Technical Site Survey (BSC/RNC)

Basic information
Region City
Building name Floor No.
BL supervisor BL supervisor Tel No.
Air conditioner status Temperature in room
Address
Information of Site Surveyor
Company Date
Surveyor Phone
Equipment Room
Cement
Wall type Shelter Others__________________________
concrete
Equipment Room Type Shelter Cement Others:_________
Floor type
Antistatic Floor, Floor Height ________mm(Very Important)

New ZTE Equipments Dimension


BSC Rack height*width*depth(mm) ( ) Quantity:( )Rack Power comsumption:(

RNC Rack height*width*depth(mm) ( ) Quantity:( )Rack Power comsumption:(

CTN Rack height*width*depth(mm) ( ) Quantity:( )Rack Power comsumption:(

Alarm box height*width*depth(mm) ( ) Quantity:( )Rack Power comsumption:(

New ZTE Equipments breaker requirement


BSC Rack Breaker Quantity in Demands______Pcs Capacity in Demands_______A (DC)

RNC Rack Breaker Quantity in Demands______Pcs Capacity in Demands_______A (DC)

CTN Rack Breaker Quantity in Demands______Pcs Capacity in Demands_______A (DC)

Alarm box Breaker Quantity in Demands______Pcs Capacity in Demands_______A (AC)

ACDB
Main Breaker capacity _________A AC cable size
ACDB Breaker Distribution diagram
Existing Grounding bar
GB avalaible or not GB spare holes
Existing DC Power system 1
Rectifier rack model Current loading
Rectifier Type1 ( ) Total Quantity:_______ Every Capacity:_____A __
Rectifier Type1 ( ) Total Quantity:_______ Every Capacity:_____A __
Rectifier module

Breaker Distribution diagram

Qty of Battery groups Groups Single capacity of Battery


Qty of Battery groups Groups Single capacity of Battery
Existing DC Power system 2
Rectifier rack model Current loading
Rectifier Type1 ( ) Total Quantity:_______ Every Capacity:_____A __
Rectifier Type1 ( ) Total Quantity:_______ Every Capacity:_____A __
Rectifier module

Breaker Distribution diagram

Qty of Battery groups Groups Single capacity of Battery


Qty of Battery groups Groups Single capacity of Battery
Existing DCDB
DCDB1 rack model DCDB2 rack model
Breaker Distribution diagram (Separate DCDB)

Existing ODF
Spare ODF 1 Spare ports Qty:_______ ODF Ports type:___
Spare ODF 2 Spare ports Qty:_______ ODF Ports type:___
Spare ODF 3 Spare ports Qty:_______ ODF Ports type:___
Spare ODF 4 Spare ports Qty:_______ ODF Ports type:___
Spare ports means---Front and back sides of ports should be both free.
Existing MUX and junipior
Spare Ports type1:_______ Spare ports type1 Q
MUX ports
Spare Ports type2:_______ Spare ports type2 Q
Spare Ports type1:_______ Spare ports type1 Q
Jnipior ports
Spare Ports type2:_______ Spare ports type2 Q

Proposed Cabinets installation


Cabinet Installation space ok? Installation location specifi
BSC Rack

RNC Rack

CTN Rack

Alarm box

DCDB
Power and breaker requirements
Capacity
DC power Capacity not enough, need module expansion Need new rectifie
enough

Model of Rec module needed Qty and Rec module needed

DC breaker needed Yes No

63A DC breaker Breaker Quantity _____Pcs Where the new breaker will be placed?___________

100A DC breaker Breaker Quantity _____Pcs Where the new breaker will be placed?___________

New DCDB needed Yes No Where the new DCDB will be placed?__________

Proposed ODF solution


New ODF needed Yes No Where the new ODF will be placed?____________

Specific the ODF and Specific:


ports if reuse ODF

Proposed distance
Cable type Single length From / To
DC cable length BSC To
DC cable length RNC To
DC cable length CTN To
DC cable length DCDB to
DC cable length
AC cable length Alarm Box to
Grounding cable length BSC To Grounding Bar
Grounding cable length RNC To Grounding Bar
Grounding cable length CTN To Grounding Bar
Grounding cable length DCDB To Grounding Bar
Grounding cable length Alarm box To GB
Optical fiber BSC To CTN
Optical fiber BSC To ODF
Optical fiber CTN To ODF
Optical fiber BSC To MUX
Ethernet cable BSC To CTN
Ethernet cable CTN To Alarm box
Ethernet cable CTN To Junipior
Clock cable BSC to clock DDF
Alarm cable BSC To Alarm DDF
Photo checklsit
Item Photo needed
overall view of equipment room 10+
Cable tray 5+
ACDB 2
ACDB breaker distribution 2
Rectifier rack overall view 2
Rectifier loading monitor display 1
Rectifier module 1
Rectifier rack breaker distribution 2
Battery groups overall view 2
Battery 2
DCDB 2
DCDB breaker distribution 2
Grounding bar 2
ODF 1 (Free ports important!) 2
ODF 2 (Free ports important!) 2
ODF 3 (Free ports important!) 2
MUX 2
Junipior 2
Clock source 2
Proposed Alarm box location 1
Proposed BSC Rack location 1
Proposed RNC Rack location 1
Proposed CTN Rack location 1
Proposed Alarm box location 1
Proposed DCDB location 1

All proposed information (Power, breaker, Rack installation location, ODF to be used,MUX,Ju
should be mark and specify in surver layout.
nical Site Survey (BSC/RNC)

Others__________________________

Others:_________
c Floor, Floor Height ________mm(Very Important)

mm) ( ) Quantity:( )Rack Power comsumption:( )W

mm) ( ) Quantity:( )Rack Power comsumption:( )W

mm) ( ) Quantity:( )Rack Power comsumption:( )W

mm) ( ) Quantity:( )Rack Power comsumption:( )W

ent
Demands______Pcs Capacity in Demands_______A (DC)

Demands______Pcs Capacity in Demands_______A (DC)

Demands______Pcs Capacity in Demands_______A (DC)

Demands______Pcs Capacity in Demands_______A (AC)

Diameter : ________mm2
ACDB Breaker Distribution diagram
A
) Total Quantity:_______ Every Capacity:_____A _________W
) Total Quantity:_______ Every Capacity:_____A _________W

Breaker Distribution diagram

Ah
Ah

A
) Total Quantity:_______ Every Capacity:_____A _________W
) Total Quantity:_______ Every Capacity:_____A _________W

Breaker Distribution diagram

Ah
Ah
er Distribution diagram (Separate DCDB)

:_______ ODF Ports type:_______


:_______ ODF Ports type:_______
:_______ ODF Ports type:_______
:_______ ODF Ports type:_______
s---Front and back sides of ports should be both free.

e1:_______ Spare ports type1 Qty:_______

e2:_______ Spare ports type2 Qty:_______


e1:_______ Spare ports type1 Qty:_______

e2:_______ Spare ports type2 Qty:_______

Installation location specification


Need new rectifier cabinet with module

____Pcs Where the new breaker will be placed?____________________________

____Pcs Where the new breaker will be placed?____________________________

Where the new DCDB will be placed?___________________________

Where the new ODF will be placed?_____________________________

Remark

Port spec:
Port spec:
Port spec:
Port spec:
Photo checklsit
Remark
overall view!! For all room

Door close and door open


Zoom in, close view and clear
Door close and door open
Show currency
Zoom in, close view and clear
Zoom in, close view and clear
Overall view
Show brand and capacity
Door close and door open
Zoom in, close view and clear
where we can connect
Front and back ports view
Front and back ports view
Front and back ports view
overall view and close view
overall view and close view
overall view and close view
overall view
overall view
overall view
overall view
overall view
overall view

er, Rack installation location, ODF to be used,MUX,Junipior,etc.)


ayout.