Duqm Refinery Project EPC Package One

Duqm Refinery Project EPC Package One


PROJECT NO: 10121 UNIT: U340-SRU
PURCHASE ORDER NUMBER (RFP): 1012201050 EQUIPMENT: REACTION FURNACE PACKAGES
REVIEW RESPONSE BY PURCHASER:
Purchaser review and comments do not indicate either responsibility or liability for accuracy and completeness of this document or alter any
contractual terms and conditions:

DATE:
VENDOR IDENTIFICATION: TECHNICAS REUNIDAS

DOCUMENT TITLE:
NAMEPLATE DRAWING OR STEAM DRUM (340V-103/203/303)
VENDOR DOCUMENT No.: REV: A CODE: ESP-0004

CONTRACTOR DOCUMENT No.: REV: 0 DOCUMENT CLASS: 3

DRP001-PUC-PRO-U-000-014-Tmp01
1 2 3 4 5 6 7 8 9 10 11 12

NAME PLATE NOTES:


1- ALL DIMENSIONS ARE IN MILLIMETERS.
2- APPLICABLE STANDARD DRAWING NO, : DRP001-PUC-SPE-V-000-003_1
250 250 3- DATA: DATA ON POLISHED SURFACE IS TO BE INSERTED (IN THE ENGLISH
LANGUAGE) BY MEANS OF ENGRAVING OR HARD STAMPING AND MUST BE CLEARLY
A 10 10 A
LEGIBLE. THE HEIGHT OF THE LETTERING SHOULD BE APPROX. 4 MM.
4- THE NAME PLATES SHOULD BE ATTACHED TO THE NAME PLATE BRACKET

6 6 6 6 6 8 6 6

6 6 6 6 6 8 6 6
ENGINEERED ENGINEERED BY MEANS OF RIVET (4MM DIA).

4
5- FINISH: 'FACE' MACHINED AND POLISHED INCLUDING CAST LETTERING.
TECNICAS REUNIDAS TECNICAS REUNIDAS BACKGROUND KNURLED AND PAINTED BLACK.

EQUIPT. / PLANT ITEM No. 340F-101 PURCHASE ORDER No. 1012201050 EQUIPT. / PLANT ITEM No. 340F-201 PURCHASE ORDER No. 1012201050 6. HYDROSTATIC TEST (DAY,MONTH,YEAR)

4 4 4 4

4 4 4 4
7. SERVICE TO BE SPECIFIED, LEATHAL HYDROGEN ETC.
MANUFACTURER: METALFAB MIDDLE EAST FZ LLC MANUFACTURER: METALFAB MIDDLE EAST FZ LLC
8. EPC CONTRACTOR STAMP.
MANUFACTURE SERIAL NUMBER: MFME-PB-1002 A MANUFACTURE SERIAL NUMBER: MFME-PB-1002 B 9. INSPECTION AUTHORITY STAMP & NUMBER.
YEAR OF MANUFACTURE: 2019 YEAR OF MANUFACTURE: 2019
4

4
B
UNITS UNITS B
DESIGN PRESSURE / MAWP Kg / m₂g 50 & FULL VACUUM / 5.32 DESIGN PRESSURE / MAWP Kg / m₂g 50 & FULL VACUUM / 5.32
DESIGN TEMPERATURE / MDMT °C 290 / 5 DESIGN TEMPERATURE / MDMT °C 290 / 5
CAPACITY m³ 27 CAPACITY m³ 27
CORROSION ALLOWANCE mm 3 CORROSION ALLOWANCE mm 3
HYDROSTATIC HORIZ. (NEW) SHOP barg 81.6 HYDROSTATIC HORIZ. (NEW) SHOP barg 81.6
230

230
TEST VERT. (NEW) FIELD - TOP barg - TEST VERT. (NEW) FIELD - TOP barg -
PRESSURE PERIODIC - TOP barg - PRESSURE PERIODIC - TOP barg -

DESIGN CODE: ASME SEC - I Ed. 2017 DESIGN CODE: ASME SEC - I Ed. 2017
WELD JOINT EFFCIENCY: SHELL 100% HEADS 100% WELD JOINT EFFCIENCY: SHELL 100% HEADS 100%
C C

STRESS RELIEVED: YES RADIOGRAPHY: FULL STRESS RELIEVED: YES RADIOGRAPHY: FULL
TOTAL MASS EMPTY: 23800 Kg. DATE: NOTE: 6 TOTAL MASS EMPTY: 23800 Kg. DATE: NOTE: 6
TOTAL MASS FULL OF WATER: 53000 Kg. TOTAL MASS FULL OF WATER: 53000 Kg.
TOTAL VOLUME: 27000 L. TOTAL VOLUME: 27000 L.
NOTE : 8 NOTE : 9 NOTE : 8 NOTE : 9

NOTE : 7 NOTE : 7

MANUFACTURE NAME PLATE DETAIL


MANUFACTURE NAME PLATE DETAIL
D D

SCALE 15:1
SCALE 15:1
250
1
10
6 6 6 6 6 8 6 6

ENGINEERED
4

TECNICAS REUNIDAS
EQUIPT. / PLANT ITEM No. 340F-301 PURCHASE ORDER No. 1012201050
4 4 4 4

E E
MANUFACTURER: METALFAB MIDDLE EAST FZ LLC
MANUFACTURE SERIAL NUMBER: MFME-PB-1002 C
YEAR OF MANUFACTURE: 2019
4

UNITS
DESIGN PRESSURE / MAWP Kg / m₂g 50 & FULL VACUUM / 5.32
DESIGN TEMPERATURE / MDMT °C 290 / 5
CAPACITY m³ 27
CORROSION ALLOWANCE mm 3
HYDROSTATIC HORIZ. (NEW) SHOP barg 81.6
230

TEST VERT. (NEW) FIELD - TOP barg -


F F
PRESSURE PERIODIC - TOP barg -

DESIGN CODE: ASME SEC - I Ed. 2017


WELD JOINT EFFCIENCY: SHELL 100% HEADS 100%
STRESS RELIEVED: YES RADIOGRAPHY: FULL
TOTAL MASS EMPTY: 23800 Kg. DATE: NOTE: 6
TOTAL MASS FULL OF WATER: 53000 Kg.
TOTAL VOLUME: 27000 L.
NOTE : 8 NOTE : 9
G METALFAB DRAWING NUMBER: MFJO840-NPL-0001 SHEET 1 OF 1 G

NOTE : 7 DESIGN & MANUFACTURER

METALFAB MIDDLE EAST FZ LLC, UAE


info@metalfabme.com, www.metalfabme.com
3
MANUFACTURE NAME PLATE DETAIL
SCALE 15:1 SECTION `A-A'

REFERENCE DOCUMENTS REFERENCE DOCUMENTS VENDOR: DRAWN BY


RS
SPECIFICATION No. REV. DESCRIPTION
REV NO DATE REVISION DESCRIPTION DRAWN CHK. APPR.
CHECKED BY
DRP001-PUC-SPE-W-000-006 S1 WELDING & NDE OF PRESSURE EQUIPMENT & PIPING KG
H 0 22 Sep 19 ISSUE FOR CLIENT REVIEW JMD DNS LC DRP001-PUC-SPE-W-000-008 S1 PAINTING OF NEW EQUIPMENT AND PIPING H
APPROVED BY. APP. DATE
DRP001-PUC-SPE-W-000-010 S1 HOT SERVICE INSULATION LC 26 MAY 19
REFERENCE DRAWINGS
THIS DRAWING AND DESIGN IT COVERS ARE THE PROPERTY
DWG. NO. REFERENCE DRAWING OF TECNICAS REUNIDAS. THEY ARE MERELY LOANED AND
ON THE BORROWER'S EXPRESS AGREEMENT THAT THEY
DRP001-PUC-SPE-X-000-008 HEAT EXCHANGER STANDARD DETAlL DRAWINGS WILL NOT BE REPRODUCED, COPIED, LOANED, EXHIBITED
NOR USED EXCEPT IN THE LIMITED WAY AND PRIVATE USE
DRP001-PUC-SPE-V-000-003 PRESSURE VESSEL STANDARD DETAlL DRAWINGS PERMITTED BY ANY WRITTEN CONSENT GIVEN BY LENDER
PIP VEFV1100 VESSEL / S&T HEAT EXCHANGER STANDARD DETAILS TO BORROWER.