CALCULATION OF PILE CAPACITY AS PER IRC:78-2014 Cl 9.

2 ABUTMENT A1 and A2
CALCULATION OF ROCK SOCKETING LENGTH

Dia.of Pile (B) = 1.2 m


Thikness of Pile cap = 1.8 m
Length of Pile m
(from rock lvl to pilecap
9.650
center) (L) =
Grade of Concrete 35 Mpa
= (Eq. A2-5, IRC-112:2011)

Elastic Modulus of Concrete (Ec)


3230825
=
Moment of Inertia of Pile (Ip) = 0.1018 m4
Unconfined Compressive t/m² (as per geotech report)
1000.00
strength of Rock (qc) = (considering 10 Mpa for safer side)
Perm. Comp. strength of the t/m² (min. of 0.33qc or 30kg/cm²)
= 300.0
intact rock
Max. axial Load (Qmax) = 550.00 t (at top of rock level)
Lateral Force per pile (H) = 30.00 t (at top of rock level)
Moment at the socket top (M) = 131.25 tm (at top of rock level)

H
(As per IRC amendment march'11, pile is assumed as pinned at top of socket to find
allowable rotation)

HL² / (2E I )
θ = c p
= 30X9.65^2/2X3230825X0.101787601976309
= 0.004248 radians
Permissible Rotation is 5% of 0.004248 radians
= 0.0002124 radians
Calculation of Socket Length
L = ( 2 H / σ D ) + [ ( 4 H² / σ ² D² ) + ( 6 M / σD ) ] ½

= (2X30/300X1.2)+[(4X30^2/300^2X1.2^2)+(6X131.25/300X1.2)]^1/2
= 1.65505 m
Provided Ls = 2.4000 m 2D (min) OK
Stresses along socket length
σmax = [H/(LsD)] + [6M / (Ls²D)] + [6H (Ls/2) / (Ls²D)]

= [30/(2.4X1.2)] + [6X131.25/(2.4^2X1.2)] + [6X30X(2.4/2)/(2.4^2X1.2)]


= 155.599 t/m2 < 300.0 t/m2 HENCE OK

σmin = [H/(LsD)] - [6M / (Ls²D)] - [6H (Ls/2) / (Ls²D)]

= [30/(2.4X1.2)] - [6X131.25/(2.4^2X1.2)] - [6X30X(2.4/2)/(2.4^2X1.2)]


= -134.766 t/m2 M

Resistance along socket length 155.599 186.7188


h= 1.3

Pmax = σmax D 0.172


A A
Socket length of pile

2.4000

= 155.598958333333X1.2 -161.7188
= 186.71875 t/m -134.766 FORCE
Pmin = σmin D pile stress
= -134.765625X1.2
= -161.71875 t/m
h = 1.29
Shear force is ZERO at section A-A
(1/2) * (Pmax * (h-x)/h + Pmax) * x = H

x = 0.172

Resistance or Force at A-A = 161.71880 t/m

Rotation (θ) at top of socket under fixed condition:


θ = ML/EI + PL²/2EI
= 0.000070078 radians
< 0.0002124 radians HENCE OK
Length of pile upto fixity= L +h

= 9.65 + 1.28609865470852
= 10.936 m