Académique Documents
Professionnel Documents
Culture Documents
Home
Browse Topics
About Us
Testimonials
Media
Contact Us
Join CEP Forum
Search... Search
What is the difference between point of virtual fixity and critical length of lateral
loading for piles?
Posted in Piles Engineering | Email This Post |
Some engineers may get confused about the difference between the two terms i.e. point of virtual fixity and critical length used for piles for resisting lateral loads. For critical length of
lateral loading for piles, it refers to a certain depth from the ground level where the piles behave as if it were infinitely long. As such, beyond the critical length, the change in lateral
response of piles with increase in pile length will be negligible.
Point of virtual fixity refers to a certain dept below ground surface where the piles are fixed without movement under loads. The depth to the point of fixity is useful in assessing the
buckling loads of piles. It is obvious that the depth to the point of virtual fixity should be smaller than the critical length of piles.
Advertisements
https://www.engineeringcivil.com/what-is-the-difference-between-point-of-virtual-fixity-and-critical-length-of-lateral-loading-for-piles.html 1/9
11/15/2018 What is the difference between point of virtual fixity and critical length of lateral loading for piles?
aashiyana.tatasteel.com OPEN
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.
More Entries :
In seismic liquefaction, what is the difference of pile failures mechanism between lateral spreading and buckling?
Is critical depth of piles a fallacy?
What is the difference between capping beams and ground beams for piles?
How do fixed and pinned connections between piles and pile caps affect the load carrying capacity of piles?
Why are sleeves often installed inside the lower part of open-ended driven piles?
Why is sleeving applied in piles constructed on slopes?
For marine pile type of steel tubular piles with reinforced concrete infill, minimum toe level is often specified in contract drawings. What is its purpose?
It is not necessary to design nominal reinforcement to piles. Is it true?
https://www.engineeringcivil.com/what-is-the-difference-between-point-of-virtual-fixity-and-critical-length-of-lateral-loading-for-piles.html 2/9
11/15/2018 What is the difference between point of virtual fixity and critical length of lateral loading for piles?
Building material calculator - Cutting Length of Stirrups Rotary Bored Piling Tools More Useful Measurement
Get a free estimate today Units
My Aradhya needs your Concrete Mix Design – M 20 Research Papers - Page 18 What is the difference between
support Grade Of Concrete free earth support method and
fixed earth support method?
Post a comment
Name
Email
Website
https://www.engineeringcivil.com/what-is-the-difference-between-point-of-virtual-fixity-and-critical-length-of-lateral-loading-for-piles.html 3/9
11/15/2018 What is the difference between point of virtual fixity and critical length of lateral loading for piles?
Share Information
Submit Content
Ask An Expert
https://www.engineeringcivil.com/what-is-the-difference-between-point-of-virtual-fixity-and-critical-length-of-lateral-loading-for-piles.html 4/9
11/15/2018 What is the difference between point of virtual fixity and critical length of lateral loading for piles?
Engineering…
21K likes
Like Page
Knowledge Center
Construction Equipments
Civil Engineering Disasters
Civil Engineering Events
Civil Engineering Facts
Civil Engineering Information
Civil Engineering Notes From Universities
Civil Engineering Presentations
Civil Engineering Quotes
Civil Engineering Videos
Civil Engineering Wonders
Construction Terms
Famous Civil Engineers
Interviews
Material and Site Testing
Measurement Units
Mix Design
Project Reports
Research Papers
Student Corner
Help Others
https://www.engineeringcivil.com/what-is-the-difference-between-point-of-virtual-fixity-and-critical-length-of-lateral-loading-for-piles.html 5/9
11/15/2018 What is the difference between point of virtual fixity and critical length of lateral loading for piles?
Bridges
Civil Engineers And Workers
Construction Equipments
Construction Site
Roads And Highways
Skyscrapers
Award
Top Contributors
You can list yourself here by submitting civil engineering related topics to us.
Sreenivasa Hassan Jayaram
Shubham Sunil Malu
Ramasesh Iyer
Sourav Dutta
Er. Kaushal Kishore
https://www.engineeringcivil.com/what-is-the-difference-between-point-of-virtual-fixity-and-critical-length-of-lateral-loading-for-piles.html 7/9
11/15/2018 What is the difference between point of virtual fixity and critical length of lateral loading for piles?
Vincent T. H. CHU
Join CEP
Recently Added
Aggregates China 2019
CIHIE 2019
PMMHF 2019
STEEL BUILD 2019
Aggregates China 2018
Aerotropolis World Summit 2018
The Road Printer
Common Abbreviation Used in Civil Engineering
10th Prefabrication & Modular Construction Asia Summit 2018
9th Dredging & Land Reclamation Asia Summit 2018
https://www.engineeringcivil.com/what-is-the-difference-between-point-of-virtual-fixity-and-critical-length-of-lateral-loading-for-piles.html 8/9
11/15/2018 What is the difference between point of virtual fixity and critical length of lateral loading for piles?
Engine…
21K likes
Like Page
https://www.engineeringcivil.com/what-is-the-difference-between-point-of-virtual-fixity-and-critical-length-of-lateral-loading-for-piles.html 9/9