China Harbour Engineering Co.L.L.C. INSPECTION AND TESTING PLAN (ITP): INSTALLATION OF WOODEN DOORS

Contractor: Date:
Contract No. & Location:
Description of Activity: INSTALLATION OF WOODEN DOORS Level :

SERIAL No.: PAGE NO.: 1 of 1


Legend for acceptance criteria: *AR = Approval *H = Hold Point *M = Monitoring *S = Surveillance *A = Actual Inspection *T/C = Test Certificate Reqd.

INSPECTION & ACCEPTANCE REMARKS/FORM


ITEM No. DESCRIPTION SPECIFICATION REPORT NO
HGC CHEC DORSCH
1.0 MATERIAL & DOCUMENT APPROVALS
Material approvals for Door frames and panels, Door hardware Specification section 08212 & 08262 (VOL-2, Part
1.1 including manufacturer & samples B) / Approval by engineer.
Specification section 08212 & 08262 (Volume 2
Method Statement, quality control procedure, ITP, checklist, &
1.2 approval
Part B) & Manufacturer method statement &
instructions / Approval by engineer
Material verification upon delivery and receipt of wooden As per approved MAR’s and samples /
1.3 doors and door hardware materials site Acceptance by engineer
2.0 EXECUTION
Specification Section 08212 (Volume - 2 Part B)
2.1 Setting out and fixing of door frames ( plumb, square and level)
/ Manufacturer method statement
Specification section 08210 (Volume - 2 Part B), /
Installation of door panels (alignment with frame, correct
2.2 Manufacturer method statement and
fit and smooth operation ) manufacturer instructions
Specification section 08262 (Volume - 2 Part B) ,
2.3 Installation of door hardware and accessories / Manufacturer method statement and
manufacturer instructions
2.4 Cleaning & protection of completed installation of doors As per method statement item 7.7

Contractor: (Name, Signature & Date) Consultant: Approved By (Name, Signature & Date)

CC: PM, RE, QA/QC, RE/ARE page -1


-