Sub: Regarding Supply and Installation of Effluent Treatment Plant for 1KLD using chemical treatment batch treatment.
Dear Sir,
This is in reference to the discussion held on17-09-18 with you regarding the proposed Effluent Treatment Plant.
Kindly refer below details which clarify this offer. We are sure that our offer will match your requirement. We will feel
happy to resolve your queries in this project as we believe in policy of customer satisfaction. We would like to inform
you that as a company, we are known for our technical expertise, quality products, flawless designs, and project
execution capabilities and after sales service.
Thanking You,
Yours Faithfully
For,Enviro CareTech
Pawan Khandelwal (M-Tech IITR)
Director– Projects
Contact no: +91-9610238442
Save water save life
ELECTROMECHANICALLY INSTRUMENT
INSTALLATION VISIT
The technical personnel will visit the site to assess and give the top layout & cross sectional drawing for the
civil works to be undertaken.
GUARANTEE
All equipment’s and its material or components supplied by us are mechanically guaranteed,(excluding
consumable component)subject to proper operation of the plant as per the user manual and usage of spares /
consumables recommended by us - for a period of twelve (12) months from the date of commissioning of the
plant or fifteen (15) months after delivery ,whichever is earlier. During the guarantee period, service personnel
will visit once in every six months to assess the functioning of the unit in addition to attending complaint calls.
POST GUARANTEE
After the guarantee period, the customer has the option of entering into an Annual Maintenance Contract (or)
Operation and Maintenance contract with the company at rates prevalent at that time.
PERFORMANCE
The treatment plant supplied by us shall produce product water of guaranteed quality at designed flow rates.
However, the quality of product water is subject to raw water condition, Regular service and proper
maintenance of the plant.
YOU’RE INVESTMENT
Total cost of Erecting and commissioning Effluent Treatment Plant
GST 18%
Transport charge By client
Transit Insurance By client
Packing/Forwarding/Freight By client
PAYMENT TERMS*
Important Note: The payment against erection and commissioning of the equipment/s is strictly subject to the
readiness of the site. The site should be ready and handed over to us within10 days from the date of delivery of
units. In the event of any delay in erection and commissioning of the units on account of site conditions, the
balance payment (5%) should be cleared within 24 days from the date of delivery of the equipments.
DELIVERY
The equipments under our scope of supply shall be delivered within 8 - 10 weeks from the date of receipt of
technically firm and commercially clear order along with advance.
ORDER FORM T&C
The standard terms and conditions as mentioned in our order form to be signed by the customer in the event of
the customer placing their order with us are construed to be an integral part of this proposal. A copy of the same
is enclosed herewith.
Save water save life
VALIDITY
Our proposal is valid for a period of 30 days for your acceptance after which it is subject to our confirmation.
CANCELLATION
Cancellation of orders by Buyer can only be made with Seller’s prior written consent. If the product is being
built to Buyer’s specification, Buyer is responsible for all expenses incurred by Seller, including any raw
materials and other non-cancellable commitments, or a minimum 55 % cancellation charge, whichever is
greater. Domestic orders: Orders cancelled less than 30 days prior to the scheduled delivery date shall be
finished and billed at the quoted price, whether shipment is accepted or not.
Client list
1. Kajaria ceramics limited,alwar(Raj.) 150KLD STP
2. Niryas dairy,Bulandshahar(UP) 50KLD ETP
3. Big Bite,Meerut(UP) 25KLD
4.Mehru electricals ,Bhiwadi 20KLD STP
5. Polyplast,Bhiwadi 40KLD STP
Flow diagram of 5KLD STP