Date
To
The Executive Engineer,
Building Proposal Department, Ward,
Marg,
(West)/ (East)
Mumbai- 400
Sir,
The proposal will require consideration on the certain aspects for which Hon’ble
M.C.’s approval is requested.
We are attaching herewith a detailed report for the concession required for the
proposal along with justification for the hardship.
Kindly process the proposal for concessions required for full potential at the
earliest.
Thanking You
Yours faithfully
Architect/L. S
Encl: - As above.
ARCHITECT’S / LICENSED SURVEYORS’ SCRUTINY REPORT
Case No. .
Owner / Developer:
Name of Consultants
a. Structural Engineer
b. Site Supervisor
c. Licensed Plumber
d. PH consultant
e. M & E consultant
f. Road Consultant
g. Fire safety
h. Traffic / Parking
i. Horticulturist
j. Any other:
Page
Date:
To,
Ex. Eng. (BP) (Zone - )
Mumbai.
Ref.: 1.
2.
Sir,
You are requested to kindly grant IOD and CC upto plinth at the earliest and
oblige.
Thanking You,
Yours faithfully,
ARCHITECT/L.S.
UNDERTAKING CUM INDEMNITY
For grant of IOD and plinth CC pending concession and other approvals.
To,
Subject:
Ref: CHE/
We indemnify MCGM and its officers against any damages / compensation if claimed
arising out of modification/ demolition/ reconstruction of the work, if required to be
done to make good the suggestions of MCGM/ HRC/ MOEF/ MCZMA/ Heritage/
under concession report.
Only on our executing this undertaking and indemnity, the MCGM has agreed to grant
IOD and CC upto plinth pending concession approval /HRC clearance /MOEF
Clearance /MCZMA clearance / Heritage approval.
WEST
A–R
EAST
I–J
J–K
K–L
SOUTH
L–M
M–N
N–O
O – PQ
Q–R
In view of above, detailed report EEBP’’s approval is requested to draft IOD upto Plinth and
plinth CC at pg & draft plan at pg. for proposed building Submitted.
Please, Prepared by
Architect
S.E.B.P A.E.B.P