Vous êtes sur la page 1sur 21

SINHGAD INSTITUTE OF

MANAGEMENT
PUNE-411041

PROJECT REPORT ON

KILLE DARSHAN

BY:
1. AMAR PATIL(02)
2. DEEP CHAUHAN(09)
3. SAKSHI GUPTA(22)
4. SUMIT SHEKHAWAR(40)
5. VISHAKHA PENMAHALE(51)

UNDER THE GUIDENCE OF


Prof. Rahul Navale Sir
CERTIFICATE

This is to certify that mentioned students of MCA-I (DIV-E)


formSINHGAD INSTITUTE OF MANAGEMENT PUNE have
satisfactory completed the mini project on “KILLE DARSHAN”
during the academic year 2017-2018 SEM-II as per the
requirement of “UNIVERSITY OF PUNE”.

1. AMAR PATIL(02)
2. DEEP CHAUHAN(09)
3. SAKSHI GUPTA(22)
4. SUMIT SHEKHAWAR(40)
5. VISHAKHA PENMAHALE(51)

The above project work is successfully carried out by these


students under our supervision.

Name & Signature of


Prof. Rahul Navale Sir Dr.ChandraniSingh mam
(Project Guide ) (Director SIOM MCA)
DATE : 17-04-2018
PLACE: PUNE
ACKNOWLEDGEMENT

We take great pleasure in expressing our deep sense to


guide and heartfelt to all those who have helped and guided us
through our project.We would not be able to complete our project in
the given time “KILLE DARSHAN” without their encouragement
and guidance for this we remain intended to all of them.

It is great in presenting the project “KILLE DARSHAN”. This


is the result of combined effort of those in involved in making success
without whom it had not possible to present the system.

We would like to present our sincere gratitude to


Prof. Rahul Navale Sir who helped us in finalizing the projects and
thanks them to provide the necessary guidance to designing and
understanding the whole system of the project “KILLE DARSHAN”.

With the complete work undertaken. We would like to take this


opportunity to thank all those who helped us to complete this
project with their guidance, co-operation and support. This
project would not have been materialized without the help from
many quarters.

We also cannot forget thanking our classmates for providing the


friendly and cordial environment to achieve the goal. Without
their valuable contribution this project would not have been a
success….!!
DECLARATION

We are here declared that with the suggestion and guidance

received from our guide Prof. Rahul NavaleSir , This project

work titled “KILLE DARSHAN’’ is our original work.

This project report as one, which substantially the same as this

has not been submitted by us for any other examination of this

university or any other university.

AMAR PATIL(02)
DEEP CHAUHAN(09)
SAKSHI GUPTA(22)
SUMIT SHEKHAWAR(40)
VISHAKHA PENMAHALE(51)
(MCA 1ST DIV-E)
INTRODUCTION TO SYSTEM

KILLE DARSHAN is use keep the information of all the


different FORTS in Maharashtra.

In this project peoples visit the website and get information


about forts.

There is multiple option where people can select forts. Each


fort is having its own historicalinformation,also people can
checkhow to reach on fort and other basic details.

People can check our website across all over india.

There is guide for non maharashtrian peoples also, by simply


visiting our website.
PROJECT PROFILE

This “KILLE DARSHAN” is being developed for the people

who love to visit historical places and it will give detail

information about number of forts in Maharashtra.

This System includes online registration of product as well as

the product information. It also gives online receipts to the

customer which they buy the product.

Because of this system the customer will be able to purchase

system efficiently.
Study of Existing System

Existing System:
People use to collect information from google and use maps
for measuring distance from their location.

People takes reviews from friends and family about fort.

While collecting information from different people sometime


it may be happen that they will get wrong information.

PROPOSEDSYSTEM:
By using our system people gets correct information about
forts and they also get the location and how to reach on
location.

They also get information about the nearest airports and other
available facilities.

People will get correct historic information of fort without


using other various applications.
Feasibility Study:

The feasibility study is carried out to select the best system


that meets performance requirements. This entails
identification, description and evaluation of candidate system
and selection of the best system for the task. Feasibility
analysis is the study of economic, technical and behavior
factors in the system.

Technical feasibility checks for the existing hardware and


software and to what extent it can support the proposed
addition.Only a few upgrades are required in the server
machine with few upgrades in the client machine. The
management is ready to incur this cost for getting the benefits
of the fully computerized system. So the proposed system is
technically feasible.

Economic feasibility checks for the cost-benefit analysis of


the particular system. The procedure is to determine the
benefits and savings that are expected from a system and
compare them with the cost. The major set up is in place and
the management is ready for additional investment to be
made. Therefore, there is economic feasibility as well.
Operational Feasibility is mainly related to human relation
and political aspects. The points to be considered are:

What changes will be brought with the system?

What organization structures are disturbed…?

What new skills will be required..?

The system is operationally feasible as it very easy for the


End users to operate it. It only needs basic information about

Windows platform.
Screenshots:

 Home Page
 Info About Forts
 Fort Shivneri
Fort raigad
Fort rajgad
Fort pratapgad
Sindhudurg
 Fort murund-janjira
 Fort ajinkyatara
fort devgiri
Contact details

Vous aimerez peut-être aussi