DIMENSION

DATE STRUCTURE TYPE GL


L W H
11-Sep-17 Pile Cap Ftg. F1 G/3-5 4.4 4.1 1.2
15-Sep-17 Pile Cap Ftg. F3 E/5-8;F/5-8;G/7-8 3.4 2.2 1.2
19-Sep-17 Pile Cap Ftg. F5A H/2-3 3.4 1.5 1
20-Sep-17 Pile Cap Ftg. F2 G/6 4.73 4.1 1.2
F3 E/9-10; F/9; G/9-10 3.4 2.2 1.2
21-Sep-17 Pile Cap Ftg. F5A H/4-5 3.4 1.5 1
23-Sep-17 Pile Cap Ftg. F3 E/11-15 :F/11-12,15 3.4 2.2 1.2
Col. Pedestal C1 G/3-5 0.8 0.8 0.25
Col. Pedestal C2
Col. Pedestal
28-Sep-17 Pile Cap Ftg. F3 F/10,13-14,16; E/16 3.4 2.2 1.2
OCTOBER
03-Oct-17 Col. Pedestal
Tie Beam FTB-2 51.75 0.35 0.8
Tie Beam FTB-3 19.075 0.3 0.7
FTB-Column C2 0.75 0.75 1.8

06-Oct-17 Tie Beam FTB-2 128.25 0.35 0.8


Tie Beam FTB-3 40.5 0.3 0.7
FTB-Column C2 0.75 0.75 1.8
09-Oct-17 Pile Cap Ftg. F6A H/6 3.4 1.5 1
Column-2 (1st lift) C-2 E/5-7; F/5-7 0.75 0.75 2.4
11-Oct-17 Column-2 (1st lift) C-2 E/5-7; F/5-7 0.75 0.75 2.4
F3 G/11 3.6 2.2 1.2
12-Oct-17 Column-2 (1st lift) C-2 E/8-12; F/8-12 0.75 0.75 2.4
Conventional Column H/3-5 0.6 0.6 1.5
14-Oct-17 Conventional Column H/2; H/6 0.6 0.6 1.5
20-Oct-17 Pile Cap Ftg. F3 3.4 2.2 1.2
Tie Beam FTB-2 67.5 0.35 0.8
Tie Beam FTB-3 23.55 0.3 0.7
FTB-Column C2 0.75 0.75 1.8
24-Oct-17 Column-2 (2nd lift) C-2 E/5-11; F/5-11 0.75 0.75 2.2
Tie Beam FTB-1D G-H/3-6 13.6 0.85 1.2
FTB-4 40.675 0.3 0.7
FTB-2 56.675 0.35 0.8
FTB-Column C1 G/3-6 0.8 0.8 1.2
C2 G/7 0.75 0.75 0.9
C3 H/3-6 0.7 0.7 1.2
Retaining Wall RW H/2-6 43.475 0.2 1
28-Oct-17 Column-1 (1st lift) C-1 G/4-5 0.8 0.8 2.4
FTB-2 5/F-G 13.8 0.35 0.8
TESTING SCHEDULE CODE
QTY VOLUME GRIDLINE STRUCTURE
7 1428 Days MARK
3 64.94 66 ######
###
EXAN G/3-5 Pile Cap Ftg. F1
10 89.76 102 ######
###
EXAN E/5-8;F/5-8;G/7-8 Pile Cap Ftg. F3
2 10.20 14 ######
###
EXAN H/2-3 Pile Cap Ftg. F5A
1 23.27 70 ######
###
EXAN G/6 Pile Cap Ftg. F2
5 44.88 E/9-10; F/9; G/9-10 F3
2 10.20 14.5 ######
###
EXAN H/4-5 Pile Cap Ftg. F5A
8 71.81 81 ######
###
EXAN E/11-15 :F/11-12,15 Pile Cap Ftg. F3
3 0.48 G/3-5 Col. Pedestal C1
Col. Pedestal C2
Col. Pedestal
5 44.88 61.5 ######
###
EXAN F/10,13-14,16; E/16 Pile Cap Ftg. F3
.
######
###
EXAN Col. Pedestal
1 14.49 Tie Beam FTB-2
1 4.01 Tie Beam FTB-3
6 6.08 FTB-Column C2

1 35.91 57 ######
###
PRIME MIX Tie Beam FTB-2
1 8.51 Tie Beam FTB-3
11 11.14 FTB-Column C2
1 5.10 18 ######
###
EXAN H/6 Pile Cap Ftg. F6A
6 8.10 E/5-7; F/5-7 Column-2 (1st lift) C-2
10 13.50 ######
###
EXAN E/5-7; F/5-7 Column-2 (1st lift) C-2
1 9.50 G/11 F3
1 1.35 5 ######
###
EXAN E/8-12; F/8-12 Column-2 (1st lift) C-2
3 1.62 H/3-5 Conventional Column
2 1.08 3 ######
###
EXAN H/2; H/6 Conventional Column
4 35.90 71 ######
###
EXAN Pile Cap Ftg. F3
1 18.90 Tie Beam FTB-2
1 4.95 Tie Beam FTB-3
7 7.09 FTB-Column C2
12 14.85 117 ######
###
EXAN E/5-11; F/5-11 Column-2 (2nd lift) C-2
4 55.49 G-H/3-6 Tie Beam FTB-1D
1 8.54 FTB-4
1 15.87 FTB-2
4 3.07 G/3-6 FTB-Column C1
1 0.51 G/7 C2
4 2.35 H/3-6 C3
1 8.70 H/2-6 Retaining Wall RW
2 3.07 10 ######
###
EXAN G/4-5 Column-1 (1st lift) C-1
1 3.86 5/F-G FTB-2
DIMENSION DIMENSION
FACE Qty AREA FACE Qty AREA
L H W H/L
4.4 1.2 2 3 31.68 4.1 1.2 2 3 29.52
3.4 1.2 2 10 81.60 2.2 1.2 2 10 52.8
3.4 1 2 2 13.60 1.5 1 2 2 6
4.73 1.2 2 1 11.35 4.1 1.2 2 1 9.84
3.4 1.2 2 5 40.80 2.2 1.2 2 5 26.4
3.4 1 2 2 13.60 1.5 1 2 2 6
3.4 1.2 2 8 65.28 2.2 1.2 2 8 42.24
0.8 0.25 4 3 2.40
-
-
3.4 1.2 2 5 40.80 2.2 1.2 2 5 26.4
-
-
51.75 0.8 2 1 82.80
19.075 0.7 2 1 26.71
0.75 1.8 4 6 32.40
-
128.25 0.8 2 1 205.20
40.5 0.7 2 1 56.70
0.75 1.8 4 11 59.40
3.4 1 2 1 6.80 1.5 1 2 1 3
0.75 2.4 4 6 43.20
0.75 2.4 4 10 72.00
3.6 1.2 2 1 8.64
0.75 2.4 4 1 7.20
0.6 1.5 4 3 10.80
0.6 1.5 4 2 7.20
3.4 1.2 2 4 32.64 2.2 1.2 2 4 21.12
67.5 0.8 2 1 108.00
23.55 0.7 2 1 32.97
0.75 1.8 4 7 37.80
0.75 2.2 4 12 79.20
13.6 1.2 2 4 130.56
40.675 0.7 2 1 56.95
56.675 0.8 2 1 90.68
0.8 1.2 4 4 15.36
0.75 0.9 4 1 2.70
0.7 1.2 4 4 13.44
43.475 1 1 -
0.8 2.4 4 2 15.36
13.8 0.8 2 1 22.08
TOTAL
AREA
61.20
134.40
19.60
21.19
67.20
19.60
107.52
2.40
-
-
67.20
-
-
82.80
26.71
32.40
-
205.20
56.70
59.40
9.80
43.20
72.00
8.64
7.20
10.80
7.20
53.76
108.00
32.97
37.80
79.20
130.56
56.95
90.68
15.36
2.70
13.44
-
15.36
22.08
DIMENSION
DATE STRUCTURE TYPE GL QTY
L W H
02-Nov-17 Column-1 (1st lift) C1 G/6 0.8 0.8 2.4 1
Column-2 (1st lift) C-2 E/13-15, F/14- 0.75 0.75 2.4 5
Column-2 (2nd lift) C-2 E/11-12, F/12- 0.75 0.75 2.2 4
Column-3 (1st lift) C-3 H/3-5 0.7 0.7 2.4 3
Tie Beam FTB-2 17.25 0.35 0.8 1
FTB-3 6.3 0.3 0.7 1
FTB-Column C-2 16/E-F 0.75 0.75 1.8 2
Tie Beam FTB-2 71.075 0.35 0.8 1
MAPI FTB-Column C-2 G/13-15 0.75 0.75 1.8 3
03-Nov-17 Tie Beam FTB-2 153.025 0.35 0.8 1
MAPI FTB-Column C-2 0.75 0.75 1.8 5
06-Nov-17 Column-1 (1st lift) C1 G/3 0.8 0.8 2.4 1
Column-1 (2nd lift) C1 G/4-6 0.8 0.8 2.2 3
Column-2 (1st lift) C-2 G/8 0.75 0.75 2.4 1
Column-3 (1st lift) C-3 H/6 0.7 0.7 2.4 1
Column-3 (2nd lift) C-3 H/3 0.7 0.7 2.2 1
Pile Cap Ftg. F3 G/2 3.4 2.2 1.2 1
Pile Cap Ftg. F6A H/1 3.4 1.5 1 1
08-Nov-17 Pile Cap Ftg. F3 D/8-11 3.4 2.2 1.2 4
Column-2 (2nd lift) C-2 F/11 0.75 0.75 2.2 1
Column-1 (2nd lift) C1 G/3 0.8 0.8 2.2 1
Column-3 (2nd lift) C-3 H/4-6 0.7 0.7 2.2 3
Column-2 (2nd lift) C-2 G/7 0.75 0.75 2.2 1
10-Nov-17 Pile Cap Ftg. F3 D/7 3.4 2.2 1.2 1
Column-2 (1st lift) C-2 G/13-15 0.75 0.75 2.4 3
11-Nov-17 Pile Cap Ftg. F3 D/12 3.4 2.2 1.2 1
Column-2 (1st lift) C-2 G/10-12; 16/E- 0.75 0.75 2.4 5
Column-2 (2nd lift) C-2 E/13-15, F/14- 0.75 0.75 2.2 5
13-Nov-17 Column-2 (1st lift) C-2 G/8-9 0.75 0.75 2.4 2
14-Nov-17 Pile Cap Ftg. F4 G/1 2.7 2.7 1.1 1
15-Nov-17 Pile Cap Ftg. F3 D/13 3.4 2.2 1.2 1
Conventional Column H/1 0.6 0.6 1.5 1
Col. Pedestal C-2 D/7-9 0.75 0.75 0.8 3
16-Nov-17 Tie Beam FTB-1D G-H/2 13.625 0.85 1.2 1
FTB-2 11.625 0.35 0.7 1
FTB-4 G-H/1 18.325 0.3 0.7 1
FTB-5 6.162 0.3 0.7 1
FTB-6 6.207 0.3 0.6 1
FTB-Column C-2 G/1-2 0.75 0.75 1.2 2
C-3 H/1-2 0.7 0.7 1.2 2
17-Nov-17 Column-2 (2nd lift) C-2 E/16; F/16; G/ 0.75 0.75 2.2 3
20-Nov-17 Column-2 (1st lift) C-2 G/1-2 0.75 0.75 2.4 2
Column-3 (1st lift) C-3 H/1-2 0.7 0.7 2.4 2
22-Nov-17 Pile Cap Ftg. F3 G/16 3.4 2.2 1.2 1
Tower Crane Foundation F-G/14-15 9 9 1.7 1
23-Nov-17 SLAB (Zone 2A) S-1 ZONE 2A 0.15 603.33
FRB-3 H/3-6 26.0417 0.5 0.65 1
FRB-5 G/5-6 10.875 0.65 0.75 1
FRB-6 G/3-5 14.9167 0.65 0.75 1
FRB-11 F-H/4-6 55.59 0.5 0.65 1
FRB-12 G/6-7 4.2 0.5 0.75 1
B-1 F-H/3-6 94.4 0.5 0.65 1
B-8 F-G/6-7 5.08 0.55 0.65 1
SB-1 G/6-7 4.25 0.2 0.25 1
MAPI CB-2 G/6-7 3.55 0.3 0.55 1
Column(3rd lift) C-1 G/4-6 0.8 0.8 1.4 3
Column(3rd lift) C-3 H/4-6 0.7 0.7 1.4 3
23-Nov-17 Column-2 (2nd lift) C-2 G/8-14 0.75 0.75 2.2 7
Tie Beam FTB-2 D-E/10-11 11.625 0.35 0.8 2
D/9-11 16 0.35 0.8 1
FTB-Column C-2 D/10-11 0.75 0.75 1.2 2
Pile Cap Ftg. F5A A/14-15 3.4 1.5 1 2
25-Nov-17 Pile Cap Ftg. F5A A/13 3.4 1.5 1 1
27-Nov-17 Column-3 (2nd lift) C-3 H/1-2 0.75 0.75 2.2 2
Column-2 (2nd lift) C-2 G/1-2 0.75 0.75 2.2 2
Tie Beam FTB-2 D-E/7-9 11.625 0.35 0.8 3
D/6-10 32.6 0.35 0.8 1
C-D/7-9 1 0.35 0.8 3
C-2 D/7-9 0.75 0.75 1.8 3
FTB-2 D-E/11-12 10.625 0.35 0.8 2
D/10-13 21.1 0.35 0.8 1
C-D/12-13 1 0.35 0.8 2
C-2 D/12-13 0.75 0.75 1.8 2
29-Nov-17 Column-2 (1st lift) C-2 D/10-13 0.75 0.75 2.4 4
30-Nov-17 Tie Beam FTB-2 G/15-16 10.25 0.35 0.8 1
F-G/16 13.65 0.35 0.8 1
FTB-Column C-2 G/16 0.75 0.75 1.8 1
Column-2 (1st lift) C-2 D/7-9 0.75 0.75 2.4 3
Pile Cap Ftg. F5A A/10-11 3.4 1.7 1 2
TESTING SCHEDULE CODE DIMENSION
VOLUME GRIDLINE STRUCTURE
7 1428 Days MARK L
1.54 60 ###
###
###EXAN G/6 Column-1 (1st lift) C1 0.8
6.75 E/13-15, F/14-15 Column-2 (1st lift) C-2 0.75
4.95 E/11-12, F/12-13 Column-2 (2nd lift) C-2 0.75
3.53 H/3-5 Column-3 (1st lift) C-3 0.7
4.83 Tie Beam FTB-2 17.25
1.32 FTB-3 6.3
2.03 16/E-F FTB-Column C-2 0.75
19.90 Tie Beam FTB-2 71.075
3.04 G/13-15 FTB-Column C-2 0.75
42.85 58 ###
######EXAN Tie Beam FTB-2 153.025
5.06 FTB-Column C-2 0.75
1.54 29.5 ###
######EXAN G/3 Column-1 (1st lift) C1 0.8
4.22 G/4-6 Column-1 (2nd lift) C1 0.8
1.35 G/8 Column-2 (1st lift) C-2 0.75
1.18 H/6 Column-3 (1st lift) C-3 0.7
1.08 H/3 Column-3 (2nd lift) C-3 0.7
8.98 G/2 Pile Cap Ftg. F3 3.4
5.10 H/1 Pile Cap Ftg. F6A 3.4
35.90 49 ###
######EXAN D/8-11 Pile Cap Ftg. F3 3.4
1.24 F/11 Column-2 (2nd lift) C-2 0.75
1.41 G/3 Column-1 (2nd lift) C1 0.8
3.23 H/4-6 Column-3 (2nd lift) C-3 0.7
1.24 G/7 Column-2 (2nd lift) C-2 0.75
8.98 15 ###
######EXAN D/7 Pile Cap Ftg. F3 3.4
4.05 G/13-15 Column-2 (1st lift) C-2 0.75
8.98 25 ###
######EXAN D/12 Pile Cap Ftg. F3 3.4
6.75 G/10-12; 16/E-F Column-2 (1st lift) C-2 0.75
6.19 E/13-15, F/14-15 Column-2 (2nd lift) C-2 0.75
2.70 5 ###
######EXAN G/8-9 Column-2 (1st lift) C-2 0.75
8.02 9.5 ###
######EXAN G/1 Pile Cap Ftg. F4 2.7
8.98 12 ###
######EXAN D/13 Pile Cap Ftg. F3 3.4
0.54 H/1 Conventional Column 0.6
1.35 D/7-9 Col. Pedestal C-2 0.75
13.90 33.5 ###
######EXAN G-H/2 Tie Beam FTB-1D 13.625
2.85 FTB-2 11.625
3.85 G-H/1 FTB-4 18.325
1.29 FTB-5 6.162
1.12 FTB-6 6.207
1.35 G/1-2 FTB-Column C-2 0.75
1.18 H/1-2 C-3 0.7
3.71 5 ###
######EXAN E/16; F/16; G/15 Column-2 (2nd lift) C-2 0.75
2.70 ###
######EXAN G/1-2 Column-2 (1st lift) C-2 0.75
2.35 H/1-2 Column-3 (1st lift) C-3 0.7
8.98 10 ###
######N. Zircon G/16 Pile Cap Ftg. F3 3.4
137.70 156 ###
######N. Zircon F-G/14-15 Tower Crane Foundati 0 9
90.50 ZONE 2A SLAB (Zone 2A) S-1
8.46 H/3-6 FRB-3 26.0417
5.30 G/5-6 FRB-5 10.875
7.27 G/3-5 FRB-6 14.9167
18.07 F-H/4-6 FRB-11 55.59
1.58 G/6-7 FRB-12 4.2
30.68 F-H/3-6 B-1 94.4
1.82 F-G/6-7 B-8 5.08
0.21 G/6-7 SB-1 4.25
0.59 G/6-7 CB-2 3.55
2.69 G/4-6 C-1 0.8
2.06 H/4-6 C-3 0.7
8.66 44 ###
######N. Zircon G/8-14 Column-2 (2nd lift) C-2 0.75
6.51 D-E/10-11 Tie Beam FTB-2 11.625
4.48 D/9-11 16
1.35 D/10-11 FTB-Column C-2 0.75
10.20 A/14-15 Pile Cap Ftg. F5A 3.4
5.10 7 ###
######EXAN A/13 Pile Cap Ftg. F5A 3.4
2.48 46 ###
######EXAN H/1-2 Column-3 (2nd lift) C-3 0.75
2.48 G/1-2 Column-2 (2nd lift) C-2 0.75
9.77 D-E/7-9 Tie Beam FTB-2 11.625
9.13 D/6-10 32.6
0.84 C-D/7-9 1
3.04 D/7-9 C-2 0.75
5.95 D-E/11-12 FTB-2 10.625
5.91 D/10-13 0 21.1
0.56 C-D/12-13 0 1
2.03 D/12-13 C-2 0.75
5.40 6 ###
######N. Zircon D/10-13 Column-2 (1st lift) C-2 0.75
2.87 ###
######EXAN G/15-16 Tie Beam FTB-2 10.25
3.82 F-G/16 13.65
1.01 G/16 FTB-Column C-2 0.75
4.05 D/7-9 Column-2 (1st lift) C-2 0.75
11.56 A/10-11 Pile Cap Ftg. F5A 3.4
DIMENSION FACE Qty AREA DIMENSION FACE Qty AREA
H L H TOTAL AREA
2.4 4 1 7.68 7.68
2.4 4 5 36 36
2.2 4 4 26.4 26.4
2.4 4 3 20.16 20.16
0.8 2 1 27.6 27.6
0.7 2 1 8.82 8.82
1.8 4 2 10.8 10.8
0.8 2 1 113.72 113.72
1.8 4 3 16.2 16.2
0.8 2 1 244.84 244.84
1.8 2 5 13.5 13.5
2.4 4 1 7.68 7.68
2.2 4 3 21.12 21.12
2.4 4 1 7.2 7.2
2.4 4 1 6.72 6.72
2.2 4 1 6.16 6.16
1.2 2 1 8.16 1.5 1.2 2 1 3.6 11.76
1 2 1 6.8 2.2 1 2 1 4.4 11.2
1.2 2 4 32.64 2.2 1.2 2 4 21.12 53.76
2.2 4 1 6.6 6.6
2.2 4 1 7.04 7.04
2.2 4 3 18.48 18.48
2.2 4 1 6.6 6.6
1.2 2 1 8.16 2.2 1.2 2 1 5.28 13.44
2.4 2 3 10.8 10.8
1.2 2 1 8.16 2.2 1.2 2 1 5.28 13.44
2.4 4 5 36 36
2.2 4 5 33 33
2.4 4 2 14.4 14.4
1.1 2 1 5.94 2.7 1.1 2 1 5.94 11.88
1.2 2 1 8.16 2.2 1.2 2 1 5.28 13.44
1.5 4 1 3.6 3.6
0.8 4 3 7.2 7.2
1.2 2 1 32.7 32.7
0.7 2 1 16.275 16.275
0.7 2 1 25.655 25.655
0.7 2 1 8.6268 8.6268
0.6 2 1 7.4484 7.4484
1.2 4 2 7.2 7.2
1.2 4 2 6.72 6.72
2.2 4 3 19.8 19.8
2.4 4 2 14.4 14.4
2.4 4 2 13.44 13.44
1.2 2 1 8.16 2.2 1.2 2 1 5.28 13.44
1.7 4 1 61.2 61.2
603.33 603.33
0.65 2 1 33.85421 33.85421
0.75 2 1 16.3125 16.3125
0.75 2 1 22.37505 22.37505
0.65 2 1 72.267 72.267
0.75 2 1 6.3 6.3
0.65 2 1 122.72 122.72
0.65 2 1 6.604 6.604
0.25 2 1 2.125 2.125
0.55 2 1 3.905 3.905
1.4 2 3 6.72 6.72
1.4 4 3 11.76 11.76
2.2 4 7 46.2 46.2
0.8 2 2 37.2 37.2
0.8 2 1 25.6 25.6
1.2 4 2 7.2 7.2
1 2 2 13.6 1.5 1 2 2 6 19.6
1 2 1 6.8 1.5 1 2 1 3 9.8
2.2 4 2 13.2 13.2
2.2 4 2 13.2 13.2
0.8 2 3 55.8 55.8
0.8 2 1 52.16 52.16
0.8 2 3 4.8 4.8
1.8 4 3 16.2 16.2
0.8 2 2 34 10.625 0.35 1 2 7.4375 41.4375
0.8 2 1 33.76 21.1 0.35 1 1 7.385 41.145
0.8 2 2 3.2 1 0.35 1 2 0.7 3.9
1.8 4 2 10.8 10.8
2.4 4 4 28.8 28.8
0.8 2 1 16.4 10.25 0.35 1 1 3.5875 19.9875
0.8 2 1 21.84 13.65 0.35 1 1 4.7775 26.6175
1.8 4 1 5.4 5.4
2.4 4 3 21.6 21.6
1 2 2 13.6 1.5 1 2 2 6 19.6
DIMENSION
DATE STRUCTURE TYPE GL QTY
L W H
02-Dec-17 Pile Cap Ftg. F5A A/9 3.4 1.5 1 1
05-Dec-17 Column-2 (2nd lift) C-2 D/10-11 0.75 0.75 2.2 2
SLAB S-1 ZONE 1A 0.15 581.13
Girder FRB-1 H/1-2 6.207 0.3 0.45 1
Girder FRB-2 H/2-3 11.7 0.5 0.65 1
Girder FRB-3 H/3-4 7.93 0.5 0.65 1
Girder FRB-4 G/1-2 4.632 0.35 0.55 1
Girder FRB-5 G/2-3 11.625 0.65 0.75 1
Girder FRB-6 G/3-4 7.88 0.65 0.75 1
Girder FRB-9 G-H/1 11.625 0.6 0.65 1
Girder FRB-10 F-H/2 18.62 0.5 0.65 1
Cant. Beam FRB-11 F-H/3 18.53 0.5 0.65 1
Int. Beam B-1 F-H/2-4 18.88 0.5 0.65 4
Int. Beam B-10 G-H/1-2 6.407 0.3 0.45 2
Int. Beam B-10 F-G/1-2 4.757 0.3 0.45 1
Ext. Beam SB-1 G-H/1 12.325 0.2 0.25 1
Ext. Beam SB-7 G-H/1-2 6.407 0.2 0.3 1
Cant. Beam CB-1 G-H/1 2.95 0.3 0.5 4
Column(3rd lift) C-1 G/3 0.8 0.8 1.4 1
Column(3rd lift) C-2 G/2-3 0.75 0.75 1.4 1
Column(3rd lift) C-3 H/1-3 0.7 0.7 1.4 3
06-Dec-17 SLAB S-1 ZONE 1C 0.15 417.8
FRB-8 F/10-12 11.3 0.6 0.65 1

FRB-11 F-G/11 14.825 0.5 0.65 1


FRB-11 F-G/12 9.885 0.5 0.65 1
FRB-12 G/10-13 19.8 0.5 0.75 1
FRB-14 E-F/11 4.2 0.3 0.45 1
B-2 E-F/11-12 4.35 0.3 0.45 1
B-8 F-G/11-13 39.91 0.55 0.65 1
CB-2 G/11-12 3.425 0.5 0.25 2
CB-2 G/11-12 3.55 0.5 0.25 3
SB-1 G/11-12 21.3 0.2 0.25 1
SB-3 E-F/11-12 1.825 0.2 0.3 1
SB-5 E-F/11-12 4.35 0.3 0.45 1
Column(3rd lift) C-2 G/1-2 0.75 0.75 1.4 3
MAPI Pile Cap Ftg. F5A A/7-8 3.4 1.5 1 2
08-Dec-17 Column-2 (2nd lift) C-2 D/12-13 0.75 0.75 2.2 2
Pile Cap Ftg. F5A A/5-6 3.4 1.5 1 2
12-Dec-17 Pile Cap Ftg. F5A A/4; A/12 3.4 1.5 1 2
Column-2 (1st lift) C-2 G/16 0.75 0.75 2.4 1
13-Dec-17 Pile Cap Ftg. F3 D/14 3.4 2.2 1.2 1
14-Dec-17 SLAB S-1 0.15 272.82
Girder FRB-8 E/9-12 22.425 0.6 0.65 1
Girder FRB-14 E-F/10-11 2.1 0.3 0.45 2
Girder FRB-19 D-E/10-11 8.725 0.45 0.55 2
Int. Beam B-2 E-F/10-12 2.25 0.3 0.45 3
Int. Beam B-14 D-E/10-12 8.725 0.45 0.55 4
Ext. Beam SB-5 E-F/11-12 2.25 0.3 0.45 1
Column(3rd lift) C-2 E/10-11 0.75 0.75 1.4 2
16-Dec-17 Pile Cap Ftg. F3 D/15 3.4 2.2 1.2 1
SLAB S-1 Zone 1B-4B 0.15 644.66
FRB-8 11.075 0.6 0.65 2
FRB-11 40.4586 0.5 0.65 1
FRB-12 27.275 0.5 0.75 1
FRB-14 6.3 0.3 0.45 1
FRB-19 2.9 0.45 0.55 1
B-2 6.6 0.3 0.45 1
B-3 2.9 0.45 0.55 2
B-8 12.9418 0.55 0.65 2
B-8 14.95 0.55 0.65 2
CB-2 3.425 0.5 0.25 3
CB-2 3.55 0.5 0.25 4
SB-1 29.525 0.2 0.25 1
SB-4 2 0.25 0.35 1
SB-5 6.6 0.3 0.45 1
Column(3rd lift) C-2 G/7-9; E-F/9 0.75 0.75 1.4 5
18-Dec-17 Column-2 (2nd lift) C-2 D/7-9; G/16 0.75 0.75 2.2 4
19-Dec-17 FTB FTB-1B,1C 2.5 0.5 1.6 3
FTB-4 30.227 0.3 0.7 1
C-3 0.7 0.7 2 3
CC 0.4 0.4 1 3
CODE DIMENSION
VOLUME GRIDLINE STRUCTURE
Subcon MARK L H
5.10 8 EXAN A/9 Pile Cap Ftg. F5A 3.4 1
2.48 Admin 5 N. Zirc D/10-11 Column-2 (2nd lift)C-2 0.75 2.2
87.17 SJMKS ZONE 1A SLAB S-1 0.15
0.84 H/1-2 FRB-1 6.207 0.45
3.80 H/2-3 FRB-2 11.7 0.65
2.58 H/3-4 FRB-3 7.93 0.65
0.89 G/1-2 FRB-4 4.632 0.55
5.67 G/2-3 FRB-5 11.625 0.75
3.84 G/3-4 FRB-6 7.88 0.75
4.53 G-H/1 FRB-9 11.625 0.65
6.05 F-H/2 FRB-10 18.62 0.65
6.02 F-H/3 FRB-11 18.53 0.65
24.54 F-H/2-4 B-1 18.88 0.65
1.73 G-H/1-2 B-10 6.407 0.45
0.64 F-G/1-2 B-10 4.757 0.45
0.62 G-H/1 SB-1 12.325 0.25
0.38 G-H/1-2 SB-7 6.407 0.3
1.77 G-H/1 CB-1 2.95 0.5
0.90 G/3 C-1 0.8 1.4
0.79 G/2-3 C-2 0.75 1.4
2.06 H/1-3 C-3 0.7 1.4
62.67 VE 107 N. Zirc ZONE 1C 0.15
4.41 F/10-12 FRB-8 11.3 0.65

4.82 F-G/11 FRB-11 14.825 0.65


3.21 F-G/12 FRB-11 9.885 0.65
7.43 G/10-13 FRB-12 19.8 0.75
0.57 E-F/11 FRB-14 4.2 0.45
0.59 E-F/11-12 B-2 4.35 0.45
14.27 F-G/11-13 B-8 39.91 0.65
0.86 G/11-12 CB-2 3.425 0.25
1.33 G/11-12 CB-2 3.55 0.25
1.07 G/11-12 SB-1 21.3 0.25
0.11 E-F/11-12 SB-3 1.825 0.3
0.59 E-F/11-12 SB-5 4.35 0.45
2.36 G/1-2 C-2 0.75 1.4
10.20 VE 13 EXAN A/7-8 Pile Cap Ftg. F5A 3.4 1
2.48 Admin 16 D/12-13 Column-2 (2nd lift)C-2 0.75 2.2
10.20 VE N. Zirc A/5-6 Pile Cap Ftg. F5A 3.4 1
10.20 Admin N. Zirc A/4; A/12 Pile Cap Ftg. F5A 3.4 1
1.35 Admin G/16 Column-2 (1st lift) C-2 0.75 2.4
8.98 Admin D/14 Pile Cap Ftg. F3 3.4 1.2
40.923 VE SLAB S-1
8.75 E/9-12 Girder FRB-8 22.425 0.65
0.57 E-F/10-11 Girder FRB-14 2.1 0.45
4.32 D-E/10-11 Girder FRB-19 8.725 0.55
0.91 E-F/10-12 Int. Beam B-2 2.25 0.45
8.64 D-E/10-12 Int. Beam B-14 8.725 0.55
0.30 E-F/11-12 Ext. Beam SB-5 2.25 0.45
1.58 E/10-11 Column(3rd lift) C-2 0.75 1.4
8.98 Admin nz D/15 Pile Cap Ftg. F3 3.4 1.2
96.70 VE exan Zone 1B-4B SLAB S-1
8.64 FRB-8 11.075 0.65
13.15 FRB-11 40.4586 0.65
10.23 FRB-12 27.275 0.75
0.85 FRB-14 6.3 0.45
0.72 FRB-19 2.9 0.55
0.89 B-2 6.6 0.45
1.44 B-3 2.9 0.55
9.25 B-8 12.9418 0.65
10.69 B-8 14.95 0.65
1.28 CB-2 3.425 0.25
1.78 CB-2 3.55 0.25
1.48 SB-1 29.525 0.25
0.18 SB-4 2 0.35
0.89 SB-5 6.6 0.45
3.94 G/7-9; E-F/9 Column(3rd lift) C-2 0.75 1.4
4.95 Admin D/7-9; G/16 Column-2 (2nd lift)C-2 0.75 2.2
6.00 Admin FTB FTB-1B,1C 2.5 1.6
6.35 FTB-4 30.227 0.7
2.94 C-3 0.7 2
0.48 CC 0.4 1
DIMENSION
FACE Qty AREA FACE Qty AREA
W H TOTAL AREA
2 1 6.80 1.5 1 2 1 3 9.80
4 2 13.2 13.2
581.13 581.13
2 1 5.59 5.59
2 1 15.21 15.21
2 1 10.31 10.31
2 1 5.10 5.10
2 1 17.44 17.44
2 1 11.82 11.82
2 1 15.11 15.11
2 1 24.21 24.21
2 1 24.09 24.09
2 4 98.18 98.18
2 2 11.53 11.53
2 1 4.28 4.28
2 1 6.16 6.16
2 1 3.84 3.84
2 4 11.80 11.80
4 1 4.48 4.48
4 1 4.20 4.20
4 3 11.76 11.76
417.8 417.80
2 1 14.69 14.69

2 1 19.27 19.27
2 1 12.85 12.85
2 1 29.70 29.70
2 1 3.78 3.78
2 1 3.92 3.92
2 1 51.88 51.88
2 2 3.43 3.43
2 3 5.33 5.33
2 1 10.65 10.65
2 1 1.10 1.10
2 1 3.92 3.92
4 3 12.60 12.60
2 2 13.60 1.5 1 2 2 6 19.60
4 2 13.2 13.20
2 2 13.60 1.5 1 2 2 6 19.60
2 2 13.60 1.5 1 2 2 6 19.60
4 1 7.2 7.20
2 1 8.16 2.2 1.2 2 1 5.28 13.44
272.82 272.82
2 1 29.15 29.15
2 2 3.78 3.78
2 2 19.20 19.20
2 3 6.08 6.08
2 4 38.39 38.39
2 1 2.03 2.03
4 2 8.40 8.40
2 1 8.16 2.2 1.2 2 1 5.28 13.44
644.66 644.66
2 2 28.80 28.80
2 1 52.60 52.60
2 1 40.91 40.91
2 1 5.67 5.67
2 1 3.19 3.19
2 1 5.94 5.94
2 2 6.38 6.38
2 2 33.65 33.65
2 2 38.87 38.87
2 3 5.14 5.14
2 4 7.10 7.10
2 1 14.76 14.76
2 1 1.40 1.40
2 1 5.94 5.94
4 5 21.00 21.00
4 4 26.40 26.40
2 3 24.00 24.00
2 1 42.32 42.32
4 3 16.80 16.80
4 3 4.80 4.80
DIMENSION
DATE STRUCTURE TYPE LEVEL GL
L W
03-Jan-18 Pile Cap Ftg. F3 D/16 3.4 2.2
Column (1st lift) C2 2F F/11; G/11-12 0.75 0.75
04-Jan-18 Tie Beam FTB-2 D-E/14-16 66.875 0.35
MAPI FTB-Column C-2 D/14-16 0.75 0.75
05-Jan-18 Pile Cap Ftg. F5A A/16 3.4 1.5
08-Jan-18 Column (1st lift) C2 GF D/14-16 0.75 0.75
09-Jan-18 Column (1st lift) C3 GF A/13-15 0.7 0.7
10-Jan-18 SLAB S-1 2F
FRB-8 2F E/7-8; F/7-8 38.325 0.6
FRB-11 2F F-G/7, 8 3.83 0.5
FRB-14 2F E-F/7; E-F/8 12.775 0.3
FRB-18 2F C-D/7-9 2.9 0.45
FRB-19 2F D-E/7, 8, 9 31.975 0.45
FRB-27 2F D/7-9 33.2 0.55
B-2 2F 2.25 0.3
B-3 2F D-E/7-9 64.55 0.45
B-4 2F C-D/7-9 3 0.45
B-8 2F F-G/7-8 2 0.55
SB-1 2F 2.4 0.2
SB-3 2F 6.61 0.25
Column(3rd lift) C-2 2F D/7-9; E/7-8; F/7-8 0.75 0.75
Column (1st lift) C2 2F E/10-11 0.75 0.75
Tie Beam FTB-1A,1B 2.5 0.5
Tie Beam FTB-4 33.993 0.3
FTB-Column C-3 A/10-12 0.7 0.7
Cvntl Column A/10-12 0.4 0.4
13-Jan-18 Column (1st lift) C1 2F G/3-6 0.8 0.8
Column (1st lift) C2 2F G/2 0.75 0.75
Column (1st lift) C3 2F H/3-6 0.7 0.7
SLAB S-1 2F
FRB-8 2F 17.025 0.6
FRB-11 2F 19.765 0.5
FRB-12 2F 8.525 0.5
FRB-14 2F 6.3 0.3
FRB-19 2F 8.725 0.45
B-3 2F 8.725 0.45
B-8 2F 19.89 0.55
SB-1 2F 14.45 0.2
SB-3 2F 6.6 0.25
CB-2 2F 6.975 0.5
Column(3rd lift) C-2 2F 0.75 0.75
Column (2nd lift) C2 GF 0.75 0.75
16-Jan-18 Tie Beam FTB-1A,1B 2.5 0.5
Tie Beam FTB-4 44.012 0.3
FTB-Column C-3 A/7-10 0.7 0.7
Cvntl Column A/7-10 0.6 0.6
Column (1st lift) C2 2F D-F/7-8; G/7 0.75 0.75
Column (2nd lift) C1 2F G/3-6 0.8 0.8
Column (2nd lift) C2 2F G/2 0.75 0.75
MAPI Column (2nd lift) C3 2F H/3-6 0.7 0.7
18-Jan-18 Column (2nd lift) C2 2F E/11; F/11; G/11-12 0.75 0.75
19-Jan-18 SLAB S-1 2F Zone 2C,4C
FRB-8 2F 18.1 0.6
FRB-14 2F 5.3 0.3
FRB-19 2F 8.725 0.45
B-2 2F 5.45 0.3
B-3 2F 8.725 0.45
Column(3rd lift) C-2 2F E/14 0.75 0.75
Column (2nd lift) C2 2F D/7-9; E/8-10; F/9 0.75 0.75
Column (1st lift) C2 2F E/12-13; F12-13; G/13 0.75 0.75
22-Jan-18 Column (2nd lift) C2 2F E/7; F-7-8; G/7 0.75 0.75
Column (2nd lift) C2 2F E/12-13; F12-13; G/13 0.75 0.75
FTB-4 7.55 0.3
FTB-1C 2.5 0.5
FTB-Column C-3 A/16 0.7 0.7
Cvntl Column A/16 0.6 0.6

24-Jan-18 SLAB S-1 3F Zone 1A-2A-1B


FRB-2 3F H/5-6 10.975 0.5
FRB-3 3F H/2-5 25.15 0.5
FRB-5 3F G/5-6 10.875 0.65
FRB-6 3F G/2-5 24.9 0.65
FRB-11 3F F-H/3,4,5,6 15.6 0.5
FRB-12 3F G/6-7 1.5 0.5
B-1 3F F-H/3-6 15.95 0.5
SB-1 3F G/6-7 1.55 0.2
Column (3rd lift) C1 3F G/3-6 0.8 0.8
Column (3rd lift) C3 3F H/3-6 0.7 0.7
Column (1st lift) C-3 GF A/7-12 0.7 0.7
26-Jan-18 SLAB S-1 2F Zone 1A
FRB-4 2F 1.35 0.35
FRB-9 2F 6.955 0.6
B-10 2F 1.5 0.3
CB-1 2F 2.95 0.3
SB-1 2F 7.705 0.2
Column(3rd lift) C-2 2F G/1 0.75 0.75
Pile Cap F-7 Fdtn A/3
26-Jan-18 SLAB S-1 2F Zone 2C-4C
FRB-8 26.9 0.6
FRB-11 29.3 0.5
FRB-12 14.15 0.5
FRB-14 12.95 0.3
FRB-18 11.6 0.45
FRB-19 29.05 0.45
FRB-27 36.65 0.55
FCB-1 9.65 0.6
FCB-2 4.825 0.5
FCB-3 4.825 0.55
B-2 20.1 0.3
B-3 47.175 0.45
B-4 21 0.45
B-8 44.55 0.55
SB-1 20.475 0.2
CB-2 17.375 0.3
Column(3rd lift) C-2 2F D/13-16; E,F,G/15-16 0.75 0.75
Column (1st lift) C-3 GF A/16 0.7 0.7
30-Jan-18 Column (1st lift) C2 2F D/16; E/14-16; F/15-16; 0.75 0.75
31-Jan-18 SLAB S-1 2F ZONE 1C-2C
FRB-8 16.7 0.6
FRB-11 10.042 0.5
FRB-12 5.638 0.5
FRB-14 1 0.3
B-2 4.6 0.3
B-8 49.984 0.5
CB-2 7.1 0.3
SB-1 5.638 0.2
Column(3rd lift) C-2 2F F/14 0.75 0.75
Escalator pit wall 13.2 0.25
STAIR LANDING 5.1 2.43
2.52 2.55

Column (2nd lift) C3 2F H/1-2 0.7 0.7


Column (1st lift) C2 2F 0.75 0.75
DIMENSION
QTY VOLUME GRIDLINE STRUCTURE
H Subcon CPR AV BP
1 1 7.48 ADMIN 14.5 EXAN D/16 Pile Cap Ftg.
2.4 3 4.05 ADMIN F/11; G/11-12 Column (1st lift)
0.8 1 18.73 ADMIN 26 EXAN D-E/14-16 Tie Beam
1.8 3 3.04 ADMIN D/14-16 FTB-Column
1 1 5.10 VE A/16 Pile Cap Ftg.
2.4 3 4.05 VE 49 8 NZ D/14-16 Column (1st lift)
2.4 3 3.53 VE 49 4 EXAN A/13-15 Column (1st lift)
0.15 659.48 98.92 VE 50 NZ SLAB
0.65 1 14.95 E/7-8; F/7-8
0.65 1 1.24 F-G/7, 8
0.45 1 1.72 E-F/7; E-F/8
0.55 3 2.15 C-D/7-9
0.55 1 7.91 D-E/7, 8, 9
0.75 1 13.70 D/7-9
0.45 2 0.61 0
0.55 1 15.98 D-E/7-9
0.55 6 4.46 C-D/7-9
0.65 2 1.43 F-G/7-8
0.25 2 0.24
0.4 3 1.98
1.4 7 5.51 D/7-9; E/7-8; F/7-8 Column(3rd lift)
2.4 2 2.70 VE 50 NZ E/10-11 Column (1st lift)
1.6 3 6.00 ADMIN 51 NZ
0.7 1 7.14
1.8 3 2.65
1 3 0.48
2.4 4 6.144 SJM 52 13 EXAN G/3-6 Column (1st lift)
2.4 1 1.35 G/2 Column (1st lift)
2.4 4 4.704 H/3-6 Column (1st lift)
0.15 492.44 73.87 VE 53 116 NZ SLAB
0.65 2 13.28 VE
0.65 1 6.42 VE
0.75 1 3.20 VE
0.45 2 1.70 VE
0.55 2 4.32 VE
0.55 2 4.32 VE
0.65 1 7.11 VE
0.25 1 0.72 VE
0.4 3 1.98 VE
0.25 1 0.87 VE
1.4 5 3.94 VE Column(3rd lift)
2.2 3 3.7125 VE Column (2nd lift)
1.6 4 8.00 VE 54 EXAN Tie Beam
0.7 1 9.24 VE Tie Beam
1.8 4 3.53 VE A/7-10 FTB-Column
1 4 1.44 VE A/7-10 Cvntl Column
2.4 10 13.5 SJM 55 EXAN Column (1st lift)
2.2 4 5.632 SJM 52 13 EXAN G/3-6 Column (2nd lift)
2.4 1 1.35 SJM G/2 Column (2nd lift)
2.4 4 4.704 SJM H/3-6 Column (2nd lift)
1.9 4 4.275 VE 56 EXAN E/11; F/11; G/11-12 Column (2nd lift)
0.15 278.51 41.78 VE 57 NZ Zone 2C,4C SLAB
0.65 1 2.44 VE 0 30-Dec-99
0.45 1 2.07 VE 0 30-Dec-99
0.55 1 2.16 VE 0 30-Dec-99
0.45 4 2.94 VE 0 30-Dec-99
0.55 4 8.64 VE 0 30-Dec-99
1.4 1 0.79 VE E/14 Column(3rd lift)
1.9 7 7.48 VE D/7-9; E/8-10; F/9 Column (2nd lift)
2.4 5 6.75 VE E/12-13; F12-13; G/13Column (1st lift)
1.9 4 4.28 ADMIN 58 EXAN E/7; F-7-8; G/7 Column (2nd lift)
1.9 5 5.34 VE 59 E/12-13; F12-13; G/13Column (2nd lift)
0.7 1 1.59 VE 0 30-Dec-99
1.6 1 2.00 VE 0 30-Dec-99
1.8 1 0.88 VE A/16 FTB-Column
1 1 0.36 VE A/16 Cvntl Column
0
0.15 675.54 101.33 VE-SJM 60 EXAN Zone 1A-2A-1B SLAB
0.65 1 3.57 H/5-6
0.65 1 8.17 H/2-5
0.75 1 5.30 G/5-6
0.75 1 12.14 G/2-5
0.65 4 20.28 F-H/3,4,5,6
0.75 1 0.56 G/6-7
0.65 6 31.10 F-H/3-6
0.25 1 0.08 G/6-7
1 4 2.56 G/3-6 Column (3rd lift)
1 4 1.96 H/3-6 Column (3rd lift)
2.4 6 7.06 VE 61 EXAN A/7-12 Column (1st lift)
0.15 40.45 6.07 VE-SJM EXAN Zone 1A SLAB
0.55 1 0.26
0.65 1 2.71
0.45 1 0.20
0.5 2 0.89
0.25 1 0.39
1.4 1 0.79 G/1 Column(3rd lift)
ADMIN A/3 Pile Cap
0.15 979.925 146.99 VE 62 253 PH Zone 2C-4C SLAB
0.65 1 10.49
0.65 1 9.52
0.75 1 5.31
0.45 1 1.75
0.55 1 2.87
0.55 1 7.19
0.75 1 15.12
0.65 1 3.76
0.75 1 1.81
0.75 1 1.99
0.45 1 2.71
0.55 1 11.68
0.55 1 5.20
0.65 1 15.93
0.25 1 1.02
0.4 1 2.09
1.4 10 7.88 D/13-16; E,F,G/15-16 Column(3rd lift)
2.4 1 1.18 VE A/16 Column (1st lift)
2.4 7 9.45 VE 63 Column (1st lift)
0.15 253.4 38.01 VE 64 ZONE 1C-2C SLAB
0.65 1 6.51
0.65 1 3.26
0.75 1 2.11
0.45 1 0.14
0.45 1 0.62
0.65 1 16.24
0.4 1 0.85
0.25 1 0.28
1.4 1 0.79 F/14 Column(3rd lift)
1.05 1 3.47 ADMIN Escalator pit wall
0.15 1 1.86 ADMIN STAIR LANDING
0.2 2 2.57 ADMIN

1.9 2 1.86
2.4 3 4.05 64
CODE DIMENSION DIMENSION
FACE Qty AREA FACE Qty
MARK L H W H/L
F3 3.4 1 2 1 6.80 2.2 1 2 1
C2 0.75 2.4 4 3 21.60
FTB-2 66.875 0.8 2 1 107.00
C-2 0.75 1.8 4 3 16.20
F5A 3.4 1 2 1 6.80 1.5 1 2 1
C2 0.75 2.4 4 3 21.60
C3 0.7 2.4 4 3 20.16
S-1 659.48
FRB-8 38.325 0.65 2 1 49.82
FRB-11 3.83 0.65 2 1 4.98
FRB-14 12.775 0.45 2 1 11.50
FRB-18 2.9 0.55 2 3 9.57
FRB-19 31.975 0.55 2 1 35.17
FRB-27 33.2 0.75 2 1 49.80
B-2 2.25 0.45 2 2 4.05
B-3 64.55 0.55 2 1 71.01
B-4 3 0.55 2 6 19.80
B-8 2 0.65 2 2 5.20
SB-1 2.4 0.25 2 2 2.40
SB-3 6.61 0.4 2 3 15.86
C-2 0.75 1.4 4 7 29.40
C2 0.75 2.4 4 2 14.40
FTB-1A,1B 2.5 1.6 2 3 24.00
FTB-4 33.993 0.7 2 1 47.59
C-3 0.7 1.8 4 3 15.12
0 0.4 1 4 3 4.80
C1 0.8 2.4 4 4 30.72
C2 0.75 2.4 4 1 7.20
C3 0.7 2.4 4 4 26.88
S-1 492.44
FRB-8 17.025 0.65 2 2 44.265
FRB-11 19.765 0.65 2 1 25.6945
FRB-12 8.525 0.75 2 1 12.7875
FRB-14 6.3 0.45 2 2 11.34
FRB-19 8.725 0.55 2 2 19.195
B-3 8.725 0.55 2 2 19.195
B-8 19.89 0.65 2 1 25.857
SB-1 14.45 0.25 2 1 7.225
SB-3 6.6 0.4 2 3 15.84
CB-2 6.975 0.25 2 1 3.4875
C-2 0.75 1.4 4 5 21
C2 0.75 2.2 4 3 19.8
FTB-1A,1B 2.5 1.6 2 4 32
FTB-4 44.012 0.7 2 1 61.6168
C-3 0.7 1.8 4 4 20.16
0.6 1 4 4 9.6
C2 0.75 2.4 4 10 72
C1 0.8 2.2 4 4 28.16
C2 0.75 2.4 4 1 7.20
C3 0.7 2.4 4 4 26.88
C2 0.75 1.9 4 4 22.80
S-1 0 0.15 1 278.51 -
FRB-14 18.1 0.45 2 1 16.29
#REF! 5.3 0.65 2 1 6.89
FRB-19 8.725 0.55 2 1 9.60
B-2 5.45 0.45 2 4 19.62
B-3 8.725 0.55 2 4 38.39
C-2 0.75 1.4 4 1 4.20
C2 0.75 1.9 4 7 39.90
C2 0.75 2.4 4 5 36.00
C2 0.75 1.9 4 4 22.80
C2 0.75 1.9 4 5 28.50
FTB-4 7.55 0.7 2 1 10.57
FTB-1C 2.5 1.6 2 1 8.00
C-3 0.7 1.8 4 1 5.04
0 0.6 1 4 1 2.40
0 0 0 0 -
S-1 0 0.15 1 675.54 -
FRB-2 10.975 0.65 2 1 14.27
FRB-3 25.15 0.65 2 1 32.70
FRB-5 10.875 0.75 2 1 16.31
FRB-6 24.9 0.75 2 1 37.35
FRB-11 15.6 0.65 2 4 81.12
FRB-12 1.5 0.75 2 1 2.25
B-1 15.95 0.65 2 6 124.41
SB-1 1.55 0.25 2 1 0.78
C1 0.8 1 4 4 12.80
C3 0.7 1 4 4 11.20
C-3 0.7 2.4 4 6 40.32
S-1 0 0.15 1 40.45 -
FRB-4 1.35 0.55 2 1 1.49
FRB-9 6.955 0.65 2 1 9.04
B-10 1.5 0.45 2 1 1.35
CB-1 2.95 0.5 2 2 5.90
SB-1 7.705 0.25 2 1 3.85
C-2 0.75 1.4 4 1 4.20
F-7 0 0 2 0 -
S-1 0 0.15 1 979.925 -
FRB-8 26.9 0.65 2 1 34.97
FRB-11 29.3 0.65 2 1 38.09
FRB-12 14.15 0.75 2 1 21.23
FRB-14 12.95 0.45 2 1 11.66
FRB-18 11.6 0.55 2 1 12.76
FRB-19 29.05 0.55 2 1 31.96
FRB-27 36.65 0.75 2 1 54.98
FCB-1 9.65 0.65 2 1 12.55
FCB-2 4.825 0.75 2 1 7.24
FCB-3 4.825 0.75 2 1 7.24
B-2 20.1 0.45 2 1 18.09
B-3 47.175 0.55 2 1 51.89
B-4 21 0.55 2 1 23.10
B-8 44.55 0.65 2 1 57.92
SB-1 20.475 0.25 2 1 10.24
CB-2 17.375 0.4 2 1 13.90
C-2 0.75 1.4 4 10 42.00
C-3 0.7 2.4 4 1 6.72
C2 0.75 2.4 4 7 50.40
S-1 0 0.15 1 253.4 -
FRB-8 16.7 0.65 2 1 21.71
FRB-11 10.042 0.65 2 1 13.05
FRB-12 5.638 0.75 2 1 8.46
FRB-14 1 0.45 2 1 0.90
B-2 4.6 0.45 2 1 4.14
B-8 49.984 0.65 2 1 64.98
CB-2 7.1 0.4 2 1 5.68
SB-1 5.638 0.25 2 1 2.82
C-2 0.75 1.4 4 1 4.20
0 13.2 1.05 2 1 27.72
0 5.1 0.15 1 1 0.77
AREA TOTAL
AREA
4.4 11.20
21.60
107.00
16.20
3 9.80
21.60
20.16
659.48
49.82
4.98
11.50
9.57
35.17
49.80
4.05
71.01
19.80
5.20
2.40
15.86
29.40
14.40
24.00
47.59
15.12
4.80
30.72
7.20
26.88
492.44
44.27
25.69
12.79
11.34
19.20
19.20
25.86
7.23
15.84
3.49
21.00
19.80
32.00
61.62
20.16
9.60
72.00
28.16
7.20
26.88
22.80
DIMENSION
DATE STRUCTURE TYPE LEVEL GL QTY
L W H
01-Feb-18 FTB FTB-4 Fdtn A/3-6 42.236 0.3 0.7 1
FTB FTB-1 Fdtn A/3-6 2.4 0.55 1.6 4
FTB-Column C-3 Fdtn A/3-6 0.7 0.7 1.6 4
Cnvt'l Column Fdtn A/3-6 0.6 0.6 1 4
SLAB S-1 3F ZONE 3B-4B 0.15 519.92
Girder FRB-8 3F 26.375 0.6 0.65 1
Girder FRB-14 3F 4.2 0.3 0.45 3
Girder FRB-18 3F 2 0.45 0.55 3
Girder FRB-19 3F 34.892 0.45 0.55 1
Girder FRB-27 3F 26.75 0.55 0.75 1
Int. Beam B-2 3F 4.33 0.3 0.45 1
Int. Beam B-3 3F 11.74 0.45 0.55 4
Int. Beam B-4 3F 2.1 0.45 0.55 4
Ext. Beam SB-1 3F 2.4 0.2 0.25 1
Ext. Beam SB-3 3F 4.33 0.25 0.4 3
Ext. Beam SB-5 3F 4.33 0.3 0.45 1
Col. (3rd lift) C-2 3F D/7-9; F/7 0.75 0.75 1 6
02-Feb-18 Column (1st lifC-2 2F G/13-15 0.75 0.75 2.4 3
Column(2nd lifC-2 2F E/14-15; F 0.75 0.75 1.9 5
03-Feb-18 STAIR 2.6746 0.7208
STAIR 2.6746 0.6248
LANDING 5.45 0.4326
05-Feb-18 SLAB S-1 2F 0.15 704.98
Girder FRB-8 22.975 0.6 0.65 1
Girder FRB-12 17.05 0.5 0.75 1
Girder FRB-14 4.2 0.3 0.45 1
Girder FRB-18 2.9 0.45 0.55 2
Girder FRB-19 2.9 0.45 0.55 3
Girder FRB-27 39.575 0.55 0.75 1
Int. Beam B-2 10.95 0.3 0.45 2
Int. Beam B-3 14.725 0.45 0.55 2
Int. Beam B-4 3 0.45 0.55 4
Int. Beam B-8 14.95 0.55 0.65 6
Int. Beam B-14 3.1 0.45 0.55 4
Ext. Beam SB-1 17.8 0.2 0.25 1
Ext. Beam SB-7 13.54 0.2 0.3 1
Cant. Baem CB-2 3.55 0.3 0.4 4
Cant. Baem CB-2 3.425 0.3 0.4 1
Cant. Baem CB2 3.325 0.5 0.5 1
Esc. Pit Wall W1 13.2 0.25 1.1 1
Col. (3rd lift) C-2 D/10-12; F 0.75 0.75 1.4 5
SLAB S-1 2F G/13-15 0.15 108.17
Girder FRB-12 2F G/13-15 11.062 0.5 0.75 1
Int. Beam B-8 2F F-G/13-15 4.908 0.55 0.65 4
Ext. Beam SB-1 2F G/13-15 11.812 0.2 0.25 1
Ext. Beam SB-7 2F 4.68 0.2 0.3 1
Cant. Baem CB-2 2F G/13-15 3.55 0.3 0.4 2
Cant. Baem CB-2 2F G/13-15 3.425 0.3 0.4 1
Int. Beam CB2 2F 3.325 0.5 0.5 1
Col. (3rd lift) C-2 2F G/14 0.75 0.75 1.4 1
06-Feb-18 Column (1st lifC-1 3F G/6 0.8 0.8 2.4 1
Column(2nd lifC-2 2F G/8-9 0.75 0.75 1.9 2

Column (1st lifC-2 2F G/1; F/14 0.75 0.75 2.4 2


Column(2nd lifC-2 2F G/8-9; D/1 0.75 0.75 1.9 3
Column(2nd lifC-3 2F H/1-2 0.7 0.7 1.9 2
07-Feb-18 Column (1st lifC-2 2F D/12 0.75 0.75 2.4 1
Column(2nd lifC-2 2F D/13-16 0.75 0.75 1.9 4
Staircase GF E-F/11-12 2.6746 1.3805
5.45 0.8831
Stiff. Column GF E-F/11-12 0.15 0.4 1.7 3
Stiff. Column GF E-F/11-12 0.15 0.4 2.8 2
08-Feb-18 Column (1st FilC-1 3F G/3-5 0.8 0.8 2.4 3
Column(2nd lifC-3 2F H/2 0.7 0.7 1.9 1
09-Feb-18 Column (1st FilC-2 2F D/10-11; F 0.75 0.75 2.4 3
Column(2nd lifC-2 2F D/12; E/16 0.75 0.75 1.9 2

Slab S-1 3F Z1B-Z2B 0.15 505.9799


SB-1 0.25 0.2 26.075 1
SB-3 0.4 0.25 2.275 3
SB-4 0.35 0.25 5.1 1
SB-5 0.45 0.3 2.25 1
B-2 0.45 0.3 2.25 1
B-8 0.65 0.55 14.95 4
FRB-8 0.65 0.6 21.75 1
FRB-11 0.65 0.5 29.5956 1
FRB-12 0.75 0.5 21.75 1
FRB-14 0.45 0.3 4.525 1
C-2 0.75 0.75 1 4
CB-2 0.55 0.3 3.55 6
12-Feb-18 Staircase GF-2F E-F/11-12 2.6746 0.7208
Staircase 2.6746 0.6248
LANDING 5.45 0.4326
Col.(1st lift) C-2 G/1 0.75 0.75 2.4 1
Col.(2nd lift) C-3 H/1 0.7 0.7 1.9 1
13-Feb-18 Col.(2nd lift) C-2 2F G/1; F/14; 0.75 0.75 1.9 3
SLAB 3F 0.15 683.6111
b-4 2.5 0.45 0.55 4
frb-18 2.4 0.45 0.55 2
c-2 1.05 0.75 0.75 6
frb-27 22.5 0.55 0.75 1
frb-19 40.7 0.45 0.55 1
b-3 11.725 0.45 0.55 4
b-14 8.725 0.45 0.55 2
frb-8 39.55 0.6 0.65 1
frb-14 4.5 0.3 0.45 4
b-2 4.65 0.3 0.45 3
sb-5 4.66 0.3 0.45 1
sb-3 4.65 0.25 0.4 3
14-Feb-18 Elevator Pit GF E-F/7-8
15-Feb-18 Shear wall (Tower Crane)GF F-G/6-7
Slab 3F G-H/1-3 0.15 298.9198
Girder FRB-1 0.45 0.3 6.207 1
Girder FRB-2 0.65 0.5 8.75 1
Girder FRB-4 0.55 0.4 6.132 1
Girder FRB-5 0.75 0.65 8.725 1
Girder FRB-9 0.65 0.6 15.65 1
Girder FRB-10 0.65 0.5 15.65 1
Int. Beam B-1 0.65 0.5 15.95 2
Int. Beam B-10 0.45 0.3 6.417 2
Cant. Beam CB-1 0.45 0.3 2.95 5
Ext. Beam SB-1 0.25 0.2 17.1 1
Ext. Beam SB-7 0.3 0.2 6.407 1
Col. (3rd lift) C-2 0.75 0.75 1.05 2
Col. (3rd lift) C-3 0.7 0.7 1.05 2
Col.(2nd Lift) C-2 3F G/3-4 0.75 0.75 1.9 2
17-Feb-18 Col. (1st Lift) C-3 3F H/3-6 0.7 0.7 2.4 4
C-2 3F D/7-9 0.75 0.75 2.4 3
C-3 3F E/7-9 0.75 0.75 2.4 3
C-4 3F F-G/7-8 0.75 0.75 2.4 4
C-5 2F F-G/10 0.75 0.75 2.4 2
CODE
VOLUME GRIDLINE STRUCTURE
Subcon CPR # RWI# AV BP MARK
8.87 A/3-6 FTB FTB-4
8.45 A/3-6 FTB-1
3.14 A/3-6 FTB-Column C-3
1.44 A/3-6 Cnvt'l Column
77.99 ZONE 3B-4SLAB S-1
10.29 Girder FRB-8
1.70 Girder FRB-14
1.49 Girder FRB-18
8.64 Girder FRB-19
11.03 Girder FRB-27
0.58 Int. Beam B-2
11.62 Int. Beam B-3
2.08 Int. Beam B-4
0.12 Ext. Beam SB-1
1.30 Ext. Beam SB-3
0.58 Ext. Beam SB-5
3.38 D/7-9; F/7 Col. (3rd lift) C-2
4.05 G/13-15 Column (1st lift)C-2
5.34 E/14-15; F Column(2nd lift)C-2
1.93 ADMIN 67 6 EXAN STAIR
1.67 STAIR
2.36 LANDING
105.75 VE 68.00 SLAB S-1
8.96 Girder FRB-8
6.39 Girder FRB-12
0.57 Girder FRB-14
1.44 Girder FRB-18
2.15 Girder FRB-19
16.32 Girder FRB-27
2.96 Int. Beam B-2
7.29 Int. Beam B-3
2.97 Int. Beam B-4
32.07 Int. Beam B-8
3.07 Int. Beam B-14
0.89 Ext. Beam SB-1
0.81 Ext. Beam SB-7
1.70 Cant. Baem CB-2
0.41 Cant. Baem CB-2
0.83 Cant. Baem CB2
3.63 Esc. Pit Wall W1
3.94 D/10-12; FCol. (3rd lift) C-2
16.23 G/13-15 SLAB S-1
4.15 G/13-15 Girder FRB-12
7.02 F-G/13-15 Int. Beam B-8
0.59 G/13-15 Ext. Beam SB-1
0.28 Ext. Beam SB-7
0.85 G/13-15 Cant. Baem CB-2
0.41 G/13-15 Cant. Baem CB-2
0.83 Int. Beam CB2
0.79 G/14 Col. (3rd lift) C-2
1.54 ADMIN 70 EXAN G/6 Column (1st lift)C-1
2.14 ADMIN 70 EXAN G/8-9 Column(2nd lift)C-2

2.70 70 G/1; F/14 Column (1st lift)C-2


3.21 70 G/8-9; D/1Column(2nd lift)C-2
1.86 70 H/1-2 Column(2nd lift)C-3
1.35 66 56 6 EXAN D/12 Column (1st lift)C-2
4.28 66 56 D/13-16 Column(2nd lift)C-2
3.69 ADMIN 67 57 9 NEW ZIRCONE-F/11-12 Staircase 0
4.81 0 0 0
0.31 E-F/11-12 Stiff. Column 0
0.34 E-F/11-12 Stiff. Column 0
4.61 SJM 68 58 7 EXAN G/3-5 Column (1st Fill)C-1
0.93 68 58 H/2 Column(2nd lift)C-3
4.05 VE 70 60 6.5 EXAN D/10-11; FColumn (1st Fill)C-2
2.14 70 60 D/12; E/16Column(2nd lift)C-2

75.90 SJM 71 61 155 PHILHATTORIZ1B-Z2B Slab S-1


1.30 0 0 SB-1
0.68 0 0 SB-3
0.45 0 0 SB-4
0.30 0 0 SB-5
0.30 0 0 B-2
21.38 0 0 B-8
8.48 0 0 FRB-8
9.62 0 0 FRB-11
8.16 0 0 FRB-12
0.61 0 0 FRB-14
2.25 0 0 C-2
3.51 0 0 CB-2
1.93 ADMIN 72 7 EXAN
1.67 ADMIN 72
2.36 ADMIN 72
1.35 ADMIN 72 3 EXAN
0.93 ADMIN 72
3.21 ADMIN 73 EXAN
102.54 VE 73 EXAN
2.48 73
1.19
3.54
9.28
10.07
11.61
4.32
15.42
2.43
1.88
0.63
1.40
14.00 ADMIN 74 EXAN
4.00 ADMIN
44.84 SJM 75 EXAN
0.84
2.84
1.35
4.25
6.10
5.09
10.37
1.73
1.99
0.86
0.38
1.18
1.03
2.14 SJM 75
4.70 ADMIN 75 EXAN
4.05 76
4.05
5.40
2.70
DIMENSION DIMENSION
FACE Qty AREA FACE Qty AREA
L H W H/L
42.236 0.7 2 1 59.13
2.4 1.6 4 -
0.7 1.6 4 -
0.6 1 4 -
0.15 519.92 -
26.375 0.65 1 -
4.2 0.45 3 -
2 0.55 3 -
34.892 0.55 1 -
26.75 0.75 1 -
4.33 0.45 1 -
11.74 0.55 4 -
2.1 0.55 4 -
2.4 0.25 1 -
4.33 0.4 3 -
4.33 0.45 1 -
0.75 1 6 -
0.75 2.4 3 -
0.75 1.9 5 -
2.6746 0.7208 -
2.6746 0.6248 -
5.45 0.4326 -
0 0.15 2 704.98 - 0 0.15 2 704.98 0
22.975 0.65 1 -
17.05 0.75 1 -
4.2 0.45 1 -
2.9 0.55 2 -
2.9 0.55 3 -
39.575 0.75 1 -
10.95 0.45 2 -
14.725 0.55 2 -
3 0.55 4 -
14.95 0.65 6 -
3.1 0.55 4 -
17.8 0.25 1 -
13.54 0.3 1 -
3.55 0.4 4 -
3.425 0.4 1 -
3.325 0.5 1 -
13.2 1.1 1 -
0.75 1.4 5 -
0 0.15 108.17 -
11.062 0.75 1 -
4.908 0.65 4 -
11.812 0.25 1 -
4.68 0.3 1 -
3.55 0.4 2 -
3.425 0.4 1 -
3.325 0.5 1 -
0.75 1.4 1 -
0.8 2.4 1 -
0.75 1.9 2 -
0 -
0.75 2.4 2 -
0.75 1.9 3 -
0.7 1.9 2 -
0.75 2.4 1 -
0.75 1.9 4 -
0 0 1.3805 -
0 0 0.8831 -
0.15 1.7 3 -
0.15 2.8 2 -
0.8 2.4 3 -
0.7 1.9 1 -
0.75 2.4 3 -
0.75 1.9 2 -

0 0.15 505.9799 -
0.25 26.075 1 -
0.4 2.275 3 -
0.35 5.1 1 -
0.45 2.25 1 -
0.45 2.25 1 -
0.65 14.95 4 -
0.65 21.75 1 -
0.65 29.5956 1 -
0.75 21.75 1 -
0.45 4.525 1 -
0.75 1 4 -
0.55 3.55 6 -
TOTAL
AREA

-
C-1 0.8 0.8 6 4 15.36
C-2 0.75 0.75 6 46 155.25
C-3 0.7 0.7 6 6 17.64

C-1 0.8 0.8 2.4 4 6.144


C-2 0.75 0.75 2.4 17 22.95
C-3 0.7 0.7 2.4 4 4.704

C-1 0.8 0.8 1.9 4 4.864


C-2 0.75 0.75 1.9 1 1.06875
C-3 0.7 0.7 1.9 4 3.724

231.7048
feb 1.78
jan 639.82
dec 150
nov
oct