Vous êtes sur la page 1sur 14

MGº INGº LUIS DIAZ HUIZA

CIP#36994
TELF.4754256-99004184

PRESUPUESTO
OBRA:
PROPIETARIO:
CONTRATISTA:

ITEM DESCRIPCIÓN UND. CANT.


1.00

0.00
0.00
0.00
1.02
0.00
0.00
0.00
1.03
0.00
0.00
0.00
0.00
2.00
0.00
0.00
COSTO DIRECTO
GASTOS GENERALES ( 15% )
UTILIDAD ( 10 % )
SUBTOTAL
IGV
TOTAL
MGº INGº LUIS DIAZ HUIZA
CIP#36994
TELF.4754256-99004184

STO
FECHA:
UBICACIÓN:
AREA GEOGRÁFICA:

P. UNIT. PARCIAL IMPORTE

0.00 0.00
0.00 0.00
0.00 0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00 0.00

0.00 0.00
0.00 0.00 0.00
TO DIRECTO 0.00
TOS GENERALES ( 15% ) 0.00
IDAD ( 10 % ) 0.00
0.00
0.00
0.00
MGº INGº LUIS DIAZ HUIZA
CIP#36994
TELF.4754256-99004184

ANÁLISIS DE COSTOS

PARTIDA: UND:
DESCRIPCIÓN: FECHA:
CUADRILLA: ELABORADO POR:
RENDIMIENTO:

IU MATERIALES UND CANT. P.UNIT


0.0000 0.00
0.0000 0.00
0.0000 0.00

IU MANO DE OBRA UND CANT. P.UNIT


0.0000 0.00
0.0000 0.00
0.0000 0.00
0.0000 0

IU MAQUINARIA-EQUIPO UND CANT. P.UNIT


0.0000 0.00
0.0000 0.00
0.0000 0.00
MGº INGº LUIS DIAZ HUIZA
CIP#36994
TELF.4754256-99004184

BORADO POR:

P.PARCIAL IMPORTE
0.00
0.00
0.00
0.00

P.PARCIAL IMPORTE
0.00
0.00
0.00
0.00
0.00

P.PARCIAL IMPORTE
0.00
0.00
0.00
0.00

P. UNIT. 0.00
I M

# 1 2
I.U 21 4
ITEM DESCRIPCIÓN UND. CANT. P. UNIT. PARCIAL CEMENTO ARENA G.
1.00 CONCRETEO ARMADO
1.01 COLUMNA
1.01.01 CONCRETO FC= 175 KG/CM2 M3 12.00 333.94 4007.28 1584.84 183.60
1.01.02 ENCOFRA. - DESENCOF. M2 60.00 42.00 2520.00
1.01.03 ACERO CORRUGADO KG 800.00 4.94 3952.00
1.02 VIGA
1.02.01 CONCRETO FC= 175 KG/CM2 M3 8.00 305.15 2441.20 1056.56 122.40
1.02.02 ENCOFRA. - DESENCOF. M2 40.00 46.53 1861.20
1.02.03 ACERO CORRUGADO KG 500.00 4.94 2470.00
1.03 LOSA ALIGERADA
1.03.01 CONCRETO FC= 175 KG/CM2 M3 9.00 279.22 2512.98 1188.63 137.70
1.03.02 ENCOFRA. - DESENCOF. M2 120.00 33.07 3968.40
1.03.03 ACERO CORRUGADO KG 700.00 4.94 3458.00
1.03.04 LADRILLO O.15x0.30x0.30 UND 1020.00 2.67 2723.40
2.00 MUROS
2.01 LADRILLO KK 18 HCO. SOGA M2 30.00 48.84 1465.20 108.00 26.10
2.02 LADRILLO KK 18 HCO. CABE M2 48.00 76.09 3652.32 292.80 83.52
### 4230.83 553.32

SUBTOTAL ###

COEFICIENTE DE INCIDENCIA
COEFICIENTE DEL IMPORTE DE CADA INSUMO Y EL SUBITO DEL PRESUPUESTO
LA SUMA DE LOS C.I DEBEN SER IGUAL A LA UNIDAD

IMPORTE DE CADA INSUMO


CI = SUBTOTAL O.ABC
SUMATORIACI=1.000

IMPORTE 4230.83 553.32


S.T 43,789.98
C.I 0.097 0.013

# 1 2
I.U 21 4
INSUMOS CEMENTO ARENA G.
C.I 0.097 0.013
MAXIMO 8 MONOMIOS FIJOS

OBRA: AMPLIACIÓN DE LABORATORIO


CONTRATISTA: NQT CONTRATISTAS SAC
ESPECIALIDAD: ESTRUCTURAS

MONOMIO DESCRIPCIÓ
CEMENTO P.T 1
1 PIEDRA CHANCADA
MAQUINARIA NACIONAL
LADRILLO ARCILLA
2
ARENA GRUESA
MADERA NACIONAL P/E
3
HERR.
4 ACERO CORRUGADO
5 MANO DE OBRA INC. BS
6 G.G.U

k= 0.133

Ir = INDICE DE PRECIO
Io = INDIDE DE PRECIO
K= COEFICIENTE DE REA
P O R T E DE I

MATERIALES
3 4 5 6 7 8 9
5 43 2 2 2 3 17
PIEDRA CH. MADERA CLAVO ALAM. #8 ALAM. #16 FIERRO LAD. TEC.

410.40
1129.20 42.00 42.00
72.00 2912.00

273.60
776.00 25.20 14.00
45.00 1820.00

307.80
1794.00 42.00 42.00
63.00 2548.00
1999.20

41.70 1.20
66.72 1.92
991.80 3807.62 112.32 98.00 180.00 7280.00 1999.20

SUPUESTO

991.80 3807.62 112.32 98.00 180.00 7280.00 1999.20

0.023 0.087 0.003 0.002 0.004 0.166 0.046

3 4 5 6 7 8 9
5 43 2 2 2 3 17
PIEDRA CH. MADERA CLAVO ALAM. #8 ALAM. #16 FIERRO LAD. TEC.
0.023 0.087 0.003 0.002 0.004 0.166 0.046
0.003 C5 C7 0.004 0.096
0.002 C6 0.17
0.092

INSUMO DESCRIPCION I.U C.I %


CEMENTO 21 0.097 72.93
PIEDRA CHANCADA 5 0.023 17.29
MAQUINARIA 48 0.013 9.77
0.133 100

INSUMO DESCRIPCION I.U C.I %


ARENA G. 4 0.013 11.93
LADRILLO 17 0.096 88.07
0.109 100

INSUMO DESCRIPCION I.U C.I %


MADERA 43 0.092 89.32
HERRE. 37 0.011 10.68
0.103 100

FÓRMULA POLINÓMICA

CIÓN DE LABORATORIO P.B= 43,789.98


NQT CONTRATISTAS SAC FECHA= Jul-12
ESTRUCTURAS AREA GEOGRAFICA: 02

DESCRIPCIÓN SÍMBOLO I.U C.I %


CEMENTO P.T 1 21 72.93
PIEDRA CHANCADA CPM 5 0.133 17.29
MAQUINARIA NACIONAL 48 9.78
LADRILLO ARCILLA 17 11.93
LA 0.109
ARENA GRUESA 4 88.07
MADERA NACIONAL P/ENCOFRADO 43 89.32
DH 0.103
HERR. 37 10.68
ACERO CORRUGADO F 3 0.170 100
MANO DE OBRA INC. BS J 47 0.285 100
G.G.U 39 0.200 100

CPMr+ 0.109 0.103 DHr + 0.170 Fr+


CMPo LAr + LAo DHo Fo

INDICE DE PRECIO DEL ELEMENTO A FECHA DEL MES QUE SE VALORIZA


INDIDE DE PRECIO DEL ELEMENTO A FECHA DEL PRESUPUESTO BASE O VALOR REFERENCIAL
COEFICIENTE DE REAJUSTE
N S M O S

MANO DE OBRA MAQUINARIA


10 11 12 13 14 15 16 17 18
17 47 47 47 47 48 48 48 37
LAD. KK. CAP. OP. OF. PE. MEZC. VIBRA. WINCHE HERRA.

29.52 254.76 218.40 984.84 160.80 120.60 59.52


73.80 636.60 546.00 50.40
144.00 424.00 360.00 40.00

16.88 145.52 62.40 562.72 64.00 48.00 57.60 31.52


59.20 509.60 436.80 40.40
90.00 265.00 225.00 25.00

21.24 137.52 78.66 460.89 57.60 43.20 51.84 27.90


117.60 1018.80 873.60 80.40
126.00 371.00 315.00 35.00
91.80 632.40

555.00 47.10 406.50 251.40 28.20


1632.00 101.28 873.12 540.48 60.48
2187.00 918.42 5042.42 ### 3432.73 282.40 211.80 109.44 478.82

###

2187.00 918.42 5042.42 ### 3432.73 282.40 211.80 109.44 478.82

0.05 0.021 0.115 0.071 0.078 0.006 0.005 0.002 0.011

10 11 12 13 14 15 16 17 18
17 47 47 47 47 48 48 48 37
LAD. KK. CAP. OP. OF. PE. MEZC. VIBRA. WINCHE HERRA.
0.05 0.021 0.115 0.071 0.078 0.006 0.005 0.002 0.011
0.096 0.285 0.013
0.285 Jr + 0.200 G.G.Ur
Jo G.G.Uo

R=V(K-1)
C.I.
19
39
GGU

4007.28
2520.00
3952.00
0.00
2441.20
1861.20
2470.00
0.00
2512.98
3968.40
3458.00
2723.40
0.00
1465.20
3652.32
8758 35031.98

###

0.20

19
39
GGU
0.20 >= 0.05 LA SUMA = LA UNIDAD
INSUMO UND P.UNIT. (S/.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
INDICES UNIFICADOS

IU DESCRIPCION
1 Aceite
2 Acero de construcción liso
3 Acero de construcción corrugado
4 Agregado fino
5 Agregado grueso
6 Alambre y cable de cobre desnudo
7 Alambre y cable tipo TW y TWH
8 Alambre y cable tipo WP
9 Alcantarilla metálica
10 Aparato sanitario con grifería
11 Artefacto de alumbrado exterior
12 Artefacto de alumbrado interior
13 Asfalto
14 Baldosa acústica
15 Baldosa asfáltica
16 Baldosa vinílica
17 Bloque y ladrillo
18 Cable telefónico
19 Cable NYY y NKY
20 Cemento asfáltico
21 Cemento Portland tipo I
22 Cemento Portland tipo II
23 Cemento Portland tipo V
24 Cerámica esmaltada y sin esmaltar
25 Cerrajería importada
26 Cerrajería nacional
27 Desmonte
28 Dinamita
30 Dólar mas inflación mercado USA
31 Ducto de concreto
32 Flete terrestre
33 Flete aéreo
34 Gasolina
37 Herramienta manual
38 Hormigón
39 Indice general de precios al consumidor
40 Loseta
41 Madera en tiras para piso
42 Madera importada para encofrado y carp.
43 Madera nacional para encofrado y carp.
44 Madera terciada para carpintería
45 Madera terciada para encofrado
46 Malla de acero
47 Mano de obra
48 Maquinaria y equipo nacional
49 Maquinaria y equipo importado
50 Marco y tapa de fierro fundido
51 Perfil de acero liviano
52 Perfil de aluminio
53 Petróleo Diesel
54 Pintura látex
55 Pintura temple
56 Plancha de acero LAC
57 Plancha de acero LAF
59 Plancha de asbesto-cemento
60 Plancha de poliuretano
61 Plancha galvanizada
62 Poste de concreto
63 Poste de fierro
64 Terrazo
65 Tubería de acero negro y/o galvanizado
66 Tubería de asbesto-cemento
68 Tubería de cobre
69 Tubería de concreto simple
70 Tubería de concreto reforzado
71 Tubería de fierro fundido
72 Tubería de PVC para agua
73 Ductos telefónicos de PVC
77 Válvula de bronce nacional
78 Válvula de fierro fundido nacional
79 Vidrio incoloro nacional
80 Concreto Premezclado

Vous aimerez peut-être aussi