Vous êtes sur la page 1sur 50

MAKATI BGC

Close proximity to
NAIA,Makati
and BGC
FOR INTERNAL TRAINING PURPOSES ONLY
MAKATI
7.4 km
9.8km 20 mins
28 mins

Prime
Accessibility
through the government’s

Skyway and
Intermodal
6.7 km
23 mins

Transport System FOR INTERNAL TRAINING PURPOSES ONLY


TAGUIG INTEGRATED
TERMINAL EXCHANGE
ADJACENT TO ARCA SOUTH
SKYWAY RAMP ARCA SOUTH EXIT
METRO MANILA EXPRESSWAY PROJECT OR C6 PROJECT STAGE 1
Groundbreaking: Jan 8, 2018
Target Completion: 2020
MEGA MANILA SUBWAY
Outline of the MMSP Phase 1

Length of Subway Approx. 25km

Start of Construction Q4 2018

Start of Construction Q3 2022


(BGC, Arca South)

Start of Operations Q3 2025

Arca South

Source: Rappler
TAGUIG INTEGRATED TERMINAL EXCHANGE
ADJACENT TO ARCA SOUTH
Groundbreaking: Jan 17, 2018
Target Completion: 2020

Arca South

ITS Site
5.57 ha
TAGUIG INTEGRATED TERMINAL EXCHANGE SOUTH EAST METRO MANILA EXPRESSWAY
Groundbreaking: Jan 17, 2018 Groundbreaking: Jan 8, 2018
Target Completion: 2020 Target Completion: 2020
FAMILY PARK
CENTRAL EVENTS AREA
ARCA SOUTH
PHASE 1
CONSTRUCTION UPDATES
2020
Q4 2018

Q1 2019

Q1 2018

2017 Launches
1. Avida Towers Vireo
2. Alveo Park Cascades
3,500M
3,500M
3,500M
• Derived from “trine”, defined as a set of three.

• Represents the three buildings of the development

• Communicates GROWTH, business ADVANCEMENT, and professional


workspaces that inspire connectivity and openness
SOUTH
ITX

AYALA REG’L
MALL

LIFESTYLE
MALL/BPO/SEDA

COMMERCIAL LOT

AYALA LIFESTYLE
MALL
INSTITUTIONAL
AREA
DEVELOPMENT DATA
Total Land Area 11,590 sqm
FAR 8.49
No. of Towers 3
No. Floors 13
No. of Basements 5
Air-conditioning Air Cooled VRF
System

West Tower
Turnover Q4 2023
Typical Floor Plate 2,428 sqm
LEGEND
No. of Office Units 180 RETAIL UNIT SPACE
HALLWAY ACCESS

Modal Size 92 PE/STAIR TOWER ACCESS


RETAIL PE/STAIR ACCESS

No. of Elevators 9 POWERHOUSE


OFFICE UNITS
F R O M I T S

PEDESTRIAN
CIRCULATION T3

RETAIL ARCADE

PEDESTRIAN ACCESS T3

MAIN LOBBY

SECONDARY T1
ENTRANCE T2

T2

LEGEND
RETAIL UNIT SPACE
HALLWAY ACCESS
PE/STAIR TOWER ACCESS
RETAIL PE/STAIR ACCESS
POWERHOUSE
OFFICE UNITS
VEHICULAR
CIRCULATION

MAIN DROP-OFF

SECONDARY
DROP-OFF

RETAIL & OFFICE Parking


Entry/Exit
OFFICE
Parking Entry/Exit

VEHICULAR
CIRCULATION

LEGEND
RETAIL UNIT SPACE
HALLWAY ACCESS
PE/STAIR TOWER ACCESS
RETAIL PE/STAIR ACCESS
POWERHOUSE
OFFICE UNITS
BASEMENT 1
PARKING PLAN
BASEMENT 2
PARKING PLAN
VEHICULAR
CIRCULATION

MAIN DROP-OFF

SECONDARY
DROP-OFF

RETAIL & OFFICE Parking


Entry/Exit
OFFICE
Parking Entry/Exit

VEHICULAR
CIRCULATION

LEGEND
RETAIL UNIT SPACE
HALLWAY ACCESS
PE/STAIR TOWER ACCESS
RETAIL PE/STAIR ACCESS
POWERHOUSE
OFFICE UNITS
BASEMENT 2
PARKING PLAN
BASEMENT 3-5
PARKING PLAN
GF
FLOOR PLAN
WEST TOWER GF
GLA 705 SQM
GFA 2,037 SQM
NO. OF UNITS 8
UNIT SIZES 63 – 129 SQM
7 th
Low Zone 701
245 sqm 702
101 sqm
703 705
WEST TOWER 7F 99 sqm 92 sqm
NSA 1,960 SQM 706 707
GFA 2,428 SQM 92 sqm 92 sqm
708
COMMON AREAS 467 SQM 718 243 sqm
NO. OF UNITS 15 230 sqm
UNIT SIZES 92 – 245 SQM
717
92 sqm 716
92 sqm
715 712
92 sqm 92 sqm711
92 sqm 710 709
92 sqm 214 sqm
8 th
801
High Zone 245 sqm 802
101 sqm 803
99 sqm 805
WEST TOWER 8F 92 sqm 806
92 sqm
NSA 1,960 SQM 807
GFA 2,428 SQM 92 sqm

COMMON AREAS 467 SQM 809


818 243 sqm
NO. OF UNITS 15 230 sqm
UNIT SIZES 92 – 245 SQM
817
92 sqm 816
92 sqm
815 812 809
92 sqm 92 sqm 811 214 sqm
92 sqm
810
92 sqm
9 th – 12 th
x01
High Zone 245 sqm
x02
101 sqm x03 x05
99 sqm
92 sqm
x06
x07
TOWER 1 9F – 16F 92 sqm
92 sqm
NSA 1,994 SQM x08
GFA 2,428 SQM x18 260 sqm
230 sqm
COMMON AREAS 432 SQM
NO. OF UNITS 15 x17
UNIT SIZES 92 – 245 SQM 92 sqm
x16
92 sqm x15
92 sqm x12
92 sqm x11
92 sqm x10 x09
231 sqm
92 sqm
VIEW FROM ARCA BOULEVARD

West
VIEW FROM RADIAN ROAD Cor. ARCA
BOULEVARD
VIEW FROM RADIAN ROAD
Green Building Code and LEED Compliant

Gray water reuse through rainwater harvesting

Low-flow fixtures, dual flush valves for toilets

Increased operable windows for better ventilation and natural light

Motion sensors would be installed throughout the building for


energy saving
Alveo Projects in Arca South

West Veranda South Veranda East Veranda North Veranda


Launched: Sept. 2014 Launched: Oct. 2014 Launched: Sept. 2015 Launched: Sept. 2016
Launch Price: P130k/sqm Launch Price: P133k/sqm Launch Price: P137k/sqm Launch Price: P140k/sqm
Current Price : P207k/sqm Current Price : P207k/sqm Current Price : P207k/sqm Current Price : P207k/sqm
% inc : 59% % inc : 56% % inc : 51% % inc : 48%
Alveo Projects in Arca South

Park Cascades East Park Cascades North & South


Launched: Nov. 2017 Launched: Aug. 2018
Launch Price: P185k/per sqm Launch Price: 203k/sqm
Current Price:P215k/sqm Current Price: P215k/sqm
% inc : 16% % inc : 6%
Alveo Office Projects

HSS Corporate Plaza Tower 1 HSS Corporate Plaza Tower 2 PT Corporate Plaza Alveo Park Triangle
Launched: Oct. 2012 Launched: May 2013 Launched: Aug 2014 Launched: Mar 2016
Launch Price: P133k/sqm Launch Price: P139k/sqm Launch Price: P199k/sqm Launch Price: P210k/sqm
Current Price : P300k/sqm Current Price : P300k/sqm Current Price : P300k/sqm Current Price : P300k/sqm
% inc : 126% % inc : 116% % inc : 51% % inc : 43%
Alveo Office Projects

The Stiles Enterprise Plaza Alveo Financial Tower


Launched: Feb 2015 Launched: Sept 2015
Launch Price: P147k/sqm Launch Price: P240k/sqm
Current Price: P240k/sqm Current Price:P300k/sqm
% inc : 63% % inc : 25%
Pricing and Payment Terms
Average Selling Price : P275k / sqm

STANDARD TERMS DP MA BALANCE DISCOUNT

Cash 95-5 100% - 8%


20-80 (Bank) 20% - 80% 8%
50-50 (60) 50% 50% over 60 months - 2%
30-70 (60) 30% 70% over 60 months - 1%
20-80 (60) 20% 80% over 60 months - -
10-90 (60) 10% 90% over 60 months - -
Floor Holding
7F to 12F to be released
Courtyard Sync Street
X01 X02 X03 X05 X06 X07 X08 x09 X10 X11 X12 X15 X16 X17 18
16 HOLD
15 HOLD
12 12F Floor Buyer
11 11F Floor Buyer
10 10F Floor Buyer
9 9F Floor Buyer
8 801-802-803 805-806-807-808 809-810-811-812-815 816-817-818
7 701-702-703 705-706-707-708 709-710-711-712-715 716-717-718
6 HOLD
5 HOLD
3 HOLD
2 HOLD

Floors on Hold
Released Floors
Reasons to Purchase
HIGHLY NETWORKED
o VIA THE SKYWAY AND SOUTH INTERMODAL
o TRANSPORT SYSTEM PROXIMITY TO MAKATI AND BGC CBDs

MODERN WORK SPACE


o PEDESTRIAN RETAIL EXPERIENCE ON THE GROUND FLOOR
o MODERN ARCHITECTURE AND INTERIOR DESIGN.
o GRADE A OFFICE BUILDING

SUSTAINABLE INVESTMENT

₱ o FIRST OFFICE FOR SALE BUILDING IN ARCA SOUTH


o OPERATIONAL EFFICIENCY (GBC and LEED)
o ALVEO OFFICE AND ARCA TRACK RECORD
THANK YOU

Vous aimerez peut-être aussi