152 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN12EP1X162 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN12EP2X155 DB's enclosure 7 DB's enclosure
MY202CN12EP2X165 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN12EP2X145 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN12EPFX149 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN12EPFX159 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN12EPFX169 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN12EW1X143 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN12EW1X153 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN12EW2X155 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN12EW2X145 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
76 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN12EWFX148 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN12EWFX158 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN12ET1X152 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN12ET1X162 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN12ET2X164 Cable Tray fixing 4 Cable Tray fixing
MY202CN12ET2X154 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN12ETFX145 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN12EL1X148 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN12EL2X149 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN12ELFX151 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN12EC1X154 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN12EC2X155 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN12ECFX156 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN12EF2X171 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN12EF2X181 Modules 3 Modules
Final Fix Final Fix
MY202CN12EFFX173 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN12EFFX183 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN12EB1X166 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN12EB2X178 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN12EB2X188 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN12EBFX169 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN12EV1X172 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN12EV2X173 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN12EVFX174 TV System Outlet 4 TV System Outlet

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
77 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Intercom System Intercom System
First Fix First Fix
MY202CN12EI1X177 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN12EI2X178 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN12EIFX179 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN12ES1X182 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN12ES2X183 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN12ESFX184 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN12EELP390 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN12CLER120 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN12SNAG120 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 13 Floor Level 13
Structural Structural
Reinforcement Reinforcement
MY202CN13STR131 Columns & Walls Reinforcement - FL13 1 Columns & Walls Reinforcement - FL13
MY202CN13STR141 Core Wall reinforcement - FL13 1 Core Wall reinforcement - FL13
MY202CN13STR121 Beam & Slab reinforcement - FL14 2 Beam & Slab reinforcement - FL14
MY202CN13STR151 Reinforcement for Stairs - FL13 2 Reinforcement for Stairs - FL13
Shuttering & Formworks Shuttering & Formworks
MY202CN13STR171 Columns & Walls shuttering - FL13 1 Columns & Walls shuttering - FL13
MY202CN13STR181 Core Wall shuttering - FL13 1 Core Wall shuttering - FL13
MY202CN13STR161 Beam & Slab shuttering - FL14 2 Beam & Slab shuttering - FL14
MY202CN13STR191 Shuttering for Stairs - FL13 2 Shuttering for Stairs - FL13
Concrete Casting Concrete Casting
MY202CN13STR211 Columns & Walls concrete casting - FL13 1 Columns & Walls concrete casting - FL13
MY202CN13STR221 Core Wall concrete casting - FL13 1 Core Wall concrete casting - FL13
MY202CN13STR201 Beam & Slab concrete casting- FL14 1 Beam & Slab concrete casting- FL14
MY202CN13STR231 Casting for the Stairs - FL13 1 Casting for the Stairs - FL13
Architectural Architectural
Masonry Masonry
MY202CN13ARC335 Blockworks 8 Blockworks
MY202CN13ARC365 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN13ARC345 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN13ARC355 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN13ARC515 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN13ARC525 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN13ARC535 Aluminum Window Frame 2 Aluminum Window Frame

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
78 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN13ARC565 Aluminum Door 4 Aluminum Door
MY202CN13ARC555 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN13ARC545 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN13ARC585 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN13ARC575 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN13ARC255 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN13ARC275 Screeding works 4 Screeding works
MY202CN13ARC265 Threshold 3 Threshold
MY202CN13ARC295 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN13ARC285 Skirting works 5 Skirting works
MY202CN13ARC305 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN13ARC315 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN13ARC325 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN13ARC415 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN13ARC445 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN13ARC405 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN13ARC375 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN13ARC425 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN13ARC385 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN13ARC395 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN13ARC435 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN13ARC455 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN13ARC475 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN13ARC495 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN13ARC485 False Ceiling Board/Tiles (Corridor) 8 False Ceiling Board/Tiles (Corridor)
MY202CN13ARC465 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN13ARC505 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN13ARC225 Aluminum Louvers 4 Aluminum Louvers
MY202CN13ARC235 Glass Partitions 5 Glass Partitions
MY202CN13ARC175 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN13ARC185 Wardrobe 6 Wardrobe
MY202CN13ARC165 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN13ARC215 Balcony Handrail 7 Balcony Handrail
MY202CN13ARC205 Staircase Handrail 4 Staircase Handrail
MY202CN13ARC195 Mirror 4 Mirror
MY202CN13ARC245 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN13AC1X110 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN13AC2X115 Duct installation 0 Duct installation

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
79 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN13AC2X135 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN13AC2X145 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN13AC2X155 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN13AC2X125 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN13ACFX116 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN13ACTC117 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN13NG2X111 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN13NG2X121 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN13NGFX112 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN13NGTC113 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN13PD1X111 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN13PD1X121 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN13PD2X136 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN13PD2X146 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN13PD2X156 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN13PD2X116 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN13PD2X126 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN13PDFX129 Water Heater 3 Water Heater
MY202CN13PDFX149 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN13PDFX159 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN13PDFX139 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN13PDTC121 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN13PDTC131 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN13FF1X110 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN13FF2X113 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN13FF2X123 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN13FF2X133 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN13FF3X126 Hose Reel 4 Hose Reel
MY202CN13FF3X136 Fire Extinguisher 1 Fire Extinguisher
MY202CN13FF3X116 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN13FFTC117 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
80 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN13EP1X112 Electrical Sleeve 3 Electrical Sleeve
MY202CN13EP1X122 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN13EP1X132 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN13EP2X125 DB's enclosure 7 DB's enclosure
MY202CN13EP2X135 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN13EP2X115 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN13EPFX119 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN13EPFX129 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN13EPFX139 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN13EW1X123 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN13EW1X133 Wiring Hangers & supports 4 Wiring Hangers & supports
2nd Fix 2nd Fix
MY202CN13EW2X135 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN13EW2X125 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN13EWFX128 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN13EWFX138 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN13ET1X132 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN13ET1X142 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN13ET2X144 Cable Tray fixing 4 Cable Tray fixing
MY202CN13ET2X134 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN13ETFX135 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN13EL1X138 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN13EL2X139 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN13ELFX141 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN13EC1X144 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN13EC2X145 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN13ECFX146 CCTV System Camera 3 CCTV System Camera

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
81 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN13EF2X151 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN13EF2X161 Modules 3 Modules
Final Fix Final Fix
MY202CN13EFFX153 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN13EFFX163 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN13EB1X156 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN13EB2X158 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN13EB2X168 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN13EBFX159 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN13EV1X162 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN13EV2X163 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN13EVFX164 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN13EI1X167 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN13EI2X168 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN13EIFX169 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN13ES1X172 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN13ES2X173 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN13ESFX174 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN13EELP200 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN13CLER110 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN13SNAG110 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 14 Floor Level 14
Structural Structural
Reinforcement Reinforcement
MY202CN14STR131 Columns & Walls Reinforcement - FL14 1 Columns & Walls Reinforcement - FL14
MY202CN14STR141 Core Wall reinforcement - FL14 1 Core Wall reinforcement - FL14

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
82 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN14STR121 Beam & Slab reinforcement - FL15 2 Beam & Slab reinforcement - FL15
MY202CN14STR151 Reinforcement for Stairs - FL14 2 Reinforcement for Stairs - FL14
Shuttering & Formworks Shuttering & Formworks
MY202CN14STR171 Columns & Walls shuttering - FL14 1 Columns & Walls shuttering - FL14
MY202CN14STR181 Core Wall shuttering - FL14 1 Core Wall shuttering - FL14
MY202CN14STR161 Beam & Slab shuttering - FL15 2 Beam & Slab shuttering - FL15
MY202CN14STR191 Shuttering for Stairs - FL14 2 Shuttering for Stairs - FL14
Concrete Casting Concrete Casting
MY202CN14STR211 Columns & Walls concrete casting - FL14 1 Columns & Walls concrete casting - FL14
MY202CN14STR221 Core Wall concrete casting - FL14 1 Core Wall concrete casting - FL14
MY202CN14STR201 Beam & Slab concrete casting- FL15 1 Beam & Slab concrete casting- FL15
MY202CN14STR231 Casting for the Stairs - FL14 1 Casting for the Stairs - FL14
Architectural Architectural
Masonry Masonry
MY202CN14ARC395 Blockworks 8 Blockworks
MY202CN14ARC425 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN14ARC405 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN14ARC415 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN14ARC165 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN14ARC175 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN14ARC185 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN14ARC215 Aluminum Door 4 Aluminum Door
MY202CN14ARC205 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN14ARC195 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN14ARC235 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN14ARC225 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN14ARC435 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN14ARC455 Screeding works 4 Screeding works
MY202CN14ARC445 Threshold 3 Threshold
MY202CN14ARC475 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN14ARC465 Skirting works 5 Skirting works
MY202CN14ARC485 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN14ARC495 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN14ARC245 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN14ARC355 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN14ARC345 Tile Wall Finish (Corridor) 8 Tile Wall Finish (Corridor)
MY202CN14ARC385 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN14ARC315 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN14ARC325 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN14ARC365 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN14ARC335 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN14ARC375 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
83 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN14ARC255 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN14ARC275 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN14ARC295 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN14ARC285 False Ceiling Board/Tiles (Corridor) 8 False Ceiling Board/Tiles (Corridor)
MY202CN14ARC265 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN14ARC305 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN14ARC565 Aluminum Louvers 4 Aluminum Louvers
MY202CN14ARC575 Glass Partitions 5 Glass Partitions
MY202CN14ARC515 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN14ARC525 Wardrobe 6 Wardrobe
MY202CN14ARC505 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN14ARC555 Balcony Handrail 7 Balcony Handrail
MY202CN14ARC545 Staircase Handrail 4 Staircase Handrail
MY202CN14ARC535 Mirror 4 Mirror
MY202CN14ARC585 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN14AC1X110 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN14AC2X115 Duct installation 0 Duct installation
MY202CN14AC2X135 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN14AC2X145 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN14AC2X155 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN14AC2X125 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN14ACFX116 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN14ACTC117 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN14NG2X111 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN14NG2X121 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN14NGFX112 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN14NGTC113 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN14PD1X111 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN14PD1X121 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN14PD2X136 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN14PD2X146 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN14PD2X156 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN14PD2X116 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
84 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN14PD2X126 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN14PDFX129 Water Heater 3 Water Heater
MY202CN14PDFX149 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN14PDFX159 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN14PDFX139 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN14PDTC121 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN14PDTC131 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN14FF1X110 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN14FF2X113 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN14FF2X123 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN14FF2X133 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN14FF3X126 Hose Reel 4 Hose Reel
MY202CN14FF3X136 Fire Extinguisher 1 Fire Extinguisher
MY202CN14FF3X116 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN14FFTC117 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN14EP1X112 Electrical Sleeve 3 Electrical Sleeve
MY202CN14EP1X122 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN14EP1X132 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN14EP2X125 DB's enclosure 7 DB's enclosure
MY202CN14EP2X135 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN14EP2X115 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN14EPFX119 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN14EPFX129 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN14EPFX139 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN14EW1X123 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN14EW1X133 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN14EW2X135 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN14EW2X125 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN14EWFX128 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN14EWFX138 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
85 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
First Fix First Fix
MY202CN14ET1X132 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN14ET1X142 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN14ET2X144 Cable Tray fixing 4 Cable Tray fixing
MY202CN14ET2X134 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN14ETFX135 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN14EL1X138 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN14EL2X139 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN14ELFX141 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN14EC1X144 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN14EC2X145 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN14ECFX146 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN14EF2X151 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN14EF2X161 Modules 3 Modules
Final Fix Final Fix
MY202CN14EFFX153 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN14EFFX163 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN14EB1X156 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN14EB2X158 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN14EB2X168 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN14EBFX159 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN14EV1X162 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN14EV2X163 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN14EVFX164 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN14EI1X167 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
86 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
2nd Fix 2nd Fix
MY202CN14EI2X168 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN14EIFX169 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN14ES1X172 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN14ES2X173 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN14ESFX174 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN14EELP220 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN14CLER110 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN14SNAG110 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 15 Floor Level 15
Structural Structural
Reinforcement Reinforcement
MY202CN15STR131 Columns & Walls Reinforcement - FL15 1 Columns & Walls Reinforcement - FL15
MY202CN15STR141 Core Wall reinforcement - FL15 1 Core Wall reinforcement - FL15
MY202CN15STR121 Beam & Slab reinforcement - FL16 2 Beam & Slab reinforcement - FL16
MY202CN15STR151 Reinforcement for Stairs - FL15 2 Reinforcement for Stairs - FL15
Shuttering & Formworks Shuttering & Formworks
MY202CN15STR171 Columns & Walls shuttering - FL15 1 Columns & Walls shuttering - FL15
MY202CN15STR181 Core Wall shuttering - FL15 1 Core Wall shuttering - FL15
MY202CN15STR161 Beam & Slab shuttering - FL16 2 Beam & Slab shuttering - FL16
MY202CN15STR191 Shuttering for Stairs - FL15 2 Shuttering for Stairs - FL15
Concrete Casting Concrete Casting
MY202CN15STR211 Columns & Walls concrete casting - FL15 1 Columns & Walls concrete casting - FL15
MY202CN15STR221 Core Wall concrete casting - FL15 1 Core Wall concrete casting - FL15
MY202CN15STR201 Beam & Slab concrete casting- FL16 1 Beam & Slab concrete casting- FL16
MY202CN15STR231 Casting for the Stairs - FL15 1 Casting for the Stairs - FL15
Architectural Architectural
Masonry Masonry
MY202CN15ARC315 Blockworks 8 Blockworks
MY202CN15ARC345 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN15ARC325 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN15ARC335 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN15ARC425 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN15ARC435 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN15ARC445 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN15ARC475 Aluminum Door 4 Aluminum Door
MY202CN15ARC465 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN15ARC455 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
87 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN15ARC495 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN15ARC485 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN15ARC355 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN15ARC375 Screeding works 4 Screeding works
MY202CN15ARC365 Threshold 3 Threshold
MY202CN15ARC395 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN15ARC385 Skirting works 5 Skirting works
MY202CN15ARC405 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN15ARC415 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN15ARC165 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN15ARC215 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN15ARC205 Tile Wall Finish (Corridor) 7 Tile Wall Finish (Corridor)
MY202CN15ARC245 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN15ARC175 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN15ARC225 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN15ARC185 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN15ARC195 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN15ARC235 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN15ARC255 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN15ARC275 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN15ARC295 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN15ARC285 False Ceiling Board/Tiles (Corridor) 8 False Ceiling Board/Tiles (Corridor)
MY202CN15ARC265 False Ceiling Board/Tiles (Unit) 8 False Ceiling Board/Tiles (Unit)
MY202CN15ARC305 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN15ARC565 Aluminum Louvers 4 Aluminum Louvers
MY202CN15ARC575 Glass Partitions 5 Glass Partitions
MY202CN15ARC515 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN15ARC525 Wardrobe 6 Wardrobe
MY202CN15ARC505 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN15ARC555 Balcony Handrail 7 Balcony Handrail
MY202CN15ARC545 Staircase Handrail 4 Staircase Handrail
MY202CN15ARC535 Mirror 4 Mirror
MY202CN15ARC585 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN15AC1X110 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN15AC2X115 Duct installation 0 Duct installation
MY202CN15AC2X135 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN15AC2X145 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN15AC2X155 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
88 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN15AC2X125 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN15ACFX116 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN15ACTC117 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN15NG2X111 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN15NG2X121 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN15NGFX112 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN15NGTC113 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN15PD1X111 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN15PD1X121 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN15PD2X136 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN15PD2X146 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN15PD2X156 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN15PD2X116 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN15PD2X126 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN15PDFX127 Water Heater 3 Water Heater
MY202CN15PDFX147 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN15PDFX157 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN15PDFX137 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN15PDTC121 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN15PDTC131 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN15FF1X110 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN15FF2X113 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN15FF2X123 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN15FF2X133 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN15FF3X126 Hose Reel 4 Hose Reel
MY202CN15FF3X136 Fire Extinguisher 1 Fire Extinguisher
MY202CN15FF3X116 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN15FFTC117 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
89 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN15EP1X112 Electrical Sleeve 3 Electrical Sleeve
MY202CN15EP1X122 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN15EP1X132 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN15EP2X125 DB's enclosure 7 DB's enclosure
MY202CN15EP2X135 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN15EP2X115 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN15EPFX119 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN15EPFX129 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN15EPFX139 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN15EW1X123 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN15EW1X133 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN15EW2X135 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN15EW2X125 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN15EWFX128 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN15EWFX138 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN15ET1X132 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN15ET1X142 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN15ET2X144 Cable Tray fixing 4 Cable Tray fixing
MY202CN15ET2X134 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN15ETFX135 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN15EL1X138 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN15EL2X139 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN15ELFX141 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN15EC1X144 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN15EC2X145 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN15ECFX146 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN15EF2X151 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
90 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN15EF2X161 Modules 3 Modules
Final Fix Final Fix
MY202CN15EFFX153 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN15EFFX163 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN15EB1X156 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN15EB2X158 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN15EB2X168 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN15EBFX159 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN15EV1X162 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN15EV2X163 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN15EVFX164 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN15EI1X167 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN15EI2X168 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN15EIFX169 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN15ES1X172 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN15ES2X173 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN15ESFX174 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN15EELP240 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN15CLER110 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN15SNAG110 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 16 Floor Level 16
Structural Structural
Reinforcement Reinforcement
MY202CN16STR131 Columns & Walls Reinforcement - FL16 1 Columns & Walls Reinforcement - FL16
MY202CN16STR141 Core Wall reinforcement - FL16 1 Core Wall reinforcement - FL16
MY202CN16STR121 Beam & Slab reinforcement - FL17 2 Beam & Slab reinforcement - FL17
MY202CN16STR151 Reinforcement for Stairs - FL16 2 Reinforcement for Stairs - FL16
Shuttering & Formworks Shuttering & Formworks

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
91 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN16STR171 Columns & Walls shuttering - FL16 1 Columns & Walls shuttering - FL16
MY202CN16STR181 Core Wall shuttering - FL16 1 Core Wall shuttering - FL16
MY202CN16STR161 Beam & Slab shuttering - FL17 2 Beam & Slab shuttering - FL17
MY202CN16STR191 Shuttering for Stairs - FL16 2 Shuttering for Stairs - FL16
Concrete Casting Concrete Casting
MY202CN16STR211 Columns & Walls concrete casting - FL16 1 Columns & Walls concrete casting - FL16
MY202CN16STR221 Core Wall concrete casting - FL16 1 Core Wall concrete casting - FL16
MY202CN16STR201 Beam & Slab concrete casting- FL17 1 Beam & Slab concrete casting- FL17
MY202CN16STR231 Casting for the Stairs - FL16 1 Casting for the Stairs - FL16
Architectural Architectural
Masonry Masonry
MY202CN16ARC315 Blockworks 8 Blockworks
MY202CN16ARC345 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN16ARC325 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN16ARC335 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN16ARC515 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN16ARC525 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN16ARC535 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN16ARC565 Aluminum Door 4 Aluminum Door
MY202CN16ARC555 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN16ARC545 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN16ARC585 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN16ARC575 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN16ARC445 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN16ARC465 Screeding works 4 Screeding works
MY202CN16ARC455 Threshold 3 Threshold
MY202CN16ARC485 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN16ARC475 Skirting works 5 Skirting works
MY202CN16ARC495 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN16ARC505 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN16ARC165 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN16ARC215 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN16ARC205 Tile Wall Finish (Corridor) 7 Tile Wall Finish (Corridor)
MY202CN16ARC245 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN16ARC175 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN16ARC225 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN16ARC185 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN16ARC195 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN16ARC235 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN16ARC255 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN16ARC275 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN16ARC295 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
92 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN16ARC285 False Ceiling Board/Tiles (Corridor) 8 False Ceiling Board/Tiles (Corridor)
MY202CN16ARC265 False Ceiling Board/Tiles (Unit) 7 False Ceiling Board/Tiles (Unit)
MY202CN16ARC305 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Work
MY202CN16ARC415 Aluminum Louvers 4 Aluminum Louvers
MY202CN16ARC425 Glass Partitions 5 Glass Partitions
MY202CN16ARC365 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN16ARC375 Wardrobe 6 Wardrobe
MY202CN16ARC355 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN16ARC405 Balcony Handrail 7 Balcony Handrail
MY202CN16ARC395 Staircase Handrail 4 Staircase Handrail
MY202CN16ARC385 Mirror 4 Mirror
MY202CN16ARC435 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN16AC1X110 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN16AC2X135 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN16AC2X115 Duct installation 0 Duct installation
MY202CN16AC2X145 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN16AC2X155 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN16AC2X125 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN16ACFX116 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN16ACTC117 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN16NG2X111 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN16NG2X121 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN16NGFX112 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN16NGTC113 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN16PD1X111 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN16PD1X121 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN16PD2X136 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN16PD2X146 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN16PD2X156 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN16PD2X116 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN16PD2X126 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN16PDFX127 Water Heater 3 Water Heater

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
93 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN16PDFX147 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN16PDFX157 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN16PDFX137 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN16PDTC121 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN16PDTC131 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN16FF1X110 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN16FF2X113 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN16FF2X123 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN16FF2X133 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN16FF3X126 Hose Reel 4 Hose Reel
MY202CN16FF3X136 Fire Extinguisher 1 Fire Extinguisher
MY202CN16FF3X116 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN16FFTC117 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN16EP1X112 Electrical Sleeve 3 Electrical Sleeve
MY202CN16EP1X122 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN16EP1X132 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN16EP2X125 DB's enclosure 7 DB's enclosure
MY202CN16EP2X135 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN16EP2X115 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN16EPFX119 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN16EPFX129 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN16EPFX139 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN16EW1X123 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN16EW1X133 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN16EW2X135 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN16EW2X125 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN16EWFX128 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN16EWFX138 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN16ET1X132 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN16ET1X142 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
94 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
2nd Fix 2nd Fix
MY202CN16ET2X144 Cable Tray fixing 4 Cable Tray fixing
MY202CN16ET2X134 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN16ETFX135 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN16EL1X138 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN16EL2X139 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN16ELFX141 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN16EC1X144 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN16EC2X145 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN16ECFX146 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN16EF2X151 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN16EF2X161 Modules 3 Modules
Final Fix Final Fix
MY202CN16EFFX153 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN16EFFX163 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN16EB1X156 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN16EB2X158 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN16EB2X168 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN16EBFX159 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN16EV1X162 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN16EV2X163 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN16EVFX164 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN16EI1X167 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN16EI2X168 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
95 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN16EIFX169 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN16ES1X172 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN16ES2X173 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN16ESFX174 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN16EELP260 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN16CLER110 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN16SNAG110 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 17 Floor Level 17
Structural Structural
Reinforcement Reinforcement
MY202CN17STR131 Columns & Walls Reinforcement - FL17 1 Columns & Walls Reinforcement - FL17
MY202CN17STR141 Core Wall reinforcement - FL17 1 Core Wall reinforcement - FL17
MY202CN17STR121 Beam & Slab reinforcement - FL18 2 Beam & Slab reinforcement - FL18
MY202CN17STR151 Reinforcement for Stairs - FL17 2 Reinforcement for Stairs - FL17
Shuttering & Formworks Shuttering & Formworks
MY202CN17STR211 Columns & Walls shuttering - FL17 1 Columns & Walls shuttering - FL17
MY202CN17STR221 Core Wall shuttering - FL17 1 Core Wall shuttering - FL17
MY202CN17STR201 Beam & Slab shuttering - FL18 2 Beam & Slab shuttering - FL18
MY202CN17STR231 Shuttering for Stairs - FL17 2 Shuttering for Stairs - FL17
Concrete Casting Concrete Casting
MY202CN17STR171 Columns & Walls concrete casting - FL17 1 Columns & Walls concrete casting - FL17
MY202CN17STR181 Core Wall concrete casting - FL17 1 Core Wall concrete casting - FL17
MY202CN17STR161 Beam & Slab concrete casting- FL18 1 Beam & Slab concrete casting- FL18
MY202CN17STR191 Casting for the Stairs - FL17 1 Casting for the Stairs - FL17
Architectural Architectural
Masonry Masonry
MY202CN17ARC405 Blockworks 8 Blockworks
MY202CN17ARC435 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN17ARC415 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN17ARC425 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN17ARC445 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN17ARC455 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN17ARC465 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN17ARC495 Aluminum Door 4 Aluminum Door
MY202CN17ARC485 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN17ARC475 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN17ARC515 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN17ARC505 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
96 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN17ARC525 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN17ARC545 Screeding works 4 Screeding works
MY202CN17ARC535 Threshold 3 Threshold
MY202CN17ARC565 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN17ARC555 Skirting works 5 Skirting works
MY202CN17ARC575 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN17ARC585 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN17ARC165 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN17ARC215 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN17ARC205 Tile Wall Finish (Corridor) 7 Tile Wall Finish (Corridor)
MY202CN17ARC225 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN17ARC245 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN17ARC175 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN17ARC185 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN17ARC195 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN17ARC235 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN17ARC255 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN17ARC275 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN17ARC295 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN17ARC285 False Ceiling Board/Tiles (Corridor) 8 False Ceiling Board/Tiles (Corridor)
MY202CN17ARC265 False Ceiling Board/Tiles (Unit) 7 False Ceiling Board/Tiles (Unit)
MY202CN17ARC305 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum Wor
MY202CN17ARC375 Aluminum Louvers 4 Aluminum Louvers
MY202CN17ARC385 Glass Partitions 5 Glass Partitions
MY202CN17ARC325 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN17ARC335 Wardrobe 6 Wardrobe
MY202CN17ARC365 Balcony Handrail 7 Balcony Handrail
MY202CN17ARC315 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN17ARC355 Staircase Handrail 4 Staircase Handrail
MY202CN17ARC345 Mirror 4 Mirror
MY202CN17ARC395 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN17AC1X110 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN17AC2X135 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN17AC2X115 Duct installation 0 Duct installation
MY202CN17AC2X145 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN17AC2X155 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN17AC2X125 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN17ACFX116 Grills & Diffuser installation 4 Grills & Diffuser installation

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
97 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN17ACTC117 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN17NG2X111 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN17NG2X121 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN17NGFX112 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN17NGTC113 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN17PD1X111 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN17PD1X121 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN17PD2X136 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN17PD2X146 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN17PD2X156 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN17PD2X116 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN17PD2X126 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN17PDFX127 Water Heater 3 Water Heater
MY202CN17PDFX147 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN17PDFX157 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN17PDFX137 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN17PDTC121 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN17PDTC131 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN17FF1X110 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN17FF2X113 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN17FF2X123 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN17FF2X133 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN17FF3X126 Hose Reel 4 Hose Reel
MY202CN17FF3X136 Fire Extinguisher 1 Fire Extinguisher
MY202CN17FF3X116 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN17FFTC117 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN17EP1X112 Electrical Sleeve 3 Electrical Sleeve
MY202CN17EP1X122 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN17EP1X132 Power Hangers & Supports 3 Power Hangers & Supports

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
98 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
2nd Fix 2nd Fix
MY202CN17EP2X125 DB's enclosure 7 DB's enclosure
MY202CN17EP2X135 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN17EP2X115 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN17EPFX119 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN17EPFX129 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN17EPFX139 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN17EW1X123 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN17EW1X133 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN17EW2X135 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN17EW2X125 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN17EWFX128 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN17EWFX138 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN17ET1X132 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN17ET1X142 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN17ET2X144 Cable Tray fixing 4 Cable Tray fixing
MY202CN17ET2X134 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN17ETFX135 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN17EL1X138 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN17EL2X139 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN17ELFX141 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN17EC1X144 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN17EC2X145 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN17ECFX146 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN17EF2X151 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN17EF2X161 Modules 3 Modules
Final Fix Final Fix
MY202CN17EFFX153 Fire Alarm Detector 2 Fire Alarm Detector

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
99 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN17EFFX163 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN17EB1X156 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN17EB2X158 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN17EB2X168 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN17EBFX159 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN17EV1X162 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN17EV2X163 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN17EVFX164 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN17EI1X167 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN17EI2X168 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN17EIFX169 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN17ES1X172 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN17ES2X173 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN17ESFX174 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN17EELP280 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN17CLER110 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN17SNAG110 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 18 Floor Level 18
Structural Structural
Reinforcement Reinforcement
MY202CN18STR131 Columns & Walls Reinforcement - FL18 1 Columns & Walls Reinforcement - FL18
MY202CN18STR141 Core Wall reinforcement - FL18 1 Core Wall reinforcement - FL18
MY202CN18STR121 Beam & Slab reinforcement - FL19 2 Beam & Slab reinforcement - FL19
MY202CN18STR151 Reinforcement for Stairs - FL18 2 Reinforcement for Stairs - FL18
Shuttering & Formworks Shuttering & Formworks
MY202CN18STR171 Columns & Walls shuttering - FL18 1 Columns & Walls shuttering - FL18
MY202CN18STR181 Core Wall shuttering - FL18 1 Core Wall shuttering - FL18
MY202CN18STR161 Beam & Slab shuttering - FL19 2 Beam & Slab shuttering - FL19

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
100 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN18STR191 Shuttering for Stairs - FL18 2 Shuttering for Stairs - FL18
Concrete Casting Concrete Casting
MY202CN18STR211 Columns & Walls concrete casting - FL18 1 Columns & Walls concrete casting - FL18
MY202CN18STR221 Core Wall concrete casting - FL18 1 Core Wall concrete casting - FL18
MY202CN18STR201 Beam & Slab concrete casting- FL19 1 Beam & Slab concrete casting- FL19
MY202CN18STR231 Casting for the Stairs - FL18 1 Casting for the Stairs - FL18
Architectural Architectural
Masonry Masonry
MY202CN18ARC255 Blockworks 8 Blockworks
MY202CN18ARC285 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN18ARC265 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN18ARC275 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN18ARC515 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN18ARC525 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN18ARC535 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN18ARC565 Aluminum Door 4 Aluminum Door
MY202CN18ARC555 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN18ARC545 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN18ARC585 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN18ARC575 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN18ARC445 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN18ARC465 Screeding works 4 Screeding works
MY202CN18ARC455 Threshold 3 Threshold
MY202CN18ARC485 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN18ARC475 Skirting works 5 Skirting works
MY202CN18ARC495 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN18ARC505 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN18ARC165 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN18ARC215 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN18ARC205 Tile Wall Finish (Corridor) 7 Tile Wall Finish (Corridor)
MY202CN18ARC225 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN18ARC245 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN18ARC175 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN18ARC185 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN18ARC195 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN18ARC235 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN18ARC385 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN18ARC405 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN18ARC425 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN18ARC395 False Ceiling Board/Tiles (Unit) 7 False Ceiling Board/Tiles (Unit)
MY202CN18ARC415 False Ceiling Board/Tiles (Corridor) 8 False Ceiling Board/Tiles (Corridor)
MY202CN18ARC435 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
101 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum W
MY202CN18ARC355 Aluminum Louvers 4 Aluminum Louvers
MY202CN18ARC365 Glass Partitions 5 Glass Partitions
MY202CN18ARC345 Balcony Handrail 7 Balcony Handrail
MY202CN18ARC305 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN18ARC315 Wardrobe 6 Wardrobe
MY202CN18ARC295 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN18ARC335 Staircase Handrail 4 Staircase Handrail
MY202CN18ARC325 Mirror 4 Mirror
MY202CN18ARC375 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN18AC1X110 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN18AC2X135 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN18AC2X115 Duct installation 0 Duct installation
MY202CN18AC2X145 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN18AC2X155 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN18AC2X125 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN18ACFX116 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN18ACTC117 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN18NG2X111 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN18NG2X121 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN18NGFX112 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN18NGTC113 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN18PD1X111 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN18PD1X121 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN18PD2X136 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN18PD2X146 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN18PD2X156 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN18PD2X116 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN18PD2X126 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN18PDFX127 Water Heater 3 Water Heater
MY202CN18PDFX147 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN18PDFX157 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN18PDFX137 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
102 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN18PDTC121 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN18PDTC131 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN18FF1X110 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN18FF2X113 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN18FF2X123 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN18FF2X133 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN18FF3X126 Hose Reel 4 Hose Reel
MY202CN18FF3X136 Fire Extinguisher 1 Fire Extinguisher
MY202CN18FF3X116 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN18FFTC117 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN18EP1X112 Electrical Sleeve 3 Electrical Sleeve
MY202CN18EP1X122 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN18EP1X132 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN18EP2X125 DB's enclosure 7 DB's enclosure
MY202CN18EP2X135 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN18EP2X115 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN18EPFX119 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN18EPFX129 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN18EPFX139 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN18EW1X123 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN18EW1X133 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN18EW2X135 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN18EW2X125 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN18EWFX128 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN18EWFX138 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN18ET1X132 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN18ET1X142 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN18ET2X144 Cable Tray fixing 4 Cable Tray fixing
MY202CN18ET2X134 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
103 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Final Fix Final Fix
MY202CN18ETFX135 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System)
First Fix First Fix
MY202CN18EL1X138 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN18EL2X139 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosure
Final Fix Final Fix
MY202CN18ELFX141 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN18EC1X144 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN18EC2X145 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN18ECFX146 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN18EF2X151 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN18EF2X161 Modules 3 Modules
Final Fix Final Fix
MY202CN18EFFX153 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN18EFFX163 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN18EB1X156 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN18EB2X158 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN18EB2X168 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN18EBFX159 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN18EV1X162 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN18EV2X163 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN18EVFX164 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN18EI1X167 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN18EI2X168 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN18EIFX169 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
104 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN18ES1X172 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN18ES2X173 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN18ESFX174 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN18EELP300 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN18CLER110 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN18SNAG110 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 19 Floor Level 19
Structural Structural
Reinforcement Reinforcement
MY202CN19STR131 Columns & Walls Reinforcement - FL19 1 Columns & Walls Reinforcement - FL19
MY202CN19STR141 Core Wall reinforcement - FL19 1 Core Wall reinforcement - FL19
MY202CN19STR121 Beam & Slab reinforcement - FL20 2 Beam & Slab reinforcement - FL20
MY202CN19STR151 Reinforcement for Stairs - FL19 2 Reinforcement for Stairs - FL19
Shuttering & Formworks Shuttering & Formworks
MY202CN19STR171 Columns & Walls shuttering - FL19 1 Columns & Walls shuttering - FL19
MY202CN19STR181 Core Wall shuttering - FL19 1 Core Wall shuttering - FL19
MY202CN19STR161 Beam & Slab shuttering - FL20 2 Beam & Slab shuttering - FL20
MY202CN19STR191 Shuttering for Stairs - FL19 2 Shuttering for Stairs - FL19
Concrete Casting Concrete Casting
MY202CN19STR211 Columns & Walls concrete casting - FL19 1 Columns & Walls concrete casting - FL19
MY202CN19STR221 Core Wall concrete casting - FL19 1 Core Wall concrete casting - FL19
MY202CN19STR201 Beam & Slab concrete casting- FL20 1 Beam & Slab concrete casting- FL20
MY202CN19STR231 Casting for the Stairs - FL19 1 Casting for the Stairs - FL19
Architectural Architectural
Masonry Masonry
MY202CN19ARC325 Blockworks 8 Blockworks
MY202CN19ARC355 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN19ARC335 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN19ARC345 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN19ARC365 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN19ARC375 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN19ARC385 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN19ARC415 Aluminum Door 4 Aluminum Door
MY202CN19ARC405 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN19ARC395 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN19ARC435 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN19ARC425 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN19ARC165 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN19ARC185 Screeding works 4 Screeding works
MY202CN19ARC175 Threshold 3 Threshold

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
105 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN19ARC205 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN19ARC195 Skirting works 5 Skirting works
MY202CN19ARC215 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN19ARC225 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN19ARC235 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN19ARC285 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN19ARC275 Tile Wall Finish (Corridor) 7 Tile Wall Finish (Corridor)
MY202CN19ARC295 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN19ARC315 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN19ARC245 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN19ARC255 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN19ARC265 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN19ARC305 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN19ARC535 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN19ARC555 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN19ARC575 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN19ARC545 False Ceiling Board/Tiles (Unit) 7 False Ceiling Board/Tiles (Unit)
MY202CN19ARC565 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (Corridor)
MY202CN19ARC585 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminum
MY202CN19ARC505 Aluminum Louvers 4 Aluminum Louvers
MY202CN19ARC515 Glass Partitions 5 Glass Partitions
MY202CN19ARC495 Balcony Handrail 7 Balcony Handrail
MY202CN19ARC455 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN19ARC465 Wardrobe 6 Wardrobe
MY202CN19ARC445 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN19ARC485 Staircase Handrail 4 Staircase Handrail
MY202CN19ARC475 Mirror 4 Mirror
MY202CN19ARC525 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN19AC1X110 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN19AC2X135 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN19AC2X115 Duct installation 0 Duct installation
MY202CN19AC2X145 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN19AC2X155 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN19AC2X125 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN19ACFX116 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN19ACTC117 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
106 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
First & 2nd Fix First & 2nd Fix
MY202CN19NG2X111 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN19NG2X121 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN19NGFX112 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN19NGTC113 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN19PD1X111 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN19PD1X121 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN19PD2X136 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN19PD2X146 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN19PD2X156 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN19PD2X116 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN19PD2X126 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN19PDFX127 Water Heater 3 Water Heater
MY202CN19PDFX147 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN19PDFX157 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN19PDFX137 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN19PDTC121 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN19PDTC131 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN19FF1X110 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN19FF2X113 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN19FF2X123 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN19FF2X133 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN19FF3X126 Hose Reel 4 Hose Reel
MY202CN19FF3X136 Fire Extinguisher 1 Fire Extinguisher
MY202CN19FF3X116 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN19FFTC117 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN19EP1X112 Electrical Sleeve 3 Electrical Sleeve
MY202CN19EP1X122 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN19EP1X132 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN19EP2X125 DB's enclosure 7 DB's enclosure
MY202CN19EP2X135 Cable tray & trunkings 4 Cable tray & trunkings

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
107 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN19EP2X115 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN19EPFX119 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN19EPFX129 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN19EPFX139 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN19EW1X123 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN19EW1X133 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN19EW2X135 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN19EW2X125 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN19EWFX128 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN19EWFX138 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN19ET1X132 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN19ET1X142 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN19ET2X144 Cable Tray fixing 4 Cable Tray fixing
MY202CN19ET2X134 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN19ETFX135 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting System
First Fix First Fix
MY202CN19EL1X138 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN19EL2X139 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Enclosu
Final Fix Final Fix
MY202CN19ELFX141 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN19EC1X144 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN19EC2X145 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN19ECFX146 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN19EF2X151 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN19EF2X161 Modules 3 Modules
Final Fix Final Fix
MY202CN19EFFX153 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN19EFFX163 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
108 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN19EB1X156 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN19EB2X158 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN19EB2X168 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN19EBFX159 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN19EV1X162 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN19EV2X163 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN19EVFX164 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN19EI1X167 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN19EI2X168 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN19EIFX169 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN19ES1X172 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN19ES2X173 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN19ESFX174 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN19EELP320 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN19CLER110 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN19SNAG110 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 20 Floor Level 20
Structural Structural
Reinforcement Reinforcement
MY202CN20STR171 Columns & Walls Reinforcement - FL20 1 Columns & Walls Reinforcement - FL20
MY202CN20STR181 Core Wall reinforcement - FL20 1 Core Wall reinforcement - FL20
MY202CN20STR161 Beam & Slab reinforcement - FL21 2 Beam & Slab reinforcement - FL21
MY202CN20STR191 Reinforcement for Stairs - FL20 2 Reinforcement for Stairs - FL20
Shuttering & Formworks Shuttering & Formworks
MY202CN20STR211 Columns & Walls shuttering - FL20 1 Columns & Walls shuttering - FL20
MY202CN20STR221 Core Wall shuttering - FL20 1 Core Wall shuttering - FL20
MY202CN20STR201 Beam & Slab shuttering - FL21 2 Beam & Slab shuttering - FL21
MY202CN20STR231 Shuttering for Stairs - FL20 2 Shuttering for Stairs - FL20
Concrete Casting Concrete Casting
MY202CN20STR131 Columns & Walls concrete casting - FL20 1 Columns & Walls concrete casting - FL20

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
109 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN20STR141 Core Wall concrete casting - FL20 1 Core Wall concrete casting - FL20
MY202CN20STR121 Beam & Slab concrete casting- FL21 1 Beam & Slab concrete casting- FL21
MY202CN20STR151 Casting for the Stairs - FL20 1 Casting for the Stairs - FL20
Architectural Architectural
Masonry Masonry
MY202CN20ARC475 Blockworks 8 Blockworks
MY202CN20ARC505 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN20ARC485 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN20ARC495 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN20ARC515 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN20ARC525 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN20ARC535 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN20ARC565 Aluminum Door 4 Aluminum Door
MY202CN20ARC555 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN20ARC545 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN20ARC585 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN20ARC575 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN20ARC255 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN20ARC275 Screeding works 4 Screeding works
MY202CN20ARC265 Threshold 3 Threshold
MY202CN20ARC295 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN20ARC285 Skirting works 5 Skirting works
MY202CN20ARC305 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN20ARC315 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN20ARC165 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN20ARC215 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN20ARC205 Tile Wall Finish (Corridor) 7 Tile Wall Finish (Corridor)
MY202CN20ARC225 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN20ARC245 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN20ARC175 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN20ARC185 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN20ARC195 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN20ARC235 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN20ARC325 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN20ARC345 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN20ARC365 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN20ARC335 False Ceiling Board/Tiles (Unit) 6 False Ceiling Board/Tiles (Unit)
MY202CN20ARC355 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (Corridor)
MY202CN20ARC375 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Aluminu
MY202CN20ARC445 Aluminum Louvers 4 Aluminum Louvers
MY202CN20ARC455 Glass Partitions 5 Glass Partitions

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
110 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN20ARC435 Balcony Handrail 7 Balcony Handrail
MY202CN20ARC395 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN20ARC405 Wardrobe 6 Wardrobe
MY202CN20ARC385 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN20ARC425 Staircase Handrail 4 Staircase Handrail
MY202CN20ARC415 Mirror 4 Mirror
MY202CN20ARC465 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN20AC1X110 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN20AC2X135 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN20AC2X115 Duct installation 0 Duct installation
MY202CN20AC2X145 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN20AC2X155 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN20AC2X125 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN20ACFX116 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN20ACTC117 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN20NG2X111 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN20NG2X121 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN20NGFX112 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN20NGTC113 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN20PD1X111 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN20PD1X121 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN20PD2X136 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN20PD2X146 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN20PD2X156 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN20PD2X116 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN20PD2X126 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN20PDFX127 Water Heater 3 Water Heater
MY202CN20PDFX147 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN20PDFX157 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN20PDFX137 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & acc's
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN20PDTC121 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN20PDTC131 Water Supply Pipe Testing 2 Water Supply Pipe Testing

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
111 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN20FF1X110 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN20FF2X113 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN20FF2X123 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN20FF2X133 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN20FF3X126 Hose Reel 4 Hose Reel
MY202CN20FF3X136 Fire Extinguisher 1 Fire Extinguisher
MY202CN20FF3X116 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN20FFTC117 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN20EP1X112 Electrical Sleeve 3 Electrical Sleeve
MY202CN20EP1X122 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN20EP1X132 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN20EP2X125 DB's enclosure 7 DB's enclosure
MY202CN20EP2X135 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN20EP2X115 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN20EPFX119 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN20EPFX129 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN20EPFX139 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN20EW1X123 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN20EW1X133 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN20EW2X135 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN20EW2X125 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN20EWFX128 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN20EWFX138 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN20ET1X132 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN20ET1X142 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN20ET2X144 Cable Tray fixing 4 Cable Tray fixing
MY202CN20ET2X134 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN20ETFX135 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting Sys

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
112 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
First Fix First Fix
MY202CN20EL1X138 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN20EL2X139 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB Encl
Final Fix Final Fix
MY202CN20ELFX141 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN20EC1X144 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN20EC2X145 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN20ECFX146 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN20EF2X151 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN20EF2X161 Modules 3 Modules
Final Fix Final Fix
MY202CN20EFFX153 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN20EFFX163 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN20EB1X156 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN20EB2X158 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN20EB2X168 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN20EBFX159 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN20EV1X162 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN20EV2X163 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN20EVFX164 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN20EI1X167 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN20EI2X168 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN20EIFX169 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN20ES1X172 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN20ES2X173 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
113 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Final Fix Final Fix
MY202CN20ESFX174 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN20EELP350 PVC Earth cable networks 6 PVC Earth cable networks
MY202CN20EELP360 Lightning protection system copper tape 6 Lightning protection system copper tape
Clearance Clearance
MY202CN20CLER110 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN20SNAG110 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 21 Floor Level 21
Structural Structural
Reinforcement Reinforcement
MY202CN21STR131 Columns & Walls Reinforcement - FL21 1 Columns & Walls Reinforcement - FL21
MY202CN21STR141 Core Wall reinforcement - FL21 1 Core Wall reinforcement - FL21
MY202CN21STR121 Beam & Slab reinforcement - FL22 2 Beam & Slab reinforcement - FL22
MY202CN21STR151 Reinforcement for Stairs - FL21 2 Reinforcement for Stairs - FL21
Shuttering & Formworks Shuttering & Formworks
MY202CN21STR211 Columns & Walls shuttering - FL21 1 Columns & Walls shuttering - FL21
MY202CN21STR221 Core Wall shuttering - FL21 1 Core Wall shuttering - FL21
MY202CN21STR201 Beam & Slab shuttering - FL22 2 Beam & Slab shuttering - FL22
MY202CN21STR231 Shuttering for Stairs - FL21 2 Shuttering for Stairs - FL21
Concrete Casting Concrete Casting
MY202CN21STR171 Columns & Walls concrete casting - FL21 1 Columns & Walls concrete casting - FL21
MY202CN21STR181 Core Wall concrete casting - FL21 1 Core Wall concrete casting - FL21
MY202CN21STR161 Beam & Slab concrete casting- FL22 1 Beam & Slab concrete casting- FL22
MY202CN21STR191 Casting for the Stairs - FL21 1 Casting for the Stairs - FL21
Architectural Architectural
Masonry Masonry
MY202CN21ARC395 Blockworks 8 Blockworks
MY202CN21ARC425 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN21ARC405 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN21ARC415 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN21ARC315 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN21ARC325 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN21ARC335 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN21ARC365 Aluminum Door 4 Aluminum Door
MY202CN21ARC355 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN21ARC345 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutters
MY202CN21ARC385 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN21ARC375 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN21ARC525 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN21ARC545 Screeding works 4 Screeding works
MY202CN21ARC535 Threshold 3 Threshold
MY202CN21ARC565 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN21ARC555 Skirting works 5 Skirting works

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
114 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN21ARC575 Floor Tile Finish (Dry Area) 8 Floor Tile Finish (Dry Area)
MY202CN21ARC585 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN21ARC165 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN21ARC215 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN21ARC205 Tile Wall Finish (Corridor) 7 Tile Wall Finish (Corridor)
MY202CN21ARC225 First Coat Paint (Corridor) 7 First Coat Paint (Corridor)
MY202CN21ARC245 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN21ARC175 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN21ARC185 First Coat Paint (Unit) 7 First Coat Paint (Unit)
MY202CN21ARC195 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN21ARC235 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN21ARC255 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN21ARC275 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN21ARC295 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN21ARC265 False Ceiling Board/Tiles (Unit) 6 False Ceiling Board/Tiles (Unit)
MY202CN21ARC285 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (Corridor)
MY202CN21ARC305 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Alum
MY202CN21ARC495 Aluminum Louvers 4 Aluminum Louvers
MY202CN21ARC505 Glass Partitions 5 Glass Partitions
MY202CN21ARC485 Balcony Handrail 7 Balcony Handrail
MY202CN21ARC445 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN21ARC455 Wardrobe 6 Wardrobe
MY202CN21ARC435 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN21ARC475 Staircase Handrail 4 Staircase Handrail
MY202CN21ARC465 Mirror 4 Mirror
MY202CN21ARC515 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN21AC1X110 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN21AC2X135 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN21AC2X115 Duct installation 0 Duct installation
MY202CN21AC2X145 CHW, Duct Equipments Insulation 7 CHW, Duct Equipments Insulation
MY202CN21AC2X155 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN21AC2X125 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN21ACFX116 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN21ACTC117 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN21NG2X111 NG Pipes (Riser) 3 NG Pipes (Riser)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
115 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN21NG2X121 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN21NGFX112 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN21NGTC113 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN21PD1X111 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN21PD1X121 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN21PD2X136 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN21PD2X146 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN21PD2X156 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN21PD2X116 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN21PD2X126 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN21PDFX127 Water Heater 3 Water Heater
MY202CN21PDFX147 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN21PDFX157 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN21PDFX137 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings & ac
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN21PDTC121 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN21PDTC131 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN21FF1X110 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN21FF2X113 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN21FF2X123 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN21FF2X133 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN21FF3X126 Hose Reel 4 Hose Reel
MY202CN21FF3X136 Fire Extinguisher 1 Fire Extinguisher
MY202CN21FF3X116 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN21FFTC117 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN21EP1X112 Electrical Sleeve 3 Electrical Sleeve
MY202CN21EP1X122 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN21EP1X132 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN21EP2X125 DB's enclosure 7 DB's enclosure
MY202CN21EP2X135 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN21EP2X115 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
116 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN21EPFX119 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN21EPFX129 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN21EPFX139 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN21EW1X123 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN21EW1X133 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN21EW2X135 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN21EW2X125 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN21EWFX128 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN21EWFX138 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN21ET1X132 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN21ET1X142 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN21ET2X144 Cable Tray fixing 4 Cable Tray fixing
MY202CN21ET2X134 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN21ETFX135 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting S
First Fix First Fix
MY202CN21EL1X138 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN21EL2X139 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB En
Final Fix Final Fix
MY202CN21ELFX141 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN21EC1X144 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN21EC2X145 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN21ECFX146 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation System
2nd Fix 2nd Fix
MY202CN21EF2X151 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN21EF2X161 Modules 3 Modules
Final Fix Final Fix
MY202CN21EFFX153 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN21EFFX163 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN21EB1X156 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
117 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN21EB2X158 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN21EB2X168 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN21EBFX159 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN21EV1X162 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN21EV2X163 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN21EVFX164 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN21EI1X167 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN21EI2X168 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN21EIFX169 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN21ES1X172 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN21ES2X173 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN21ESFX174 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN21EELP360 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN21CLER110 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspension
Snagging and Desnagging Snagging and Desnagging
MY202CN21SNAG110 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 22 Floor Level 22
Structural Structural
Reinforcement Reinforcement
MY202CN22STR571 Columns & Walls Reinforcement - FL22 1 Columns & Walls Reinforcement - FL22
MY202CN22STR581 Core Wall reinforcement - FL22 1 Core Wall reinforcement - FL22
MY202CN22STR561 Beam & Slab reinforcement - FL23 2 Beam & Slab reinforcement - FL23
MY202CN22STR591 Reinforcement for Stairs - FL22 2 Reinforcement for Stairs - FL22
Shuttering & Formworks Shuttering & Formworks
MY202CN22STR531 Columns & Walls shuttering - FL22 1 Columns & Walls shuttering - FL22
MY202CN22STR541 Core Wall shuttering - FL22 1 Core Wall shuttering - FL22
MY202CN22STR521 Beam & Slab shuttering - FL23 2 Beam & Slab shuttering - FL23
MY202CN22STR551 Shuttering for Stairs - FL22 2 Shuttering for Stairs - FL22
Concrete Casting Concrete Casting
MY202CN22STR491 Columns & Walls concrete casting - FL22 1 Columns & Walls concrete casting - FL22
MY202CN22STR501 Core Wall concrete casting - FL22 1 Core Wall concrete casting - FL22
MY202CN22STR481 Beam & Slab concrete casting- FL23 1 Beam & Slab concrete casting- FL23

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
118 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN22STR511 Casting for the Stairs - FL22 1 Casting for the Stairs - FL22
Architectural Architectural
Masonry Masonry
MY202CN22ARC765 Blockworks 8 Blockworks
MY202CN22ARC795 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN22ARC775 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN22ARC785 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN22ARC805 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN22ARC815 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN22ARC825 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN22ARC855 Aluminum Door 4 Aluminum Door
MY202CN22ARC845 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN22ARC835 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shutter
MY202CN22ARC875 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN22ARC865 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN22ARC455 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN22ARC475 Screeding works 4 Screeding works
MY202CN22ARC465 Threshold 3 Threshold
MY202CN22ARC495 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN22ARC485 Skirting works 5 Skirting works
MY202CN22ARC505 Floor Tile Finish (Dry Area) 7 Floor Tile Finish (Dry Area)
MY202CN22ARC515 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN22ARC525 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN22ARC575 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN22ARC565 Tile Wall Finish (Corridor) 7 Tile Wall Finish (Corridor)
MY202CN22ARC585 First Coat Paint (Corridor) 6 First Coat Paint (Corridor)
MY202CN22ARC605 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN22ARC535 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN22ARC545 First Coat Paint (Unit) 6 First Coat Paint (Unit)
MY202CN22ARC555 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN22ARC595 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN22ARC615 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN22ARC635 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN22ARC655 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN22ARC625 False Ceiling Board/Tiles (Unit) 6 False Ceiling Board/Tiles (Unit)
MY202CN22ARC645 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (Corridor)
MY202CN22ARC665 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, Alu
MY202CN22ARC735 Aluminum Louvers 4 Aluminum Louvers
MY202CN22ARC745 Glass Partitions 5 Glass Partitions
MY202CN22ARC725 Balcony Handrail 7 Balcony Handrail
MY202CN22ARC685 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
119 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN22ARC695 Wardrobe 6 Wardrobe
MY202CN22ARC675 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern top
MY202CN22ARC715 Staircase Handrail 4 Staircase Handrail
MY202CN22ARC705 Mirror 4 Mirror
MY202CN22ARC755 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN22AC1X140 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN22AC2X285 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN22AC2X265 Duct installation 0 Duct installation
MY202CN22AC2X295 CHW, Duct Equipments Insulation 6 CHW, Duct Equipments Insulation
MY202CN22AC2X305 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN22AC2X275 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN22ACFX146 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN22ACTC147 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN22NG2X171 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN22NG2X181 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN22NGFX142 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN22NGTC143 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN22PD1X171 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN22PD1X181 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN22PD2X286 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN22PD2X296 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN22PD2X306 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN22PD2X266 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN22PD2X276 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN22PDFX247 Water Heater 3 Water Heater
MY202CN22PDFX267 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN22PDFX277 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN22PDFX257 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings &
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN22PDTC181 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN22PDTC191 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
120 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN22FF1X140 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN22FF2X203 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN22FF2X213 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN22FF2X223 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN22FF3X216 Hose Reel 4 Hose Reel
MY202CN22FF3X226 Fire Extinguisher 1 Fire Extinguisher
MY202CN22FF3X206 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN22FFTC147 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN22EP1X202 Electrical Sleeve 3 Electrical Sleeve
MY202CN22EP1X212 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN22EP1X222 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN22EP2X215 DB's enclosure 7 DB's enclosure
MY202CN22EP2X225 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN22EP2X205 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN22EPFX209 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN22EPFX219 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN22EPFX229 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN22EW1X183 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN22EW1X193 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN22EW2X195 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN22EW2X185 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN22EWFX188 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtures
MY202CN22EWFX198 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN22ET1X192 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN22ET1X202 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN22ET2X204 Cable Tray fixing 4 Cable Tray fixing
MY202CN22ET2X194 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN22ETFX165 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lighting
First Fix First Fix
MY202CN22EL1X168 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
121 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
2nd Fix 2nd Fix
MY202CN22EL2X169 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & DB
Final Fix Final Fix
MY202CN22ELFX171 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN22EC1X174 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN22EC2X175 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN22ECFX176 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation Syste
2nd Fix 2nd Fix
MY202CN22EF2X211 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN22EF2X221 Modules 3 Modules
Final Fix Final Fix
MY202CN22EFFX213 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN22EFFX223 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN22EB1X186 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN22EB2X218 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN22EB2X228 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN22EBFX189 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN22EV1X192 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN22EV2X193 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN22EVFX194 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN22EI1X197 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN22EI2X198 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN22EIFX199 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN22ES1X202 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN22ES2X203 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN22ESFX204 Smart Home System Devices 4 Smart Home System Devices

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
122 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN22EELP410 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN22CLER140 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspens
Snagging and Desnagging Snagging and Desnagging
MY202CN22SNAG140 Snagging and De-Snagging 6 Snagging and De-Snagging
Floor Level 23 Floor Level 23
Structural Structural
Reinforcement Reinforcement
MY202CN23STR691 Columns & Walls Reinforcement - FL23 1 Columns & Walls Reinforcement - FL23
MY202CN23STR701 Core Wall reinforcement - FL23 1 Core Wall reinforcement - FL23
MY202CN23STR681 Beam & Slab reinforcement - FL24 2 Beam & Slab reinforcement - FL24
MY202CN23STR711 Reinforcement for Stairs - FL23 2 Reinforcement for Stairs - FL23
Shuttering & Formworks Shuttering & Formworks
MY202CN23STR651 Columns & Walls shuttering - FL23 1 Columns & Walls shuttering - FL23
MY202CN23STR661 Core Wall shuttering - FL23 1 Core Wall shuttering - FL23
MY202CN23STR641 Beam & Slab shuttering - FL24 1 Beam & Slab shuttering - FL24
MY202CN23STR671 Shuttering for Stairs - FL23 1 Shuttering for Stairs - FL23
Concrete Casting Concrete Casting
MY202CN23STR611 Columns & Walls concrete casting - FL23 1 Columns & Walls concrete casting - FL23
MY202CN23STR621 Core Wall concrete casting - FL23 1 Core Wall concrete casting - FL23
MY202CN23STR601 Beam & Slab concrete casting- FL24 1 Beam & Slab concrete casting- FL24
MY202CN23STR631 Casting for the Stairs - FL23 1 Casting for the Stairs - FL23
Architectural Architectural
Masonry Masonry
MY202CN23ARC195 Blockworks 8 Blockworks
MY202CN23ARC225 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN23ARC205 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN23ARC215 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN23ARC235 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN23ARC245 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN23ARC255 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN23ARC285 Aluminum Door 4 Aluminum Door
MY202CN23ARC275 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN23ARC265 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Shut
MY202CN23ARC305 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN23ARC295 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN23ARC885 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN23ARC905 Screeding works 4 Screeding works
MY202CN23ARC895 Threshold 3 Threshold
MY202CN23ARC925 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN23ARC915 Skirting works 5 Skirting works
MY202CN23ARC935 Floor Tile Finish (Dry Area) 7 Floor Tile Finish (Dry Area)
MY202CN23ARC945 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
123 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN23ARC955 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN23ARC005 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN23ARC995 Tile Wall Finish (Corridor) 7 Tile Wall Finish (Corridor)
MY202CN23ARC015 First Coat Paint (Corridor) 6 First Coat Paint (Corridor)
MY202CN23ARC035 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN23ARC965 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN23ARC975 First Coat Paint (Unit) 6 First Coat Paint (Unit)
MY202CN23ARC985 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN23ARC025 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN23ARC045 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN23ARC065 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN23ARC085 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN23ARC055 False Ceiling Board/Tiles (Unit) 6 False Ceiling Board/Tiles (Unit)
MY202CN23ARC075 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (Corridor
MY202CN23ARC095 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work, A
MY202CN23ARC165 Aluminum Louvers 4 Aluminum Louvers
MY202CN23ARC175 Glass Partitions 5 Glass Partitions
MY202CN23ARC155 Balcony Handrail 7 Balcony Handrail
MY202CN23ARC115 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN23ARC125 Wardrobe 6 Wardrobe
MY202CN23ARC105 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern to
MY202CN23ARC145 Staircase Handrail 4 Staircase Handrail
MY202CN23ARC135 Mirror 4 Mirror
MY202CN23ARC185 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN23AC1X150 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN23AC2X315 Duct installation 0 Duct installation
MY202CN23AC2X335 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN23AC2X345 CHW, Duct Equipments Insulation 6 CHW, Duct Equipments Insulation
MY202CN23AC2X355 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN23AC2X325 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN23ACFX156 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN23ACTC157 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN23NG2X191 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN23NG2X201 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN23NGFX152 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
124 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Pressure Testing of NG Pressure Testing of NG
MY202CN23NGTC153 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN23PD1X191 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN23PD1X201 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN23PD2X336 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN23PD2X346 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN23PD2X356 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN23PD2X316 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN23PD2X326 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN23PDFX287 Water Heater 3 Water Heater
MY202CN23PDFX307 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN23PDFX317 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN23PDFX297 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fittings
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN23PDTC201 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN23PDTC211 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN23FF1X150 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN23FF2X233 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN23FF2X243 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN23FF2X253 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN23FF3X246 Hose Reel 4 Hose Reel
MY202CN23FF3X256 Fire Extinguisher 1 Fire Extinguisher
MY202CN23FF3X236 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN23FFTC157 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN23EP1X232 Electrical Sleeve 3 Electrical Sleeve
MY202CN23EP1X242 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN23EP1X252 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN23EP2X245 DB's enclosure 7 DB's enclosure
MY202CN23EP2X255 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN23EP2X235 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN23EPFX239 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN23EPFX249 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN23EPFX259 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
125 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN23EW1X203 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN23EW1X213 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN23EW2X215 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN23EW2X205 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN23EWFX208 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixture
MY202CN23EWFX218 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN23ET1X212 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN23ET1X222 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN23ET2X224 Cable Tray fixing 4 Cable Tray fixing
MY202CN23ET2X214 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN23ETFX175 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Light
First Fix First Fix
MY202CN23EL1X178 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN23EL2X179 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring & D
Final Fix Final Fix
MY202CN23ELFX181 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN23EC1X184 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN23EC2X185 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN23ECFX186 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation Sy
2nd Fix 2nd Fix
MY202CN23EF2X231 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN23EF2X241 Modules 3 Modules
Final Fix Final Fix
MY202CN23EFFX233 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN23EFFX243 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN23EB1X196 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN23EB2X238 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN23EB2X248 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
126 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN23EBFX199 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN23EV1X202 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN23EV2X203 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN23EVFX204 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN23EI1X207 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN23EI2X208 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN23EIFX209 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN23ES1X212 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN23ES2X213 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN23ESFX214 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN23EELP420 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN23CLER150 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Suspe
Snagging and Desnagging Snagging and Desnagging
MY202CN23SNAG150 Snagging and De-Snagging 6 Snagging and De-Snaggin
Floor Level 24 Floor Level 24
Structural Structural
Reinforcement Reinforcement
MY202CN24STR811 Columns & Walls Reinforcement - FL24 1 Columns & Walls Reinforcement - FL24
MY202CN24STR821 Core Wall reinforcement - FL24 1 Core Wall reinforcement - FL24
MY202CN24STR801 Beam & Slab reinforcement - FL25 2 Beam & Slab reinforcement - FL25
MY202CN24STR831 Reinforcement for Stairs - FL24 2 Reinforcement for Stairs - FL24
Shuttering & Formworks Shuttering & Formworks
MY202CN24STR771 Columns & Walls shuttering - FL24 1 Columns & Walls shuttering - FL24
MY202CN24STR781 Core Wall shuttering - FL24 1 Core Wall shuttering - FL24
MY202CN24STR761 Beam & Slab shuttering - FL25 1 Beam & Slab shuttering - FL25
MY202CN24STR791 Shuttering for Stairs - FL24 1 Shuttering for Stairs - FL24
Concrete Casting Concrete Casting
MY202CN24STR731 Columns & Walls concrete casting - FL24 1 Columns & Walls concrete casting - FL24
MY202CN24STR741 Core Wall concrete casting - FL24 1 Core Wall concrete casting - FL24
MY202CN24STR721 Beam & Slab concrete casting- FL25 1 Beam & Slab concrete casting- FL25
MY202CN24STR751 Casting for the Stairs - FL24 1 Casting for the Stairs - FL24
Architectural Architectural
Masonry Masonry

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
127 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN24ARC625 Blockworks 7 Blockworks
MY202CN24ARC655 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN24ARC635 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN24ARC645 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN24ARC665 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN24ARC675 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN24ARC685 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN24ARC715 Aluminum Door 4 Aluminum Door
MY202CN24ARC705 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN24ARC695 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and Sh
MY202CN24ARC735 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN24ARC725 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN24ARC315 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN24ARC335 Screeding works 4 Screeding works
MY202CN24ARC325 Threshold 3 Threshold
MY202CN24ARC355 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN24ARC345 Skirting works 5 Skirting works
MY202CN24ARC365 Floor Tile Finish (Dry Area) 7 Floor Tile Finish (Dry Area)
MY202CN24ARC375 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN24ARC385 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN24ARC435 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN24ARC425 Tile Wall Finish (Corridor) 7 Tile Wall Finish (Corridor)
MY202CN24ARC445 First Coat Paint (Corridor) 6 First Coat Paint (Corridor)
MY202CN24ARC465 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN24ARC395 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN24ARC405 First Coat Paint (Unit) 6 First Coat Paint (Unit)
MY202CN24ARC415 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN24ARC455 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN24ARC475 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN24ARC495 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN24ARC515 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN24ARC485 False Ceiling Board/Tiles (Unit) 6 False Ceiling Board/Tiles (Unit)
MY202CN24ARC505 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (Corrid
MY202CN24ARC525 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Unit)
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden work
MY202CN24ARC595 Aluminum Louvers 4 Aluminum Louvers
MY202CN24ARC605 Glass Partitions 5 Glass Partitions
MY202CN24ARC585 Balcony Handrail 7 Balcony Handrail
MY202CN24ARC545 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry Top
MY202CN24ARC555 Wardrobe 6 Wardrobe
MY202CN24ARC535 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cistern
MY202CN24ARC575 Staircase Handrail 4 Staircase Handrail

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
128 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN24ARC565 Mirror 4 Mirror
MY202CN24ARC615 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN24AC1X160 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN24AC2X365 Duct installation 0 Duct installation
MY202CN24AC2X385 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN24AC2X395 CHW, Duct Equipments Insulation 6 CHW, Duct Equipments Insulation
MY202CN24AC2X405 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN24AC2X375 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN24ACFX166 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN24ACTC167 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN24NG2X211 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN24NG2X221 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN24NGFX162 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switches
Pressure Testing of NG Pressure Testing of NG
MY202CN24NGTC163 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN24PD1X211 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN24PD1X221 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN24PD2X386 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN24PD2X396 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN24PD2X406 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN24PD2X366 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN24PD2X376 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN24PDFX327 Water Heater 3 Water Heater
MY202CN24PDFX347 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN24PDFX357 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN24PDFX337 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fitting
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN24PDTC221 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN24PDTC231 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN24FF1X160 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN24FF2X263 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
129 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN24FF2X273 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN24FF2X283 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN24FF3X276 Hose Reel 4 Hose Reel
MY202CN24FF3X286 Fire Extinguisher 1 Fire Extinguisher
MY202CN24FF3X266 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN24FFTC167 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN24EP1X262 Electrical Sleeve 3 Electrical Sleeve
MY202CN24EP1X272 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN24EP1X282 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN24EP2X275 DB's enclosure 7 DB's enclosure
MY202CN24EP2X285 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN24EP2X265 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN24EPFX269 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN24EPFX279 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN24EPFX289 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN24EW1X223 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN24EW1X233 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN24EW2X235 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN24EW2X225 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN24EWFX228 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fixtu
MY202CN24EWFX238 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN24ET1X232 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN24ET1X242 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN24ET2X244 Cable Tray fixing 4 Cable Tray fixing
MY202CN24ET2X234 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN24ETFX185 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency Lig
First Fix First Fix
MY202CN24EL1X188 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN24EL2X189 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring &
Final Fix Final Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
130 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN24ELFX191 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN24EC1X194 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN24EC2X195 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN24ECFX196 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation S
2nd Fix 2nd Fix
MY202CN24EF2X251 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN24EF2X261 Modules 3 Modules
Final Fix Final Fix
MY202CN24EFFX253 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN24EFFX263 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN24EB1X206 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN24EB2X258 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN24EB2X268 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN24EBFX209 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN24EV1X212 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN24EV2X213 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN24EVFX214 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN24EI1X217 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN24EI2X218 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN24EIFX219 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN24ES1X222 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN24ES2X223 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN24ESFX224 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN24EELP430 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
131 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN24CLER160 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling Sus
Snagging and Desnagging Snagging and Desnagg
MY202CN24SNAG160 Snagging and De-Snagging 6 Snagging and De-Snagg
Floor Level 25 Floor Level 25
Structural Structural
Reinforcement Reinforcement
MY202CN25STR451 Columns & Walls Reinforcement - FL25 1 Columns & Walls Reinforcement - FL25
MY202CN25STR461 Core Wall reinforcement - FL25 1 Core Wall reinforcement - FL25
MY202CN25STR441 Beam & Slab reinforcement - FL26 2 Beam & Slab reinforcement - FL26
MY202CN25STR471 Reinforcement for Stairs - FL25 2 Reinforcement for Stairs - FL25
Shuttering & Formworks Shuttering & Formworks
MY202CN25STR411 Columns & Walls shuttering - FL25 1 Columns & Walls shuttering - FL25
MY202CN25STR421 Core Wall shuttering - FL25 1 Core Wall shuttering - FL25
MY202CN25STR401 Beam & Slab shuttering - FL26 1 Beam & Slab shuttering - FL26
MY202CN25STR431 Shuttering for Stairs - FL25 1 Shuttering for Stairs - FL25
Concrete Casting Concrete Casting
MY202CN25STR371 Columns & Walls concrete casting - FL25 1 Columns & Walls concrete casting - FL25
MY202CN25STR381 Core Wall concrete casting - FL25 1 Core Wall concrete casting - FL25
MY202CN25STR361 Beam & Slab concrete casting- FL26 1 Beam & Slab concrete casting- FL26
MY202CN25STR391 Casting for the Stairs - FL25 1 Casting for the Stairs - FL25
Architectural Architectural
Masonry Masonry
MY202CN25ARC335 Blockworks 7 Blockworks
MY202CN25ARC365 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN25ARC345 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN25ARC355 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN25ARC375 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN25ARC385 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN25ARC395 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN25ARC425 Aluminum Door 4 Aluminum Door
MY202CN25ARC415 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN25ARC405 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame and S
MY202CN25ARC445 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN25ARC435 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN25ARC025 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN25ARC045 Screeding works 4 Screeding works
MY202CN25ARC035 Threshold 3 Threshold
MY202CN25ARC065 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN25ARC055 Skirting works 5 Skirting works
MY202CN25ARC075 Floor Tile Finish (Dry Area) 7 Floor Tile Finish (Dry Area)
MY202CN25ARC085 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN25ARC095 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN25ARC145 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
132 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN25ARC135 Tile Wall Finish (Corridor) 7 Tile Wall Finish (Corridor)
MY202CN25ARC155 First Coat Paint (Corridor) 6 First Coat Paint (Corridor)
MY202CN25ARC175 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN25ARC105 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN25ARC115 First Coat Paint (Unit) 6 First Coat Paint (Unit)
MY202CN25ARC125 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN25ARC165 Final Coat Paint (Corridor) 5 Final Coat Paint (Corridor)
Ceiling Finish Ceiling Finish
MY202CN25ARC185 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN25ARC205 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN25ARC225 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN25ARC195 False Ceiling Board/Tiles (Unit) 6 False Ceiling Board/Tiles (Unit)
MY202CN25ARC215 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (Cor
MY202CN25ARC235 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (Uni
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden wo
MY202CN25ARC305 Aluminum Louvers 4 Aluminum Louvers
MY202CN25ARC315 Glass Partitions 5 Glass Partitions
MY202CN25ARC295 Balcony Handrail 7 Balcony Handrail
MY202CN25ARC255 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry T
MY202CN25ARC265 Wardrobe 6 Wardrobe
MY202CN25ARC245 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Ciste
MY202CN25ARC285 Staircase Handrail 4 Staircase Handrail
MY202CN25ARC275 Mirror 4 Mirror
MY202CN25ARC325 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN25AC1X130 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN25AC2X215 Duct installation 0 Duct installation
MY202CN25AC2X235 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN25AC2X245 CHW, Duct Equipments Insulation 6 CHW, Duct Equipments Insulation
MY202CN25AC2X255 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damper
MY202CN25AC2X225 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN25ACFX136 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN25ACTC137 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN25NG2X151 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN25NG2X161 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN25NGFX132 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Switch
Pressure Testing of NG Pressure Testing of NG
MY202CN25NGTC133 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
133 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
First Fix First Fix
MY202CN25PD1X151 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN25PD1X161 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supports
2nd Fix 2nd Fix
MY202CN25PD2X236 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN25PD2X246 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN25PD2X256 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN25PD2X216 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN25PD2X226 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN25PDFX207 Water Heater 3 Water Heater
MY202CN25PDFX227 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN25PDFX237 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN25PDFX217 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, Fitt
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testing
MY202CN25PDTC161 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN25PDTC171 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN25FF1X130 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN25FF2X173 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN25FF2X183 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN25FF2X193 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix
MY202CN25FF3X186 Hose Reel 4 Hose Reel
MY202CN25FF3X196 Fire Extinguisher 1 Fire Extinguisher
MY202CN25FF3X176 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN25FFTC137 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN25EP1X172 Electrical Sleeve 3 Electrical Sleeve
MY202CN25EP1X182 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN25EP1X192 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN25EP2X185 DB's enclosure 7 DB's enclosure
MY202CN25EP2X195 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN25EP2X175 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN25EPFX179 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board)
MY202CN25EPFX189 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN25EPFX199 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN25EW1X163 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
134 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN25EW1X173 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN25EW2X175 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN25EW2X165 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN25EWFX168 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light Fix
MY202CN25EWFX178 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN25ET1X172 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN25ET1X182 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN25ET2X184 Cable Tray fixing 4 Cable Tray fixing
MY202CN25ET2X174 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN25ETFX155 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency L
First Fix First Fix
MY202CN25EL1X158 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN25EL2X159 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wiring &
Final Fix Final Fix
MY202CN25ELFX161 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN25EC1X164 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN25EC2X165 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN25ECFX166 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuation
2nd Fix 2nd Fix
MY202CN25EF2X191 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN25EF2X201 Modules 3 Modules
Final Fix Final Fix
MY202CN25EFFX193 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN25EFFX203 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speakers
BMS BMS
First Fix First Fix
MY202CN25EB1X176 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN25EB2X198 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN25EB2X208 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN25EBFX179 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
135 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN25EV1X182 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN25EV2X183 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN25EVFX184 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN25EI1X187 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN25EI2X188 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN25EIFX189 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN25ES1X192 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN25ES2X193 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wiring
Final Fix Final Fix
MY202CN25ESFX194 Smart Home System Devices 4 Smart Home System Devices
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN25EELP400 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN25CLER130 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling S
Snagging and Desnagging Snagging and Desnag
MY202CN25SNAG130 Snagging and De-Snagging 6 Snagging and De-Sna
Floor Level 26 Floor Level 26
Structural Structural
Reinforcement Reinforcement
MY202CN6STR1171 Columns & Walls Reinforcement - FL26 1 Columns & Walls Reinforcement - FL26
MY202CN6STR1181 Core Wall reinforcement - FL26 1 Core Wall reinforcement - FL26
MY202CN6STR1161 Beam & Slab reinforcement - FL27 2 Beam & Slab reinforcement - FL27
MY202CN6STR1191 Reinforcement for Stairs - FL26 2 Reinforcement for Stairs - FL26
Shuttering & Formworks Shuttering & Formworks
MY202CN6STR1131 Columns & Walls shuttering - FL26 1 Columns & Walls shuttering - FL26
MY202CN6STR1141 Core Wall shuttering - FL26 1 Core Wall shuttering - FL26
MY202CN6STR1121 Beam & Slab shuttering - FL27 1 Beam & Slab shuttering - FL27
MY202CN6STR1151 Shuttering for Stairs - FL26 1 Shuttering for Stairs - FL26
Concrete Casting Concrete Casting
MY202CN6STR1091 Columns & Walls concrete casting - FL26 1 Columns & Walls concrete casting - FL26
MY202CN6STR1101 Core Wall concrete casting - FL26 1 Core Wall concrete casting - FL26
MY202CN6STR1081 Beam & Slab concrete casting- FL27 1 Beam & Slab concrete casting- FL27
MY202CN6STR1111 Casting for the Stairs - FL26 1 Casting for the Stairs - FL26
Architectural Architectural
Masonry Masonry
MY202CN26ARC915 Blockworks 7 Blockworks
MY202CN26ARC945 Plastering - wall & ceiling (Corridor) 8 Plastering - wall & ceiling (Corridor)
MY202CN26ARC925 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
136 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN26ARC935 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN26ARC955 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN26ARC965 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN26ARC975 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN6ARC4005 Aluminum Door 4 Aluminum Door
MY202CN26ARC995 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN26ARC985 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame an
MY202CN6ARC4025 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN6ARC4015 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN26ARC605 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN26ARC625 Screeding works 4 Screeding works
MY202CN26ARC615 Threshold 3 Threshold
MY202CN26ARC645 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN26ARC635 Skirting works 5 Skirting works
MY202CN26ARC655 Floor Tile Finish (Dry Area) 7 Floor Tile Finish (Dry Area)
MY202CN26ARC665 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN26ARC675 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN26ARC725 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN26ARC715 Tile Wall Finish (Corridor) 7 Tile Wall Finish (Corridor)
MY202CN26ARC735 First Coat Paint (Corridor) 6 First Coat Paint (Corridor)
MY202CN26ARC755 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN26ARC685 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN26ARC695 First Coat Paint (Unit) 6 First Coat Paint (Unit)
MY202CN26ARC705 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN26ARC745 Final Coat Paint (Corridor) 5 Final Coat Paint (Corrido
Ceiling Finish Ceiling Finish
MY202CN26ARC765 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN26ARC785 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor)
MY202CN26ARC805 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN26ARC775 False Ceiling Board/Tiles (Unit) 6 False Ceiling Board/Tiles (Un
MY202CN26ARC795 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (C
MY202CN26ARC815 Painting for the Ceiling (Unit) 5 Painting for the Ceiling (U
Accessories, Wooden work, Aluminum
Al Work Accessories, Wooden w
MY202CN26ARC885 Aluminum Louvers 4 Aluminum Louvers
MY202CN26ARC895 Glass Partitions 5 Glass Partitions
MY202CN26ARC875 Balcony Handrail 7 Balcony Handrail
MY202CN26ARC835 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pantry
MY202CN26ARC845 Wardrobe 6 Wardrobe
MY202CN26ARC825 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/Cis
MY202CN26ARC865 Staircase Handrail 4 Staircase Handrail
MY202CN26ARC855 Mirror 4 Mirror
MY202CN26ARC905 Room and Lift signage 2 Room and Lift signage
MEP Works MEP Works

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
137 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
HVAC Works HVAC Works
First Fix First Fix
MY202CN26AC1X190 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN26AC2X515 Duct installation 0 Duct installation
MY202CN26AC2X535 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN26AC2X545 CHW, Duct Equipments Insulation 6 CHW, Duct Equipments Insulati
MY202CN26AC2X555 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Damp
MY202CN26AC2X525 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN26ACFX196 Grills & Diffuser installation 4 Grills & Diffuser installation
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN26ACTC197 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN26NG2X271 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN26NG2X281 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN26NGFX192 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Swit
Pressure Testing of NG Pressure Testing of NG
MY202CN26NGTC193 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN26PD1X271 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN26PD1X281 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & suppor
2nd Fix 2nd Fix
MY202CN26PD2X536 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN26PD2X546 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN26PD2X556 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN26PD2X516 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN26PD2X526 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN26PDFX447 Water Heater 3 Water Heater
MY202CN26PDFX467 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN26PDFX477 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN26PDFX457 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares, F
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Testin
MY202CN26PDTC281 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN26PDTC291 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN26FF1X190 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN26FF2X353 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN26FF2X363 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN26FF2X373 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessories
Final Fix Final Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
138 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN26FF3X366 Hose Reel 4 Hose Reel
MY202CN26FF3X376 Fire Extinguisher 1 Fire Extinguisher
MY202CN26FF3X356 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN26FFTC197 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN26EP1X352 Electrical Sleeve 3 Electrical Sleeve
MY202CN26EP1X362 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN26EP1X372 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN26EP2X365 DB's enclosure 7 DB's enclosure
MY202CN26EP2X375 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN26EP2X355 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN26EPFX359 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Board
MY202CN26EPFX369 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN26EPFX379 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN26EW1X283 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN26EW1X293 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN26EW2X295 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN26EW2X285 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN26EWFX288 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Light F
MY202CN26EWFX298 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN26ET1X292 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN26ET1X302 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supports
2nd Fix 2nd Fix
MY202CN26ET2X304 Cable Tray fixing 4 Cable Tray fixing
MY202CN26ET2X294 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN26ETFX215 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergency
First Fix First Fix
MY202CN26EL1X218 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN26EL2X219 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wirin
Final Fix Final Fix
MY202CN26ELFX221 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
139 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN26EC1X224 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN26EC2X225 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN26ECFX226 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacuat
2nd Fix 2nd Fix
MY202CN26EF2X311 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN26EF2X321 Modules 3 Modules
Final Fix Final Fix
MY202CN26EFFX313 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN26EFFX323 Sounder, Flashers & Speakers 2 Sounder, Flashers & Speak
BMS BMS
First Fix First Fix
MY202CN26EB1X236 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN26EB2X318 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN26EB2X328 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN26EBFX239 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN26EV1X242 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN26EV2X243 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN26EVFX244 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN26EI1X247 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN26EI2X248 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN26EIFX249 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN26ES1X252 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN26ES2X253 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wirin
Final Fix Final Fix
MY202CN26ESFX254 Smart Home System Devices 4 Smart Home System Devic
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN26EELP460 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN26CLER190 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceiling
Snagging and Desnagging Snagging and Desn
MY202CN26SNAG190 Snagging and De-Snagging 6 Snagging and De-S

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
140 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Floor Level 27 Floor Level 27
Structural Structural
Reinforcement Reinforcement
MY202CN7STR1051 Columns & Walls Reinforcement - FL27 1 Columns & Walls Reinforcement - FL27
MY202CN7STR1061 Core Wall reinforcement - FL27 1 Core Wall reinforcement - FL27
MY202CN7STR1041 Beam & Slab reinforcement - FL28 2 Beam & Slab reinforcement - FL28
MY202CN7STR1071 Reinforcement for Stairs - FL27 2 Reinforcement for Stairs - FL27
Shuttering & Formworks Shuttering & Formworks
MY202CN7STR1011 Columns & Walls shuttering - FL27 1 Columns & Walls shuttering - FL27
MY202CN7STR1021 Core Wall shuttering - FL27 1 Core Wall shuttering - FL27
MY202CN7STR1001 Beam & Slab shuttering - FL28 1 Beam & Slab shuttering - FL28
MY202CN7STR1031 Shuttering for Stairs - FL27 1 Shuttering for Stairs - FL27
Concrete Casting Concrete Casting
MY202CN27STR971 Columns & Walls concrete casting - FL27 1 Columns & Walls concrete casting - FL27
MY202CN27STR981 Core Wall concrete casting - FL27 1 Core Wall concrete casting - FL27
MY202CN27STR961 Beam & Slab concrete casting- FL28 1 Beam & Slab concrete casting- FL28
MY202CN27STR991 Casting for the Stairs - FL27 1 Casting for the Stairs - FL27
Architectural Architectural
Masonry Masonry
MY202CN27ARC485 Blockworks 7 Blockworks
MY202CN27ARC515 Plastering - wall & ceiling (Corridor) 7 Plastering - wall & ceiling (Corridor)
MY202CN27ARC495 Plastering - wall & ceiling (Unit) 0 Plastering - wall & ceiling (Unit)
MY202CN27ARC505 Stair Screeding Finishes 4 Stair Screeding Finishes
Doors & Windows Doors & Windows
MY202CN27ARC525 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN27ARC535 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN27ARC545 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN27ARC575 Aluminum Door 4 Aluminum Door
MY202CN27ARC565 Aluminum Window & Glazing 7 Aluminum Window & Glazing
MY202CN27ARC555 Wooden Door Main Frame and Shutters 7 Wooden Door Main Frame a
MY202CN27ARC595 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN27ARC585 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN27ARC175 Floor Tile Finish (Corridor) 5 Floor Tile Finish (Corridor)
MY202CN27ARC195 Screeding works 4 Screeding works
MY202CN27ARC185 Threshold 3 Threshold
MY202CN27ARC215 Floor Tile Finish (Wet Area) 6 Floor Tile Finish (Wet Area)
MY202CN27ARC225 Floor Tile Finish (Dry Area) 5 Floor Tile Finish (Dry Area)
MY202CN27ARC205 Skirting works 5 Skirting works
MY202CN27ARC235 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN27ARC245 Wet area Water Proofing 4 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN27ARC295 Basecoat Paint (Corridor) 6 Basecoat Paint (Corridor)
MY202CN27ARC285 Tile Wall Finish (Corridor) 7 Tile Wall Finish (Corridor)
MY202CN27ARC305 First Coat Paint (Corridor) 6 First Coat Paint (Corridor)
MY202CN27ARC325 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
141 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN27ARC255 Basecoat Paint (Unit) 6 Basecoat Paint (Unit)
MY202CN27ARC265 First Coat Paint (Unit) 6 First Coat Paint (Unit)
MY202CN27ARC275 Final Coat Paint (Unit) 5 Final Coat Paint (Unit)
MY202CN27ARC315 Final Coat Paint (Corridor) 5 Final Coat Paint (Corrid
Ceiling Finish Ceiling Finish
MY202CN27ARC335 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN27ARC355 False Ceiling Grid (Corridor) 5 False Ceiling Grid (Corridor
MY202CN27ARC375 False Ceiling Grid (Unit) 5 False Ceiling Grid (Unit)
MY202CN27ARC345 False Ceiling Board/Tiles (Unit) 6 False Ceiling Board/Tiles (
MY202CN27ARC365 False Ceiling Board/Tiles (Corridor) 7 False Ceiling Board/Tiles (
MY202CN27ARC385 Painting for the Ceiling (Unit) 5 Painting for the Ceiling
Accessories, Wooden work, Aluminum
Al Work Accessories, Woode
MY202CN27ARC455 Aluminum Louvers 4 Aluminum Louvers
MY202CN27ARC465 Glass Partitions 5 Glass Partitions
MY202CN27ARC445 Balcony Handrail 7 Balcony Handrail
MY202CN27ARC405 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pant
MY202CN27ARC415 Wardrobe 6 Wardrobe
MY202CN27ARC395 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top/C
MY202CN27ARC435 Staircase Handrail 4 Staircase Handrail
MY202CN27ARC425 Mirror 4 Mirror
MY202CN27ARC475 Room and Lift signage 2 Room and Lift signag
MEP Works MEP Works
HVAC Works HVAC Works
First Fix First Fix
MY202CN27AC1X180 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN27AC2X465 Duct installation 0 Duct installation
MY202CN27AC2X485 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN27AC2X495 CHW, Duct Equipments Insulation 6 CHW, Duct Equipments Insula
MY202CN27AC2X505 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Dam
MY202CN27AC2X475 FCU installation 5 FCU installation
Final Fix Final Fix
MY202CN27ACFX186 Grills & Diffuser installation 4 Grills & Diffuser installatio
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN27ACTC187 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN27NG2X251 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN27NG2X261 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN27NGFX182 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, Sw
Pressure Testing of NG Pressure Testing of NG
MY202CN27NGTC183 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN27PD1X251 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN27PD1X261 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & supp

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
142 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
2nd Fix 2nd Fix
MY202CN27PD2X486 Hot & cold water pipes (inside blockwall) 6 Hot & cold water pipes (inside blockwall)
MY202CN27PD2X496 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN27PD2X506 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN27PD2X466 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pipe
MY202CN27PD2X476 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN27PDFX407 Water Heater 3 Water Heater
MY202CN27PDFX427 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN27PDFX437 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN27PDFX417 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Wares
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Test
MY202CN27PDTC261 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN27PDTC271 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN27FF1X180 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix
MY202CN27FF2X323 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN27FF2X333 Fire Fighting Piping - Horizontal 7 Fire Fighting Piping - Horizontal
MY202CN27FF2X343 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessori
Final Fix Final Fix
MY202CN27FF3X336 Hose Reel 4 Hose Reel
MY202CN27FF3X346 Fire Extinguisher 1 Fire Extinguisher
MY202CN27FF3X326 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN27FFTC187 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN27EP1X322 Electrical Sleeve 3 Electrical Sleeve
MY202CN27EP1X332 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN27EP1X342 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN27EP2X335 DB's enclosure 7 DB's enclosure
MY202CN27EP2X345 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN27EP2X325 Power Cabling & Wiring 7 Power Cabling & Wiring
Final Fix Final Fix
MY202CN27EPFX329 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Boa
MY202CN27EPFX339 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN27EPFX349 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN27EW1X263 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN27EW1X273 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN27EW2X275 Cable Tray Fixing 7 Cable Tray Fixing

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
143 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN27EW2X265 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN27EWFX268 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Ligh
MY202CN27EWFX278 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN27ET1X272 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN27ET1X282 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Suppo
2nd Fix 2nd Fix
MY202CN27ET2X284 Cable Tray fixing 4 Cable Tray fixing
MY202CN27ET2X274 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN27ETFX205 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergenc
First Fix First Fix
MY202CN27EL1X208 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN27EL2X209 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and Wir
Final Fix Final Fix
MY202CN27ELFX211 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN27EC1X214 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN27EC2X215 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN27ECFX216 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evacu
2nd Fix 2nd Fix
MY202CN27EF2X291 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN27EF2X301 Modules 3 Modules
Final Fix Final Fix
MY202CN27EFFX293 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN27EFFX303 Sounder, Flashers & Speakers 2 Sounder, Flashers & Spea
BMS BMS
First Fix First Fix
MY202CN27EB1X226 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN27EB2X298 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN27EB2X308 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN27EBFX229 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN27EV1X232 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN27EV2X233 TV System Cabling and Wiring 7 TV System Cabling and Wiring

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
144 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Final Fix Final Fix
MY202CN27EVFX234 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN27EI1X237 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN27EI2X238 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN27EIFX239 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN27ES1X242 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN27ES2X243 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and Wi
Final Fix Final Fix
MY202CN27ESFX244 Smart Home System Devices 4 Smart Home System Dev
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN27EELP450 PVC Earth cable networks 6 PVC Earth cable networks
Clearance Clearance
MY202CN27CLER180 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ceilin
Snagging and Desnagging Snagging and De
MY202CN27SNAG180 Snagging and De-Snagging 6 Snagging and De
Floor Level 28 Floor Level 28
Structural Structural
Reinforcement Reinforcement
MY202CN28STR100 Columns & Walls Reinforcement -FL28 1 Columns & Walls Reinforcement -FL28
MY202CN28STR101 Core Wall reinforcement - FL28 1 Core Wall reinforcement - FL28
MY202CN28STR102 Beam & Slab reinforcement - RF 2 Beam & Slab reinforcement - RF
MY202CN28STR103 Reinforcement for Stairs - FL28 2 Reinforcement for Stairs - FL28
MY202CN28STR113 Parapet reinforcement - FL28 2 Parapet reinforcement - FL28
Shuttering & Formworks Shuttering & Formworks
MY202CN28STR104 Columns & Walls shuttering - FL28 1 Columns & Walls shuttering - FL28
MY202CN28STR105 Core Wall shuttering - FL28 1 Core Wall shuttering - FL28
MY202CN28STR106 Beam & Slab shuttering - RF 1 Beam & Slab shuttering - RF
MY202CN28STR107 Shuttering for Stairs - FL28 1 Shuttering for Stairs - FL28
MY202CN28STR117 Parapet shuttering - FL28 2 Parapet shuttering - FL28
Concrete Casting Concrete Casting
MY202CN28STR108 Columns & Walls concrete casting - FL28 1 Columns & Walls concrete casting - FL28
MY202CN28STR109 Core Wall concrete casting - FL28 1 Core Wall concrete casting - FL28
MY202CN28STR110 Beam & Slab concrete casting- RF 1 Beam & Slab concrete casting- RF
MY202CN28STR111 Casting for the Stairs - FL28 1 Casting for the Stairs - FL28
MY202CN28STR121 Parapet concrete casting - FL28 1 Parapet concrete casting - FL28
Architectural Architectural
Masonry Masonry
MY202CN28ARC113 Blockworks 7 Blockworks
MY202CN28ARC115 Plastering - wall & ceiling (Corridor) 7 Plastering - wall & ceiling (Corridor)
MY202CN28ARC114 Plastering - wall & ceiling (Unit) 8 Plastering - wall & ceiling (Unit)

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
145 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN28ARC116 Stair Screeding Finishes 4 Stair Screeding Finishe
Doors & Windows Doors & Windows
MY202CN28ARC117 Wooden Door Sub Frame 3 Wooden Door Sub Frame
MY202CN28ARC118 Aluminum Door Frame 2 Aluminum Door Frame
MY202CN28ARC119 Aluminum Window Frame 2 Aluminum Window Frame
MY202CN28ARC121 Aluminum Door 4 Aluminum Door
MY202CN28ARC122 Aluminum Window & Glazing 5 Aluminum Window & Glazing
MY202CN28ARC120 Wooden Door Main Frame and Shutters 5 Wooden Door Main Frame
MY202CN28ARC123 Wooden Door Architrave 4 Wooden Door Architrave
MY202CN28ARC124 Door Iron Mongrey 3 Door Iron Mongrey
Floor Finish Floor Finish
MY202CN28ARC125 Floor Tile Finish (Corridor) 4 Floor Tile Finish (Corridor)
MY202CN28ARC126 Screeding works 4 Screeding works
MY202CN28ARC127 Threshold 3 Threshold
MY202CN28ARC129 Floor Tile Finish (Wet Area) 5 Floor Tile Finish (Wet Area)
MY202CN28ARC130 Floor Tile Finish (Dry Area) 5 Floor Tile Finish (Dry Area)
MY202CN28ARC128 Skirting works 4 Skirting works
MY202CN28ARC131 Epoxy for Floor 4 Epoxy for Floor
Wet Area Waterproofing Wet Area Waterproofing
MY202CN28ARC132 Wet area Water Proofing 3 Wet area Water Proofing
Wall Finish Wall Finish
MY202CN28ARC133 Basecoat Paint (Corridor) 5 Basecoat Paint (Corridor)
MY202CN28ARC136 Tile Wall Finish (Corridor) 6 Tile Wall Finish (Corridor)
MY202CN28ARC138 First Coat Paint (Corridor) 6 First Coat Paint (Corridor)
MY202CN28ARC135 Tile Wall Finish (Wet Area) 5 Tile Wall Finish (Wet Area)
MY202CN28ARC134 Basecoat Paint (Unit) 5 Basecoat Paint (Unit)
MY202CN28ARC137 First Coat Paint (Unit) 6 First Coat Paint (Unit)
MY202CN28ARC139 Final Coat Paint (Unit) 4 Final Coat Paint (Unit
MY202CN28ARC140 Final Coat Paint (Corridor) 4 Final Coat Paint (Corr
Ceiling Finish Ceiling Finish
MY202CN28ARC141 Spray Paint for Ceiling 6 Spray Paint for Ceiling
MY202CN28ARC144 False Ceiling Grid (Corridor) 3 False Ceiling Grid (Corrido
MY202CN28ARC143 False Ceiling Grid (Unit) 3 False Ceiling Grid (Unit)
MY202CN28ARC146 False Ceiling Board/Tiles (Corridor) 5 False Ceiling Board/Tiles
MY202CN28ARC145 False Ceiling Board/Tiles (Unit) 5 False Ceiling Board/Tiles
MY202CN28ARC142 Painting for the Ceiling (Unit) 5 Painting for the Ceiling
Accessories, Wooden work, Aluminum
Al Work Accessories, Wood
MY202CN28ARC147 Aluminum Louvers 4 Aluminum Louvers
MY202CN28ARC148 Glass Partitions 5 Glass Partitions
MY202CN28ARC149 Kitchen Cabinets & Pantry Top 6 Kitchen Cabinets & Pa
MY202CN28ARC150 Wardrobe 6 Wardrobe
MY202CN28ARC151 Balcony Handrail 7 Balcony Handrail
MY202CN28ARC152 Vanity Unit/Pantry top/Cistern top 7 Vanity Unit/Pantry top
MY202CN28ARC153 Staircase Handrail 4 Staircase Handrail
MY202CN28ARC154 Mirror 4 Mirror
MY202CN28ARC155 Room and Lift signage 2 Room and Lift sign
MEP Works MEP Works

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
146 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
HVAC Works HVAC Works
First Fix First Fix
MY202CN28AC1X100 Fixing AC Hangers & supports 5 Fixing AC Hangers & supports
2nd Fix 2nd Fix
MY202CN28AC2X101 Duct installation 8 Duct installation
MY202CN28AC2X102 Chilled Water Pipes 7 Chilled Water Pipes
MY202CN28AC2X103 CHW, Duct Equipments Insulation 5 CHW, Duct Equipments Insul
MY202CN28AC2X104 Volume, Smoke and Fire Damper 4 Volume, Smoke and Fire Da
MY202CN28AC2X105 FCU installation 5 FCU installation
MY202CN28AC2X106 AC Chillers 5 AC Chillers
MY202CN28AC2X107 Chilled water pump set 5 Chilled water pump set
MY202CN28AC2X108 FAHU Installation 5 FAHU Installation
Final Fix Final Fix
MY202CN28ACFX116 Louvre Installation 4 Louvre Installation
MY202CN28ACFX106 Grills & Diffuser installation 4 Grills & Diffuser installa
Pressure Testing of HVAC Pressure Testing of HVAC
MY202CN28ACTC107 Pressure Testing CHW Pipes 2 Pressure Testing CHW Pipes
NG System NG System
First & 2nd Fix First & 2nd Fix
MY202CN28NG2X100 NG Pipes (Riser) 3 NG Pipes (Riser)
MY202CN28NG2X101 NG Pipes (Horizontal) 4 NG Pipes (Horizontal)
Final Fix Final Fix
MY202CN28NGFX102 Gas Detector, Meter, Sensor, Switches 4 Gas Detector, Meter, Sensor, S
Pressure Testing of NG Pressure Testing of NG
MY202CN28NGTC103 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
First Fix First Fix
MY202CN28PD1X100 Sleeve in Concrete Slab 2 Sleeve in Concrete Slab
MY202CN28PD1X101 Plumbing & Drainage hangers & supports 4 Plumbing & Drainage hangers & sup
2nd Fix 2nd Fix
MY202CN28PD2X102 Hot & cold water pipes (inside blockwall) 5 Hot & cold water pipes (inside blockwall)
MY202CN28PD2X103 Drainage Pipe - Vertical 6 Drainage Pipe - Vertical
MY202CN28PD2X104 Water Supply Pipe - Vertical 6 Water Supply Pipe - Vertical
MY202CN28PD2X105 H/L Horizontal Water Supply Pipe 8 H/L Horizontal Water Supply Pip
MY202CN28PD2X106 H/L Horizontal Drainage Pipe 8 H/L Horizontal Drainage Pipe
Final Fix Final Fix
MY202CN28PDFX107 Water Heater 3 Water Heater
MY202CN28PDFX108 Water Supply Valve, Tap 3 Water Supply Valve, Tap
MY202CN28PDFX119 Drain Fixture Installation 3 Drain Fixture Installation
MY202CN28PDFX109 Sanitary Fixtures, Wares, Fittings & acc's 5 Sanitary Fixtures, Ware
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Tes
MY202CN28PDTC110 Drainage Pipe Testing 2 Drainage Pipe Testing
MY202CN28PDTC111 Water Supply Pipe Testing 2 Water Supply Pipe Testing
Fire Fighting Works Fire Fighting Works
First Fix First Fix
MY202CN28FF1X100 Fire Fighting Supports & Hangers 5 Fire Fighting Supports & Hangers
2nd Fix 2nd Fix

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
147 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CN28FF2X101 Fire Fighting Piping - (Riser) 4 Fire Fighting Piping - (Riser)
MY202CN28FF2X102 Fire Fighting Piping - Horizontal 6 Fire Fighting Piping - Horizontal
MY202CN28FF2X103 Fixing of FF Valves & accessories 3 Fixing of FF Valves & accessor
Final Fix Final Fix
MY202CN28FF3X105 Hose Reel 3 Hose Reel
MY202CN28FF3X106 Fire Extinguisher 1 Fire Extinguisher
MY202CN28FF3X104 Sprinkler 4 Sprinkler
Fire Fighting Pipe Testing Fire Fighting Pipe Testing
MY202CN28FFTC107 Fire Fighting Pipe Testing 3 Fire Fighting Pipe Testing
Electrical Electrical
Power Distribution Power Distribution
First Fix First Fix
MY202CN28EP1X100 Electrical Sleeve 3 Electrical Sleeve
MY202CN28EP1X101 Power Conduit works - Vertical 6 Power Conduit works - Vertical
MY202CN28EP1X102 Power Hangers & Supports 3 Power Hangers & Supports
2nd Fix 2nd Fix
MY202CN28EP2X103 DB's enclosure 6 DB's enclosure
MY202CN28EP2X104 Cable tray & trunkings 4 Cable tray & trunkings
MY202CN28EP2X105 Power Cabling & Wiring 6 Power Cabling & Wiring
Final Fix Final Fix
MY202CN28EPFX106 SMDB(sub Main Distribution Board) 4 SMDB(sub Main Distribution Bo
MY202CN28EPFX108 DB (Distribution Board) 4 DB (Distribution Board)
MY202CN28EPFX109 Wiring Accessories & Isolator 4 Wiring Accessories & Isolator
Wiring Devices Wiring Devices
First Fix First Fix
MY202CN28EW1X112 Lighting Conduit works - Vertical 6 Lighting Conduit works - Vertical
MY202CN28EW1X113 Wiring Hangers & Supports 4 Wiring Hangers & Supports
2nd Fix 2nd Fix
MY202CN28EW2X114 Cable Tray Fixing 7 Cable Tray Fixing
MY202CN28EW2X115 Lighting Cabling & Wiring 7 Lighting Cabling & Wiring
Final Fix Final Fix
MY202CN28EWFX116 Switches, Sockets & Light Fixtures 4 Switches, Sockets & Lig
MY202CN28EWFX118 Exit Signs Installation 2 Exit Signs Installation
Telecommunication System Telecommunication System
First Fix First Fix
MY202CN28ET1X121 Telephone Conduit works - Vertical 6 Telephone Conduit works - Vertical
MY202CN28ET1X122 Telecommunication Hangers & Supports 3 Telecommunication Hangers & Supp
2nd Fix 2nd Fix
MY202CN28ET2X123 Cable Tray fixing 4 Cable Tray fixing
MY202CN28ET2X124 Telephone Cabling & Wiring 7 Telephone Cabling & Wiring
Final Fix Final Fix
MY202CN28ETFX125 Telephone/ Data Outlet 4 Telephone/ Data Outlet
Low Current System (Emergency
(Emerg Lighting System) Low Current System (Emergen
First Fix First Fix
MY202CN28EL1X128 Emergency Lighting Conduit works - Wall 6 Emergency Lighting Conduit works - Wall
2nd Fix 2nd Fix
MY202CN28EL2X129 Emergency Lighting Cabling and Wiring & DB Enclosure 7 Emergency Lighting Cabling and W

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
148 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Final Fix Final Fix
MY202CN28ELFX131 Emergency Lighting 7 Emergency Lighting
CCTV System CCTV System
First Fix First Fix
MY202CN28EC1X134 CCTV System Conduit works - Vertical 6 CCTV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN28EC2X135 CCTV System Cabling and Wiring 7 CCTV System Cabling and Wiring
Final Fix Final Fix
MY202CN28ECFX136 CCTV System Camera 3 CCTV System Camera
Fire Alarm & Voice Evacuation
Evacuati System Fire Alarm & Voice Evac
2nd Fix 2nd Fix
MY202CN28EF2X139 Fire Alarm Cabling & Wiring 5 Fire Alarm Cabling & Wiring
MY202CN28EF2X141 Modules 3 Modules
Final Fix Final Fix
MY202CN28EFFX142 Fire Alarm Detector 2 Fire Alarm Detector
MY202CN28EFFX143 Sounder, Flashers & Speakers 2 Sounder, Flashers & Sp
BMS BMS
First Fix First Fix
MY202CN28EB1X146 BMS Conduit works - Vertical 6 BMS Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN28EB2X147 BMS Cable Tray Fixing 4 BMS Cable Tray Fixing
MY202CN28EB2X148 BMS Cabling & Wiring 5 BMS Cabling & Wiring
Final Fix Final Fix
MY202CN28EBFX149 BMS Devices 3 BMS Devices
TV System TV System
First Fix First Fix
MY202CN28EV1X152 TV System Conduit works - Vertical 6 TV System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN28EV2X153 TV System Cabling and Wiring 7 TV System Cabling and Wiring
Final Fix Final Fix
MY202CN28EVFX154 TV System Outlet 4 TV System Outlet
Intercom System Intercom System
First Fix First Fix
MY202CN28EI1X157 Intercom Conduit works - Vertical 6 Intercom Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN28EI2X158 Intercom Cabling and Wiring 7 Intercom Cabling and Wiring
Final Fix Final Fix
MY202CN28EIFX159 Intercom Devices 4 Intercom Devices
Smart Home System Smart Home System
First Fix First Fix
MY202CN28ES1X162 Smart Home System Conduit works - Vertical 6 Smart Home System Conduit works - Vertical
2nd Fix 2nd Fix
MY202CN28ES2X163 Smart Home System Cabling and Wiring 7 Smart Home System Cabling and W
Final Fix Final Fix
MY202CN28ESFX164 Smart Home System Devices 4 Smart Home System De
Earthing & Lightning Protection
Protec System Earthing & Lightning Protection System
MY202CN28EELP380 PVC Earth cable networks 6 PVC Earth cable networks

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
149 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CNB11EELP390 Lightning protection system copper tape 6 Lightning protection system copper tape
Obstruction Warning Lighting
Lightin Obstruction Warning Lightin
MY202CN28EOWL130 Control Panel 2 Control Panel
MY202CN28EOWL140 Cables connection 4 Cables connection
MY202CN28EOWL150 Obstruction lights 3 Obstruction lights
Clearance Clearance
MY202CN28CLER100 MEP Clearance - False Ceiling Suspension 1 MEP Clearance - False Ce
Snagging and Desnagging Snagging and D
MY202CN28SNAG100 Snagging and De-Snagging 6 Snagging and D
Roof Floor Roof Floor
Structural Structural
Reinforcement Reinforcement
MY202CNRFSTR100 Parapet reinforcement - RF 4 Parapet reinforcement - RF
Shuttering & Formworks Shuttering & Formworks
MY202CNRFSTR101 Parapet shuttering - RF 3 Parapet shuttering - RF
Concrete Casting Concrete Casting
MY202CNRFSTR102 Parapet concrete casting - RF 1 Parapet concrete casting - RF
Roofing Works Roofing Works
MY202CNRFARC100 Roofing waterproofing system 5 Roofing waterproofing system
MY202CNRFARC101 Roof flooring & skirting finishes 0 Roof flooring & skirting fin
MEP Works MEP Works
HVAC Works HVAC Works
MY202CNRFACFX101 FCU Installation 5 FCU Installation
MY202CNRFACFX102 Duct & Shafts 5 Duct & Shafts
NG System NG System
MY202CNRFNGFX100 NG supports 2 NG supports
MY202CNRFNGFX101 NG horizontal pipes 2 NG horizontal pipes
Pressure Testing of NG Pressure Testing of NG
MY202CNRFNGTC102 Pressure Testing NG Pipes 2 Pressure Testing NG Pipes
Plumbing & Drainage Plumbing & Drainage
MY202CNRFPDFX100 Rain water pipe riser 4 Rain water pipe riser
MY202CNRFPDFX101 Roof drain water outlet 4 Roof drain water outlet
MY202CNRFPDFX111 Drain Fixture Installation 3 Drain Fixture Installation
Plumbing & Drainage Pipes Testing Plumbing & Drainage Pipes Tes
MY202CNRFPDTC102 Drainage Pipe Testing 2 Drainage Pipe Testing
Electrical Electrical
Obstruction Warning Lighting
Lightin Obstruction Warning Light
MY202CNRFEOWL110 Cables connection 4 Cables connection
MY202CNRFEOWL120 Obstruction lights 3 Obstruction lights
Snagging and Desnagging Snagging and
MY202CNRFSNAG100 Snagging and De-Snagging 6 Snagging and
Others Others

BMU System / Window washing


washin equipment BMU System / Window washing equipment
MY202CNPWBMUS100 Installation of BMU System / Window washing equipment 30 Installation of BMU System / Window washing equipment
Audio Entry, Security & Access
Acces Control System Audio Entry, Security & Access Control System
MY202CNPWASAS101 Installation of Audio Entry, Security & Access Control S... 0 Installation of Audio Entry, Security & Access Co
Sundries for Aluminium Composite
Comp Panel Cladding Sundrie

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
150 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CNPWSWEF102 Installation of Sundries for Aluminium Composite Panel... 30 Installa
SMATV System SMATV System
MY202CNPWSMTV103 Installation of SMATV System GF 7 Installation of SMATV System GF
MY202CNPWSMTV104 Installation of SMATV System 1F 7 Installation of SMATV System 1F
MY202CNPWSMTV105 Installation of SMATV System 2F 7 Installation of SMATV System 2F
MY202CNPWSMTV106 Installation of SMATV System 3F 7 Installation of SMATV System 3F
MY202CNPWSMTV107 Installation of SMATV System 4F 7 Installation of SMATV System 4F
MY202CNPWSMTV108 Installation of SMATV System 5F 7 Installation of SMATV System 5F
MY202CNPWSMTV109 Installation of SMATV System 6F 7 Installation of SMATV System 6F
MY202CNPWSMTV110 Installation of SMATV System 7F 7 Installation of SMATV System 7F
MY202CNPWSMTV111 Installation of SMATV System 8F 7 Installation of SMATV System 8F
MY202CNPWSMTV112 Installation of SMATV System 9F 7 Installation of SMATV System 9F
MY202CNPWSMTV113 Installation of SMATV System 10F 7 Installation of SMATV System 10F
MY202CNPWSMTV114 Installation of SMATV System 11F 7 Installation of SMATV System 11F
MY202CNPWSMTV115 Installation of SMATV System 12F 7 Installation of SMATV System 12F
MY202CNPWSMTV116 Installation of SMATV System 13F 7 Installation of SMATV System 13F
MY202CNPWSMTV117 Installation of SMATV System 14F 7 Installation of SMATV System 14F
MY202CNPWSMTV118 Installation of SMATV System 15F 7 Installation of SMATV System 15F
MY202CNPWSMTV119 Installation of SMATV System 16F 7 Installation of SMATV System 16F
MY202CNPWSMTV120 Installation of SMATV System 17F 7 Installation of SMATV System 17F
MY202CNPWSMTV121 Installation of SMATV System 18F 7 Installation of SMATV System 18F
MY202CNPWSMTV122 Installation of SMATV System 19F 7 Installation of SMATV System 19F
MY202CNPWSMTV123 Installation of SMATV System 20F 7 Installation of SMATV System 20F
MY202CNPWSMTV124 Installation of SMATV System 21F 7 Installation of SMATV System 21F
MY202CNPWSMTV129 Installation of SMATV System 22F 7 Installation of SMATV System 22F
MY202CNPWSMTV130 Installation of SMATV System 23F 7 Installation of SMATV System 23F
MY202CNPWSMTV131 Installation of SMATV System 24F 7 Installation of SMATV System 24F
MY202CNPWSMTV132 Installation of SMATV System 25F 7 Installation of SMATV System 25F
MY202CNPWSMTV133 Installation of SMATV System 26F 7 Installation of SMATV System 26F
MY202CNPWSMTV134 Installation of SMATV System 27F 7 Installation of SMATV System 27F
MY202CNPWSMTV144 Installation of SMATV System 28F 7 Installation of SMATV System 28F
Building Common Work Building Commo

Elevations Work Elevations Work


Elevation - North Elevation - North
MY202CNBWELVN100 Insulation to external wall 35 Insulation to external wall
MY202CNBWELVN101 Install proprietary anodized aluminum cladding fixing sy... 25 Install proprietary anodized aluminum cladding fix
MY202CNBWELVN102 Steel brackets for glazing 20 Steel brackets for glazing
MY202CNBWELVN103 Fixation of external facade 30 Fixation of external facade
MY202CNBWELVN104 Curtain wall frames 35 Curtain wall frames
MY202CNBWELVN105 Install glass panel 40 Install glass panel
Elevation - South Elevation - South
MY202CNBWELVS107 Insulation to external wall 35 Insulation to external wall
MY202CNBWELVS108 Install proprietary anodized aluminum cladding fixing sy... 25 Install proprietary anodized aluminum
MY202CNBWELVS110 Steel brackets for glazing 20 Steel brackets for glazing
MY202CNBWELVS109 Fixation of external facade 30 Fixation of external facade
MY202CNBWELVS111 Curtain wall frames 35 Curtain wall frames
MY202CNBWELVS112 Install glass panel 40 Install glass panel

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
151 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
Elevation - East Elevation - East
MY202CNBWELVE114 Insulation to external wall 35 Insulation to external wall
MY202CNBWELVE115 Install proprietary anodized aluminum cladding fixing sy... 25 Install proprietary anodized aluminum claddi
MY202CNBWELVE116 Steel brackets for glazing 20 Steel brackets for glazing
MY202CNBWELVE117 Fixation of external facade 30 Fixation of external facade
MY202CNBWELVE118 Curtain wall frames 35 Curtain wall frames
MY202CNBWELVE119 Install glass panel 40 Install glass panel
Elevation - West Elevation - West
MY202CNBWELVW121 Insulation to external wall 35 Insulation to external wall
MY202CNBWELVW122 Install proprietary anodized aluminum cladding fixing sy... 25 Install proprietary anodized alum
MY202CNBWELVW124 Steel brackets for glazing 20 Steel brackets for glazing
MY202CNBWELVW123 Fixation of external facade 30 Fixation of external facade
MY202CNBWELVW125 Curtain wall frames 35 Curtain wall frames
MY202CNBWELVW126 Install glass panel 40 Install glass pane
Conveying System Conveying System
Service Lift Service Lift
MY202CNBWSLFT100 Survey and Preparation for Core 6 Survey and Preparation for Core
MY202CNBWSLFT101 Car & CWT Bracket 6 Car & CWT Bracket
MY202CNBWSLFT102 Car & CWT Weight Guide Rail installation 8 Car & CWT Weight Guide Rail installation
MY202CNBWSLFT103 Door Frame & Landing Doors 0 Door Frame & Landing Doors
MY202CNBWSLFT104 Entrance Frame Grouting 6 Entrance Frame Grouting
MY202CNBWSLFT105 Machine, Drive & Governor installation 6 Machine, Drive & Governor installation
MY202CNBWSLFT106 Car & Cwt frame assembly 0 Car & Cwt frame assembly
MY202CNBWSLFT107 Car & Governor Roping 0 Car & Governor Roping
MY202CNBWSLFT108 Permanent shaft lightings 5 Permanent shaft lightings
MY202CNBWSLFT109 Cabin Assembly (incl. C.O.P. & Car Door) 5 Cabin Assembly (incl. C.O.P. & Car Doo
MY202CNBWSLFT110 Electrical work (travelling cable, car top wiring) 6 Electrical work (travelling cable, car to
MY202CNBWSLFT111 Pit Set Assembly 6 Pit Set Assembly
MY202CNBWSLFT112 Starting of Mech'l Adjustment 3 Starting of Mech'l Adjustment
Passenger Lift Passenger Lift
MY202CNBWPLFT100 Survey and Preparation for Core 5 Survey and Preparation for Core
MY202CNBWPLFT101 Car & CWT Bracket 0 Car & CWT Bracket
MY202CNBWPLFT102 Car & CWT Weight Guide Rail installation 0 Car & CWT Weight Guide Rail installation
MY202CNBWPLFT103 Door Frame & Landing Doors 2 Door Frame & Landing Doors
MY202CNBWPLFT104 Entrance Frame Grouting 6 Entrance Frame Grouting
MY202CNBWPLFT105 Machine, Drive & Governor installation 6 Machine, Drive & Governor installation
MY202CNBWPLFT106 Car & Cwt frame assembly 0 Car & Cwt frame assembly
MY202CNBWPLFT107 Car & Governor Roping 0 Car & Governor Roping
MY202CNBWPLFT108 Permanent shaft lightings 5 Permanent shaft lightings
MY202CNBWPLFT109 Cabin Assembly (incl. C.O.P. & Car Door) 7 Cabin Assembly (incl. C.O.P. & Car D
MY202CNBWPLFT110 Electrical work (travelling cable, car top wiring) 6 Electrical work (travelling cable, car to
MY202CNBWPLFT111 Pit Set Assembly 6 Pit Set Assembly
MY202CNBWPLFT112 Starting of Mech'l Adjustment 3 Starting of Mech'l Adjustment
Refuse Chute System Refuse Chute System
MY202CNBWCHUT100 Install garbage chute system 50 Install garbage chute system
Landscaping Landscaping
MY202CNLN0000100 Waterproofing & screed 0 Waterproofing & screed

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
152 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202CNLN0000101 Granular coarse, soil fill and plants 8 Granular coarse, soil fill and plants
MY202CNLN0000102 Wall ceramic tiles around Air well 2 Wall ceramic tiles around Air well
MY202CNLN0000103 Prefinished Aluminium Decorative Screen on Air well 6 Prefinished Aluminium Decorative Scre
MY202CNLN0000104 Floor ceramic tiles 8 Floor ceramic tiles
MY202CNLN0000105 Sidewalks, curbs & pavers 5 Sidewalks, curbs & pavers
MY202CNLN105 Swimming Pools, jacuzzi & water feature 45 Swimming Pools, jacuzzi
Preliminary Testing & Commissioning
Commissio Works Preliminary Testin
MY202CNPRTACW100 Testing & Commissioning of Garbage Chute Works 5 Testing & Commissioning of Garbag
MY202CNPRTACW107 Testing & Commissioning of Elevator Works 6 Testing & Commissioning of Elev
MY202CNPRTACW106 Testing & Commissioning of Plumbing & Drainage Works 5 Testing & Commiss
MY202CNPRTACW103 Testing & Commissioning of Fire Fighting & Fire Alarm ... 5 Testing & Commiss
MY202CNPRTACW105 Testing & Commissioning of HVAC Works 5 Testing & Commis
MY202CNPRTACW101 Testing & Commissioning of NG Works 5 Testing & Commis
MY202CNPRTACW102 Testing & Commissioning of Electrical Works 5 Testing & Commis
MY202CNPRTACW104 Testing & Commissioning of Communication Works 5 Testing & Commis

Authorities Approval Authoriti

Roads Authority Approval Roads Authority Appro

Application & Inspection Application & Inspectio


MY202AUA0000101 Roads application & inspection 20 Roads application & ins
Achieve NOC Achieve NOC
MY202AUA0000107 Obtain Roads Authority completion Certificate 1 Obtain Roads Authority
Authority Approval from ADSSC Authority App

Application & Inspection Application &


MY202AUA0000108 ADSSC application & inspection 20 ADSSC appli
Achieve NOC Achieve NOC
MY202AUA0000109 Obtain ADSSC Authority completion Certificate 1 Obtain ADSS
Authority Approval from Etisalat Authority A

Application & Inspection Application


MY202AUA0000110 Etisalat application & inspection 20 Etisalat app
Achieve NOC Achieve NO
MY202AUA0000111 Obtain Etisalat Authority completion Certificate 1 Obtain Etis
Authority Approval from Civil Defense
De Authority A

Application & Inspection Application


MY202AUA0000112 CIVIL DEFENSE application & inspection 20 CIVIL DEFE
Achieve NOC Achieve NO
MY202AUA0000113 Obtain CIVIL DEFENSE Completion Certificate 1 Obtain CIV
Consultant Building Completion Certifiacate Consultant

Application & Inspection Application


MY202AUA0000114 Consultant Final Inspection 5 Consultant
Achieve NOC Achieve NO
MY202AUA0000115 Issuance of Consultant Completion Certificate 1 Issuance of
Authority Approval from ADM Authority

Application & Inspection Applicatio


MY202AUA0000116 ADM application & inspection 5 ADM app
Achieve NOC Achieve N

Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone
SIEDCO General Contracting Co LLC
Remaining Work Summary © Primavera Systems, Inc.
153 of 154
Client: Project Name: Consultant:

Aabar Properties AABAR RESIDENTIAL TOWER CONTRACT SCHEDULE Architecural & Planning Group

Shams Abu Dhabi, Plot No. RS1 - C12

Activity ID Activity Name al Month


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
n
MY202AUA0000117 Obtain ADM Building Completion Certificate 1 Obtain AD
Authority Approval from ADDC Authority

Application & Inspection Applicatio


MY202AUA0000118 ADDC application & inspection (preliminary) 20 ADDC application & inspection (preliminary)
MY202AUA0000119 ADDC Final Application and Inspection for Power and ... 5 ADDC Fin
Achieve NOC Achieve NOC
MY202AUA0000120 Achieve NOC from ADDC to Install the Meters and Pay... 40 Achieve NOC from ADDC to Install the Meters and Pay
MY202AUA0000121 Preliminary ADDC Approval 7 Preliminary ADDC Approval
Statutory Completion Statutory
ADDC - Power Supply ADDC -
MY202AUA0000122 Power Meter Installation and Final Connection 40 Power Meter Installation and Final Conne
MY202AUA0000123 Permanent Power On 1 Permane
ADDC - Water Suply ADDC -
MY202AUA0000124 Water Meter Installation 4 Water Meter Installation
MY202AUA0000125 Permenant Water Supply 1 Permena

Post Construction Po

Preliminary Handing Over Pre

Preliminary Completion Certificate


Certifi Pre
MY202AUH0000100 Building Preliminary Handing Over 2 Bu
Final Handing Over Fin

Tie-in Works Tie-


MY202AUH0000101 Release of Snag List by consultant 5 Release of
MY202AUH0001102 Final Testing & Commissioning 5 Final T
MY202AUH0002103 Final Cleaning for Building 5 Final C
MY202AUH0003104 Final Snagging & Desnagging 0 Fina
Project Close-out and Documentation
Docume Proje
MY202AUH0000105 Submit Operation Manuals and warranties 0 Subm
Demobilization De
MY202AUH0000106 Cleaning and De-mobilization Cle

---

---

---

Actual Units ---


Remaining Early Units
Overallocated Early Units
---
Limit

---
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Month
Remaining Level of Effort Critical Remaining Work Bidder: TASK filter: All Activities
Resource Profile Filter:
Actual Work Milestone