Académique Documents
Professionnel Documents
Culture Documents
Project Summary
Analysis Results
Analysis type - Combinations
Number of Combinations 6
Number of Valid Wedges 2
Number of Invalid Wedges 4
Number of Failed Wedges 0
Number of Stable Wedges 2
Water Pressures/Forces
Average pressure [MPa] Force [MN] Design Factor Factored Force [MN]
Joint 1 0.005 0.009 1.000 0.009
Joint 2 0.005 0.003 1.000 0.003
Shotcrete Force
Shotcrete force [MN] 0.881008
Pressure
Project
SWEDGE - Surface Wedge Stability Analysis
Analysis Description
Drawn By Company
Failure Mode
Sliding on intersection line (joints 1&2)
Trace Lengths
Slope Face [m] Upper Face [m]
Joint 1 3.834 1.014
Joint 2 4.175 0.326
Persistence
Joint 1 [m] 4.1878
Joint 2 [m] 4.1878
Intersection Angles
Slope Face Upper Face
Joint 1 & Joint 2 14.329 88.000
Joint 1 & Crest 101.544 18.000
Joint 2 & Crest 64.127 74.000
Project
SWEDGE - Surface Wedge Stability Analysis
Analysis Description
Drawn By Company
Slope Data
Slope height [m] 3.72
Bench width [m] 1
Unfactored rock unit weight [MN/m3]: 0.0273
Rock unit weight design factor: 1
Factored rock unit weight [MN/m3]: 0.0273
Water pressures in the slope YES
Overhanging slope face NO
Externally applied force NO
Tension crack NO
Resultant
Trend [deg]: 0.000
Plunge [deg]: 90.000
Force [MN]: 0.216
Shotcrete Data
Thickness [m] Shear strength [MPa] Design factor Factored shear strength [MPa] Location Direction
0.100 1.100 1.000 1.100 On Slope Face Only Normal to Slope Face, Into Slope
Project
SWEDGE - Surface Wedge Stability Analysis
Analysis Description
Drawn By Company
Bolt 1 Data
Model active
Trend [deg] 271.000
Plunge [deg] 15.000
Length [m] 4.000
Anch. Length [m] 3.798
Capacity [MN] 0.200
Design Factor 1.100
Factored Capacity [MN] 0.182
Design Standard
Selected Type: Eurocode 7 - Design Approach 1, Combination 1
Project
SWEDGE - Surface Wedge Stability Analysis
Analysis Description
Drawn By Company