Vous êtes sur la page 1sur 23

PERI ASIA PTE LTD

No1, Sims Lane #06-10


Singapore 387355
Phone: Singapore (65) 6744-2989
Fax: Singapore (65) 6744-3693

PRELIMINARY CALCULATION INFORMATION


Revision B
(for offer purpose only)

PROJECT : Vinh Tan 4 Thermal Power Plant - Turbine Generator


PROJECT NO : EXP14VN002
SUBJECT : Slab Formwork

DATE SUBMITTED : March 18, 2015

PREPARED BY : :

Nguyen, Linh Giang


FOR OFFER PURPOSE ONLY

CALCULATION CONTENT

CLIENT : Bach Dang Construction Corporation


PROJECT : Vinh Tan 4 Thermal Power Plant - Turbine Generator
PROJECT NO : EXP14VN002
SUBJECT : Slab Formwork
Revision A

ITEM DESCRIPTION PAGE No.

1 Calculation Content 1

2 Design information 2

3 Standard Slab Formwork Loading Calculation A1 - A4


Bottom Formwork

4 Standard Wall Formwork Loading Calculation A5 - A7


Side Formwork

5 Appendices
Appendix 1 Vertical and Horizontal Loads, Regulations and Standards B1
Appendix 2 DIN 18218 - Fresh Concrete Pressure B2 - B3
Appendix 3 DIN 18202 - Tolerances in Buildings B4 - B5
Appendix 4 Structural Analysis of Secondary Runner - Side Formwork B6
Appendix 5 MULTIFLEX - Girder Overview B7
Appendix 6 Steel Waler SRZ 100 information B8
Appendix 7 DW Tie Rod B9
Appendix 8 Push-Pull Props, Kicker Braces B10 - B12

Total number of pages in this submission : 22 pages

Calculation Content Prepared by : Peri Asia Pte. Ltd.


18/03/2015 1 Giang
FOR OFFER PURPOSE ONLY

CLIENT : Bach Dang Construction Corporation


PROJECT : Vinh Tan 4 Thermal Power Plant - Turbine Generator
PROJECT NO : EXP14VN002
SUBJECT : Slab Formwork
Revision B

DESIGN INFORMATION :

Codes and standards used for PERI calculations:


Please see Appendix 1

References:
▪ PERI Design Tables Formwork and Shoring that are based on DIN standards listed above
▪ PERI Product Information

Design information Prepared by : Peri Asia Pte. Ltd.


18/03/2015 2 Giang
FOR OFFER PURPOSE ONLY

STANDARD SLAB FORMWORK LOADING CALCULATION:

PROJECT : Bach Dang Construction Corporation


SUBJECT : Vinh Tan 4 Thermal Power Plant - Turbine Generator
OFFER NO : EXP14VN002
CLIENT : Slab Formwork Revision B
Bottom Formwork

GIVEN :
* Concrete Density = 26 kN/m3
* Slab/Beam Thickness (d) = 3000 mm
* Floor Height = 17.30 m
* Primary Runner = GT 24
* Secondary Runner = GT 24

CONCRETE LOAD

Slab/Beam Thickness = 3m

Concrete load = 26.0 kN/m3 x 3m = 78 kN/m2


Live load = 5.0 kN/m2
Dead Load = 0.4 kN/m3
Total Load (w) = 83.40 kN/m2

(I) CHECK PLYWOOD (ply of 18mm THK)

Consider 1000mm width,


Support Spacing, L = 250 mm ( also Secondary Girder spacing)
Design Concrete Pressure, w = 83.40 kN/m2
Cross-section Area, A = 18,000 mm2
Young's modulus, E = 10 kN/mm2
Moment of Inertia, I = 486,000 mm4
Section Modulus, Z = 54,000 mm3
Bending resistance, EI = 4.86 kNm2
Allowable Bending Stress = 26.20 N/mm2
Allowable Shear Stress = 2.62 N/mm2
Max. allowable deflection = 0.003 m
Safety Factor = 2

Consider simply supported,

BENDING MOMENT (MB) = wL2 (4 support)


10
= 0.52 kNm

BENDING STRESS = MB
Z
= 9.65 N/mm2
< 26.20 N/mm2 / 2 = 13.1 N/mm2 OK

Slab Formwork Loading Calculation Prepared by : Peri Asia Pte. Ltd.


18/03/2015 A1 Giang
FOR OFFER PURPOSE ONLY

STANDARD SLAB FORMWORK LOADING CALCULATION:

PROJECT : Bach Dang Construction Corporation


SUBJECT : Vinh Tan 4 Thermal Power Plant - Turbine Generator
OFFER NO : EXP14VN002
CLIENT : Slab Formwork Revision B
Bottom Formwork

SHEAR ( V ) = 6wL
10
= 12.51 kN

SHEAR STRESS = V
A
= 0.70 N/mm2
< 2.62 N/mm2 / 2 = 1.31 N/mm2 OK

ALLOWABLE DEFLECTION = L mm or 3 mm whichever is greater


270 (CP23:2000)
= 0.93
= 3.00 mm

ACTUAL DEFLECTION = 5wL4


384EI
= 0.87 mm < 3 mm OK

Therefore, the plywood satisfies the load requirements.

(II) CHECK SECONDARY GIRDER: GT 24

Young's modulus, E = 10 kN/mm2


Moment of Inertia, I = 80000000 mm4
Bending resistance, EI = 800 kNm2
Allowable bending moment = 14 kNm
Allowable shear = 28 kN
Max. allowable deflection = 0.003 m (L,clear/270 or 0.003m whichever is greater)
Secondary Girder spacing = 250 m
Load per metre run, w = 83.4 kN/m2 * 0.25 = 20.85 kN/m
Safety Factor = 2

Consider simply supported,

At Mid-span, Max. bending moment, M = wL2/8 = 14.0 kNm / 2


20.85 *L2/8 = 7.0
Lspan = 1.64 m

At Mid-span, Max. deflection, d = 5wL4/384EI = 0.003 m


5* 20.85 *L4/384EI = 0.003
Lspan = 1.78 m

Max. allowable Secondary Girder support span = 1.64 m

Actual Secondary Girder support span = 0.91 m


< 1.64 m OK

Slab Formwork Loading Calculation Prepared by : Peri Asia Pte. Ltd.


18/03/2015 A2 Giang
FOR OFFER PURPOSE ONLY

STANDARD SLAB FORMWORK LOADING CALCULATION:

PROJECT : Bach Dang Construction Corporation


SUBJECT : Vinh Tan 4 Thermal Power Plant - Turbine Generator
OFFER NO : EXP14VN002
CLIENT : Slab Formwork Revision B
Bottom Formwork

At Mid-span, Actual deflection, d = 5wL4/384EI where L = 0.91 m


= 0.0002 m
< 0.0034 m OK

At Support, Actual Shear, V = wL/2 where L = 0.91 m


= 9.49 kN
< 28.0 kN / 2 = 14 kN
OK

At Cantilever, Max. bending moment, M = wL2/2 = 14.0 kNm / 2


20.85 *L2/2 = 7.0
Lcantilever = 0.82 m

At Cantilever, Maximum deflection, d = wL4/8EI = 0.003 m


20.85 *L4/8EI = 0.003
Lcantilever = 0.98 m

Max. allow. Secondary Girder support cantilever = 0.82 m

Actual Secondary Girder cantilever = 0.60 m


< 0.82 m OK

Therefore, the secondary runner PERI GT24 Girder satisfies the load requirements.

(III) CHECK PRIMARY RUNNER: GT 24

No. of Girders used = 2 no.


as Primary Girder(single or twin)
Young's modulus, E = 10 kN/mm2
Moment of Inertia, I = 80000000 mm4
Bending resistance, EI = 1600 kNm2
Allowable bending moment = 28 kNm
Allowable shear = 56 kN
Max. allowable deflection = 0.0050 m (L,clear/270 or 0.003mm whichever is greater)
Effective Width = 0.61 m
2
Load per metre run, w = 83.4 kN/m * 0.61 m = 50.87 kN/m
No. of Supports = 2 no.
Safety Factor = 2

MID SPAN

At Mid-span, Max. bending moment, M = 0.125 * w * L^2 = 28.0 kNm / 2


0.125 * w * L^2 = 14.0 kNm
Lspan = 1.48 m

At Mid-span, Max. deflection, d = (5 * w * L^4) / (384 * EI) = 0.005 m


Lspan = 1.86 m

Slab Formwork Loading Calculation Prepared by : Peri Asia Pte. Ltd.


18/03/2015 A3 Giang
FOR OFFER PURPOSE ONLY

STANDARD SLAB FORMWORK LOADING CALCULATION:

PROJECT : Bach Dang Construction Corporation


SUBJECT : Vinh Tan 4 Thermal Power Plant - Turbine Generator
OFFER NO : EXP14VN002
CLIENT : Slab Formwork Revision B
Bottom Formwork

Max. allowable Primary Girder support span = 1.48 m

Actual Primary Girder support span = 0.91 m


< 1.48 m OK

At Mid-span, Actual deflection, d = (5 * w * L^4) / (384 * EI) where L = 0.91 m


= 0.0003 m
< 0.0050 m OK

At Support, Actual Shear, V = wL/2 where L = 0.91 m


= 23.2 kN
< 56.0 kN / 2 = 28 kN OK

CANTILEVER
At Cantilever, Max. bending moment, M = wL2/2 = 28.0 kNm / 2
50.87 *L2/2 = 14.0
Lcantilever = 0.74 m

At Cantilever, Max. deflection, d = wL4/8EI = 0.003 m


50.87 *L4/8EI = 0.003
Lcantilever = 0.93 m

Max. allow. Primary Girder support cantilever = 0.74 m

Actual Primary Girder support cantilever = 0.50 m


< 0.74 m OK

Therefore, the primary runner PERI GT24 Girder satisfies the load requirements.

Slab Formwork Loading Calculation Prepared by : Peri Asia Pte. Ltd.


18/03/2015 A4 Giang
FOR OFFER PURPOSE ONLY

STANDARD WALL FORM LOADING CALCULATION

PROJECT : Bach Dang Construction Corporation


SUBJECT : Vinh Tan 4 Thermal Power Plant - Turbine Generator
OFFER NO : EXP14VN002
CLIENT : Slab Formwork Revision B
Side Formwork

CALCULATION OF CONCRETE PRESSURE

Rate of concrete placement, R = 2.60 m/hr


Concrete temperature, T = 28°C
Concrete density, ρ = 2500 kg/m3
Height of pour, h = 3.0 m
Vertical form height = 3.0 m

Coefficient dependent on the size and shape = 1 (CP23 : 2000)


of the formwork, C1 (for walls, C1=1; for columns, C1=1.5)

Coefficient for the constituent material of = 0.45 Assume OPC Used


the concrete, C2 (Table 1, CP23: 2000)

Temperature coefficient, K = 0.669


= (36/(T+16))²

Vertical form or concrete discharge height = 3


whichever is greater, H

The maximum lateral pressure exerted by the plastic concrete shall be the smaller of the
following: (CP 23: 2000)
hs = P/ρ
(a) Pmax. = ρ = 2.00 m
[C R + C 2 K ( H −C 1 R ) ]
100 1
(b) Pmax = ρh/100

THEREFORE : h=
Pmax = 49.18 kN/m2 3m
DESIGN PRESSURE, P = 50 kN/m2

DEPTH OF HYDROSTATIC PRESSURE hs = 2.00m


1.00 m

Slab Formwork Loading Calculation Prepared by : Peri Asia Pte. Ltd.


18/03/2015 A5 Giang
FOR OFFER PURPOSE ONLY

STANDARD WALL FORM LOADING CALCULATION

PROJECT : Bach Dang Construction Corporation


SUBJECT : Vinh Tan 4 Thermal Power Plant - Turbine Generator
OFFER NO : EXP14VN002
CLIENT : Slab Formwork Revision B
Side Formwork

(I) CHECK PLYWOOD (18mm THK)


Consider 1000mm width,
Plywood thickness = 18 mm
Support Spacing, L = 350 mm
Design Concrete Pressure, w= 50 kN/m2
Cross-section area, A = 18,000 mm2
Section Modulus, Z = 54,000 mm3
Modulus of Inertia, I = 486,000 mm4
Young's modulus, E = 10 kN/mm2
Allowable Bending Stress = 26.2 N/mm2
Allowable Shear Stress = 2.62 N/mm2
Safety Factor = 2

Consider simply supported,

MAX BENDING MOMENT = wL2 (4 support)


(MB) 10
= 0.61 kNm

MAX BENDING STRESS = MB


Z
2
= 11.34 N/mm
< 26.2 N/mm2 / 2 = 13.1 N/mm2 OK

MAX SHEAR (V) = 6wL


10
= 10.50 kN

MAX SHEAR STRESS = V


A
= 0.58 N/mm2
< 2.62 N/mm2 / 2 = 1.31 kNm OK

ALLOWABLE DEFLECTION = L
270
= 3.70 mm or 3mm whichever is greater (CP23:2000)
= 3.70 mm

Slab Formwork Loading Calculation Prepared by : Peri Asia Pte. Ltd.


18/03/2015 A6 Giang
FOR OFFER PURPOSE ONLY

STANDARD WALL FORM LOADING CALCULATION

PROJECT : Bach Dang Construction Corporation


SUBJECT : Vinh Tan 4 Thermal Power Plant - Turbine Generator
OFFER NO : EXP14VN002
CLIENT : Slab Formwork Revision B
Side Formwork

ACTUAL DEFLECTION = 5wL4


384EI
= 2.01 mm < 3.70 mm OK

Therefore, the plywood satisfies the load requirements.

(II) CALCULATION OF SECONDARY RUNNER : PERI GT24 GIRDER

SUPPORT SPACING = 0.350 m


ALLOWABLE BENDING MOMENT (M) = 14 kNm
ALLOWABLE SHEAR (V) = 28 kN
CONCRETE PRESSURE (w) = 50 kN/m2
GT24 GIRDER (EI) = 800 kNm2
SAFETY FACTOR = 2

From Computer Output: Appendix 4 Page B6

MAX BENDING MOMENT = 6.9 kNm per m run


= 6.9 x 0.350 m
= 2.415 kNm
< 14 kNm / 2 = 7 kNm OK

MAX SHEAR V = 34.9 kN per m run


= 34.9 x 0.350 m
= 12.22 kN
< 28 kN / 2 = 14 kN OK

ACTUAL SPAN DEFLECTION = 1.66 mm per m run


= 1.66 x 0.350 m
= 0.581 mm < 3.00 mm OK

ACTUAL CANTILEVER DEFLECTION = 1.36 mm


= 1.36 x 0.350 m
= 0.476 mm < 3.00 mm OK

MAX. WALER LOAD = 58.0 kN/m

Therefore, the secondary runner PERI GT24 Girder satisfies the load requirements.

Slab Formwork Loading Calculation Prepared by : Peri Asia Pte. Ltd.


18/03/2015 A7 Giang
FOR OFFER PURPOSE ONLY

STANDARD WALL FORM LOADING CALCULATION

PROJECT : Bach Dang Construction Corporation


SUBJECT : Vinh Tan 4 Thermal Power Plant - Turbine Generator
OFFER NO : EXP14VN002
CLIENT : Slab Formwork Revision B
Side Formwork

(III) CALCULATION OF MAIN BEARER : PERI COLUMN STEEL WALER

SUPPORT SPAN (MAX) or Tie-rod spacing = 1.30 m


MAX. WALING LOAD (w) = 58.00 kN/m
ALLOWABLE BENDING MOMENT (M) = 24.72 kNm
ALLOWABLE SHEAR (V) = 180 kN
SRZ 100 WALER (EI) = 845 kNm2
SAFETY FACTOR = 2

MAX BENDING MOMENT = wL2


8

= 58.00 x ( 1.3 )2
8
= 12.25 kNm
< 24.72 kNm / 2 = 12.4 kNm OK

MAX SHEAR V = wL
2
= 58.00 kN/m x 1.3
2
= 37.7 kN
< 180 kN / 2 = 90.0 kN OK

ALLOWABLE DEFLECTION = L
270

= 4.81 mm or 3mm whichever is greater


= 4.81 mm

ACTUAL DEFLECTION = 5wL4


384EI
= 2.553 mm < 4.81 mm OK

Therefore, the main bearer PERI Column Steel Waler satisfies the load requirements.

(IV) CALCULATION OF TIE ROD DW 15.0

Allowable Working Load = 180.0 kN


Actual Tie Rod Spacing = 1.30 m
Safety Factor = 2

At Maximum (Full) Pressure Area,


Consider the most critical steel waler,
Max. Waling Load = 58.00 kN/m

FORCE ON TIE ROD = 58.00 * 1.30 m


= 75.40 kN
< 180.00 kN / 2 = 90.0 kN OK

Therefore, Tie Rod dw 15.0 satisfies the load requirements.

Slab Formwork Loading Calculation Prepared by : Peri Asia Pte. Ltd.


18/03/2015 A8 Giang
Vertical and Horizontal Loads,
Regulations and Standards

Vertical Loads
Dead Load: – PERI system parts see: component catalogue
– Otherwise DIN 1055

Concrete Load: – According to DIN 1055 generally reinforced concrete 25 kN/m³


allowance for fresh concrete 1 kN/m³

Live Loads: – Shoring systems according to DIN 4421 generally 20 % of the


fresh concrete load, at least 1.5 kN/m², but not more than 5.0 kN/m²
– Working scaffolds according to DIN 4420

Horizontal Loads
Wall Formwork / Vertical Formwork / Stopend Formwork
– Fresh concrete pressure according DIN 18218
– Wind load according to DIN 1055

Wind velocity Impact pressure Wind load w for wall formwork


[m/s] [km/h] q [kN/m2] (cp = 1.3) [kN/m2]
0 to 8 m above ground 28.3 102 0.5 0.65
8 to 20 m above ground 35.8 129 0.8 1.04
20 to 100 m above ground 42.0 151 1.1 1.43
over 100 m above ground 45.6 164 1.3 1.69

Wind load w is obtained by multiplying the impact pressure q by


the coefficient cp (generally for wall formwork cp = 1.3).

Scaffolds / Falsework according to DIN 4421 generally Scaffolds / Falsework according DIN 4421 generally
– Wind loads according to DIN 1055.
– Equivalent horizontal load from working operations:
1 % of the locally effective vertical load.
– Equivalent horizontal load from inclined slab props:
1 % of the locally effective vertical load
(already taken into account in the diagrams
for the type-tested free standing PERI systems).

Horizontal Loads: – Such as rope tension forces, shear forces, etc.

General Standards Special Standards


DIN 1045 Solid Structures DIN 4420 Work and Safety Scaffolds
DIN 1052 Timber Structures DIN 4421 Shoring Systems
DIN 4113 Aluminium Structures DIN 4422 Mobile Scaffolds
DIN 18800 Steel Structures DIN 4425 Light Scaffold Spindles
DIN 18216 Formwork Tie Rods
Standards for Load Assumptions DIN 18217 Concrete Surfaces and Plywood

DIN 1055 Load Assumptions for Structures DIN EN 74 Scaffold Couplers


DIN 18218 Fresh Concrete Pressure DIN EN 1065 Steel Slab Props with Extension Unit
DIN 18202 Tolerances in Buildings

Safety and Health Rules of the national Construction Liability Insurance

3
- B1 -
DIN 18218 Fresh Concrete Pressure

Vibration depth Consistency Range


The fresh concrete pressure obtained old new
from the Figure 1 chart applies for a vi- K1 v = 1.45 – 1.26 KS (stiff) v ≥ 1.20
bration depth hr up to the hydrostatic K2 a ≤ 40 cm KP (plastic) a = 35 – 41 cm
head hs. If the vibration depth is intend- K3 a = 41 – 50 cm KR (high slump) a = 42 – 48 cm
ed to be greater than hs, and the other Flowing Concrete a = 51 – 60 cm KF (flowing) a = 49 – 60 cm
assumptions specified on the chart re-
main the same, the fresh concrete pres- v = compaction according to Walz a = slump dimension
sure is to be increased to pb = 25 hr.

Table 10.13 Slump dimensions classification DIN 1045-2:2001, Table 6


Consistency class Classification Slump dimension
stiff F1 ≤ 34 cm
plastic F2 35 – 41 cm
slump F3 42 – 48 cm
Chart for determining the fresh con- high slump F4 49 – 55 cm
crete pressure pb depending on the flowing F5 56 – 62 cm
rate of rise vb and the consistency. high flowing F6 ≥ 63 cm

140
Assumption:
– Bulk density fresh concrete: 25 kN/m³
130
– Final set of the concrete: 5 h
Fresh Concrete Pressure pb in kN/m²

5
– Temperature of the fresh concrete: +15 °C
120 – Compaction with internal vibrators
– Tight formwork joints
110

4 100

90 17
+
v b
17
e
et
80 n cr
co 18
3 g +
in v b
lo
w 14
70 F K3
9
+1
10v
b
60
K2

2 50
21
vb +
K1 5
40
Hydrostatic head hs in m

30
1
Columns
20
Walls

10
Rate of Rise vb in m/h

0 0
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5 7

4
- B2 -
Examples of concrete pressures with differing concrete temperatures, with or without retarding agent.

1. Concrete temperature 15 °C 2. Concrete temperature 5 °C


without retarding agent without retarding agent
140 140

130 130
Fresh Concrete Pressure p in kN/m²

Fresh Concrete Pressure p in kN/m²


120 120

110 110

te
re
nc
100 100
te

co
c re K3

g
90 on 90

in
c

ow
g
in

Fl
80 80
ow K3 K2
Fl
70 70
K2
60 60
K1
50 50
K1
40 40

30 30
Columns Columns
20 20
Walls Walls
10 10
0 0
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5 7 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5 7
Rate of Rise vb in m/h Rate of Rise vb in m/h

3. Concrete temperature 15 °C 4. Concrete temperature 5 °C


with 5 h retarding agent with 5 h retarding agent
140 140

130 130
Fresh Concrete Pressure p in kN/m²

Fresh Concrete Pressure p in kN/m²

te

120 120
re
nc
co

110 110
te

ng

K3
re
nc

100 100
wi
co

K2
Flo
g

90 90
in

K3
ow

80 80
Fl

70 K2 70
K1
60 60
K1
50 50

40 40

30 30
Columns Columns
20 20
Walls Walls
10 10
0 0
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5 7 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5 7
Rate of Rise vb in m/h Rate of Rise vb in m/h

All other assumptions according to DIN 18218:


– Bulk density fresh concrete 25 kN/m³
– Tight formwork joints
– Compaction with internal vibrators

5
- B3 -
DIN 18202 Tolerances in Building

Extract from DIN 18202, Tolerances in Building, Edition May 1986


Table 3. Deflection tolerances
Line 1 2 3 4 5 6
Position deviations (limit values), in mm,
for distance of measuring points in m, up to
0.1 11 41 101 151
1 Unfinished surfaces of slabs, concrete bases and subfloors 10 15 20 25 30
2 Unfinished surfaces of slabs, concrete bases and subfloors to more strin- 5 8 12 15 20
gent specifications, e.g. to take floating screeds, industrial floors, tiles,
composite screeds
Finished surfaces for secondary purposes, e.g. in stores, cellars, base-
ments

3 Floors with finished surfaces, e.g. screes as wearing surfaces, screeds to 2 4 10 12 15


take flooring
Flooring, tiles, trowelled finishes and glued flooring

4 Floors with finished surfaces to more stringent specifications, e.g. with 1 3 9 12 15


self-levelling screeds
5 Wall surfaces and soffits of structural slabs that are unfinished 5 10 15 25 30
6 Wall surfaces and soffits of slabs tht are finished, e.g. plastered walls, 3 5 10 20 25
wall claddings, suspended ceilings
7 As in Line 6, but more stringent specifications 2 3 8 15 20

1) Intermediate values are to be taken from Fig. 1and 2 and rounded to mm.

[mm]

30

25

20
Line 5
Tolerances

15
Line 6

10

5 Line 7

0 [m]
0,1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Spacing of measuring points

Figure 2
Deflection tolerances of wall surfaces and slab
soffits (according to Lines in Table 3).

6
- B4 -
Measurement of deflection
With our large panels, the tie points
can normally be taken as reference of
check points. In accordance with the di-
agram below, a straight edge is applied
in such a way that it touches the
stripped concrete wall, with the two
measuring wedges showing the same
deflection. This deflection it to be com-
pared to the permissible deflection.

Example:
TRIO panel 270 x 240: maximum defor- l = 2.03 m
mation is measured in the middle of max f
the panel.

According to DIN 18202, Fig. 2, with a


check point interval of about 2.0 m and
complying with Line 7, a maximum de-
flection of approx. 4.8 mm is permissi-
ble.

Straight edge

Measuring wedge

max f

Measuring wedge

The permissible deflection is always de-


termined from the check point interval
(here, the tie point interval).

7
- B5 -
!" # $! # % & ! '! !
( ) **+
# & "$ , !- .
/! "$ ,

0 / ! ,! 1 " !.

. ! /2 ! !/ &7 ! . !8 /8
+34*)4+*)5 6 '
MULTIFLEX
Girder Overview

GT 24 VT 20
60

40
240

120

200

120
60

40

28 27

80 80

Static Values
GT 24 VT 20
Perm. Shear Force Q QD 14.0 kN 11.0 kN
QZ 13.0 kN
Perm. Bending Moment M 7.0 kNm 5.0 kNm

Moment of Inertia ly 8000 cm4 4290 cm4

Flexural Strength EIy 800 kNm2 429 kNm2


Weight 5.9 kg/m 5.9 kg/m

66
4

&
! " #$ $% &
+
! " '( ( )% * &
, ' , & -

.) / %
0 % & -
. '( '0 %1 '( '2 3 4 " &
4 -

5 ' %
" 6 / 5 ' %1 '( '2 )%
4 " * &
+3 -

%
" 6 / 7 8 3 %1 '( '2 9

6 9 0 "4"
: 8 3 " 4 "
; -

<.$ 7 6 < , +
Tie Rod
DW 15, DW 20, DW 26.5

Rod Diameter Ø [mm]


15 20 26.5
Nominal cross-section [mm²] 177 314 551
Load group according to DIN 18216 [kN] 90 150 250

Elongation of Dywidag
threaded tie rod

E = 205 000 N/mm2

IO

Ø 26.5
250

200

Ø 20
Tie Load [kN]

150

100 Ø 15

50

0 0.5 1.0 1.5 2.0 2.5

Tie Elongation [ mm
m ]

57
Push-Pull Props, Kicker Braces
Load Capacity

General Notes

– all PERI push-pull props and kicker


braces are type-tested.

– the load capacity information refers


to use with symmetrical extensions.

– the connections are to be pin jointed


and made structurally adequate by
calculations in each individual case.

Push-Pull Prop RS I L = 1.84 – 2.94 m


Extension length L [m] 1.84 – 2.45 2.75 2.94
Perm. Compressive Force F [kN] 16.3 14.6 12.5
Perm. Tension Force F [kN] 10.9

Push-Pull Prop RS II L = 2.56 – 4.06 m


Extension length L [m] 2.56 – 2.95 3.35 3.75 4.06
Perm. Compressive Force F [kN] 16.3 11.7 8.5 7.0
Perm. Tension Force F [kN] 10.9

Push-Pull Prop RSS I L = 2.05 – 2.94 m


Extension length L [m] 2.05 2.25 2.50 2.75 2.94
Perm. Compressive Force F [kN] 37.7 36.6 34.2 28.7 22.6
Perm. Tension Force F [kN] 21.1 Static System for Push-Pull Props
perm. F

Push-Pull Prop RSS II L = 2.91 – 3.80 m


Extension length L [m] 2.91– 3.00 3.25 3.50 3.80
Perm. Compressive Force F [kN] 30.0 25.0 19.0 13.0
Perm. Tension Force F [kN] 21.1
Wind

Push-Pull Prop RSS III L = 4.60 – 6.00 m


Extension length L [m] 4.60 5.00 5.30 5.65 6.00
Perm. Compressive Force F [kN] 30.4 24.7 21.0 17.1 13.4
Perm. Tension Force F [kN] 28.9 60°

51
Push-Pull Props, Kicker Braces
Load Capacity

Push-Pull Prop RS 1000 L = 6.40 – 10.00 m


Extension length L [m] 6.40 7.00 8.00 9.00 10.00
Perm. Compressive Force F [kN] 29.5 26.0 19.6 14.6 11.1
Perm. Tension Force F [kN] 30.2

Push-Pull Prop RS 1400 L = 6.40 – 14.00 m


Extension length L [m] 6.40 –11.00 12.00 13.00 14.00
Perm. Compressive Force F [kN] 30.9 28.6 23.4 19.1
Perm. Tension Force F [kN] 30.9

Kicker Brace AV L = 1.08 – 1.40 m


Extension length L [m] 1.08 1.25 1.40
Perm. Compressive Force F [kN] 25.4 20.1 16.2
Perm. Tension Force F [kN] 21.1

Kicker Brace AV 190 L = 1.08 – 1.90 m


Extension length L [m] 1.08 1.25 1.50 1.75 1.90
Perm. Compressive Force F [kN] 39.2 38.5 37.4 34.6 31.3
Perm. Tension Force F [kN] 21.1

Static System for Kicker Braces

Kicker Brace AV 210 L = 1.28 – 2.10 m


Extension length L [m] 1.28 1.45 1.70 1.95 2.10
Perm. Compressive Force F [kN] 38.7 38.4 37.3 34.2 30.6
Perm. Tension Force F [kN] 21.1
Wind

Kicker Brace AV for RSS III L = 2.03 – 2.92 m


perm
Extension length L [m] 2.03 2.25 2.50 2.75 2.92 .F
L
Perm. Compressive Force F [kN] 37.7 36.6 34.2 28.7 22.6
Perm. Tension Force F [kN] 21.1 0°-90°

52
Table of maximum Widths of Influence

Figure 1 Figure 2
Formwork Height h [m] 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0
max. width of influence [m] 3.53 2.73 2.19 1.82 1.58 1.42 1.93 1.67 1.49 1.35
act. push-pull prop load. FRS [kN] 9.7 9.7 9.8 9.8 9.8 9.6 FRS1 9.4 11.3 11.3 11.3
at max. spacing FRS2 9.5 8.5 9.3 10.1
act. kicker brace load FAV [kN] 2.1 2.3 2.2 2.2 2.3 2.6 2.6 2.3 2.1 1.9
at max. spacing
Distance of base plate [m] 1.2 1.6 2.0 2.4 2.9 3.5 x1 4.3 4.7 5.3 5.9
x=
from rear side of formwork x2 2.6 2.6 2.8 3.0
*Top connection point [m] 1.0 1.2 1.5 1.8 2.0 2.0 y1 1.5 1.8 1.8 1.8
y=
from top of formwork y2 4.5 5.5 6.2 6.9

*If neccessary, the distances must be Figure 2


adapted to the existing formwork sys-
tem.

y1

y2
0.8 kN/m2
A maximum force of 11.3 kN is to be
transfered into the building at the base
of the push-pull prop for the given
width of influence.

Figure 1
h

Wind Loads:
y

h < 8 m = 0.5 kN/m2

F RS
8 m < h < 20 m = 0.8 kN/m2
0.5 kN/m2

0.5 kN/m2

1
F RS
h

2
F RS

FAV FAV
60° 60° 60°

x x2

x1

53