1) What are the key definitions of material handling (MH)?
1. Material handling is the art and science of moving, storing, protecting, and controlling
material.
2. Material handling means providing the right amount of the right material, in the right
condition, at the right place, at the right time, in the right position, in the right sequence,
and for the right cost, by using the right method(s).
2017-2018 Page | 1
Industrial Engineering Tutorials
5. Unit Load Principle: A unit load is one that can be stored or moved as a single entity
at one time, such as a pallet, container, or tote, regardless of the number of individual
items that make up the load.
6. Space Utilization: Space in material handling is three-dimensional and therefore is
counted as cubic space.
7. System Principle: A system is a collection of interacting and/or interdependent entities
that form a unified whole.
8. Automation Principle: Automation is a technology concerned with the application of
electromechanical devices, electronics, and computer-based systems to operate and
control production and service activities. It suggests the linking of multiple mechanical
operations to create a system that can be controlled by instructions.
9. Environmental Principle: Environmental consciousness stems from a desire not to
waster natural resources and to predict and eliminate the possible negative effects of
our daily actions on the environment.
10. Life-Cycle Cost Principle: Life-cycle cost include all cash flows that will occur from
the time the first dollar is spent to plan or procure a new piece of equipment, or to put
in place a new method, until that method and/or equipment is replaced.
6) What is meant by material flow and how to develop material flow system?
The combination of material characteristics and move or flow requirements is referred to
as material flow.
To develop material flow system requirements, one should focus on the material to be
handled, stored, and controlled and the flow or throughput requirements for the system.
Material flow is transformed to material handling by the method of handling, storing, and
controlling the material.
2017-2018 Page | 2
Industrial Engineering Tutorials
10) What are the different characteristics of materials that affect the selection of
material handling equipment?
Material characteristics affect type of transport and storage equipment required:
Solid, liquid or gas – Size – Weight – Shape (long, flat, bulky) - Condition (hot, cold, wet,
dirty) - Risk of damage (fragile, brittle, sturdy) Safety risk (explosive, flammable, toxic).
11) Material handling equipment must be included in the plant layout design, show
the correlation between layout type and material handling equipment.
Correlation between layout type and material handling equipment:
Plant layout type Material handling equipment
Fixed-position Cranes, hoists, industrial trucks
Process layout Hand trucks, forklift trucks, AGVs
Product layout Conveyors for product flow Trucks to deliver parts to stations.
2017-2018 Page | 3
Industrial Engineering Tutorials
12) What is the definition of unit load and what are the components of unit load?
The concept of a unit load is derived from the unit size principle; a unit load can be defined
simply as the unit to be moved or handled at one time. In some cases, the unit load is one
item of production; in other situations, the unit load is several cartons, each containing
numerous items of production.
The unit load includes the container, carrier, or support that will be used to move materials.
Unit loads consists of material in, on, or grouped together by something.
2017-2018 Page | 4
Industrial Engineering Tutorials
2017-2018 Page | 5
Industrial Engineering Tutorials
b) Forklift Truck: Widely used in factories and warehouses because pallet loads are so
common - Capacities from 450 kg up to 4500 kg - Power sources include on-board
batteries and internal combustion motors.
2017-2018 Page | 6
Industrial Engineering Tutorials
c) Towing Tractor: Designed to pull one or more trailing carts in factories and
warehouses, as well as for airport baggage handling - Powered by on-board batteries
or IC engines.
18) What is meant by AGV and what are the main types of AGVs?
An Automated Guided Vehicle System (AGVS) is a material handling system that uses
independently operated, self-propelled vehicles guided along defined pathways in the
facility floor. Types of AGV:
1. Driverless trains
2. Pallet trucks
3. Unit load AGVs.
2017-2018 Page | 7
Industrial Engineering Tutorials
21) What is meant by an industrial robot and what is the importance of using it?
An industrial robot is a general-purpose, programmable machine possessing certain
anthropomorphic characteristics. Mechanical arm is the most common characteristic of an
industrial arm and is used to perform various industrial tasks. Making decisions, capability
to communicate with other machines, and capability to respond to sensory inputs are the
important attributes of an industrial robot.
Importance of using robot:
1. Robots can be substituted for humans in hazardous or uncomfortable work
environments. A robot performs its work cycle with a consistency and repeatability that
cannot be attained by humans.
2. Robots can be reprogrammed. When the production run of the current task is completed,
a robot can be reprogrammed and equipped with necessary tooling to perform an
altogether different task.
3. Robots are controlled by computers and can therefore be connected to other computer
systems to achieve computer integrated manufacturing.
2017-2018 Page | 8
Industrial Engineering Tutorials
On the basis of control system industrial robots are classified in three different types:
a) Point-to-point (PTP) control robot
b) Continuous-path (CP) control robot
c) Controlled-path robot
23) What are the types of conveyors? Briefly discuss each type.
1. Roller Conveyor: Pathway consists of a series of rollers that are perpendicular to
direction of travel - Loads must possess a flat bottom to span several rollers - Powered
rollers rotate to drive the loads forward - Unpowered roller conveyors also available.
2. Skate-Wheel Conveyor: Similar in operation to roller conveyor but use skate wheels
instead of rollers - Lighter weight and unpowered - Sometimes built as portable units
that can be used for loading and unloading truck trailers in shipping and receiving.
3. Belt Conveyor: Continuous loop with forward path to move loads - Belt is made of
reinforced elastomer - Support slider or rollers used to support forward loop - Two
common forms (Flat belt – V shaped for bulk materials).
2017-2018 Page | 9
Industrial Engineering Tutorials
6. Cart-On-Track Conveyor: Carts ride on a track above floor level - Carts are driven
by a spinning tube - Forward motion of cart is controlled by a drive wheel whose angle
can be changed from zero (idle) to 45 degrees (forward).
2017-2018 Page | 10
Industrial Engineering Tutorials
26) What is meant by automated storage and retrieval system (ASRS or AS/RS)?
Automated Storage and Retrieval Systems (AS/RS)
• To get right parts, pallets, fixtures, and tools to the right place at the right time, an
efficient system for their storage and retrieval together with a material transportation
system is required.
• An integrated FMS, AGVS, and AS/RS system provides an efficient production system
for manufacturing low- to medium- volume and middle- to high-variety products.
2017-2018 Page | 11
Industrial Engineering Tutorials
2017-2018 Page | 12
Industrial Engineering Tutorials
2017-2018 Page | 13
Industrial Engineering Tutorials
30) A new belt conveyor which is required as a flow line of dry sand from the
warehousing to the sand casting workshop, two types of belt conveyors can be
used (flat or troughed) as the following figure:
- The following data were available: width of sand (b) = 80 cm, dynamic angle of
repose (Φ) = 30o, sand density = 1600 kg/m3, conveyor speed is 0.5 m/s. Find the
conveying capacity for two types of belt conveyor.
- If the length of flat belt conveyor is 10 m, and the mass of belt per meter is 12 kg/m,
and the moving mass of carrying and return idlers are 15 kg/m and 3 kg/m
respectively, and the coefficient of friction between belt and idlers is 0.05. Find the
power required to drive this conveyor.
Solution
1) Finding conveying capacity (Q):
𝑄 =𝑣𝐴𝜌
- For the flat belt
𝐴 = 0.5 𝑏ℎ = 0.5 𝑏 (0.5 𝑏 tan(∅))
𝐴 = 0.5 𝑏ℎ = 0.5 × 0.8 (0.5 × 0.8 × tan(30)) = 0.092 𝑚2
𝑸 = 0.5 × 0.092 × 1600 = 𝟕𝟑. 𝟔 𝑲𝒈/𝒔
- For the troughed belt
𝐴 = 𝐴1 + 𝐴2 𝐴2 = 0.5(𝑏 + 0.4𝑏) × 0.3 𝑏 tan (20)
𝐴 = 0.092 + 0.5(0.8 + 0.4 × 0.8) × 0.3 × 0.8 tan(20) = 0.141 𝑚2
𝑸 = 0.5 × 0.141 × 1600 = 𝟏𝟏𝟐. 𝟖 𝑲𝒈/𝒔
2) Finding power required (P) (flat belt conveyor):
𝑇𝑒 × 𝑣
𝑃= 𝑇𝑒 𝑒ffective tension
1000
𝑇𝑒 = 𝜇 𝐿 𝑔 (𝑚𝑐 + 𝑚𝑟 + 𝑚𝑙 + 2𝑚𝑏 )
𝑇𝑒 = 0.05 × 10 × 9.8 (15 + 3 + (1600 × 0.092) + 2 × 12) = 927.08 𝑁
927.08 × 0.5
𝑃= = 0.463 𝐾𝑤
1000
2017-2018 Page | 14
Industrial Engineering Tutorials
31) A single direction conveyor system has to be designed to meet a part flow rate of
60 parts per minute. Each container in the conveyor can hold 6 parts. The distance
between the loading and unloading points is about 10 m. Determine the required
conveyor speed and the allowable loading time if the spacing between the
containers is 1 m.
Solution
1) Calculating the required conveyor speed:
𝑆𝑅 1 × 60
𝑣= = = 10 𝑚/𝑚𝑖𝑛
𝑛 6
S Space between containers, R Rate parts, n number of parts per container
2) Calculating the allowable loading time:
𝑆 1
𝐿≤ 𝑆𝑜 → 𝐿 ≤ 𝑚𝑖𝑛
𝑣 10
So, the loading time should not to be more than 0.1 min
32) An overhead conveyor has hooks and moves painted doors over a distance of 400
m in a single direction at 100 m/min between the paint station and the
intermediate storage area. The cycle time for painting a door is 2 min. Determine
the spacing between the hooks and the flow rate of parts in the conveyor system.
Assume the unloading time is equal to the paint cycle time.
Solution
1) Calculating spacing between hooks:
𝑆
𝑝𝑎𝑖𝑛𝑡𝑖𝑛𝑔 𝑐𝑦𝑐𝑙𝑒 + 𝑢𝑛𝑙𝑜𝑎𝑑𝑖𝑛𝑔 𝑡𝑖𝑚𝑒 ≤
𝑣
𝑆
2+2≤ 𝑆 = 400 𝑚
100
2) Calculating the flow rates of part:
𝑆𝑅 100 × 1
𝑣= → 𝑹= = 𝟎. 𝟐𝟓 𝑑𝑜𝑜𝑟/𝑚𝑖𝑛 = 15 𝑑𝑜𝑜𝑟/ℎ𝑟
𝑛 400
2017-2018 Page | 15
Industrial Engineering Tutorials
33) A forklift truck initially costs L.E. 200,000 and has an expected life of 5 years. Fuel
cost is L.E. 100.00 per 8 hours of operation, and maintenance cost is L.E. 15.0 an
hour. If the truck travels an average of 3,000 meter per day, determine the cost
per meter. Assume that the truck operates 360 days a year and that the operator
is paid L.E. 25.00 an hour.
Solution
34) A L.E. 100,000 tractor truck has an expected life of 8 years. The truck operates
280 days a year and travels an average of 5,000 meter per day. If the fuel costs
about L.E. 90.00 a day and maintenance costs are L.E. 7.5 an hour, determine the
cost per meter for operating this vehicle. Operator cost is L.E. 80.00/hour.
Solution
1) Total cost per hour:
2017-2018 Page | 16
Industrial Engineering Tutorials
35) Johnson and Johnson (JJ) is planning to integrate the AGVS and AS/RS with their
flexible manufacturing system. JJ is interested in estimating the number of AGVSs
required to satisfy the needs of the manufacturing system; that means the system
must be capable of making 65 deliveries per hour. JJ has already decided to install
a laser guide path system and unit load AGVS adequately serves company needs.
The following data have been collected: vehicle speed = 55 m/min, average loaded
travel distance per delivery = 165 m, average empty travel distance per delivery =
110 m, pickup lime = 0.5 min, drop off time = 0.5 min, traffic factor = 0.85.
Solution
1) Calculating the total delivery time of one AGV:
𝑑 (165 + 110)
𝑡𝑖𝑚𝑒 (𝐴𝐺𝑉 ) = + 𝐻 = + 0.5 + 0.5 = 6 𝑚𝑖𝑛
𝑣 55
2) Calculating the number of AGVs required:
𝑡𝑜𝑡𝑎𝑙 𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑑𝑒𝑙𝑖𝑣𝑒𝑟𝑖𝑒𝑠/ℎ𝑟
𝑁=( ) /𝑡𝑟𝑎𝑓𝑓𝑖𝑐 𝑓𝑎𝑐𝑡𝑜𝑟
𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑑𝑒𝑙𝑒𝑣𝑒𝑟𝑖𝑒𝑠 𝑝𝑒𝑟 𝐴𝐺𝑉/ℎ𝑟
65
𝑵=( ) = 𝟕. 𝟔𝟒 = 𝟖 𝑨𝑮𝑽
60
× 0.85
6
36) The proposed AGV system for a manufacturing unit must be capable of making
80 deliveries per hour. The type of AGV selected for this application has a velocity
of 50 m/min. Based on the current facility layout, the average loaded travel
distance will be 150 m and the average empty travel distance will be 100 m. The
total loading and unloading time will average about 1 min. Assuming a traffic
factor of 0.8, determine the number of AGVs required.
Solution
1) Calculating the total delivery time of one AGV:
𝑑 (150 + 100)
𝑡𝑖𝑚𝑒 (𝐴𝐺𝑉 ) = + 𝐻 = + 1 = 6 𝑚𝑖𝑛
𝑣 50
2) Calculating the number of AGVs required:
𝑡𝑜𝑡𝑎𝑙 𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑑𝑒𝑙𝑖𝑣𝑒𝑟𝑖𝑒𝑠/ℎ𝑟
𝑁=( ) /𝑡𝑟𝑎𝑓𝑓𝑖𝑐 𝑓𝑎𝑐𝑡𝑜𝑟
𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑑𝑒𝑙𝑒𝑣𝑒𝑟𝑖𝑒𝑠 𝑝𝑒𝑟 𝐴𝐺𝑉/ℎ𝑟
80
𝑵=( ) = 𝟏𝟎 𝑨𝑮𝑽
60
× 0.8
6
2017-2018 Page | 17
Industrial Engineering Tutorials
37) An automated guided vehicle system is used inside a telephone repair facility. The
vehicles move repaired telephones from the repair facility to the packing area.
Owing to the nature of the layout, the loaded travel distance is 300 m and the
empty travel distance is 500 m. The system must be able to move 750 phones per
hour. The load and unload time is about 1 min and the speed of the vehicle is 120
m/min. Determine the number of AGVs required. Knowing that each vehicle
capacity is 20 phones.
Solution
1) Calculating the total delivery time of one AGV:
𝑑 (300 + 500)
𝑡𝑖𝑚𝑒 (𝐴𝐺𝑉 ) = + 𝐻 = + 1 = 7.7 𝑚𝑖𝑛
𝑣 120
2) Calculating the number of AGVs required:
𝑡𝑜𝑡𝑎𝑙 𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑑𝑒𝑙𝑖𝑣𝑒𝑟𝑖𝑒𝑠/ℎ𝑟
𝑁=( ) /𝑡𝑟𝑎𝑓𝑓𝑖𝑐 𝑓𝑎𝑐𝑡𝑜𝑟
𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑑𝑒𝑙𝑒𝑣𝑒𝑟𝑖𝑒𝑠 𝑝𝑒𝑟 𝐴𝐺𝑉/ℎ𝑟
750
𝑵=( ) = 𝟒. 𝟖 = 𝟓 𝑨𝑮𝑽
60 × 20
×1
7.7
2017-2018 Page | 18
Industrial Engineering Tutorials
38) Suppose an AGV system is chosen for delivering small parts from storage to four
shops in a plant, as shown in Figure. (Most guided vehicles can carry a load of 1000
to 4000 Kg) Determine the number of vehicles needed, given the information in
Table. (Assume that each vehicle can carry parts to and from only one shop at a
time) The AGVs under consideration can travel at a rate of 60 m/min. (Between
60 and 78 m/min is the normal speed for an AGV), and a congestion factor of 0.85.
Solution
1) Calculating the total time travelled by AGVs (hour):
𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝑜𝑓 𝑜𝑛𝑒 𝑡𝑟𝑖𝑝
𝑡𝑖𝑚𝑒 𝑡𝑟𝑎𝑣𝑒𝑙𝑙𝑒𝑑 = × 𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑡𝑟𝑖𝑝𝑠
𝑣𝑒𝑙𝑜𝑐𝑖𝑡𝑦 𝑜𝑓 𝑎𝑔𝑣
𝑡𝑖𝑚𝑒 𝑡𝑟𝑎𝑣𝑒𝑙𝑙𝑒𝑑
(90 × 2) (150 × 2) (180 × 2)
=( × 14) + ( × 16) + ( × 5)
60 × 60 60 × 60 60 × 60
(240 × 2)
+( × 8) = 3.6 ℎ𝑟
60 × 60
2) Calculating the total time of loading and unloading of AGVs (hour):
2(14 × 2 + 16 × 3 + 5 × 3 + 8 × 2)
𝑡𝑖𝑚𝑒 (𝑙𝑜𝑎𝑑𝑖𝑛𝑔 + 𝑢𝑛𝑙𝑜𝑎𝑑𝑖𝑛𝑔) =
60
= 3.57 ℎ𝑟
3) Calculating the total time of AGVs (hour):
𝑡𝑖𝑚𝑒 = 3.6 + 3.57 = 𝟕. 𝟏𝟕 𝒉𝒓
4) Number of AGVs needed per hour:
7.17
𝑁 = = 8.43 = 𝟗 𝑨𝑮𝑽/𝒉𝒓
1 × 0.85
2017-2018 Page | 19
Industrial Engineering Tutorials
39) Parts needed for production in departments 1, 2, and 3 are moved from storage
by AGVs. Using the distance from the storage to each department as shown in
Figure and given the number of trips that will be made per hour to each
department and the time needed for loading and unloading given in the
accompanying table. Determine how many vehicles are needed. Assume an AGV
speed of 60 m/min and a congestion factor of 0.85.
Solution
1) Calculating the total time travelled by AGVs (hour):
𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 𝑜𝑓 𝑜𝑛𝑒 𝑡𝑟𝑖𝑝
𝑡𝑖𝑚𝑒 𝑡𝑟𝑎𝑣𝑒𝑙𝑙𝑒𝑑 = × 𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑡𝑟𝑖𝑝𝑠
𝑣𝑒𝑙𝑜𝑐𝑖𝑡𝑦 𝑜𝑓 𝑎𝑔𝑣
𝑡𝑖𝑚𝑒 𝑡𝑟𝑎𝑣𝑒𝑙𝑙𝑒𝑑
(46 × 2) (64 × 2)
=( × 10) + ( × 15)
60 × 60 60 × 60
(141 × 2)
+( × 20) = 2.36 ℎ𝑟
60 × 60
2) Calculating the total time of loading and unloading of AGVs (hour):
2(10 × 2 + 15 × 4 + 20 × 3)
𝑡𝑖𝑚𝑒 (𝑙𝑜𝑎𝑑𝑖𝑛𝑔 + 𝑢𝑛𝑙𝑜𝑎𝑑𝑖𝑛𝑔) = = 4.67 ℎ𝑟
60
3) Calculating the total time of AGVs (hour):
𝑡𝑖𝑚𝑒 = 2.36 + 4.67 = 𝟕. 𝟎𝟑 𝒉𝒓
4) Number of AGVs needed per hour:
7.03
𝑁 = = 8.27 = 𝟗 𝑨𝑮𝑽/𝒉𝒓
1 × 0.85
2017-2018 Page | 20
Industrial Engineering Tutorials
40) The oval of a top-driven carousel has a length of 15 m and a width of 1.5 m. The
speed of the carousel is 3 m/min, there are 60 carriers around the carousel and
each carrier contains only one bin, for a single and bidirectional carousel, compute
the average part retrieval time assuming a handling time of 30 s, Also, determine
the spacing between the carriers.
Solution
1) Calculating the total circumference of the path:
𝐶 = 2(15 − 1.5) + (𝜋 × 1.5) = 31.7 𝑚
2) Calculating the average retrieval time:
0.5𝐶 0.5 × 31.7 30
𝒔𝒊𝒏𝒈𝒍𝒆 𝒅𝒊𝒓𝒆𝒄𝒕𝒊𝒐𝑛: 𝑡 = +𝐻 = + = 𝟓. 𝟖 𝒎𝒊𝒏
𝑣 3 60
0.25𝐶 0.25 × 31.7 30
𝒃𝒊𝒅𝒊𝒓𝒆𝒄𝒕𝒊𝒐𝒏𝒂𝒍 𝒅𝒊𝒓𝒆𝒄𝒕𝒊𝒐𝒏: 𝑡 = +𝐻 = + = 𝟑. 𝟏𝟒 𝒎𝒊𝒏
𝑣 3 60
3) Calculating the spacing between carriers:
𝑆 = (𝐶/𝑛) = (31.7 /60) = 𝟎. 𝟓𝟑 𝒎
2017-2018 Page | 21
Industrial Engineering Tutorials
41) Calculate the cycle and production rate for a single-machine robotic cell one or
two-handed gripper for an 8-hr shift if the system availability is 85 %. Also
determine the percent utilization of machine and robot. On average, the machine
takes 48 sec. to process a part. The other robot operation times are as follows:
Activities Time (sec)
Robot picks a shaft from the conveyor 4.5
Robot moves the shaft to the lathe 2
Robot loads the shaft onto the lathe 1
Robot unloads the shaft from the lathe 0.5
Robot moves the conveyor 2
Robot puts the shaft on the outgoing conveyor 0.75
Robot moves from the output conveyor to the input conveyor 5
Solution
1) Using one handed gripper:
Finding Cycle time:
𝐶𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒 = 48 + 4.5 + 2 + 1 + 0.5 + 2 + 0.75 + 5 = 𝟔𝟑. 𝟕𝟓 𝒔
Finding total production/day:
8 × 3600
𝑝𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛 = × 0.85 = 𝟑𝟖𝟒 𝒖𝒏𝒊𝒕𝒔/𝒅𝒂𝒚
63.75
Machine utilization %:
𝑀/𝑐 𝑐𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒 48
𝑀/𝑐 𝑢𝑡𝑖𝑙𝑖𝑧𝑎𝑡𝑖𝑜𝑛 % = = × 100 = 𝟕𝟓. 𝟑 %
𝑇𝑜𝑡𝑎𝑙 𝑐𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒 63.75
Robot utilization %:
𝑅𝑜𝑏𝑜𝑡 𝑐𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒 15.75
𝑅𝑜𝑏𝑜𝑡 𝑢𝑡𝑖𝑙𝑖𝑧𝑎𝑡𝑖𝑜𝑛 % = = × 100 = 𝟐𝟒. 𝟕 %
𝑇𝑜𝑡𝑎𝑙 𝑐𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒 63.75
2017-2018 Page | 22
Industrial Engineering Tutorials
42) An Industrial robot is used in production facility load and unload workpieces from
a machine, these data table can be found:
Elemental Operation Times for a Robot
Activities Time (sec)
Machine operation time 25
Times associated with the robot
Unload unit 1.2
Move to the finished part conveyor 1.7
Release the unit 0.2
Move the arm to the input conveyor 2.6
Pick up a unit 0.3
Move to the machine 1.9
Load the machine 2.1
Find the cycle time using: one or two-handed gripper, then find the total
production units in an 8-hour-per-day operation with 80% efficiency.
Solution
1) Using one handed gripper:
Finding Cycle time:
𝐶𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒 = 25 + 1.2 + 1.7 + 0.2 + 2.6 + 0.3 + 1.9 + 2.1 = 𝟑𝟓 𝒔
Finding total production/day:
8 × 3600
𝑝𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛 = × 0.8 = 𝟔𝟓𝟖 𝒖𝒏𝒊𝒕𝒔/𝒅𝒂𝒚
35
2) Using two handed grippers:
Finding Cycle time:
𝐶𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒 = 25 + 1.2 + 2.1 = 𝟐𝟖. 𝟑 𝒔
Finding total production/day:
8 × 3600
𝑝𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛 = × 0.8 = 𝟖𝟏𝟒 𝒖𝒏𝒊𝒕𝒔/𝒅𝒂𝒚
28.3
2017-2018 Page | 23