SLAB TYPE S1

A. DATA MATERIAL STRUCTURE

Concrete Quality, fc' = 21


Yield strength of reinforcing steel wiremesh, fy = 485

B. DATA SLAB

Lenght slab x direction, Lx = 4.00


Lenght slab y direction, Ly = 6.00
Thickness of slab, h= 80
Slab Moment Coefitient : Ly / L x = 1.50 KOEFISIEN MOMEN PLAT
TWO WAY SLAB because Ly/Lx<2
Lapangan x Clx = 36
Lapangan y Cly = 17
Tumpuan x Ctx = 76
Tumpuan y Cty = 57
Tabel 1 Pelat, Terjepit 4 sisi

Diameter Reinforcing, Wiremesh M6 Single Layer M6 = 6


Concrete Cover, ts = 20

C. LOAD OF SLAB

1. Dead Load (According to the design code PPPURG 1987)

No Type of Loads Weight Thick (m) Q (kN/m2)


1 Weight of unit volume concrete 24.0 0.08 1.920
2 The load of finish floor level 22.0 0.05 1.100
® QD = 3.020

2. Live Load (According to the design code PPPURG 1987)


Live Load = 240
® QL = 2.40
3. THE LOAD ULTIMATE

The load ultimate Qu = 1.2 * QD + 1.6 * QL = 7.464


4. MOMENT SLAB COEFICIENT (MOMENT ULTIMATE)

Momen lapangan arah x, Mulx = Clx * 0.001 * Qu * Lx2 = 4.299


Momen lapangan arah y, Muly = Cly * 0.001 * Qu * Lx = 2
2.030
Momen tumpuan arah x, Mutx = Ctx * 0.001 * Qu * Lx = 2
9.076
Momen tumpuan arah y, Muty = Cty * 0.001 * Qu * Lx = 2
6.807
Momen rencana (maksimum) plat, ® Mu = 9.076

D. SLAB REINFORCING

For : fc' ≤ 30 MPa, b1 = 0.85


For : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 = -
® b1 = 0.85
Ratio factor balance condition,
rb = b1* 0.85 * fc'/ fy * 600 / ( 600 + fy ) = 0.0171
Factor moment maximum,
Rmax = 0.75 * rb * fy * [ 1 – ½* 0.75 * rb * fy / ( 0.85 * fc') ] = 5.1218
Reduction factor f = 0.80
Concrete cover to longitudinal centre ds = ts + Æ / 2 = 23.0
The thick efective slab d = h - ds = 57.0
® b= 1000
Moment nominal Mn = M u / f = 11.345
Momen factor resistance Rn = Mn * 10 / ( b * d ) =
-6 2
3.49193
Rn < Rmax ® (OK)
The ratio are needed,
Rebar ratio minmum rmin = 0.0023
Rabar ratio are used, ® rmin = 0.0023
The required reinforcement area, As = r * b * d = 134
The rebar distance maximum smax = 2 * h = 160
The rebar distance maximum smax = 160
Distance of reinforcement used, s= 150.00
® s= 150
Used reinfororcement M6 - 150
The area of reinforcement used, M6 As = p / 4 * Æ 2 * b / s = 188

As perlu > As pakai ® (OK)


MPa
MPa

m
m
mm

mm
mm

kg/m2
kN/m2

kN/m2
kNm/m
kNm/m
kNm/m
kNm/m
kNm/m

mm
mm
mm
kNm

mm2
mm
mm
mm
mm

mm2
ANALYSIS WALL SWIMMING POOL (CHILDREN POO

A. DATA MATERIAL STRUCTURE OF WALL POOL

Concrete Quality fc' =


Yield strength of reinforcing steel fy =
Thicness of Slab Used h=
Diameter Reinforcing P=
Concrete Cover ts =
Height of Wall H=
Lenght of Wall L=
Width of Wall W=
Soil Density of Clay Organic, (Hardiyatmo, 1992) ɣ=
Shear Angle Clay Organic (φ), (Hardiyatmo, 1992) φ=

B. LOAD OF WALL

1. Dead Load
No Type of Loads Weight Thick (m)
1 Concrete Density 24.0 0.2
2 The load of finish floor level 22.0 0.05
QD =
2. Live Load
Live Load (Swimming Pool) =
® QL =
3. Water Pressure Load
No Type of Loads
1 Water Density
2 The Height Water
Qwp =
4. Soil Pressure Load
No Type of Loads
1 Soil Density
2 The Angle of Shear (φ)
3 The Height of Soil
Qsp =

4. THE LOAD ULTIMATE

The load ultimate Qu = 1.2 * QD + 1.6 * QL + 1.6 * Qwp + 1.6 * Qsp =

5. MOMENT ULTIMATE
Mu = 1/12*Qu*h^2 =
Momen Maximum From Analysis SAP2000 ® Mu =

D. SLAB REINFORCING
(This design according to the SNI 2847 -2013)
For : fc' ≤ 30 MPa, b1 =
For : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 =
® b1 =
Ratio factor balance condition,
rb = b1* 0.85 * fc'/ fy * 600 / ( 600 + fy ) =
Factor moment maximum,
Rmax = 0.75 * rb * fy * [ 1 – ½* 0.75 * rb * fy / ( 0.85 * fc') ] =
Reduction factor f =
Concrete cover to longitudinal centre ds = ts + Æ / 2 =
The thick efective slab d = h - ds =
® b=
Moment nominal Mn = M u / f =
Momen factor resistance Rn = Mn * 10-6 / ( b * d2 ) =
Rn < Rmax ®

The ratio reinforcement, r = 0.85 * fc' / fy * [ 1 - Ö [ 1 – 2 * Rn / ( 0.85 * fc' ) ] =


The Retio Minimum rmin = √fc / 4*fy
Rebar ratio are used, ® rmin =
The required reinforcement area, As = r * b * d =
The rebar distance maximum smax = 2 * h =
The rebar distance maximum smax =
Distance of reinforcement used, s = p / 4 * Æ2 * b / A s =
® s=
Used reinfororcement P8 -
The area of reinforcement used, As = p / 4 * Æ 2 * b / s =

As perlu > As pakai ®


MMING POOL (CHILDREN POOL)

18.68 MPa
240 MPa
200 mm
8 mm
40 mm
1000 mm
3800 mm
3800 mm
2.6 kg/m3
30 ⁰

Q (kN/m2)
2.880
1.100
3.980

359 kg/m2
3.59 kN/m2

10 kN/m3
1 m
10 kN/m2

0.026 kN/m3
30 ⁰
1 m
4.32 kN/m2

33.430 kN/m2

2.79 kNm/m
2.79

0.85
-
0.85

0.0402

5.5825
0.90
44.0 mm
156.0 mm
1000 mm
3.095 kNm
0.127
(OK)

0.0005
0.0045
0.0045
702 mm2
400 mm
400 mm
72 mm
71 mm
70
718 mm2

(OK)
SLAB TYPE S2

A. DATA MATERIAL STRUCTURE

Concrete Quality, fc' = 21


Yield strength of reinforcing steel wiremesh, fy = 500

B. DATA SLAB

Lenght slab x direction, Lx = 4.00


Lenght slab y direction, Ly = 4.00
Thickness of slab, h= 80
Slab Moment Coefitient : Ly / L x = 1.00 KOEFISIEN MOMEN PLAT
TWO WAY SLAB because Ly/Lx<2
Lapangan x Clx = 21
Lapangan y Cly = 21
Tumpuan x Ctx = 52
Tumpuan y Cty = 52
Tabel 1 Pelat, Terjepit 4 sisi

Diameter Reinforcing, Wiremesh M6 Single Layer M6 = 6


Concrete Cover, ts = 20

C. LOAD OF SLAB

1. Dead Load (According to the design code PPPURG 1987)

No Type of Loads Weight Thick (m) Q (kN/m2)


1 Weight of unit volume concrete 24.0 0.08 1.920
2 The load of finish floor level 22.0 0.05 1.100
® QD = 3.020

2. Live Load (According to the design code PPPURG 1987)


Live Load = 240
® QL = 2.40
3. THE LOAD ULTIMATE

The load ultimate Qu = 1.2 * QD + 1.6 * QL = 7.464


4. MOMENT SLAB COEFICIENT (MOMENT ULTIMATE)

Momen lapangan arah x, Mulx = Clx * 0.001 * Qu * Lx2 = 2.508


Momen lapangan arah y, Muly = Cly * 0.001 * Qu * Lx = 2
2.508
Momen tumpuan arah x, Mutx = Ctx * 0.001 * Qu * Lx = 2
6.210
Momen tumpuan arah y, Muty = Cty * 0.001 * Qu * Lx = 2
6.210
Momen rencana (maksimum) plat, ® Mu = 6.210

D. SLAB REINFORCING

For : fc' ≤ 30 MPa, b1 = 0.85


For : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 = -
® b1 = 0.85
Ratio factor balance condition,
rb = b1* 0.85 * fc'/ fy * 600 / ( 600 + fy ) = 0.0164
Factor moment maximum,
Rmax = 0.75 * rb * fy * [ 1 – ½* 0.75 * rb * fy / ( 0.85 * fc') ] = 5.0667
Reduction factor f = 0.80
Concrete cover to longitudinal centre ds = ts + M / 2 = 23.0
The thick efective slab d = h - ds = 57.0
® b= 1000
Moment nominal Mn = M u / f = 7.763
Momen factor resistance Rn = Mn * 10 / ( b * d ) =
-6 2
2.38922
Rn < Rmax ® (OK)
The ratio are needed,
Rebar ratio minmum rmin = 0.0023
Rabar ratio are used, ® rmin = 0.0023
The required reinforcement area, As = r * b * d = 130
The rebar distance maximum smax = 2 * h = 160
The rebar distance maximum smax = 160
Distance of reinforcement used, s= 150.00
® s= 150
Used reinfororcement M6 - 150
The area of reinforcement used, As = p / 4 * Æ 2 * b / s = 188

As perlu > As pakai ® (OK)


MPa
MPa

m
m
mm

mm
mm

kg/m2
kN/m2

kN/m2
kNm/m
kNm/m
kNm/m
kNm/m
kNm/m

mm
mm
mm
kNm

mm2
mm
mm
mm
mm

mm2
Tabel Koefisien Moment Peat Lantai (PBBI '71)
Momen - momen pelat akibat beban terbagi rata ( Tumpuan terjepit penuh )
Ly / Lx
1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70 1.80 1.90 2.00 2.10

(Mlx) = + 0.001 qLx2 X 44 52 59 66 73 78 84 88 93 97 100 103


(Mly) = + 0.001 qLx2 X 44 45 45 44 44 43 41 40 39 38 37 36

(Mlx) = + 0.001 qLx2 X 21 25 28 31 34 36 37 38 40 40 41 41


(Mly) = + 0.001 qLx2 X 21 21 20 19 18 17 16 14 13 12 12 11
(Mtx) = - 0.001 qLx2 X 52 59 64 69 73 76 79 81 82 83 83 83
(Mty) = - 0.001 qLx2 X 52 54 56 57 57 57 57 57 57 57 57 57

(Mlx) = + 0.001 qLx2 X 28 33 38 42 45 48 51 53 55 57 58 59


(Mly) = + 0.001 qLx2 X 28 28 28 27 26 25 23 23 22 21 19 18
(Mtx) = - 0.001 qLx2 X 68 77 85 92 98 103 107 111 113 116 118 119
(Mty) = - 0.001 qLx2 X 68 72 74 76 77 77 78 78 78 78 79 79

(Mlx) = + 0.001 Wu Lx2 X 22 28 34 42 49 55 62 68 74 80 85 89


(Mly) = + 0.001 Wu Lx2 X 32 35 37 39 40 41 41 41 41 40 39 38
(Mty) = - 0.001 Wu Lx2 X 70 79 87 94 100 105 109 112 115 117 119 120

(Mlx) = + 0.001 Wu Lx2 X 32 34 36 39 40 41 41 42 42 42 42 42


(Mly) = + 0.001 Wu Lx2 X 22 20 18 17 15 14 13 12 11 10 10 10
(Mty) = - 0.001 Wu Lx2 X 70 74 77 79 81 82 83 84 84 84 84 84

(Mlx) = + 0.001 Wu Lx2 X 31 38 45 53 60 66 72 78 83 88 92 96


(Mly) = + 0.001 Wu Lx2 X 37 39 41 41 42 42 41 41 40 39 38 37
(Mty) = - 0.001 Wu Lx2 X 84 92 99 104 109 112 115 117 119 121 122 122

(Mlx) = + 0.001 Wu Lx2 X 37 41 45 48 51 53 55 56 58 59 60 60


(Mly) = + 0.001 Wu Lx2 X 31 30 28 27 25 24 22 21 20 19 18 17
(Mty) = - 0.001 Wu Lx2 X 84 92 98 103 108 111 114 117 119 120 121 122

(Mlx) = + 0.001 qLx2 X 21 26 31 36 40 43 46 49 51 53 55 56


(Mly) = + 0.001 qLx2 X 26 27 28 28 27 26 25 23 22 21 21 20
(Mtx) = - 0.001 qLx2 X 55 65 74 82 89 94 99 103 106 110 114 116
(Mty) = - 0.001 qLx2 X 60 65 69 72 74 76 77 78 78 78 78 78

(Mlx) = + 0.001 qLx2 X 26 29 32 25 35 36 38 39 40 40 41 41


(Mly) = + 0.001 qLx2 X 21 20 19 18 17 15 14 13 12 12 11 11
(Mtx) = - 0.001 qLx2 X 60 66 71 74 77 79 80 82 83 83 83 83
(Mty) = - 0.001 qLx2 X 55 57 57 57 58 57 57 57 57 57 57 57

Catatan = Terletak bebas = Menerus atau terjepit penuh


pit penuh )

2.20 2.30 2.40 2.50 > 2.5

106 108 110 112 125


35 34 32 32 25

41 42 42 42 42
11 11 10 10 8
83 83 83 83 83
57 57 57 57 57

59 60 61 61 63
17 17 16 16 13
120 121 122 122 125
79 79 79 79 79

93 97 100 103 125


37 36 35 35 25
121 122 123 123 125

42 42 42 42 42
9 9 9 9 8
83 83 83 83 83

99 102 105 108 125


36 35 34 33 25
123 123 124 124 125

60 61 61 62 63
17 16 16 15 13
122 123 123 124 125

57 58 59 60 63
20 19 19 18 13
117 118 119 120 125
78 78 78 79 79

42 42 42 42 42
10 10 10 10 8
83 83 83 83 83
57 57 57 57 57
SLAB POOL (CHILDREN POOL)
A. DATA MATERIAL STRUCTURE

Concrete Quality, fc' =


Yield strength of reinforcing steel of wiremesh, fy =

B. DATA SLAB

Lenght slab x direction, Lx =


Lenght slab y direction, Ly =
Thickness of slab, h=
Slab Moment Coefitient : Ly / Lx = 1.00 KOEFISIEN MOMEN PLAT
TWO WAY SLAB because Ly/Lx<2
Lapangan x Clx =
Lapangan y Cly =
Tumpuan x Ctx =
Tumpuan y Cty =
Tabel 1 Pelat, Terjepit 4 sisi

Diameter Reinforcing, P=
Concrete Cover, ts =

C. LOAD OF SLAB

1. Dead Load

No Type of Loads Weight Thick (m)


1 Weight of unit volume concrete 24.0 0.2
2 The load of finish floor level 22.0 0.05
QD =

2. Live Load
Live Load (Swimming Pool) =
® QL =

No Type of Loads
1 Water Density
2 The Height Water
Qwp =

3. THE LOAD ULTIMATE

The load ultimate Qu = 1.2 * QD + 1.6 * QL + 1,6 * Qwp =

4. MOMENT SLAB COEFICIENT (MOMENT ULTIMATE)

Momen lapangan arah x, Mulx = Clx * 0.001 * Qu * Lx2 =


Momen lapangan arah y, Muly = Cly * 0.001 * Qu * Ly2 =
Momen tumpuan arah x, Mutx = Ctx * 0.001 * Qu * Lx2 =
Momen tumpuan arah y, Muty = Cty * 0.001 * Qu * Ly2 =
Momen rencana (maksimum) plat, ® Mu =

D. SLAB REINFORCING

For : fc' ≤ 30 MPa, b1 =


For : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 =
® b1 =
Ratio factor balance condition,
rb = b1* 0.85 * fc'/ fy * 600 / ( 600 + fy ) =
Factor moment maximum,
Rmax = 0.75 * rb * fy * [ 1 – ½* 0.75 * rb * fy / ( 0.85 * fc') ] =
Reduction factor f =
Concrete cover to longitudinal centre ds = ts + Æ / 2 =
The thick efective slab d = h - ds =
® b=
Moment nominal Mn = M u / f =
Momen factor resistance Rn = Mn * 10-6 / ( b * d2 ) =
Rn < Rmax ®
The ratio are needed,
r = 0.85 * fc' / fy * [ 1 - Ö [ 1 – 2 * Rn / ( 0.85 * fc' ) ] =
Rebar ratio minmum rmin =
Rabar ratio are usude, ® r=
The required reinforcement area, As = r * b * d =
Distance of reinforcement needed, s = p / 4 * Æ2 * b / As =
The rebar distance maximum smax = 2 * h =
The rebar distance maximum smax =
Distance of reinforcement used, s=
® s=
Used reinfororcement, P8 - 150 Double Layer P8 -
The area of reinforcement used, As = p / 4 * Æ 2 * b / s =

As perlu > As pakai ®

E. SLAB DEFLECTION

Modulus Elasticity Es =
Moment Inertia I = 1/12*b*h^3 =
Deflection Maximum, ζ = Qu*Lx^4/384EI =
Deflection Permit Slab ζpermit = Lx/360 =

ζ < ζpermit ®
L)

18.68 MPa
240 MPa

3.80 m
3.80 m
200 mm
N MOMEN PLAT
Ly/Lx<2
21
21
52
52
t, Terjepit 4 sisi

8 mm
40 mm

Q (kN/m2)
4.800
1.100
5.900

359 kg/m2
3.59 kN/m2

10 kN/m3
1 m
10 kN/m2

28.824 kN/m2

8.741 kNm/m
8.741 kNm/m
21.643 kNm/m
21.643 kNm/m
21.643 kNm/m

0.85
-
0.85

0.0402

5.5825
0.80
44.0 mm
156.0 mm
1000 mm
27.054 kNm
1.11169
(OK)

0.0048
0.0045
0.0048
750 mm2
67.03 mm
400 mm
400 mm
67.03 mm
67 mm
60
838 mm2

(OK)

200000 Mpa
666666666.67 mm4
0.117387 mm
10.56 mm

(OK)
ANALYSIS WALL SWIMMING POOL

A. DATA MATERIAL STRUCTURE OF WALL POOL

Concrete Quality
Yield strength of reinforcing steel
Thicness of Slab Used
Diameter Reinforcing
Concrete Cover
Height of Wall
Lenght of Wall
Width of Wall
Soil Density of Clay Organic, (Hardiyatmo, 1992)
Shear Angle Clay Organic (φ), (Hardiyatmo, 1992)

B. LOAD OF WALL

1. Dead Load
No Type of Loads Weight
1 Concrete Density 24.0
2 The load of finish floor level 22.0

2. Live Load
Live Load (Swimming Poo
®
3. Water Pressure Load
No Type of Loads
1 Water Density
2 The Height Water

4. Soil Pressure Load


No Type of Loads
1 Soil Density
2 The Angle of Shear (φ)
3 The Height of Soil
4. THE LOAD ULTIMATE

The load ultimate Qu = 1.2 * QD + 1.6 * QL + 1.6 * Qwp + 1.6 * Qs

5. MOMENT ULTIMATE
Mu = 1/12*Qu*h^
Momen Maximum From Analysis SAP2000 ®

D. SLAB REINFORCING
(This design according to the SNI 2847 -2013)
For : fc' ≤ 30 MPa,
For : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) /
®
Ratio factor balance condition,
rb = b1* 0.85 * fc'/ fy * 600 / ( 600 + fy ) =
Factor moment maximum,
Rmax = 0.75 * rb * fy * [ 1 – ½* 0.75 * rb * fy / ( 0.85 * fc')
Reduction factor f =
Concrete cover to longitudinal centre ds = ts + Æ /
The thick efective slab
®
Moment nominal Mn = M u / f =
Momen factor resistance Rn = Mn * 10-6 / ( b * d
Rn < Rmax

The ratio reinforcement, r = 0.85 * fc' / fy * [ 1 - Ö [ 1 – 2 * Rn / ( 0.85 * fc' )


The Retio Minimum rmin = √fc /
Rebar ratio are used, ®
The required reinforcement area, As = r * b * d
The rebar distance maximum smax = 2 *
The rebar distance maximum
Distance of reinforcement used, s = p / 4 * Æ2 * b / A
®
Used reinfororcement P8
The area of reinforcement used, As = p / 4 * Æ 2 * b /

As perlu > As pakai


WALL SWIMMING POOL

fc' = 18.68 MPa


fy = 240 MPa
h= 200 mm
P= 8 mm
ts = 40 mm
H= 2500 mm
L= 15000 mm
W= 780 mm
ɣ= 2.6 kg/m3
φ= 30 ⁰

Thick (m) Q (kN/m2)


0.2 2.880
0.05 1.100
QD = 3.980

Live Load (Swimming Pool) = 359 kg/m2


QL = 3.59 kN/m2

10 kN/m3
2.50 m
Qwp = 25 kN/m2

0.026 kN/m3
30 ⁰
2.50 m
Qsp = 11 kN/m2

u
= 1.2 * QD + 1.6 * QL + 1.6 * Qwp + 1.6 * Qsp = 67.795 kN/m2

Mu = 1/12*Qu*h^2 = 14.12 kNm/m


Mu = 14.12

b1 = 0.85
b1 = 0.85 - 0.05 * ( fc' - 30) / 7 = -
b1 = 0.85

= b1* 0.85 * fc'/ fy * 600 / ( 600 + fy ) = 0.0402

75 * rb * fy * [ 1 – ½* 0.75 * rb * fy / ( 0.85 * fc') ] = 5.5825


f = 0.90
ds = ts + Æ / 2 = 44.0 mm
d = h - ds = 156.0 mm
b= 1000 mm
Mn = M u / f = 15.693 kNm
Rn = Mn * 10 / ( b * d ) =
-6 2
0.645
® (OK)

= 0.85 * fc' / fy * [ 1 - Ö [ 1 – 2 * Rn / ( 0.85 * fc' ) ] = 0.0027


rmin = √fc / 4*fy 0.0045
rmin = 0.0045
As = r * b * d = 702 mm2
smax = 2 * h = 400 mm
smax = 400 mm
s = p / 4 * Æ * b / As =
2
72 mm
s= 71 mm
- 70
As = p / 4 * Æ 2 * b / s = 718 mm2

® (OK)
SLAB POOL (CHILDREN POOL)
A. DATA MATERIAL STRUCTURE

Concrete Quality, fc' =


Yield strength of reinforcing steel of wiremesh, fy =

B. DATA SLAB

Lenght slab x direction, Lx =


Lenght slab y direction, Ly =
Thickness of slab, h=
Slab Moment Coefitient : Ly / Lx = 1.92 KOEFISIEN MOMEN PLAT
TWO WAY SLAB because Ly/Lx<2
Lapangan x Clx =
Lapangan y Cly =
Tumpuan x Ctx =
Tumpuan y Cty =
Tabel 1 Pelat, Terjepit 4 sisi

Diameter Reinforcing, P=
Concrete Cover, ts =

C. LOAD OF SLAB

1. Dead Load

No Type of Loads Weight Thick (m)


1 Weight of unit volume concrete 24.0 0.25
2 The load of finish floor level 22.0 0.05
QD =

2. Live Load
Live Load (Swimming Pool) =
® QL =

No Type of Loads
1 Water Density
2 The Height Water
Qwp =
3. THE LOAD ULTIMATE

The load ultimate Qu = 1.2 * QD + 1.6 * QL + 1,6 * Qwp =

4. MOMENT SLAB COEFICIENT (MOMENT ULTIMATE)

Momen lapangan arah x, Mulx = Clx * 0.001 * Qu * Lx2 =


Momen lapangan arah y, Muly = Cly * 0.001 * Qu * Ly2 =
Momen tumpuan arah x, Mutx = Ctx * 0.001 * Qu * Lx2 =
Momen tumpuan arah y, Muty = Cty * 0.001 * Qu * Ly2 =
Momen rencana (maksimum) plat, ® Mu =

D. SLAB REINFORCING

For : fc' ≤ 30 MPa, b1 =


For : fc' > 30 MPa, b1 = 0.85 - 0.05 * ( fc' - 30) / 7 =
® b1 =
Ratio factor balance condition,
rb = b1* 0.85 * fc'/ fy * 600 / ( 600 + fy ) =
Factor moment maximum,
Rmax = 0.75 * rb * fy * [ 1 – ½* 0.75 * rb * fy / ( 0.85 * fc') ] =
Reduction factor f =
Concrete cover to longitudinal centre ds = ts + Æ / 2 =
The thick efective slab d = h - ds =
® b=
Moment nominal Mn = M u / f =
Momen factor resistance Rn = Mn * 10-6 / ( b * d2 ) =
Rn < Rmax ®
The ratio are needed,
r = 0.85 * fc' / fy * [ 1 - Ö [ 1 – 2 * Rn / ( 0.85 * fc' ) ] =
Rebar ratio minmum rmin =
Rabar ratio are usude, ® r=
The required reinforcement area, As = r * b * d =
Distance of reinforcement needed, s = p / 4 * Æ2 * b / As =
The rebar distance maximum smax = 2 * h =
The rebar distance maximum smax =
Distance of reinforcement used, s=
® s=
Used reinfororcement, P8 - 150 Double Layer P8 -
The area of reinforcement used, As = p / 4 * Æ 2 * b / s =
As perlu < As pakai ®

E. SLAB DEFLECTION

Modulus Elasticity Es =
Moment Inertia I = 1/12*b*h^3 =
Deflection Maximum, ζ = Qu*Lx^4/384EI =
Deflection Permit Slab ζpermit = Lx/360 =

ζ < ζpermit ®
L)

18.68 MPa
240 MPa

7.80 m
15.00 m
250 mm
N MOMEN PLAT
Ly/Lx<2
40
12
83
57
t, Terjepit 4 sisi

8 mm
40 mm

Q (kN/m2)
6.000
1.100
7.100

359 kg/m2
3.59 kN/m2

10 kN/m3
1 m
10 kN/m2
30.264 kN/m2

73.650 kNm/m
22.095 kNm/m
152.825 kNm/m
104.952 kNm/m
152.825 kNm/m

0.85
-
0.85

0.0402

5.5825
0.80
44.0 mm
206.0 mm
1000 mm
191.031 kNm
4.50162
(OK)

0.0226
0.0045
0.0226
4661 mm2
10.78 mm
500 mm
500 mm
10.78 mm
11 mm
60
838 mm2
NotGood

200000 Mpa
1302083333.33 mm4
1.120224 mm
21.67 mm

(OK)
Tabel Koefisien Moment Peat Lantai (PBBI'71)
Momen - momen pelat akibat beban terbagi rata
Ly / Lx
1.00 1.10 1.20 1.30 1.40 1.50 1.60 1.70

(Mlx) = + 0.001 qLx2 X 44 52 59 66 73 78 84 88


Ly (Mly) = + 0.001 qLy2 Y 44 45 45 44 44 43 41 40

(Mlx) = + 0.001 qLx2 X 21 25 28 31 34 36 37 38


(Mly) = + 0.001 qLy2 Y 21 21 20 19 18 17 16 14
(Mtx) = - 0.001 qLx2 X 52 59 64 69 73 76 79 81
(Mty) = - 0.001 qLy2 Y 52 54 56 57 57 57 57 57

(Mlx) = + 0.001 qLx2 X 28 33 38 42 45 48 51 53


(Mly) = + 0.001 qLy2 Y 28 28 28 27 26 25 23 23
(Mtx) = - 0.001 qLx2 X 68 77 85 92 98 103 107 111
(Mty) = - 0.001 qLy2 Y 68 72 74 76 77 77 78 78

(Mlx) = + 0.001 qLx2 X 22 28 34 42 49 55 62 68


(Mly) = + 0.001 qLy2 Y 32 35 37 39 40 41 41 41
(Mty) = - 0.001 qLy2 Y 70 79 87 94 100 105 109 112

(Mlx) = + 0.001 qLx2 X 32 34 36 39 40 41 41 42


(Mly) = + 0.001 qLy2 Y 22 20 18 17 15 14 13 12
(Mty) = - 0.001 qLy2 Y 70 74 77 79 81 82 83 84

(Mlx) = + 0.001 qLx2 X 31 38 45 53 60 66 72 78


(Mly) = + 0.001 qLy2 Y 37 39 41 41 42 42 41 41
(Mty) = - 0.001 qLy2 Y 84 92 99 104 109 112 115 117

(Mlx) = + 0.001 qLx2 X 37 41 45 48 51 53 55 56


(Mly) = + 0.001 qLy2 Y 31 30 28 27 25 24 22 21
(Mty) = - 0.001 qLy2 Y 84 92 98 103 108 111 114 117

(Mlx) = + 0.001 qLx2 X 21 26 31 36 40 43 46 49


(Mly) = + 0.001 qLy2 X 26 27 28 28 27 26 25 23
(Mtx) = - 0.001 qLx2 X 55 65 74 82 89 94 99 103
(Mty) = - 0.001 qLy2 Y 60 65 69 72 74 76 77 78

(Mlx) = + 0.001 qLx2 X 26 29 32 25 35 36 38 39


(Mly) = + 0.001 qLY2 Y 21 20 19 18 17 15 14 13
(Mtx) = - 0.001 qLx2 X 60 66 71 74 77 79 80 82
(Mty) = - 0.001 qLy2 Y 55 57 57 57 58 57 57 57

Catatan = Terletak bebas = Menerus atau terjepit penuh


t Lantai (PBBI'71)
beban terbagi rata
Ly / Lx
1.80 1.90 2.00 2.10 2.20 2.30 2.40 2.50 > 2.5

93 97 100 103 106 108 110 112 125


39 38 37 36 35 34 32 32 25

40 40 41 41 41 42 42 42 42
13 12 12 11 11 11 10 10 8
82 83 83 83 83 83 83 83 83
57 57 57 57 57 57 57 57 57

55 57 58 59 59 60 61 61 63
22 21 19 18 17 17 16 16 13
113 116 118 119 120 121 122 122 125
78 78 79 79 79 79 79 79 79

74 80 85 89 93 97 100 103 125


41 40 39 38 37 36 35 35 25
115 117 119 120 121 122 123 123 125

42 42 42 42 42 42 42 42 42
11 10 10 10 9 9 9 9 8
84 84 84 84 83 83 83 83 83

83 88 92 96 99 102 105 108 125


40 39 38 37 36 35 34 33 25
119 121 122 122 123 123 124 124 125

58 59 60 60 60 61 61 62 63
20 19 18 17 17 16 16 15 13
119 120 121 122 122 123 123 124 125

51 53 55 56 57 58 59 60 63
22 21 21 20 20 19 19 18 13
106 110 114 116 117 118 119 120 125
78 78 78 78 78 78 78 79 79

40 40 41 41 42 42 42 42 42
12 12 11 11 10 10 10 10 8
83 83 83 83 83 83 83 83 83
57 57 57 57 57 57 57 57 57