Mecha Naranja 2,802.50 1.20 3,363.00 3,363.00 1.20
Fulminante 1,485.33 1.00 1,485.33 1,485.33 0.53
Dinamita 420.38 15.00 6,305.70 6,305.63 2.25
Barreno 1.40 350.00 490.00 490.44 0.14
Anfo 700.63 6.00 4,203.78 4,203.75 0.14
Herramientas manuales 261.95 84.08 0.03
Oficial 176.84 7.70 1,361.65 1,335.76 0.49
Peon 240.17 6.87 1,650.00 1,540.25 0.59
Operario perforista 80.15 8.57 686.89 641.27 0.25
Volquete 672.60 90.00 60,534.00 60,534.00 21.60
Compresora Neumatica 80.15 90.00 7,213.50 7,213.64 2.40
Cargador s/llantas 73.02 180.00 13,143.60 13,166.15 4.73
Tractor de Orugas 190-240 46.75 180.00 8,415.00 10,296.39 3.20
Martillo neumatico 160.02 15.00 2,400.30 2,400.34 0.80
3,698.53 3,517.27
0.04 112.1
3,363.00
1,485.33
6,305.63
392.35
392.35 11,938.65
84.08
1,373.23
1,653.48
700.63 3,727.33
60,534.00 672.60
6,726.00 74.73
13,255.83 73.64
8,968.00 49.82
2,242.00 149.47 91,725.83
107,475.88
329,272.40 1,020.27
ANALISIS DE COSTOS DIRECTOS
PROYECTO : ADICIONAL ENCAUZ. Y DEFENSA RIBEREÑA RIO CHANCHAMAYO V ETAPA - II
LONGITUD : 440.00 ML
FECHA : NOVIEMBRE 2005
UBICACIÓN : PICHANAKI - CHANCHAMAYO - JUNIN
PRESUPUESTO TOTAL :S/. 49,000.06
COSTO DIRECTO :S/. 44,651.05
GASTOS GENERALES : S/. 4,349.01
JORNAL TOTAL
ITEM EQUIPO / MAQUINA H-M H-H
(S/.) (S/.)
NOTA : Se considera 2.5% HH por traslado diario del patio de maquinas al pie de obra además de la revision de maquina en operación.
COMBUSTIBLE Y LUBRICANTES
PROYECTO : MEJORAMIENTO Y REHABILITACION DE CAMINOS VECINALES
LONGITUD 107 KM
FECHA : Jul-07
UBICACIÓN : PICHANAKI - CHANCHAMAYO - JUNIN
1 CAMION VOLQUETE 6x4 330 HP 10 M3. 864.8440 4.00 3,459.38 0.300 259.45 0.200 172.97
2 MOTOBOMBA 10 HP 4" 63.9600 0.25 15.99 0.150 9.59 0.100 6.40
3 CAMION CISTERNA 4X2 (AGUA) 2,000 GAL. 132.8400 3.50 464.94 0.300 39.85 0.200 26.57
4 RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T. 195.2010 4.00 780.80 0.300 58.56 0.200 39.04
5 CARGADOR S/LLANTAS 125-155 HP 3 YD3. 471.8205 6.50 3,066.83 0.350 165.14 0.200 94.36
6 TRACTOR DE ORUGAS DE 140-160 HP 921.3583 6.00 5,528.15 0.350 322.48 0.200 184.27
7 MOTONIVELADORA DE 125 HP 286.1800 5.00 1,430.90 0.300 85.85 0.200 57.24
TOTAL 14,746.99 940.93 580.84
NOTA : Se considera 2.5%HM por traslado diario del patio de maquinas al pie de obra
ademas de la revision de maquina en operacion
DESAGREGADO DE GASTOS EN EQUIPO Y MAQUINARIA
OPERACIÓN (S/.)
COSTO DE COSTO DE
ITEM MAQUINA %M,R H-M COMBUSTIBLE ACEITES GRASA FILTROS NEUM/T.RODAJ MANTENIM. Y/O MANO DE OBRA OPERACIÓN POSESION TOTAL (S/.)
REPUESTOS OPERADOR (S/.) (S/.)
GLN. S/. GLN. S/. LB. S/. S/. S/.
1 CAMION VOLQUETE 6x4 330 HP 10 M3. 0.70 864.84 3,459.38 39,229.32 259.45 7,783.60 172.97 1,383.75 9,679.33 6,910.85 6,910.85 7,087.50 72,074.36 0.00 78,985.21
2 MOTOBOMBA 10 HP 4" 2.00 63.96 15.99 201.15 9.59 287.82 6.40 51.17 108.03 584.11 292.05 524.16 1,756.44 0.00 2,048.50
3 CAMION CISTERNA 4X2 (AGUA) 2,000 GAL. 0.75 132.84 464.94 5,272.42 39.85 1,195.56 26.57 212.54 1,336.10 3,411.99 682.40 1,088.64 12,517.25 0.00 13,199.65
4 RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T. 0.75 195.20 780.80 8,854.32 58.56 1,932.49 39.04 312.32 2,219.83 3,008.23 1,002.74 1,599.70 17,926.89 0.00 18,929.63
5 CARGADOR S/LLANTAS 125-155 HP 3 YD3. 0.70 471.82 3,066.83 34,777.89 165.14 5,449.53 94.36 754.91 8,196.47 5,356.78 5,356.78 3,866.63 58,402.20 0.00 63,758.98
6 TRACTOR DE ORUGAS DE 140-160 HP 0.70 921.36 5,528.15 62,689.22 322.48 10,641.69 184.27 1,474.17 14,961.02 9,107.19 13,252.41 7,550.64 106,423.93 0.00 119,676.34
7 MOTONIVELADORA DE 125 HP 0.70 286.18 1,430.90 16,226.41 85.85 2,833.18 57.24 457.89 3,903.50 6,860.48 2,744.19 2,345.28 32,626.73 0.00 35,370.92
TOTAL (S/.) 14,746.99 167,250.72 940.93 30,123.86 580.84 4,646.76 40,404.27 35,239.63 30,241.43 24,062.55 301,727.79 0.00 331,969.75
0.00
PRECIOS 227,616.02
- Combustible (Petroleo) Galón : S/ 11.34
- Combustible (Gasolina) Galón * : S/ 12.58
- Lubricantes (Camiones, Volquetes, Otros) Galón : S/ 30.00
- Lubricantes (Tractor, Cargador, Motoniveladora, Rodillo) Galón : S/ 33.00
- Grasa Libra : S/ 8.00
RELACIÓN DE EQUIPO PROPIO Y DE EQUIPO ALQUILADO
Costo HM sin
Costo HM
EQUIPOS incluir Costo
alquilado
de Posesion
EQUIPO PROPIO
CAMION VOLQUETE 6x4 330 HP 10 M3. 90.00
#REF! 70.00
MOTOBOMBA 10 HP 4" 90.00
CAMION CISTERNA 4X2 (AGUA) 2,000 GAL. 180.00
RODILLO LISO VIBR AUTOP 70-100 HP 7-9 T. 160.00
TRACTOR DE ORUGAS DE 140-160 HP 220.00
CARGADOR S/LLANTAS 125-155 HP 3 YD3. 140.00
#REF! 12.00
#REF! 6.25
0 5.00
#REF! 15.00
#REF! 90.00
#REF! 9.00
#REF! 15.00
EQUIPO ALQUILADO
EXCAVADORA S/ORUGAS 115-165 HP, 0.75-1.60 YD3 280.00
ANALISIS DE GASTOS GENERALES
PROYECTO : ADICIONAL ENCAUZ. Y DEFENSA RIBEREÑA RIO CHANCHAMAYO V ETAPA - II
LONGITUD : 440.00 ML
FECHA : NOVIEMBRE 2005
UBICACIÓN : PICHANAKI - CHANCHAMAYO - JUNIN
PRESUPUESTO TOTAL : S/. 49,000.06
COSTO DIRECTO : S/. 44,651.05
GASTOS GENERALES : S/. 4,349.01
Coeficient
e
Código Descripción MES 01 MES 02 MES 03 MES 04 Liquidacion Total
Participaci
on
COSTO DIRECTO ###
6.5.11.10 Retribuciones y Compromisos Plazo Fij 16,002.53
Topografo 1.00 1,311.30 1,311.30 1,311.30 1,311.30
Operario 1.00 65.73 65.73 65.73 65.73
Oficial 1.00 641.01 641.01 641.01 641.01
Peon 1.00 1,982.60 1,982.60 1,982.60 1,982.60
6.5.11.23 Combustible y Lubricantes ###
Petroleo 1.00 31,294.67 31,294.67 31,294.67 31,294.67
Lubricantes 1.00 5,749.02 5,749.02 5,749.02 5,749.02
Grasa 1.00 692.92 692.92 692.92 692.92
6.5.11.27 Servicios no Personales 1.00 12,190.81 12,190.81 12,190.81 12,190.81 48,763.22
6.5.11.29 Materiales de Construcción 765.70
Yeso 25 Kg 1.00 23.25 0.00 23.25 0.00
Estaca de madera 1.00 155.00 155.00 155.00 155.00
Pintura Esmalte 1.00 24.80 24.80 24.80 24.80
6.5.11.30 Bienes de Consumo 99,716.42
Repuestos para Reparaciones y Mantenimie 1.00 24,929.11 24,929.11 24,929.11 24,929.11
6.5.11.37 Alquiler de Bienes 948.75
Zaranda metalica 1.00 237.19 237.19 237.19 237.19
6.5.11.39 Otros Servicios de Terceros 16,954.85
Cartel de Obra 1.00 2,800.00 0.00 0.00 0.00
Movilizacion y Desmovilizacion 1.00 2,500.00 2,500.00 2,500.00 2,500.00
Pagos por Reparaciones de Maquinarias 1.00 1,038.71 1,038.71 1,038.71 1,038.71
6.5.11.51 Equipamiento y Bienes Durarderos 103.54
Herramientas 1.00 25.89 25.89 25.89 25.89
Coef.
Código Descripción MES 01 MES 02 MES 03 MES 04 LIQUIDAC. Total
Part.
MESES
ITEM DESCRIPCION MONTO (S/.)
MES 1 MES 2 MES 3 MES 4
01.00.00 OBRAS PROVISIONALES 13,359.08 7,660.95 0.00 5,698.14
01.01.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO 11,396.27 5,698.14 50% 0.00 0% 5,698.14 50%
01.02.00 CARTEL DE OBRA DE 3.60M X 2.40M. 500.01 500.01 100% 0.00 0% 0.00 0%
01.03.00 INSTALACION DE ALMACEN Y CASETA DE GUARDIANIA 1,462.80 1,462.80 100% 0.00 0% 0.00 0%
02.00.00 TRABAJOS PRELIMINARES 490.05 490.05 0.00 0.00
02.01.00 MANTENIMIENTO DE ACCESOS 6,745.90 6,745.90 100% 0.00 0% 0.00 0% 0.00 0%
02.02.00 LIMPIEZA Y DESBROCE 78,019.20 46,923.52 60% 31,095.68 40% 0.00 0% 0.00 0%
02.03.00 TRAZO, NIVELACION Y REPLANTEO
02.07.00 LIMPIEZA DE DESVIO DEL RIO CHANCHAMAYO 490.05 490.05 100% 0.00 0% 0.00 0% 0.00 0%
03.00.00 MOVIMIENTO DE TIERRAS 88,605.93 34,579.98 49,278.14 4,749.85
03.01.00 CORTE Y ELIMINACION DE MATERIAL SUELTO 68.21 68.21 100% 0.00 0% 2.05 3%
03.02.00 CONSTRUCCION DE TERRAPLEN 70,260.71 28,104.28 40% 42,156.43 60% 0.00 0%
03.03.00 EXCAVACION DE UÑA DE CIMENTACION 4,810.13 0.00 0% 2,886.08 60% 1,924.05 40%
03.04.00 RELLENO PARA FILTRO 7,059.39 0.00 0% 4,235.63 60% 2,823.76 40%
03.05.00 RELLENO Y NIVELACION DE BASE 6,407.49 6,407.49 100% 0.00 0% 0.00 0%
04.00.00 ENROCADO 129,251.31 0.00 81,886.25 47,365.06
04.01.00 EXTRACCION Y PREPARACION DE ROCA 28,529.45 0.00 0% 19,970.62 70% 8,558.84 30%
04.02.00 SELECCIÓN DE ROCA 14,825.23 0.00 0% 10,377.66 70% 4,447.57 30%
04.03.00 CARGUIO DE ROCA 9,360.35 0.00 0% 5,616.21 60% 3,744.14 40%
04.04.00 TRANSPORTE DE ROCA 60,534.00 0.00 0% 36,320.40 60% 24,213.60 40%
04.05.00 ACOMODO DE ROCA 16,002.28 0.00 0% 9,601.37 60% 6,400.91 40%
05.00.00 MISCELANEO 13,357.00 0.00 9,349.90 4,007.10
04.02.01 GEOTEXTILES DE 380 GR/M2 13,357.00 0.00 0% 9,349.90 70% 4,007.10 30%
2 #REF! 63.96
8 #REF! #REF!
9 #REF! #REF!
10 #REF! #REF!
11 #REF! #REF!
12 #REF! #REF!
13 #REF! #REF!
14 #REF! #REF!
CRONOGRAMA DE DESEMBOLSOS
MESES
ITEM DESCRIPCION MONTO (S/.)
SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
01.00.00 OBRAS PROVISIONALES 19,838.55 13,810.03 0.00 0.00 6,028.53
01.01.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO 12,057.05 6,028.53 50% 0.00 0% 0.00 0% 6,028.53 50%
01.02.00 CARTEL DE OBRA DE 3.60M X 4.80M. 1,536.10 1,536.10 100% 0.00 0% 0.00 0% 0.00 0%
01.03.00 INSTALACION DE ALMACEN Y CASETA DE GUARDIANIA 6,245.40 6,245.40 100% 0.00 0% 0.00 0% 0.00 0%
02.00.00 TRABAJOS PRELIMINARES 116,518.50 63,041.24 39,844.32 292.72 13,340.22 %
02.01.00 MANTENIMIENTO DE ACCESOS 9,814.44 4,907.22 50% 4,907.22 50% 0.00 0% 0.00 0%
02.02.00 LIMPIEZA Y DESBROCE 460.34 460.34 100% 0.00 0% 0.00 0% 0.00 0%
02.03.00 TRAZO, NIVELACION Y REPLANTEO 1,009.39 292.72 29% 292.72 29% 292.72 29% 131.22 13%
02.04.00 ENCAUZAMIENTO DEL RIO CHANCHAMAYO 25,377.83 15,226.70 60% 10,151.13 40% 0.00 0% 0.00 0%
02.05.00 ENCAUZAMIENTO DEL RIO GAROU 61,233.10 36,739.86 60% 24,493.24 40% 0.00 0% 0.00 0%
02.06.00 DESVIO DEL RIO CHANCHAMAYO 5,414.40 5,414.40 100% 0.00 0% 0.00 0% 0.00 0%
02.07.00 LIMPIEZA DE DESVIO DEL RIO CHANCHAMAYO 13,209.00 0.00 0.00 0% 0.00 0% 13,209.00 100%
03.00.00 MOVIMIENTO DE TIERRAS 227,387.02 5,618.16 107,821.53 112,168.74 1,778.59
03.01.00 CORTE Y ELIMINACION DE MATERIAL SUELTO 5,833.52 3,908.46 67% 1,925.06 33% 0.00 0% 0.00 0%
03.02.00 CONSTRUCCION DE TERRAPLEN 186,560.00 0.00 0% 93,280.00 50% 93,280.00 50% 0.00 0%
03.03.00 EXCAVACION DE UÑA DE CIMENTACION 23,548.75 0.00 0% 11,774.38 50% 11,774.38 50% 0.00 0%
03.04.00 RELLENO PARA FILTRO 8,892.95 0.00 0% 0.00 0% 7,114.36 80% 1,778.59 20%
03.05.00 RELLENO Y NIVELACION DE BASE 2,551.80 1,709.71 67% 842.09 33% 0.00 0% 0.00 0%
04.00.00 ENROCADO 328,184.39 10,690.70 117,818.82 136,166.46 63,508.41
04.01.00 EXTRACCION Y PREPARACION DE ROCA 70,349.91 7,034.99 10% 28,139.96 40% 28,139.96 40% 7,034.99 10%
04.02.00 SELECCIÓN DE ROCA 36,557.07 3,655.71 10% 14,622.83 40% 14,622.83 40% 3,655.71 10%
04.03.00 CARGUIO DE ROCA 23,081.40 0.00 0% 9,232.56 40% 9,232.56 40% 4,616.28 20%
04.04.00 TRANSPORTE DE ROCA 149,268.96 0.00 0% 59,707.58 40% 59,707.58 40% 29,853.79 20%
04.05.00 ACOMODO DE ROCA 48,927.05 0.00 0% 6,115.88 13% 24,463.53 50% 18,347.64 38%
05.00.00 MISCELANEO 50,424.00 0.00 50,424.00 0.00 0.00
04.02.01 GEOTEXTILES DE 380 GR/M2 50,424.00 0.00 0% 50,424.00 100% 0.00 0% 0.00 0%
TOTAL PRESUPUESTO 814,625.00 112,266.22 13.78% 332,663.36 40.84% 264,582.62 32.48% 100,512.23 12.34%
CRONOGRAMA DE EJECUCION DE OBRA
PROYECTO : ADICIONAL ENCAUZ. Y DEFENSA RIBEREÑA RIO CHANCHAMAYO V ETAPA - II
LONGITUD : 440.00 ML
FECHA : NOVIEMBRE 2005
UBICACIÓN : PICHANAKI - CHANCHAMAYO - JUNIN
100%
01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA 3.60x2.40M 1,536.10
60%
100%
02.02.00 LIMPIEZA Y DESBROCE 460.34
29% 40%
29% 29% 13%
02.03.00 TRAZO, NIVELACION Y REPLANTEO 1,009.39
60% 40%
02.04.00 ENCAUZAMIENTO DEL RIO CHANCHAMAYO 25,377.83
60% 40%
02.05.00 ENCAUZAMIENTO DEL RIO GAROU 61,233.10
100%
02.07.00 LIMPIEZA DE DESVIO DEL RIO CHANCHAMAYO 13,209.00
50% 50%
03.02.00 CONSTRUCCION DE TERRAPLEN 186,560.00
50% 50%
03.03.00 EXCAVACION DE UÑA DE CIMENTACION 23,548.75
67% 33%
03.05.00 RELLENO Y NIVELACION DE BASE 2,551.80
04.00.00 ENROCADO
10% 40% 40% 10%
04.01.00 EXTRACCION Y PREPARACION DE ROCA 70,349.91
05.00.00 MISCELANEO
20% 80%
05.01.00 GEOTEXTILES DE 380 GR/M2 50,424.00
100%
100%
CRONOGRAMA DE EJECUCION DE OBRA
OBRA : ADICIONAL ENCAUZ. Y DEFENSA RIBEREÑA RIO CHANCHAMAYO V ETAPA - II
LONGITUD : 440.00 ML ENTREGA DE 01 DE SETIEMBRE
FECHA : OCTUBRE 2005 INICIO DE OB DESDE EL 02 DE SETIEMBRE
UBICACIÓN : PICHANAKI - CHANCHAMAYO - JUNIN
OCTUBRE
PARTIDA DESCRIPCION PRESUP.
6°Sem.
01.00.00 OBRAS PROVISIONALES L-10 M-11 M-12 J-13 V-14 S-15
01.01.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO 12,057.05 5 10%
0
01.02.00 CARTEL DE IDENTIFICACION DE LA OBRA 3.60x2.40M 1,536.10 1% 50%
0
01.03.00 INSTALACION DE ALMACEN Y CASETA DE GUARDIANIA 6,245.40 0 100 % ejec.
%
02.00.00 TRABAJOS PRELIMINARES
02.01.00 MANTENIMIENTO DE ACCESOS 9,814.44 15%
02.02.00 LIMPIEZA Y DESBROCE 460.34
02.03.00 TRAZO, NIVELACION Y REPLANTEO 1,009.39 10%
02.04.00 ENCAUZAMIENTO DEL RIO CHANCHAMAYO 25,377.83 20%
02.05.00 ENCAUZAMIENTO DEL RIO GAROU 61,233.10
02.06.00 DESVIO DEL RIO CHANCHAMAYO 5,414.40 30%
02.07.00 LIMPIEZA DE DESVIO DEL RIO CHANCHAMAYO 13,209.00
03.00.00 MOVIMIENTO DE TIERRAS
03.01.00 CORTE Y ELIMINACION DE MATERIAL SUELTO 5,833.52 100
100% ejec.
03.02.00 CONSTRUCCION DE TERRAPLEN 186,560.00 %
15%
03.03.00 EXCAVACION DE UÑA DE CIMENTACION 23,548.75
03.04.00 RELLENO PARA FILTRO 8,892.95
03.05.00 RELLENO Y NIVELACION DE BASE 2,551.80 100 %
100%
100 ejec.
%
04.00.00 ENROCADO
04.01.00 EXTRACCION Y PREPARACION DE ROCA 70,349.91 10%
04.02.00 SELECCION DE ROCA 36,557.07
04.03.00 CARGUIO DE ROCA 23,081.40
04.04.00 TRANSPORTE DE ROCA 149,268.96
04.05.00 ACOMODO DE ROCA 48,927.05
05.00.00 MISCELANEO
05.01.00 GEOTEXTILES DE 380 GR/M2 50,424.00
NOTA: este cronograma esta supeditado a que se cumplan los plazos de entrega de maquinaria ,repuestos e insumos para
la operación de las mismas
CALENDARIO DE ADQUISICION DE MATERIALES
MESES
ITEM DESCRIPCION UND MET. P.U. COSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE TOTAL
1 2 3 4
1.00 GEOTEXTIL AMOCO 380 GR/M2 M2 5,544.00 6.50 36,036.00 36,036.00 36,036.00
2.00 HILO POLIETILENO (GEOTEXTIL) KG 84.48 115.00 9,715.20 9,715.20 9,715.20
3.00 ALAMBRE NEGRO RECOCIDO # 8 KG 3.00 3.50 10.50 10.50 10.50
4.00 CLAVOS PARA MADERA C/C 3" KG 3.00 3.50 10.50 10.50 10.50
5.00 PERNOS EXAGONALES DE 3/4x3 1/2 PZA 4.00 15.00 60.00 60.00 60.00
6.00 CLAVOS KG 3.52 3.50 12.32 12.32 12.32
7.00 CLAVOS PARA CALAMINA KG 5.40 7.00 37.80 37.80 37.80
8.00 CEMENTO PORTLAND TIPO I (42.5KG) BOL 2.22 19.00 42.18 42.18 42.18
9.00 MECHA NARANJA M 6,910.60 1.20 8,292.72 8,292.72 8,292.72
10.00 FULMINANTE COMUN #6 DE 45mm PZA 3,662.62 1.00 3,662.62 3,662.62 3,662.62
11.00 DINAMITA KG 1,036.59 15.00 15,548.85 15,548.85 15,548.85
12.00 YESO BOL 2.20 10.00 22.00 22.00 22.00
13.00 SOLDADURA CELLOCORD 1/8 KG 6.00 8.00 48.00 48.00 48.00
14.00 BARRENO 5x 1/8" UND 3.46 350.00 1,211.00 1,211.00 1,211.00
15.00 ANFO KG 1,727.65 6.00 10,365.90 10,365.90 10,365.90
16.00 HORMIGON M3 0.36 12.00 4.32 4.32 4.32
17.00 MADERA TORNILLO CEPILLADA P2 48.00 1.80 86.40 86.40 86.40
18.00 ESTACA DE MADERA P2 22.00 0.80 17.60 17.60 17.60
19.00 TRIPLAY DE 4'x8'x 4 mm PLN 60.00 22.00 1,320.00 1,320.00 1,320.00
20.00 ANGULO 1 1/4x1 1/4x3/16x PZA 6.00 35.00 210.00 210.00 210.00
21.00 PINTURA ESMALTE SINTETICO GLN 1.26 38.00 47.88 47.88 47.88
22.00 CALAMINA G°ZINC GA24:1.83x1.085Mx0.6MM PLN 8.00 78.00 624.00 624.00 624.00
23.00 CALAMINA #31 DE 1.83X0.83x2.7mm PZA 51.00 80.00 4,080.00 4,080.00 4,080.00
24.00 TUBERIA F°G° 1" M 16.80 9.53 160.10 160.10 160.10