REPORT

Calculation Note of Building


Prepared for PT. Inti Bangun Sejahtera, Tbk
By PT. Handasa Konsultan (HANDASA)

Rooftop Pole 12 m

Site Name : Sungai Baru


Site ID : ZBJM_0119
Area : Kalimantan Selatan
Building Upgrade : No

© Handasa 2014 (unless Handasa has expressly agreed otherwise with the Client in writing).

This report has been prepared by Handasa on the specific Instructions of our Client. It is solely for our Client’s use for the purpose
which it is intended in accordance with the agreed scope of work. Any use or reliance by any person contrary to the above, to which
Handasa has not given its prior written consent, is at that person’s own risk.
Calculation Note of Building

0 9-Dec-15 RVI Original Issue

CHECK
REV. DATE BY DESCRIPTION
ENGINEER APPROVAL CONTRACTOR COMPANY

STATUS CODE : A = Issued for comments - B = Issued for approval - C = Approved


TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN
WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER
CLASS REVISION
DOCUMENT NUMBER HK-IBS-RT-12/15 12/9/15
1 0

© Handasa | December 9, 2015


Site ID : ZBJM_0119
Site Name : Sungai Baru
Site Location : -

Revision History

Rev. No Prepared By Description Date


0 RVI Original Issue December 9, 2015

Document Acceptance

Action Name Signed Date


Prepared by Rionald Viel December 9, 2015
Checked by Firdan W December 9, 2015
Approved by Firdan W December 9, 2015

Approved by
Owner (PT. IBS)

© Handasa | December 9, 2015


Daftar Isi
1. SUMMARY REPORT

2. SPESIFIKASI ANALISIS

2.1. Spesifikasi Analisis Tower


2.1.1. Standar Desain Tower
2.1.2. Analisis Tower
2.1.3. Beban
2.1.4. Material
2.1.5. Koneksi Baut
2.1.6. Program Analisis
2.1.7. Counter Weight Analisis

3. BUILDING ANALISIS

3.1. Analysis Building Input


3.2. Building Modelling
3.3. Analysis Output

4. ATTACHMENT

5. DRAWING

© Handasa | December 9, 2015


1. SUMMARY REPORT
Site ID : ZBJM_0119 Elev. : +10.8 m
Site Name : Sungai Baru
Tower Type : Pole 12 m Max displacement h/100
ANCHOR SUMMARY
Actual Strengthen
Shear Connector 0.810 < 1 OK PASS
Conclusion Shear Connector doesn't need strengthening to support additional antenna loading
BULDING EXISTING SUMMARY
Actual Comparison Capacity
Beam 0.788 < 1 PASS
Column 0.479 < 1 PASS
Slab 0.603 < 1 PASS
Conclusion Building doesn't need strengthening to support additional antenna loading

Checked by

PT. Inti Bangun Sejahtera PT. Handasa Konsultan

Firdan Wirawan
Engineering Dept. Project Engineering Manager
2. SPESIFIKASI ANALISIS

2.1. Spesification Analysis of Tower


2.1.1. Standar Design Tower
1) EIA-222-F "Structural Standards for Steel Antenna Tower and Antenna Supporting
Structure."

2) American Institute of Steel Construction (AISC).

3) American Society for Testing and Materials (ASTM).

4) The fabrication and materials of the tower will be according to the relevant
Indonesian Standard and/or Japanese Industrial Standard.

5) American Concrete Institute (ACI 318RM-99)

2.1.2. Tower Analysis

1) Tinggi Pole : 12 meter

2) Maximum Wind velocity (V)

In the design of pole structure, a fastest mile speed is taken:

V = 120 km/hour = 33.33 m/sec.

3) Operational Wind velocity (V)

For Displacement analysis is taken:

V = 80.64 km/hour = 22.4 m/sec.

Twist : Maximum twist is 1° at service load / operational wind speed.

Sway : Maximum sway is 1° at service load / operational wind speed.

Displacement : Maximum displacement is H/100 at service load / operational


wind speed.

2.1.3. Load

1) Dead Load

Dead load is weight of tower, ladder, antenna, ancillaries, etc.

2) Wind Load on Tower

Wind load calculation method on the tower and appurtenance are According to EIA
Standard EIA-222-F.

© Handasa | December 9, 2015


3) Load Combination.

Load combination shall be investigated when calculating the maximum member


stresses and structure reactions:

1) 1.0 D

2) 1.0 D + 1.0 Wo (Fastest)

3) 1.0 D + 0.452 Wo (Operational)

Where:

D = Dead load of structure and appurtenances, excluding guy assemblies

Wo = Wind load without ice

2.1.4. Material

1) Steel

Profil yang akan digunakan untuk Tower dan perlengkapan sesuai dengan standar Indonesia
yang relevan dan / atau Japanese Industrial Standard.

Thickness Fy Fp Fu
Profile Standard spec. No. Grade
(mm) (MPa) (MPa) (MPa)

Steel SS t < 16 245 600 400


ASTM A36/JIS – G3101
Shape 400 t < 40 235 600 400

d < 16 640 1200 800


Bolts ASTM A325/JIS – B 1051 8.8
d > 16 640 1200 800

Nuts JIS – B 1052 6 - - - -

SS t < 16 245 600 400


Plate ASTM A36/JIS – G3101
400 t < 25 235 600 400

2.1.5. Koneksi Baut

Sifat mekanik baut dan bagian koneksi sebagai berikut:

1) Shear stress of bolt (Fu = 800 MPa) = 0,62 u = 496 MPa

2) Bearing stress of the lowest material grade (Fu = 400 MPa) = 1,5 x Fu = 600 MPa

2.1.6. Program Analysis

Software will be used for modeling and structure :

MS-TOWER V.6 (nomer lisensi : 3008411).

© Handasa | December 9, 2015


2.2. Spesification Analysis of Building
2.2.1. Codes and Standart

The standards used for building analysis refer to:

1. SNI 03-2847-2002, Tata Cara Perencanaan Struktur Beton untuk Bangunan Gedung –
2002.
2. SNI 03-1726-2003, Tata Cara Perencanaan Ketahanan Gempa untuk Bangunan Gedung
3. ACI-318-2005, American Concrete Institute – 2005.
4. UBC ’97, Uniform Building Code for auto seismic loads.

2.2.2. Material

All structures was made of concrete, using the following properties:


3
Concrete density : 2.400 t/m
Concrete grade (f’c) : Beam = 34.63 MPa (based on survey)
Coloumn = 46.40 MPa (based on survey)
Slab = 37.45 MPa (based on survey)
Elastic modulus : Beam = 27658.2 MPa (based on survey)
Coloumn = 32015.2 MPa (based on survey)
Slab = 28762.3 MPa (based on survey)
Steel Rebar grades are per basic engineering drawings with the following corresponding yield
stresses:
for grade U-39 Fy = 390 MPa for deform rebar (dia > 12 mm)
for grade U-24 Fy = 240 MPa for plain rebar (dia < 12 mm)

2.2.3. Loading

1. Dead Load
a. Dead Load is selfweight of the structure (beam, coloumn, and plate)
1. Concrete density is taken 2400 kg/m3.
2. Wall density is taken 250 kg/m2.
3. Floor and roof thickness assumed is 100 mm and 120 mm.
b. Dead load for floor = 120 kg/m2.
c. Dead load for roof = 100 kg/m2.

2. Live load
Floor load is taken 250 kg/m2 for all floor area and 100 kg/m2 for the roof top area.

3. Shelter Load

BTS load = 500 kg

© Handasa | December 9, 2015


Assign to building
= (500+(0.2x1.3x1.75x2400)+(2x0.15x0.15x1.6x2400))/(1.3X1.75)
= 775.736 kg/m2

4. Watertank Load

Watertank load = 1000 kg


Assign to building
= 1000 / 3.14x0.52
= 1273.239 kg/m2

5. Earthquake Load
Based on SNI-03-1726
1726-2003:
Jakarta = Zone 2 ; Ca = 0.38; Cv = 0.075; T = 0.102xH3/4 = 0.415

6. Combination Load
1. 1,4DL + 1WT + 1SL + 1TL
2. 1,2DL + 1,6LL+ 1WT + 1SL + 1TL
3. 1,2DL + 1LL + 1Ex + 0,3 Ey + 1WT + 1SL + 1TL
4. 1,2DL + 1LL - 1Ex - 0,3 Ey + 1WT + 1SL + 1TL
5. 1,2DL + 1LL + 0,3Ex + 1 Ey + 1WT + 1SL + 1TL
6. 1,2DL + 1LL - 0,3Ex – 1 Ey + 1WT + 1SL + 1TL

7. Pole Load 12 m IBS (kN-m)

Assign to building
= Beban CW + Beban Pole) / Luas CW
= ((0.4x3.0X0.5x2400)
x2400) + (0.4x2.5x0.5x2400)
(0.4x + (15.363X102)) /
((3.0x0.5)+(2.5x0.
x0.5))
= (1440 + 1200 + 1567.026)
156 / 2.75
= 1529.828 kg/m2

6.1 Program Analysis

Software will be used for modeling and structure : ETABS 9.7.0


2.17. Counter Weight Analysis

© Handasa | December 9, 2015


Site Name : Sungai Baru
CALCULATION SHEET
OF Pole Type : 12 m
COUNTER WEIGHT
Client : Date : 13/3/2012
Deep Footing Design Based on ACI 318-05

1. COUNTER WEIGHT DATA

hm
1.1 FOOTING AND SECTION DATA
BASE WIDTH OF TOWER L.as = 2.500 m
SQUARE FOOTING LENGTH L.foot1 = 3.000 m B.edge L.as B.edge
L.foot2 = 0.500 m
L.foot3 = 3.000 m
L.foot2
AS PEDESTAL TO EDGE OF FOOTING B.edge = 0.250 m
FOOTING THICKNESS hm = 0.4 m
CONCRETE COVER dcov = 0.05 m

248

1.2 MATERIAL DATA

L.foot1
CONCRETE STRENGTH fc ' = 18.675 Mpa
MAIN REBAR YIELD STRESS fy1 = 400 Mpa

L.foot2
SECONDARY REBAR YIELD STRESS fy2 = 240 MPa 247 249

3
CONCRETE DENSITY (DRY) gc = 2400 kg/m

L.foot3

1.3 LOADING DATA


FIGURE 1. FOUNDATION DIMENTION

VERT. LOAD HOR. LOAD MOMENT


node
FVd (kN) Fxd (kN) Fyd (kN) Mxd (kN) Myd (kN)
247 147.187 2.255 1.939 -5.024 6.469
249 -62.309 15.693 0.067 0 0
248 -69.680 0.033 17.554 0 0

2. VOLUME OF CONCRETE FOUNDATION

TOTAL VOLUME OF CONCRETE Vfp.d 1.100 m3


TOTAL WEIGHT OF CONCRETE Wcon 2640.000 kg

3. CHECK OF SLIDING

FRICTION COEFFICIENT = 0.45

MAXIMUM HORIZONTAL FORCE = 3 √Fxd12 + Fyd12

COMPRESSION FORCE = FVcompress

TENSION FORCE = FVuplift

TOTAL COMPRESSION FORCE = [Wcon + T1 + T2]


F resisting = δfr.(FZCmax)
SF sliding = Fresisting / Fa

FRICTION COEFFICIENT δfr 0.45


MAXIMUM HORIZONTAL FORCE Fa 8.922 kN
COMPRESSION FORCE T1 147.187 kN
TENSION FORCE T2 -131.989 kN
TOTAL COMPRESSION FORCE FZCmax 41.091 kN
F resisting 18.491 kN
SF SLIDING 2.072 > 1 OK
Site Name : Sungai Baru
CALCULATION SHEET
OF Pole Type : 12 m
COUNTER WEIGHT
Client : Date : 13/3/2012
Deep Footing Design Based on ACI 318-05

1. COUNTER WEIGHT DATA

hm
1.1 FOOTING AND SECTION DATA
BASE WIDTH OF TOWER L.as = 2.500 m
SQUARE FOOTING LENGTH L.foot1 = 3.000 m B.edge L.as B.edge
L.foot2 = 0.500 m
L.foot3 = 3.000 m
L.foot2
AS PEDESTAL TO EDGE OF FOOTING B.edge = 0.250 m
FOOTING THICKNESS hm = 0.4 m
CONCRETE COVER dcov = 0.05 m
248

1.2 MATERIAL DATA

L.foot1
CONCRETE STRENGTH f c' = 18.675 Mpa
MAIN REBAR YIELD STRESS f y1 = 400 Mpa

L.foot2
SECONDARY REBAR YIELD STRESS f y2 = 240 MPa 247 249

CONCRETE DENSITY (DRY) gc = 2400 kg/m3

L.foot3

1.3 LOADING DATA


FIGURE 1. FOUNDATION DIMENTION

VERT. LOAD HOR. LOAD MOMENT


node
FVd (kN) Fxd (kN) Fyd (kN) Mxd (kN) Myd (kN)
247 -117.738 -1.996 -2.735 5.267 -3.287
249 64.424 -16.124 -0.223 0 0
248 68.586 0.177 -17.153 0 0

2. VOLUME OF CONCRETE FOUNDATION

TOTAL VOLUME OF CONCRETE Vfp.d 1.100 m3


TOTAL WEIGHT OF CONCRETE Wcon 2640.000 kg

3. CHECK OF SLIDING

FRICTION COEFFICIENT = 0.45

MAXIMUM HORIZONTAL FORCE = 3 √Fxd1 2 + Fyd1 2

COMPRESSION FORCE = FVcompress

TENSION FORCE = FVuplift

TOTAL COMPRESSION FORCE = [Wcon + T1 + T2]


F resisting = δfr.(FZCmax)
SF sliding = Fresisting / Fa

FRICTION COEFFICIENT δfr 0.45


MAXIMUM HORIZONTAL FORCE Fa 10.158 kN
COMPRESSION FORCE T1 133.010 kN
TENSION FORCE T2 -117.738 kN
TOTAL COMPRESSION FORCE FZCmax 41.165 kN
F resisting 18.524 kN
SF SLIDING 1.824 > 1 OK
RAFT - Method 1 - ACI318(MKS) 12/9/2015

Project Na. : counter w eight


Calculation Sheet
of Project No. : sungai baru
Foundation Client : IBS
Page 1

SUMMARY REPORT FOR FOUNDATION DESIGN

Project Information
Project Name counter w eight
Structure Name counter w eight

1. CHECK OF STABILITY
1.1 Check of Sliding Force (Bi-Axial)
Ft.Name # L/C Fs Allowable Result

1.2 Check of Overturning Mom ent


Ft.Name # L/C X - OVM Y - OVM Allowable Result

1.3 Check of Bearing Pressure (Bi-Axial)


2
Ft.Name # L/C Qu(tonf/m ) Allowable Result

2. DESIGN OF FOOTING
2.1 Check of Reinforcement
2
(Unit : cm )
Ft.Name Sec.Nam # L/C Req.As top / bottom Used.As top / bottom Result
3 3.60 / 3.60 8.45 / 8.45 OK / OK
S1 (X)
4 3.60 / 3.60 8.45 / 8.45 OK / OK
F1
3 3.60 / 3.60 8.45 / 8.45 OK / OK
S1 (Y)
4 3.60 / 3.60 8.45 / 8.45 OK / OK

2.2 Check of One Way Shear (Unit : tonf)


Ft.Name Sec.Nam # L/C Vc Vu Result
3 19.92 0.00 OK
S1 (X)
4 19.92 0.00 OK
F1
3 19.19 0.00 OK
S1 (Y)
4 19.19 0.00 OK

2.3 Check of Two Way Shear (Unit : tonf)


Ft.Name # L/C Ct. Pr.Name Vc Vu Result
3 0.000 0.000 OK
F1
4 0.000 0.000 OK

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015

Project Na. : counter w eight


Calculation Sheet
of Project No. : sungai baru
Foundation Client : IBS
Page 1

FOUNDATION LISTS
Group Name No. Description No. Description
CW 1 F1

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015

Project Na. : counter w eight


Calculation Sheet
of Project No. : sungai baru
Foundation Client : IBS
Page 2

CONTENTS

1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION

4. DESIGN OF FOOTING
4.1 DESIGN MOMENT AND SHEAR FORCE
4.2 REQUIRED REINFORCEMENT
4.3 ONE WAY SHEAR FORCE
4.4 TWO WAY SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015

Project Na. : counter w eight


Calculation Sheet
of Project No. : sungai baru
Foundation Client : IBS
Page 3

1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code American Concrete Institute (ACI 318) [Metric]
Horizontal Force for Wind UNIFORM BUILDING CODE (UBC-1997)
Horizontal Force for Seismic UNIFORM BUILDING CODE [UBC-1997]
Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL

1.2 MATERIALS & UNIT WEIGHT


Items Value
2
Concrete (f'c : compressive strength) 186.750 kgf/cm
2
Lean Concrete (Lf'c : compressive strength) 0.000 kgf/cm
2
Reinforcement (D10 ~ D16 , yield strength) 4000.000 kgf/cm
2
Reinforcement (D19 ~ , yield strength) 4000.000 kgf/cm
3
Rs (Soil unit w eight) 1.600 ton/m
3
Rc (Concrete unit w eight) 2.400 ton/m
2
Es (Steel Modulus of Elasticity) 2.000 106 kgf/cm
2
Ec (Concrete Modulus of Elasticity) 203108.500 kgf/cm

- Soil Capacity
Items Value
Soil Name Unit-01
Footing List F1
2
Qa (Soil Bearing Capacity) 0 tonf/m
Buoyancy Not Consider
WL (Water Label from the EL = 0) 0 mm
FD (Frost Depth from the EL = 0) 0 mm
Internal Friction Angle 0
Passive Soil Pressure Not Consider
Cu (Undrained cohesion) Clay , 0 tonf/m2

1.3 LOAD COMBINATION


Index Load Case Name Load Case Description
1 SW SELF WEIGHT
2 TLC COMPRESS
3 TLT TENSION

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015

Project Na. : counter w eight


Calculation Sheet
of Project No. : sungai baru

Foundation Client : IBS


Page 4

Comb . ID Load Combination for Reinforcement


3 1.0 SW + 1.0 TLC
4 1.0 SW + 1.0 TLT

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015 Page 5

2. DRAWING REFERENCE DWGS


A01 NO. DWG NO. DWG TITLE

N O T ES
* OUTPUT UNIT : mm

01 F1

counter weight PROJECT

FOUNDATION LOCATION PLAN


counter weight

SQUAD CHECK
1 2
Y PROCESS PIPING VESSELS STRUCT. ELEC. INST.

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN sungai baru

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015 Page 6

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015 Page 7

REFERENCE DWGS
NO. DWG NO. DWG TITLE

CL FOOT ING
500

250

N O T ES
* OUTPUT UNIT : mm
CL FOOTING

3000

2500

counter weight PROJECT

500
1 2
250

FOUNDATION DETAIL FOR


250 250
F1
2500

SQUAD CHECK
3000

FOUNDATION PLAN PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD AS SHOWN sungai baru

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015 Page 8

REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOT ING
TO P BO TTO M

N O T ES
* OUTPUT UNIT : mm
D13@150

D13@150
counter weight PROJECT

FOUNDATION DETAIL FOR


F1
50

SQUAD CHECK
TYP. D13@150
D13@150

REINFORCEMENT PLAN PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD AS SHOWN sungai baru

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015 Page 9

500
1 2

400
3000

500
1 2 ELEVATION S1 - X

3000

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015
F1 Item No. Page 10

1 2 3
3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name F1
3000 Ft. Type IRREGULAR
500 Area 2.750 m
2

2500
Ft. Thickness 400.00 mm
0 0 Ft. Volume 1.100 m
3

Ft. Weight 2.640 tonf


Soil Height 0.00 mm
3
Soil Volume 0.000 m
2500

Soil Weight 0.000 tonf


3000

Buoyancy Not Consider


Self Weight (except Pr.SW) 2.640 tonf

0 0 0 0
500

The Origin coordinate 400


The Center of gravity (-568.18,-568.18) mm

Section Data
( mm ) Ft.Name Direction Ft. Volume Soil Volume Pier Wt
F1 All Direct 1.100 m3 0.000 m3 0.000 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


2
S1 2.750 m 2.640 tonf 0.000 tonf 2.640 tonf

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle w all, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil w eight in case circle w all except Tank1 Type(Circle Ring Footing Shape)
Unit( Length : mm , Weight : tonf , Area : m2 )

0.000
Copyright (c) GS E&C. All Rights Reserved
0.000
RAFT - Method 1 - ACI318(MKS) 12/9/2015

Project Na. : counter w eight


Calculation Sheet
of Project No. : sungai baru
Foundation Client : IBS
Page 11

Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y


1 Rectangle 0.000 0.000 0.000 0.000 -1250.000 -1250.000
F1 2 Rectangle 0.000 0.000 0.000 0.000 1250.000 -1250.000
3 Rectangle 0.000 0.000 0.000 0.000 -1250.000 1250.000

3.3 LOAD CASE


Fz
Fy
Mz Input the point loads in the global coordinate system direction. Positive directions of moments (show n in the sketch) are
My based on the right hand rule.
Fx
Mx

Index Load Case Name Load Case Description


1 SW SELF WEIGHT
2 TLC COMPRESS
3 TLT TENSION

Unit( tonf , tonf-m )


Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0 0 0 0 0
1 2 -0.23 -0.19 -14.72 0.5 -0.65
3 0.2 0.27 11.77 -0.53 0.33
1 0 0 0 0 0
2 2 -1.57 -0.01 6.23 0 0
F1
3 1.61 0.02 -6.44 0 0
1 0 0 0 0 0
3 2 0 -1.76 6.97 0 0
3 -0.02 1.72 -6.86 0 0
Footing SW 0.000 0.000 -2.640 0.000 0.000

3.4 LOAD COMBINATION


In Pier Top In Footing Bottom In Footing Bottom Center
w ithout Self Weight w ith Pier Self Weight, w ith Pier & Footing Self Weight & Soil Weight,
But w ithout Footing Self Weight, Case PileType
(Frame Analysis) in centroid of Pile Group
Case NonPileType
in centroid of Footing

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015

Project Na. : counter w eight


Calculation Sheet
of Project No. : sungai baru
Foundation Client : IBS
Page 12

3.4.1 Load Combination in Pier Top (Without SW)


Unit( tonf , tonf-m )
Ft.Name Pr.Name L.Comb.  Fx  Fy  Fz  Mx  My
3 -0.226 -0.194 -14.719 0.502 -0.647
1
4 0.200 0.273 11.774 -0.527 0.329
3 -1.569 -0.007 6.231 0.000 0.000
F1 2
4 1.612 0.022 -6.442 0.000 0.000
3 -0.003 -1.755 6.968 0.000 0.000
3
4 -0.018 1.715 -6.859 0.000 0.000

3.4.2 Load Combination in Footing Bottom (With Pier SW)


Unit( tonf , tonf-m )
Ft.Name Pr.Name L.Comb.  Fx  Fy  Fz  Mx  My
3 -0.226 -0.194 -14.719 0.580 -0.737
1
4 0.200 0.273 11.774 -0.636 0.409
3 -1.569 -0.007 6.231 0.003 -0.628
F1 2
4 1.612 0.022 -6.442 -0.009 0.645
3 -0.003 -1.755 6.968 0.702 -0.001
3
4 -0.018 1.715 -6.859 -0.686 -0.007

3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Com bination of Elastic Condition
There is no Load Combination

Load Com bination of Ultim ate Condition


- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name Sec.Nam L.Comb.  Fx  Fy  Fz  Mx  My C.G. of Loads
3 -1.798 -1.956 -1.520 19.741 -17.980 -3062.0 , -3505.0
F1 S1
4 1.794 2.011 -1.527 -17.436 16.111 4546.9 , 4796.6

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015

Project Na. : counter w eight


Calculation Sheet
of Project No. : sungai baru
Foundation Client : IBS
Page 13

4. DESIGN OF FOOTING
4.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance w ith unltimate strength method at footing bottom.
Calculated total pier load as
 Q =  Fz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y w idth

4.1.1 Data Unit( mm , tonf , tonf-m )


Ft.Name Sec.Nam Dir. L.Comb. Fl or Fw Sl or Sw  Fz M Q
3 3000.00 3000.00 1.520 -17.98 1.520
S1 X
4 3000.00 3000.00 1.527 16.11 1.527
F1
3 3000.00 3000.00 1.520 19.741 1.520
S1 Y
4 3000.00 3000.00 1.527 -17.436 1.527

4.1.2 Design Parameters


Yield Strength - D10 ~ D16 : f y1 , D19 ~ : f y2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
f_clb : Clear Cover for bottom of footing reinforcement
Loc. : Location of Critical Point from left side of footing

Unit(kgf/cm2,mm)
(Flexure) (Shear) f'c fy1 fy2 f_cl f_clt f_clb
0.85 0.8 186.75 4000.00 4000.00 50.0 50.0 50.0

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015

Project Na. : counter w eight


Calculation Sheet
of Project No. : sungai baru
Foundation Client : IBS
Page 14

4.2 REQUIRED REINFORCEMENT


4.2.1 Reinforcement Formula
- Shrinkage and temperature reinforcement ---- ACI CODE 7.12.2
As = fac b h , fac = follow ing
Area of shrinkage and temperature reinforcement shall provide at least the follow ing ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs w here Grade 40 or 50 deformed bars are used .....................................................................0.0020
(b) Slabs w here Grade 60 deformed bars or w elded w ire reinforcement are used...............................0.0018
(c) Slabs w here reinforcement w ith yield stress exeeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used ....................................................................................................
fy
- Required Reinforcement by Analysis
As As 2
- At every section of flexural members w here tensile reinforcement is required
As As 5 As 4 ---- ACI Eq (10-3)
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis ---- ACI CODE 10.5.3
As 2 =  .req b d
As 3 = 1.333  .req b d
200
As 4 = bd
fy
3 f ck
As 5 = bd
fy
As max = 0.75  b b d
f ck 0.003 Es
 b = 0.85  1
fy 0.003 Es + f y
Selected As = Max ( As 1 , As 2 , Min ( As 3 , Max ( As 4 , As 5 ) ) )
If Selected As < Using As < As max , then OK!!

Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
bd
2 ,  = 0.85 ,  .req =
fy ( 1- 1-
0.85fck )

4.2.2 Check of Footing Reinforcement


Footing Name : F1 GroupType : Irregular
- X direction (Unit Width)

2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
4 top 6.67 - D13 @ 150 0.250 1.000 34.365 8.449
S1
4 botom 6.67 - D13 @ 150 0.250 1.000 34.365 8.449

Sec.Name L.Comb. Mu (tonf-m) Rn  .Req


4 top - - -
S1
4 bottom - - -

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015

Project Na. : counter w eight


Calculation Sheet
of Project No. : sungai baru
Foundation Client : IBS
Page 15

2 2 2 2 2 2
Sec.Name L.Comb. As 1(cm ) As 2(cm ) As3(cm ) As4(cm ) As5(cm ) As max (cm )
4 top 3.600 - - 12.080 9.339 52.163
S1
4 bottom 3.600 - - 12.080 9.339 52.163
2 2
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result
4 top 8.449 3.600 OK
S1
4 bottom 8.449 3.600 OK

- Y direction (Unit Width)

2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
4 top 6.67 - D13 @ 150 0.250 1.000 33.095 8.449
S1
4 botom 6.67 - D13 @ 150 0.250 1.000 33.095 8.449

Sec.Name L.Comb. Mu (tonf-m) Rn  .Req


4 top - - -
S1
4 bottom - - -
2 2 2 2 2 2
Sec.Name L.Comb. As 1(cm ) As 2(cm ) As3(cm ) As4(cm ) As5(cm ) As max (cm )
4 top 3.600 - - 11.634 8.994 50.236
S1
4 bottom 3.600 - - 11.634 8.994 50.236
2 2
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result
4 top 8.449 3.600 OK
S1
4 bottom 8.449 3.600 OK

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015

Project Na. : counter w eight


Calculation Sheet
of Project No. : sungai baru
Foundation Client : IBS
Page 16

4.3 ONE WAY SHEAR FORCE


4.3.1 One-Way Shear Formula
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
-  V c = 0.8 2 f ck B'w d (eq 11-3)
- Vu <=  V c , then OK!!

4.3.2 Check of One-Way Shear


Footing Name : F1 GroupType : Irregular PileType : False

3000
Unit : mm
500
2500
2500
3000

2406
500

2406

- X direction One-Way Shear (Unit Width)


Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 3 2406 343.6 1000 19.923 0 OK
- Y direction One-Way Shear (Unit Width)
Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 3 2406 330.9 1000 19.187 0 OK

Copyright (c) GS E&C. All Rights Reserved


RAFT - Method 1 - ACI318(MKS) 12/9/2015

Project Na. : counter w eight


Calculation Sheet
of Project No. : sungai baru
Foundation Client : IBS
Page 17

4.4 TWO WAY SHEAR FORCE


4.4.1 Two-Way Shear Formula
Vu =  Fz Shade Ratio
(a)  V c1 = 0.8 2 (1 + 2/ c ) f ck bo d (eq 11-33) <- Vc1
(b)  V c2 = 0.8 2 (1 + s d / 2 bo) f ck bo d (eq 11-34) <- Vc2
(c)  V c3 = 0.8 4 f ck bo d (eq 11-35) <- Vc3
 Vc = Min(  V c1 ,  V c2 ,  V c3) ACI 318-05 CODE 11.12.2.1
Vu  V c , then OK
w here
 = ratio of long side to short side of the column, concentrated load or reaction area
s = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

4.4.2 Check of Two-WayShear


There is no pier that can be Analyzed

Copyright (c) GS E&C. All Rights Reserved


a. Shear Connector Main Pole

© Handasa | December 9, 2015


www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 1
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

Specifier's comments: CONTER WEIGHT MAIN POLE, CASE 620 NODE 247

1 Input data
Anchor type and diameter: HIT-RE 500 + Rebar 12mm
Dynamic set or any suitable annular gap filling solution
Effective embedment depth: hef,act = 70 mm (hef,limit = - mm)
Material: B500B
Evaluation Service Report: ETA 04/0027
Issued I Valid: 6/26/2013 | 5/16/2018
Proof: Design method Engineering judgement SOFA BOND - based on ETAG BOND testing
Stand-off installation: without clamping (anchor); restraint level (anchor plate): 2.00; eb = 5 mm; t = 1 mm
Hilti Grout: , multipurpose, fc,Grout = 30.00 N/mm2
Anchor plate: lx x ly x t = 500 mm x 500 mm x 1 mm; (Recommended plate thickness: not calculated
Profile: no profile
Base material: uncracked concrete, , fc = 37.45 N/mm2; h = 120 mm, Temp. short/long: 40/24 °C
Installation: diamond cored hole, Installation condition: Dry
Reinforcement: no reinforcement or reinforcement spacing >= 150 mm (any Ø) or >= 100 mm (Ø <= 10 mm)
no longitudinal edge reinforcement

Geometry [mm] & Loading [kN, kNm]

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 2
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

2 Load case/Resulting anchor forces y


Load case: Design loads

Anchor reactions [kN]


Tension force: (+Tension, -Compression)
Anchor Tension force Shear force Shear force x Shear force y 1 2 3 4
1 7.359 0.212 0.125 0.171
2 7.359 0.212 0.125 0.171
3 7.359 0.212 0.125 0.171
4 7.359 0.212 0.125 0.171 5 6 7 8
5 7.359 0.212 0.125 0.171
x
6 7.359 0.212 0.125 0.171 Tension
7 7.359 0.212 0.125 0.171 9 10 11 12
8 7.359 0.212 0.125 0.171
9 7.359 0.212 0.125 0.171
10 7.359 0.212 0.125 0.171
11 7.359 0.212 0.125 0.171 13 14 15 16
12 7.359 0.212 0.125 0.171
13 7.359 0.212 0.125 0.171
14 7.359 0.212 0.125 0.171
15 7.359 0.212 0.125 0.171
16 7.359 0.212 0.125 0.171
max. concrete compressive strain: - [‰]
max. concrete compressive stress: - [N/mm2]
resulting tension force in (x/y)=(0/0): 117.738 [kN]
resulting compression force in (x/y)=(0/0): 0.000 [kN]

3 Tension load (EOTA TR 029, Section 5.2.2)


Load [kN] Capacity [kN] Utilization bN [%] Status
Steel Strength* 7.359 44.286 17 OK
Combined pullout-concrete cone failure** 117.738 146.459 81 OK
Concrete Breakout Strength** 117.738 147.268 80 OK
Splitting failure** 117.738 162.170 73 OK
* anchor having the highest loading **anchor group (anchors in tension)

3.1 Steel Strength


NRk,s [kN] gM,s NRd,s [kN] NSd [kN]
62.000 1.400 44.286 7.359

3.2 Combined pullout-concrete cone failure


Ap,N [mm2] A0p,N [mm2] 2
tRk,ucr,25 [N/mm ] scr,Np [mm] ccr,Np [mm] cmin [mm]
324900 44100 12.00 210 105 ∞
2 0
yc tRk,ucr [N/mm ] k yg,Np yg,Np
1.040 12.48 3.200 1.355 1.087
ec1,N [mm] yec1,Np ec2,N [mm] yec2,Np ys,Np yre,Np
0 1.000 0 1.000 1.000 1.000
N0Rk,p [kN] NRk,p [kN] gM,p NRd,p [kN] NSd [kN]
32.933 263.626 1.800 146.459 117.738

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 3
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

3.3 Concrete Breakout Strength


Ac,N [mm2] A0c,N [mm2] ccr,N [mm] scr,N [mm]
324900 44100 105 210
ec1,N [mm] yec1,N ec2,N [mm] yec2,N ys,N yre,N k1
0 1.000 0 1.000 1.000 1.000 10.100
N0Rk,c [kN] gM,c NRd,c [kN] NSd [kN]
35.981 1.800 147.268 117.738

3.4 Splitting failure


Ac,N [mm2] A0c,N [mm2] ccr,sp [mm] scr,sp [mm] yh,sp
327184 44944 106 212 1.114
ec1,N [mm] yec1,N ec2,N [mm] yec2,N ys,N yre,N k1
0 1.000 0 1.000 1.000 1.000 10.100
N0Rk,c [kN] gM,sp NRd,sp [kN] NSd [kN]
35.981 1.800 162.170 117.738

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 4
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

4 Shear load (EOTA TR 029, Section 5.2.3)


Load [kN] Capacity [kN] Utilization bV [%] Status
Steel Strength (without lever arm)* 0.212 20.667 2 OK
Steel failure (with lever arm)* N/A N/A N/A N/A
Pryout Strength** 3.386 351.502 1 OK
Concrete edge failure in direction ** N/A N/A N/A N/A
* anchor having the highest loading **anchor group (relevant anchors)

4.1 Steel Strength (without lever arm)


VRk,s [kN] gM,s VRd,s [kN] VSd [kN]
31.000 1.500 20.667 0.212

4.2 Pryout Strength (Bond Strength controls)


Ap,N [mm2] A0p,N [mm2] 2
tRk,ucr,25 [N/mm ] ccr,Np [mm] scr,Np [mm] cmin [mm]
324900 44100 12.00 105 210 ∞
2 0
yc tRk,ucr [N/mm ] k4 k-factor yg,Np yg,Np
1.040 12.48 3.200 2.000 1.355 1.087

ys,Np ec1,V [mm] yec1,Np ec2,V [mm] yec2,Np yre,Np


1.000 0 1.000 0 1.000 1.000
N0Rk,p [kN] NRk,p [kN] gM,c,p VRd,c1 [kN] VSd [kN]
32.933 263.626 1.500 351.502 3.386

5 Combined tension and shear loads (EOTA TR 029, Section 5.2.4)


bN bV a Utilization bN,V [%] Status
0.804 0.010 1.000 68 OK
(bN + bV) / 1.2 ≤ 1

6 Displacements (highest loaded anchor)


Short term loading:
NSk = 5.451 [kN] dN = 0.062 [mm]
VSk = 0.157 [kN] dV = 0.008 [mm]
dNV = 0.062 [mm]
Long term loading:
NSk = 5.451 [kN] dN = 0.124 [mm]
VSk = 0.157 [kN] dV = 0.011 [mm]
dNV = 0.124 [mm]

Comments: Tension displacements are valid with half of the required installation torque moment for uncracked concrete! Shear displacements
are valid without friction between the concrete and the anchor plate! The gap due to the drilled hole and clearance hole tolerances are not
included in this calculation!

The acceptable anchor displacements depend on the fastened construction and must be defined by the designer!

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 5
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

7 Warnings
• Load re-distributions on the anchors due to elastic deformations of the anchor plate are not considered. The anchor plate is assumed to be
sufficiently stiff, in order not to be deformed when subjected to the loading!

Input data and results must be checked for agreement with the
existing conditions and for plausibility!
• Checking the transfer of loads into the base material is required in accordance with EOTA TR 029, Section 7!
• The design is only valid if the clearance hole in the fixture is not larger than the value given in Table 4.1 of EOTA TR029! For larger
diameters of the clearance hole see Chapter 1.1. of EOTA TR029!
• The design method ETAG (filled holes) assumes that no hole clearance between the anchors and the fixture is present. This can
be

achieved by filling the gap with mortar of sufficient compressive strength (e.g. by using the Hilti Dynamic Set) or by other suitable means
• The accessory list in this report is for the information of the user only. In any case, the instructions for use provided with the product have to
be followed to ensure a proper installation.
• Bore hole cleaning must be performed according to instructions for use (blow twice with oil-free compressed air (min. 6 bar), brush twice,
blow twice with oil-free compressed air (min. 6 bar)).
• Characteristic bond resistances depend on short- and long-term temperatures.
• The design method SOFA assumes that no hole clearance between the anchors and the fixture is present. This can be achieved by filling
the gap with mortar of sufficient compressive strength (e.g. by using the Hilti Dynamic Set) or by other suitable means.
• The compliance with current standards (e.g. EC3) is the responsibility of the user
• An SLS-check is not performed for SOFA and has to be provided by the user!

Fastening meets the design criteria!

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 6
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

8 Installation data
Anchor plate, steel: - Anchor type and diameter: HIT-RE 500 + Rebar 12mm
Profile: no profile Installation torque: 0.000 kNm
Hole diameter in the fixture: df = 12 mm Hole diameter in the base material: 16 mm
Plate thickness (input): 1 mm Hole depth in the base material: 70 mm
Recommended plate thickness: not calculated Minimum thickness of the base material: 102 mm
Cleaning: Premium cleaning of the drilled hole is required

8.1 Recommended accessories

Drilling Cleaning Setting


• Diamond core rig • Compressed air with required • Dispenser including cassette and mixer
accessories to blow from the bottom of • For deep installations, a piston plug is
the hole necessary
• Proper diameter wire brush • Dynamic set
y • Torque wrench

250 250

70
1 2 3 4

250
120

5 6 7 8
120

9 10 11 12
120

250

13 14 15 16
70

70 120 120 120 70

Coordinates Anchor [mm]


Anchor x y c-x c+x c-y c+y Anchor x y c-x c+x c-y c+y
1 -180 180 - - - - 9 -180 -60 - - - -
2 -60 180 - - - - 10 -60 -60 - - - -
3 60 180 - - - - 11 60 -60 - - - -
4 180 180 - - - - 12 180 -60 - - - -
5 -180 60 - - - - 13 -180 -180 - - - -
6 -60 60 - - - - 14 -60 -180 - - - -
7 60 60 - - - - 15 60 -180 - - - -
8 180 60 - - - - 16 180 -180 - - - -

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 7
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

9 Remarks; Your Cooperation Duties


• Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas
and security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be
strictly complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted
prior to using the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the
data you put in. Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be
put in by you. Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly
with regard to compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an
aid to interpret norms and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or
suitability for a specific application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for
the regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do
not use the AutoUpdate function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software
in each case by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or
damaged data or programs, arising from a culpable breach of duty by you.

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
b. Shear Connector Brace

© Handasa | December 9, 2015


www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 1
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

Specifier's comments: CONTER WEIGHT BRACE, CASE 560 NODE 248

1 Input data
Anchor type and diameter: HIT-RE 500 + Rebar 12mm
Dynamic set or any suitable annular gap filling solution
Effective embedment depth: hef,act = 70 mm (hef,limit = - mm)
Material: B500B
Evaluation Service Report: ETA 04/0027
Issued I Valid: 6/26/2013 | 5/16/2018
Proof: Design method Engineering judgement SOFA BOND - based on ETAG BOND testing
Stand-off installation: without clamping (anchor); restraint level (anchor plate): 2.00; eb = 5 mm; t = 1 mm
Hilti Grout: , multipurpose, fc,Grout = 30.00 N/mm2
Anchor plate: lx x ly x t = 500 mm x 500 mm x 1 mm; (Recommended plate thickness: not calculated
Profile: no profile
Base material: uncracked concrete, , fc = 37.45 N/mm2; h = 120 mm, Temp. short/long: 40/24 °C
Installation: diamond cored hole, Installation condition: Dry
Reinforcement: no reinforcement or reinforcement spacing >= 150 mm (any Ø) or >= 100 mm (Ø <= 10 mm)
no longitudinal edge reinforcement

Geometry [mm] & Loading [kN, kNm]

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 2
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

2 Load case/Resulting anchor forces y


Load case: Design loads

Anchor reactions [kN]


Tension force: (+Tension, -Compression)
Anchor Tension force Shear force Shear force x Shear force y 1 2 3 4
1 6.001 1.512 -0.003 -1.512
2 6.001 1.512 -0.003 -1.512
3 6.001 1.512 -0.003 -1.512
4 6.001 1.512 -0.003 -1.512 5 6 7 8
5 6.001 1.512 -0.003 -1.512
x
6 6.001 1.512 -0.003 -1.512 Tension
7 6.001 1.512 -0.003 -1.512 9 10 11 12
8 6.001 1.512 -0.003 -1.512
9 6.001 1.512 -0.003 -1.512
10 6.001 1.512 -0.003 -1.512
11 6.001 1.512 -0.003 -1.512 13 14 15 16
12 6.001 1.512 -0.003 -1.512
13 6.001 1.512 -0.003 -1.512
14 6.001 1.512 -0.003 -1.512
15 6.001 1.512 -0.003 -1.512
16 6.001 1.512 -0.003 -1.512
max. concrete compressive strain: - [‰]
max. concrete compressive stress: - [N/mm2]
resulting tension force in (x/y)=(0/0): 96.009 [kN]
resulting compression force in (x/y)=(0/0): 0.000 [kN]

3 Tension load (EOTA TR 029, Section 5.2.2)


Load [kN] Capacity [kN] Utilization bN [%] Status
Steel Strength* 6.001 44.286 14 OK
Combined pullout-concrete cone failure** 96.009 146.459 66 OK
Concrete Breakout Strength** 96.009 147.268 66 OK
Splitting failure** 96.009 162.170 60 OK
* anchor having the highest loading **anchor group (anchors in tension)

3.1 Steel Strength


NRk,s [kN] gM,s NRd,s [kN] NSd [kN]
62.000 1.400 44.286 6.001

3.2 Combined pullout-concrete cone failure


Ap,N [mm2] A0p,N [mm2] 2
tRk,ucr,25 [N/mm ] scr,Np [mm] ccr,Np [mm] cmin [mm]
324900 44100 12.00 210 105 ∞
2 0
yc tRk,ucr [N/mm ] k yg,Np yg,Np
1.040 12.48 3.200 1.355 1.087
ec1,N [mm] yec1,Np ec2,N [mm] yec2,Np ys,Np yre,Np
0 1.000 0 1.000 1.000 1.000
N0Rk,p [kN] NRk,p [kN] gM,p NRd,p [kN] NSd [kN]
32.933 263.626 1.800 146.459 96.009

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 3
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

3.3 Concrete Breakout Strength


Ac,N [mm2] A0c,N [mm2] ccr,N [mm] scr,N [mm]
324900 44100 105 210
ec1,N [mm] yec1,N ec2,N [mm] yec2,N ys,N yre,N k1
0 1.000 0 1.000 1.000 1.000 10.100
N0Rk,c [kN] gM,c NRd,c [kN] NSd [kN]
35.981 1.800 147.268 96.009

3.4 Splitting failure


Ac,N [mm2] A0c,N [mm2] ccr,sp [mm] scr,sp [mm] yh,sp
327184 44944 106 212 1.114
ec1,N [mm] yec1,N ec2,N [mm] yec2,N ys,N yre,N k1
0 1.000 0 1.000 1.000 1.000 10.100
N0Rk,c [kN] gM,sp NRd,sp [kN] NSd [kN]
35.981 1.800 162.170 96.009

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 4
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

4 Shear load (EOTA TR 029, Section 5.2.3)


Load [kN] Capacity [kN] Utilization bV [%] Status
Steel Strength (without lever arm)* 1.512 20.667 8 OK
Steel failure (with lever arm)* N/A N/A N/A N/A
Pryout Strength** 24.197 351.502 7 OK
Concrete edge failure in direction ** N/A N/A N/A N/A
* anchor having the highest loading **anchor group (relevant anchors)

4.1 Steel Strength (without lever arm)


VRk,s [kN] gM,s VRd,s [kN] VSd [kN]
31.000 1.500 20.667 1.512

4.2 Pryout Strength (Bond Strength controls)


Ap,N [mm2] A0p,N [mm2] 2
tRk,ucr,25 [N/mm ] ccr,Np [mm] scr,Np [mm] cmin [mm]
324900 44100 12.00 105 210 ∞
2 0
yc tRk,ucr [N/mm ] k4 k-factor yg,Np yg,Np
1.040 12.48 3.200 2.000 1.355 1.087

ys,Np ec1,V [mm] yec1,Np ec2,V [mm] yec2,Np yre,Np


1.000 0 1.000 0 1.000 1.000
N0Rk,p [kN] NRk,p [kN] gM,c,p VRd,c1 [kN] VSd [kN]
32.933 263.626 1.500 351.502 24.197

5 Combined tension and shear loads (EOTA TR 029, Section 5.2.4)


bN bV a Utilization bN,V [%] Status
0.656 0.073 1.500 56 OK
a a
bN + bV ≤ 1

6 Displacements (highest loaded anchor)


Short term loading:
NSk = 4.445 [kN] dN = 0.051 [mm]
VSk = 1.120 [kN] dV = 0.056 [mm]
dNV = 0.075 [mm]
Long term loading:
NSk = 4.445 [kN] dN = 0.101 [mm]
VSk = 1.120 [kN] dV = 0.078 [mm]
dNV = 0.128 [mm]

Comments: Tension displacements are valid with half of the required installation torque moment for uncracked concrete! Shear displacements
are valid without friction between the concrete and the anchor plate! The gap due to the drilled hole and clearance hole tolerances are not
included in this calculation!

The acceptable anchor displacements depend on the fastened construction and must be defined by the designer!

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 5
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

7 Warnings
• Load re-distributions on the anchors due to elastic deformations of the anchor plate are not considered. The anchor plate is assumed to be
sufficiently stiff, in order not to be deformed when subjected to the loading!

Input data and results must be checked for agreement with the
existing conditions and for plausibility!
• Checking the transfer of loads into the base material is required in accordance with EOTA TR 029, Section 7!
• The design is only valid if the clearance hole in the fixture is not larger than the value given in Table 4.1 of EOTA TR029! For larger
diameters of the clearance hole see Chapter 1.1. of EOTA TR029!
• The design method ETAG (filled holes) assumes that no hole clearance between the anchors and the fixture is present. This can
be

achieved by filling the gap with mortar of sufficient compressive strength (e.g. by using the Hilti Dynamic Set) or by other suitable means
• The accessory list in this report is for the information of the user only. In any case, the instructions for use provided with the product have to
be followed to ensure a proper installation.
• Bore hole cleaning must be performed according to instructions for use (blow twice with oil-free compressed air (min. 6 bar), brush twice,
blow twice with oil-free compressed air (min. 6 bar)).
• Characteristic bond resistances depend on short- and long-term temperatures.
• The design method SOFA assumes that no hole clearance between the anchors and the fixture is present. This can be achieved by filling
the gap with mortar of sufficient compressive strength (e.g. by using the Hilti Dynamic Set) or by other suitable means.
• The compliance with current standards (e.g. EC3) is the responsibility of the user
• An SLS-check is not performed for SOFA and has to be provided by the user!

Fastening meets the design criteria!

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 6
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

8 Installation data
Anchor plate, steel: - Anchor type and diameter: HIT-RE 500 + Rebar 12mm
Profile: no profile Installation torque: 0.000 kNm
Hole diameter in the fixture: df = 12 mm Hole diameter in the base material: 16 mm
Plate thickness (input): 1 mm Hole depth in the base material: 70 mm
Recommended plate thickness: not calculated Minimum thickness of the base material: 102 mm
Cleaning: Premium cleaning of the drilled hole is required

8.1 Recommended accessories

Drilling Cleaning Setting


• Diamond core rig • Compressed air with required • Dispenser including cassette and mixer
accessories to blow from the bottom of • For deep installations, a piston plug is
the hole necessary
• Proper diameter wire brush • Dynamic set
y • Torque wrench

250 250

70
1 2 3 4

250
120

5 6 7 8
120

9 10 11 12
120

250

13 14 15 16
70

70 120 120 120 70

Coordinates Anchor [mm]


Anchor x y c-x c+x c-y c+y Anchor x y c-x c+x c-y c+y
1 -180 180 - - - - 9 -180 -60 - - - -
2 -60 180 - - - - 10 -60 -60 - - - -
3 60 180 - - - - 11 60 -60 - - - -
4 180 180 - - - - 12 180 -60 - - - -
5 -180 60 - - - - 13 -180 -180 - - - -
6 -60 60 - - - - 14 -60 -180 - - - -
7 60 60 - - - - 15 60 -180 - - - -
8 180 60 - - - - 16 180 -180 - - - -

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
www.hilti.lu Profis Anchor 2.6.0
Company: PT. HANDASA KONSULTAN Page: 7
Specifier: Project: sungai baru
Address: Ruko Aster Blok C.23 Jl. Boulevard Grand Depok City Sub-Project I Pos. No.: SHEAR CONNECTOR
Phone I Fax: 021-77835352 | 021-77834656 Date: 12/9/2015
E-Mail: www.handasa-konsultan.com

9 Remarks; Your Cooperation Duties


• Any and all information and data contained in the Software concern solely the use of Hilti products and are based on the principles, formulas
and security regulations in accordance with Hilti's technical directions and operating, mounting and assembly instructions, etc., that must be
strictly complied with by the user. All figures contained therein are average figures, and therefore use-specific tests are to be conducted
prior to using the relevant Hilti product. The results of the calculations carried out by means of the Software are based essentially on the
data you put in. Therefore, you bear the sole responsibility for the absence of errors, the completeness and the relevance of the data to be
put in by you. Moreover, you bear sole responsibility for having the results of the calculation checked and cleared by an expert, particularly
with regard to compliance with applicable norms and permits, prior to using them for your specific facility. The Software serves only as an
aid to interpret norms and permits without any guarantee as to the absence of errors, the correctness and the relevance of the results or
suitability for a specific application.
• You must take all necessary and reasonable steps to prevent or limit damage caused by the Software. In particular, you must arrange for
the regular backup of programs and data and, if applicable, carry out the updates of the Software offered by Hilti on a regular basis. If you do
not use the AutoUpdate function of the Software, you must ensure that you are using the current and thus up-to-date version of the Software
in each case by carrying out manual updates via the Hilti Website. Hilti will not be liable for consequences, such as the recovery of lost or
damaged data or programs, arising from a culpable breach of duty by you.

Input data and results must be checked for agreement with the existing conditions and for plausibility!
PROFIS Anchor ( c ) 2003-2009 Hilti AG, FL-9494 Schaan Hilti is a registered Trademark of Hilti AG, Schaan
3.Building Analysis

© Handasa | December 9, 2015


3.1. Analysis Building Input

© Handasa | December 9, 2015


ETABS v9.7.0 File:SUNGAIBARU PRO CW Units:KN-m December 9, 2015 18:47 PAGE 1

S T O R Y D A T A
STORY SIMILAR TO HEIGHT ELEVATION

STORY3 None 3.420 10.800


STORY2 None 3.510 7.380
STORY1 None 3.870 3.870
BASE None 0.000

ETABS v9.7.0 File:SUNGAIBARU PRO CW Units:KN-m December 9, 2015 18:47 PAGE 2

M A T E R I A L L I S T B Y E L E M E N T T Y P E
ELEMENT TOTAL NUMBER NUMBER
TYPE MATERIAL MASS PIECES STUDS
tons

Column COLUMN 112.46 96


Beam BEAM 222.00 168 0
Wall BEAM 5.68
Wall COLUMN 22.40
Floor PLAT 298.60

ETABS v9.7.0 File:SUNGAIBARU PRO CW Units:KN-m December 9, 2015 18:47 PAGE 3


M A T E R I A L L I S T B Y S E C T I O N

ELEMENT NUMBER TOTAL TOTAL NUMBER


SECTION TYPE PIECES LENGTH MASS STUDS
meters tons

C30X30 Column 32 109.440 23.66


C34X34 Column 43 125.522 34.05
C44X44 Column 52 152.712 65.62
B33X47 Column 12 24.780 11.53
B33X47 Beam 56 230.407 79.14 0
B30X47 Column 7 15.250 5.68
B30X47 Beam 112 460.813 142.86 0
SLAB12 Floor 111.97
SLAB10 Floor 186.62

ETABS v9.7.0 File:SUNGAIBARU PRO CW Units:KN-m December 9, 2015 18:47 PAGE 4


M A T E R I A L L I S T B Y S T O R Y

ELEMENT TOTAL FLOOR UNIT NUMBER NUMBER


STORY TYPE MATERIAL WEIGHT AREA WEIGHT PIECES STUDS
tons m2 kg/m2

STORY3 Column COLUMN 23.66 388.400 60.9248 32


STORY3 Beam BEAM 72.71 388.400 187.2141 56 0
STORY3 Floor PLAT 111.97 388.400 288.2942

STORY2 Column COLUMN 31.19 388.400 80.3138 32


STORY2 Beam BEAM 79.14 388.400 203.7578 56 0
STORY2 Floor PLAT 93.31 388.400 240.2451

STORY1 Column COLUMN 57.60 388.400 148.3002 32


STORY1 Beam BEAM 70.15 388.400 180.6119 56 0
STORY1 Floor PLAT 93.31 388.400 240.2451
SUM Column COLUMN 112.46 1165.200 96.5129 96
SUM Beam BEAM 222.00 1165.200 190.5279 168 0
SUM Floor PLAT 298.60 1165.200 256.2615

TOTAL All All 633.06 1165.200 543.3024 264 0


ETABS v9.7.0 File:SUNGAIBARU PRO CW Units:KN-m December 9, 2015 18:47 PAGE 5

M A T E R I A L P R O P E R T Y D A T A

MATERIAL MATERIAL DESIGN MATERIAL MODULUS OF POISSON'S THERMAL SHEAR


NAME TYPE TYPE DIR/PLANE ELASTICITY RATIO COEFF MODULUS

STEEL Iso Steel All 200000000.00 0.3000 6.5000E-06 76923076.92


PLAT Iso Concrete All 28762300.000 0.2000 5.5000E-0611984291.667
BEAM Iso Concrete All 27658200.000 0.2000 5.5000E-0611524250.000
COLUMN Iso Concrete All 32015200.00 0.2000 5.5000E-0613339666.667
PROPOSE Iso Concrete All 20310900.000 0.2000 5.5000E-06 8462875.000

M A T E R I A L P R O P E R T Y M A S S A N D W E I G H T
MATERIAL MASS PER WEIGHT PER
NAME UNIT VOL UNIT VOL

STEEL 7.8270E+00 7.6820E+01


PLAT 2.4010E+00 2.3560E+01
BEAM 2.4010E+00 2.3560E+01
COLUMN 2.4010E+00 2.3560E+01
PROPOSE 2.4010E+00 2.3560E+01

M A T E R I A L D E S I G N D A T A F O R S T E E L M A T E R I A L S

MATERIAL STEEL STEEL STEEL


NAME FY FU COST ($)

STEEL 290000.000 500000.000 1.00

M A T E R I A L D E S I G N D A T A F O R C O N C R E T E M A T E R I A L S

MATERIAL LIGHTWEIGHT CONCRETE REBAR REBAR LIGHTWT


NAME CONCRETE FC FY FYS REDUC FACT
PLAT No 37450.000 390000.000 240000.000 N/A
BEAM No 34630.000 390000.000 240000.000 N/A
COLUMN No 46400.000 390000.000 240000.000 N/A
PROPOSE No 18675.000 390000.000 240000.000 N/A
ETABS v9.7.0 File:SUNGAIBARU PRO CW Units:KN-m December 9, 2015 18:47 PAGE 6
F R A M E S E C T I O N P R O P E R T Y D A T A

MATERIAL SECTION SHAPE NAME OR NAME CONC CONC


FRAME SECTION NAME NAME IN SECTION DATABASE FILE COL BEAM
C30X30 COLUMN Rectangular Yes
C34X34 COLUMN Rectangular Yes
C44X44 COLUMN Rectangular Yes
B33X47 BEAM Rectangular Yes
B30X47 BEAM Rectangular Yes

F R A M E S E C T I O N P R O P E R T Y D A T A
SECTION FLANGE FLANGE WEB FLANGE FLANGE
FRAME SECTION NAME DEPTH WIDTH TOP THICK TOP THICK WIDTH BOT THICK BOT

C30X30 0.3000 0.3000 0.0000 0.0000 0.0000 0.0000


C34X34 0.3400 0.3400 0.0000 0.0000 0.0000 0.0000
C44X44 0.4400 0.4400 0.0000 0.0000 0.0000 0.0000
B33X47 0.4700 0.3300 0.0000 0.0000 0.0000 0.0000
B30X47 0.4700 0.3000 0.0000 0.0000 0.0000 0.0000

F R A M E S E C T I O N P R O P E R T Y D A T A

SECTION TORSIONAL MOMENTS OF INERTIA SHEAR AREAS


FRAME SECTION NAME AREA CONSTANT I33 I22 A2 A3
C30X30 0.0900 0.0011 0.0007 0.0007 0.0750 0.0750
C34X34 0.1156 0.0019 0.0011 0.0011 0.0963 0.0963
C44X44 0.1936 0.0053 0.0031 0.0031 0.1613 0.1613
B33X47 0.1551 0.0032 0.0029 0.0014 0.1293 0.1293
B30X47 0.1410 0.0026 0.0026 0.0011 0.1175 0.1175

F R A M E S E C T I O N P R O P E R T Y D A T A
SECTION MODULI PLASTIC MODULI RADIUS OF GYRATION
FRAME SECTION NAME S33 S22 Z33 Z22 R33 R22

C30X30 0.0045 0.0045 0.0068 0.0068 0.0866 0.0866


C34X34 0.0066 0.0066 0.0098 0.0098 0.0981 0.0981
C44X44 0.0142 0.0142 0.0213 0.0213 0.1270 0.1270
B33X47 0.0121 0.0085 0.0182 0.0128 0.1357 0.0953
B30X47 0.0110 0.0071 0.0166 0.0106 0.1357 0.0866
F R A M E S E C T I O N W E I G H T S A N D M A S S E S

TOTAL TOTAL
FRAME SECTION NAME WEIGHT MASS

C30X30 260.0511 26.5018


C34X34 384.5425 39.1887
C44X44 677.8879 69.0836
B33X47 831.8193 84.7707
B30X47 1401.0135 142.7773

C O N C R E T E C O L U M N D A T A

REINF CONFIGURATION REINF NUM BARS NUM BARS BAR


FRAME SECTION NAME LONGIT LATERAL SIZE/TYPE 3DIR/2DIR CIRCULAR COVER

C30X30 Rectangular Ties #4/Check 3/3 N/A 0.0300


C34X34 Rectangular Ties #4/Check 3/4 N/A 0.0340
C44X44 Rectangular Ties #5/Check 3/4 N/A 0.0440

C O N C R E T E B E A M D A T A
TOP BOT TOP LEFT TOP RIGHT BOT LEFT BOT RIGHT
FRAME SECTION NAME COVER COVER AREA AREA AREA AREA

B33X47 0.0330 0.0330 0.000 0.000 0.000 0.000


B30X47 0.0300 0.0300 0.000 0.000 0.000 0.000

ETABS v9.7.0 File:SUNGAIBARU PRO CW Units:KN-m December 9, 2015 18:47 PAGE 7


S H E L L S E C T I O N P R O P E R T Y D A T A

SHELL MATERIAL SHELL LOAD DIST MEMBRANE BENDING TOTAL TOTAL


SECTION NAME TYPE ONE WAY THICK THICK WEIGHT MASS

SLAB12 PLAT Plate-Thin No 0.1200 0.1200 1098.0843 111.9058


SLAB10 PLAT Plate-Thin No 0.1000 0.1000 1830.1404 186.5096

ETABS v9.7.0 File:SUNGAIBARU PRO CW Units:KN-m December 9, 2015 18:47 PAGE 8


S T A T I C L O A D C A S E S

STATIC CASE AUTO LAT SELF WT NOTIONAL NOTIONAL


CASE TYPE LOAD MULTIPLIER FACTOR DIRECTION

DL DEAD N/A 1.0000


LL LIVE N/A 0.0000
EX QUAKE UBC97 0.0000
EY QUAKE UBC97 0.0000
WT OTHER N/A 0.0000
SL OTHER N/A 0.0000
TL1 OTHER N/A 0.0000

ETABS v9.7.0 File:SUNGAIBARU PRO CW Units:KN-m December 9, 2015 18:47 PAGE 9

L O A D I N G C O M B I N A T I O N S

COMBO CASE SCALE


COMBO TYPE CASE TYPE FACTOR

COMB1 ADD DL Static 1.4000


WT Static 1.0000
SL Static 1.0000
TL1 Static 1.0000
COMB2 ADD DL Static 1.2000
LL Static 1.6000
WT Static 1.0000
SL Static 1.0000
TL1 Static 1.0000
COMB3 ADD DL Static 1.2000
LL Static 1.0000
EX Static 1.0000
EY Static 0.3000
WT Static 1.0000
SL Static 1.0000
TL1 Static 1.0000
COMB4 ADD DL Static 1.2000
LL Static 1.0000
EX Static -1.0000
EY Static -0.3000
WT Static 1.0000
SL Static 1.0000
TL1 Static 1.0000
COMB5 ADD DL Static 1.2000
LL Static 1.0000
EX Static 0.3000
EY Static 1.0000
WT Static 1.0000
SL Static 1.0000
TL1 Static 1.0000
COMB6 ADD DL Static 1.2000
LL Static 1.0000
EX Static -0.3000
EY Static -1.0000
WT Static 1.0000
SL Static 1.0000
TL1 Static 1.0000

ETABS v9.7.0 File:SUNGAIBARU PRO CW Units:KN-m December 9, 2015 18:47 PAGE 10

A U T O S E I S M I C U B C 9 7
Case: EX

AUTO SEISMIC INPUT DATA

Direction: X
Typical Eccentricity = 5%
Eccentricity Overrides: No
Period Calculation: User Defined
User T = 0.607670269

Top Story: STORY3


Bottom Story: BASE

R = 8.5
I = 1

Ca = 0.0987
Cv = 0.0200

AUTO SEISMIC CALCULATION FORMULAS


V = (Cv I W) / (R T) (Eqn. 1)
V <= 2.5 Ca I W / R (Eqn. 2)
V >= 0.11 Ca I W (Eqn. 3)
If T <= 0.7 sec, then Ft = 0
If T > 0.7 sec, then Ft = 0.07 T V <= 0.25 V

AUTO SEISMIC CALCULATION RESULTS

T Used = 0.6077 sec


W Used = 5922.15

V (Eqn 1) = 0.0172W
V (Eqn 2) = 0.1292W
V (Eqn 3) = 0.0483W
V (Eqn 4) = 0.2679W

V Used = 0.0109W = 64.32


Ft Used = 0.00

AUTO SEISMIC STORY FORCES

STORY FX FY FZ MX MY MZ

STORY3 (Forces reported at X = 8.3023, Y = 18.2165, Z = 10.8000)


31.01 0.00 0.00 0.000 0.000 0.000

STORY2 (Forces reported at X = 8.2905, Y = 18.2650, Z = 7.3800)


21.55 0.00 0.00 0.000 0.000 0.000
STORY1 (Forces reported at X = 8.2907, Y = 18.3024, Z = 3.8700)
11.75 0.00 0.00 0.000 0.000 0.000

ETABS v9.7.0 File:SUNGAIBARU PRO CW Units:KN-m December 9, 2015 18:47 PAGE 11

A U T O S E I S M I C U B C 9 7
Case: EY

AUTO SEISMIC INPUT DATA

Direction: Y
Typical Eccentricity = 5%
Eccentricity Overrides: No

Period Calculation: User Defined


User T = 0.607670269

Top Story: STORY3


Bottom Story: BASE
R = 8.5
I = 1
Ca = 0.0987
Cv = 0.0200

AUTO SEISMIC CALCULATION FORMULAS


V = (Cv I W) / (R T) (Eqn. 1)
V <= 2.5 Ca I W / R (Eqn. 2)
V >= 0.11 Ca I W (Eqn. 3)

If T <= 0.7 sec, then Ft = 0


If T > 0.7 sec, then Ft = 0.07 T V <= 0.25 V

AUTO SEISMIC CALCULATION RESULTS


T Used = 0.6077 sec
W Used = 5922.15
V (Eqn 1) = 0.0172W
V (Eqn 2) = 0.1292W
V (Eqn 3) = 0.0483W
V (Eqn 4) = 0.2679W

V Used = 0.0109W = 64.32


Ft Used = 0.00

AUTO SEISMIC STORY FORCES


STORY FX FY FZ MX MY MZ

STORY3 (Forces reported at X = 8.3023, Y = 18.2165, Z = 10.8000)


0.00 31.01 0.00 0.000 0.000 0.000

STORY2 (Forces reported at X = 8.2905, Y = 18.2650, Z = 7.3800)


0.00 21.55 0.00 0.000 0.000 0.000

STORY1 (Forces reported at X = 8.2907, Y = 18.3024, Z = 3.8700)


0.00 11.75 0.00 0.000 0.000 0.000
3.2. Building Modelling

© Handasa | December 9, 2015


ETABS NAPO

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 18:49


3-D View - KN-m Units
ETABS NAPO

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 18:49


3-D View - KN-m Units
ETABS NAPO

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 18:50


3-D View - KN-m Units
ETABS NAPO

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 18:50


3-D View Uniform Loads GRAVITY (DL) - Kgf-m Units
ETABS NAPO

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 18:51


3-D View Frame Span Loads (DL) - Kgf-m Units
ETABS NAPO

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 18:51


3-D View Uniform Loads GRAVITY (LL) - Kgf-m Units
ETABS NAPO

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 18:52


3-D View Point Loads (EX) - KN-m Units
ETABS NAPO

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 18:52


3-D View Point Loads (EY) - KN-m Units
ETABS NAPO

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 18:53


Plan View - STORY3 - Elevation 10.8 Uniform Loads GRAVITY (WT) - Kgf-m Units
ETABS NAPO

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 18:53


Plan View - STORY3 - Elevation 10.8 Uniform Loads GRAVITY (SL) - Kgf-m Units
ETABS NAPO

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 18:54


Plan View - STORY3 - Elevation 10.8 Uniform Loads GRAVITY (TL1) - Kgf-m Units
3.3. Analysis Output

© Handasa | December 9, 2015


A. Balok
1. Beam 300x 470
Story Beam Load Loc P V2 V3 T M2 M3
STORY1 B535 COMB2 0.22 0 -77.27 0 1.939 0 -64.266

STORY1 B535 COMB4 0.22 0 -67.68 0 1.157 0 -57.774

STORY1 B535 COMB6 0.22 0 -67.07 0 0.492 0 -56.228

STORY1 B535 COMB5 0.22 0 -66.18 0 2.901 0 -54.329

STORY1 B535 COMB3 0.22 0 -65.57 0 2.235 0 -52.783

Story Beam Load Loc P V2 V3 T M2 M3


STORY1 B535 COMB2 1.935 0 -70.43 0 1.939 0 62.39

STORY1 B535 COMB3 1.935 0 -58.73 0 2.235 0 53.803

STORY1 B535 COMB5 1.935 0 -59.34 0 2.901 0 53.309

STORY1 B535 COMB6 1.935 0 -60.23 0 0.492 0 52.927

STORY1 B535 COMB4 1.935 0 -60.84 0 1.157 0 52.433

Longitudinal Reinforcement Control Beam


b = 300 mm
h = 470 mm
SELIMUT(pb) = 30 mm
φ bar = 10 mm
φ stirrup = 8 mm
d = h - pb - φstirrup - (0,5.φbar) = 427 mm
fy = 390 MPa
ρ min = 1,4 / fy = 0.00359
As min = ρ min . b . d = 459.85 mm²
Bar Assumed = 6

Existing Bar Capacity ≥ Capacity Bar Minimum → Okeee


Area of Reinforcement Assumed = 6 D10 = 471.24 mm²

© Handasa | December 9, 2015


ETABS NAPO

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 19:12


Plan View - STORY1 - Elevation 3.87 Moment 3-3 Diagram (COMB2) - KN-m Units
SAFETY FIBER REINFORCEMENT SYSTEM
CALCULATION DESIGN REPORT
(C) ESRC, 2011-2012
JAKARTA

A. DATA

DESIGN DATA

Design Code = ACI 440.2-02


Exposure = Interior
Element Type = Concrete Beam
Location = Support
Fiber Material = CFRP - Carbon
FRS Type =
FRS Location = Automatic

Left Support = End support


Right Support = End support

Note: Fiber material should be used only at temperature T <= Tg = 60-82 C


Fiber material should be used only for structure with good concrete
and rebar condition
Cracks wider than 0.3mm should be injected with epoxy before
installation of fiber
Adhesive bond is required for flexural and shear strengthening
Lap splices should be staggered or specially designed by engineer
Fiber application is only for Seismic Zone 1,2,3,4 (Not suitable for
zone 5,6)
Strengthening should be limited to 150% of original capacity
Column Strengthening is only to increase Circular Column axial and
shear capacity
Beam Strengthening must consider existing strain from existing self-
weight and load

© Handasa | December 9, 2015


FIBER MATERIAL

Modulus of Elasticity, Ef = 230000.0000 MPA


Tensile Strength, Fuf = 4900.0000 MPA
Compression Strength, Fcf = 4900.0000 MPA
Ultimate strain, efu = 0.0140
Limiting strain, ef,lim = 0.0075
Unit Weight, Yf = 1.2000 kg/m2
Strip Width, Wff = 0.0000 mm
Fiber Thickness, Tff = 0.1660 mm

BONDING AND ADHESIVE

fctm = 0.0000 MPA


Eb = 0.0000 MPA
ai = 0.0000 mm
f = 0.0000 mm

CONCRETE PROPERTIES

Ec = 27834.7539 MPA
fck = 34.6300 MPA
cv = 30.0000 mm
ecu = 0.0030
eparab = 0.0020
alpha = 0.8500
Trd = 0.2570 MPA

STEEL PROPERTIES

Es = 200000.0000 MPA
Fu = 390.0000 MPA
Fy = 390.0000 MPA
Fyv = 240.0000 MPA
Db = 0.0000 mm
Dbv = 8.0000 mm

SECTION PROPERTIES

L = 8000.0000 mm
bw = 300.0000 mm
ht = 470.0000 mm
bf = 0.0000 mm
tf = 0.0000 mm

EXISTING REBAR DATA

spacing = 200.0000 mm

DESIGN FORCES (FACTORED)

N1 = 0.0000 KN
M1x = 0.0000 KN.m
V1y = 0.0000 KN
M1y = 0.0000 KN.m
V1x = 0.0000 KN
N2 = 0.0000 KN
M2x = 64.2660 KN.m
V2y = 70.4300 KN
M2y = 0.0000 KN.m

© Handasa | December 9, 2015


V2x = 0.0000 KN

DERIVED PARAMETERS

Concrete Modulus, Ec = 27834.7539 MPA


Steel Modulus, Es = 200000.0000 MPA
Steel max strain, esu = 0.0100

Partial Safety Factor Yc = 1.5000


Partial Safety Factor Ys = 1.1500
Partial Safety Factor Ym = 1.5000
Partial Safety Factor Yv = 1.2500

B. DESIGN CALCULATION

TEE/RECT BEAM STRENGTHENING DESIGN - ACI-318-99/ACI-440

BASIC CONCEPTS

Steel yield in tension and Concrete Crushing


Assumed linear strain distribution
Force Equilibrium to find neutral axis

DESIGN PARAMETERS

Environmental Reduction Factor, Ce = 0.9500

DESIGN FOR BENDING

Fuf1 = Ce*Fuf = 4655.0000 MPa


efu1 = Ce*efu = 0.0133

Phi,bending = 0.9000
Phi,fiber = 0.8500
Phi,stirrups = 0.7500
Phi,fiber = 0.8500
d = h-cv-0.5*db = 440.0000 mm
d2 = cv+0.5*db = 30.0000 mm
nfbot = 0.0000
tf = 0.1660 mm
wf = 0.0000 mm
Af = nf*tf*wf = 0.0000 mm2
Beta1 = 0.8026

Ab1 = 0.25*Pi*db^2 = 0.0000 mm2


As1 = nbot*Ab1 = 0.0000 mm2
As2 = ntop*Ab1 = 0.0000 mm2

Computing Cracked Section


n = 7.1853
Asbot* = 0.0000 mm2 (Equivalent concrete area)
Astop* = 0.0000 mm2 (Equivalent concrete area)
b = 300.0000 mm
h = 470.0000 mm
d = 440.0000 mm
ds = 30.0000 mm

© Handasa | December 9, 2015


c1 = 0.0000 mm
c2 = 0.0000 mm

Cracking Section
k = 0.0000
Icr = 0.0000 mm4

Initial or Existing Bending, M1x = 0.0000 kN.m


Strain from initial loading, ebi = M1*1000*1000*(h-kcr*d)/(Icr*Emc) =
0.0000 0/00

Debonding limiter, km = (1.0/(60*efu1))*(1-nf*Ef*tf/360000) = 0.9000

Phi,bending = 0.9000
Phi,fiber = 0.8500
Phi,stirrups = 0.7500
Phi,fiber = 0.8500

Mu= 64.27 kN.m, Po= 0.000 kN, Phic=0.00, Phib=0.90, Es=200000.0, fc1=
34.63, Fy= 390.00, Beta1=0.80, ecu=0.0030, Phw=0.85
b=300.00 mm, h=470.00 mm, bf= 0.00 mm, tf= 0.00 mm, cv= 30.00 mm
Ef=230000.00 MPA, ebi=0.0000, efemax=0.0120, nfb=0, tfb= 0.166 mm, wfb=
0.00 mm
Rebar layer data, nlyr=3
lyr=1, yi=38.000 mm, di=432.000 mm, db=10.000 mm, nb=6, Ab1=78.540 mm2,
Asti= 471.239 mm2
lyr=2, yi=432.000 mm, di=38.000 mm, db=10.000 mm, nb=6, Ab1=78.540 mm2,
Asti= 471.239 mm2
lyr=3, yi=235.000 mm, di=235.000 mm, db=10.000 mm, nb=2, Ab1=78.540 mm2,
Asti= 157.080 mm2

c = 36.3654 mm
a = 29.1885 mm
Pd = 0.0000 kN
Md = 81.4608 kN.m
Ratio = Md/Mu = 1.268 > 1.0 -> STATUS = OK

DESIGN FOR SHEAR

Fuf2 = Ce*FufV = 4655.0000 MPa


efu2 = Ce*efuV = 0.0133
Ef=230000.00 MPA, tfb= 0.166 mm, wfb= 0.00 mm
k1 = (fck/27)^(2/3) = 1.1805
kv = k1*k2*Le/(11900*efu2) = 0.0000
Afv = 2*nfside*tf*wf = 0.0000 mm2
Ffe = efe*EfV = 0.0000 MPA = N/mm2
Vf = Afv*Ffe*df/Sf = 0.0000 kN
Vc = (1/6)*sqrt(fck)*bw*d = 129.4640 kN
Vs = nleg*0.25*Pi*Dbv*Dbv = 86.2556 kN
Vn = phiv*(Vc + Vs + Phbwf*Vf) = 161.7897 kN

Ratio = Vd/Vu = 2.297 > 1.0 -> STATUS = OK


Vsfmax = (2/3)*sqrt(fck)*bw*d = 517.8559 kN
Vs + Vf = 86.256 kN <= Vsfmax -> OK

MATERIAL REQUIRED

Lf,tot, bending = 0.5*L + 2*6" = 0.0000 m2


Af, bending = nfbot*Lftot*wf = 0.0000 m2FRS-CS N300
Af, shear = 0.0000 m2 FRS-CS N300
Af, total = 0.0000 m2

© Handasa | December 9, 2015


2. Beam 330x470
Story Beam Load Loc P V2 V3 T M2 M3
STORY2 B535 COMB2 0.17 0 -78.38 0 2.763 0 -63.471

STORY2 B535 COMB4 0.17 0 -68.95 0 1.82 0 -57.543

STORY2 B535 COMB6 0.17 0 -68.38 0 1.274 0 -56.019

STORY2 B535 COMB5 0.17 0 -67.48 0 3.484 0 -53.998

STORY2 B535 COMB3 0.17 0 -66.9 0 2.938 0 -52.474

Story Beam Load Loc P V2 V3 T M2 M3


STORY2 B535 COMB2 1.935 0 -70.65 0 2.763 0 68.047

STORY2 B535 COMB3 1.935 0 -59.16 0 2.938 0 58.779

STORY2 B535 COMB5 1.935 0 -59.74 0 3.484 0 58.266

STORY2 B535 COMB6 1.935 0 -60.64 0 1.274 0 57.845

STORY2 B535 COMB4 1.935 0 -61.22 0 1.82 0 57.332

Longitudinal Reinforcement Control Beam


b = 330 mm
h = 470 mm
SELIMUT(pb) = 33 mm
φ bar = 13 mm
φ stirrup = 10 mm
d = h - pb - φstirrup - (0,5.φbar) = 420.5 mm
fy = 390 MPa
ρ min = 1,4 / fy = 0.00359
As min = ρ min . b . d = 498.13 mm²
Bar Assumed = 4

Existing Bar Capacity ≥ Capacity Bar Minimum → Okeee


Area of Reinforcement Assumed = 4 D13 = 530.93 mm²

© Handasa | December 9, 2015


ETABS NAPO

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 19:13


Plan View - STORY2 - Elevation 7.38 Moment 3-3 Diagram (COMB2) - KN-m Units
SAFETY FIBER REINFORCEMENT SYSTEM
CALCULATION DESIGN REPORT
(C) ESRC, 2011-2012
JAKARTA

A. DATA

DESIGN DATA

Design Code = ACI 440.2-02


Exposure = Interior
Element Type = Concrete Beam
Location = Support
Fiber Material = CFRP - Carbon
FRS Type =
FRS Location = Automatic

Left Support = End support


Right Support = End support

Note: Fiber material should be used only at temperature T <= Tg = 60-82 C


Fiber material should be used only for structure with good concrete
and rebar condition
Cracks wider than 0.3mm should be injected with epoxy before
installation of fiber
Adhesive bond is required for flexural and shear strengthening
Lap splices should be staggered or specially designed by engineer
Fiber application is only for Seismic Zone 1,2,3,4 (Not suitable for
zone 5,6)
Strengthening should be limited to 150% of original capacity
Column Strengthening is only to increase Circular Column axial and
shear capacity

© Handasa | December 9, 2015


Beam Strengthening must consider existing strain from existing self-
weight and load

FIBER MATERIAL

Modulus of Elasticity, Ef = 230000.0000 MPA


Tensile Strength, Fuf = 4900.0000 MPA
Compression Strength, Fcf = 4900.0000 MPA
Ultimate strain, efu = 0.0140
Limiting strain, ef,lim = 0.0075
Unit Weight, Yf = 1.2000 kg/m2
Strip Width, Wff = 0.0000 mm
Fiber Thickness, Tff = 0.1660 mm

BONDING AND ADHESIVE

fctm = 0.0000 MPA


Eb = 0.0000 MPA
ai = 0.0000 mm
f = 0.0000 mm

CONCRETE PROPERTIES

Ec = 27834.7539 MPA
fck = 34.6300 MPA
cv = 33.0000 mm
ecu = 0.0030
eparab = 0.0020
alpha = 0.8500
Trd = 0.2570 MPA

STEEL PROPERTIES

Es = 200000.0000 MPA
Fu = 390.0000 MPA
Fy = 390.0000 MPA
Fyv = 240.0000 MPA
Db = 0.0000 mm
Dbv = 10.0000 mm

SECTION PROPERTIES

L = 8000.0000 mm
bw = 330.0000 mm
ht = 470.0000 mm
bf = 0.0000 mm
tf = 0.0000 mm

EXISTING REBAR DATA

spacing = 200.0000 mm

DESIGN FORCES (FACTORED)

N1 = 0.0000 KN
M1x = 0.0000 KN.m
V1y = 0.0000 KN
M1y = 0.0000 KN.m
V1x = 0.0000 KN
N2 = 0.0000 KN
M2x = 68.0470 KN.m

© Handasa | December 9, 2015


V2y = 70.6500 KN
M2y = 0.0000 KN.m
V2x = 0.0000 KN

DERIVED PARAMETERS

Concrete Modulus, Ec = 27834.7539 MPA


Steel Modulus, Es = 200000.0000 MPA
Steel max strain, esu = 0.0100

Partial Safety Factor Yc = 1.5000


Partial Safety Factor Ys = 1.1500
Partial Safety Factor Ym = 1.5000
Partial Safety Factor Yv = 1.2500

B. DESIGN CALCULATION

TEE/RECT BEAM STRENGTHENING DESIGN - ACI-318-99/ACI-440

BASIC CONCEPTS

Steel yield in tension and Concrete Crushing


Assumed linear strain distribution
Force Equilibrium to find neutral axis

DESIGN PARAMETERS

Environmental Reduction Factor, Ce = 0.9500

DESIGN FOR BENDING

Fuf1 = Ce*Fuf = 4655.0000 MPa


efu1 = Ce*efu = 0.0133

Phi,bending = 0.9000
Phi,fiber = 0.8500
Phi,stirrups = 0.7500
Phi,fiber = 0.8500
d = h-cv-0.5*db = 437.0000 mm
d2 = cv+0.5*db = 33.0000 mm
nfbot = 0.0000
tf = 0.1660 mm
wf = 0.0000 mm
Af = nf*tf*wf = 0.0000 mm2
Beta1 = 0.8026

Ab1 = 0.25*Pi*db^2 = 0.0000 mm2


As1 = nbot*Ab1 = 0.0000 mm2
As2 = ntop*Ab1 = 0.0000 mm2

Computing Cracked Section


n = 7.1853
Asbot* = 0.0000 mm2 (Equivalent concrete area)
Astop* = 0.0000 mm2 (Equivalent concrete area)
b = 330.0000 mm
h = 470.0000 mm

© Handasa | December 9, 2015


d = 437.0000 mm
ds = 33.0000 mm
c1 = 0.0000 mm
c2 = 0.0000 mm

Cracking Section
k = 0.0000
Icr = 0.0000 mm4

Initial or Existing Bending, M1x = 0.0000 kN.m


Strain from initial loading, ebi = M1*1000*1000*(h-kcr*d)/(Icr*Emc) =
0.0000 0/00

Debonding limiter, km = (1.0/(60*efu1))*(1-nf*Ef*tf/360000) = 0.9000

Phi,bending = 0.9000
Phi,fiber = 0.8500
Phi,stirrups = 0.7500
Phi,fiber = 0.8500

Mu= 68.05 kN.m, Po= 0.000 kN, Phic=0.00, Phib=0.90, Es=200000.0, fc1=
34.63, Fy= 390.00, Beta1=0.80, ecu=0.0030, Phw=0.85
b=330.00 mm, h=470.00 mm, bf= 0.00 mm, tf= 0.00 mm, cv= 33.00 mm
Ef=230000.00 MPA, ebi=0.0000, efemax=0.0120, nfb=0, tfb= 0.166 mm, wfb=
0.00 mm
Rebar layer data, nlyr=3
lyr=1, yi=43.000 mm, di=427.000 mm, db=13.000 mm, nb=4, Ab1=132.732 mm2,
Asti= 530.929 mm2
lyr=2, yi=427.000 mm, di=43.000 mm, db=13.000 mm, nb=4, Ab1=132.732 mm2,
Asti= 530.929 mm2
lyr=3, yi=235.000 mm, di=235.000 mm, db=13.000 mm, nb=2, Ab1=132.732 mm2,
Asti= 265.465 mm2

c = 41.4077 mm
a = 33.2359 mm
Pd = 0.0000 kN
Md = 97.1171 kN.m
Ratio = Md/Mu = 1.427 > 1.0 -> STATUS = OK

DESIGN FOR SHEAR

Fuf2 = Ce*FufV = 4655.0000 MPa


efu2 = Ce*efuV = 0.0133
Ef=230000.00 MPA, tfb= 0.166 mm, wfb= 0.00 mm
k1 = (fck/27)^(2/3) = 1.1805
kv = k1*k2*Le/(11900*efu2) = 0.0000
Afv = 2*nfside*tf*wf = 0.0000 mm2
Ffe = efe*EfV = 0.0000 MPA = N/mm2
Vf = Afv*Ffe*df/Sf = 0.0000 kN
Vc = (1/6)*sqrt(fck)*bw*d = 141.4394 kN
Vs = nleg*0.25*Pi*Dbv*Dbv = 133.8554 kN
Vn = phiv*(Vc + Vs + Phbwf*Vf) = 206.4711 kN

Ratio = Vd/Vu = 2.922 > 1.0 -> STATUS = OK


Vsfmax = (2/3)*sqrt(fck)*bw*d = 565.7576 kN
Vs + Vf = 133.855 kN <= Vsfmax -> OK

MATERIAL REQUIRED

Lf,tot, bending = 0.5*L + 2*6" = 0.0000 m2


Af, bending = nfbot*Lftot*wf = 0.0000 m2FRS-CS N300

© Handasa | December 9, 2015


Af, shear = 0.0000 m2 FRS-CS N300
Af, total = 0.0000 m2

© Handasa | December 9, 2015


B. Slab

The maximum moment (M11) of the rooftop slab is 7.113 kNm.

The maximum moment (M22) of the rooftop slab is 5.481 kNm.

© Handasa | December 9, 2015


Plate Analysis 5.17 m x 4.2 m

Slab Thickness = 120 mm


Material :
f'c = 37.45 Mpa
fy = 240 Mpa
4.2 m f bar = 10 mm

21.7

5.17 m

Mu = 7.113 kNm Etabs

d = 95 mm , b = 1000 mm

6
MR x 10
Rn = = 0.788
2
b x d

fy
m = = 7.54
0.85 x f'c

1 2 x m x Rn
r act =
m (1 - 1 -
fy ) = 0.0033 > r min

0.85 x f 'c x b 600


rb =
fy
( 600 + fy
) = 0.0805

r max = 0.75 x r b = 0.0604

r need = 0.00333 > r min NOT OK

As = r used x b x d = 315.93 mm2

2
Existing reinforcement = f 10 - 150 = 523.599 mm > 315.934 mm 2 OK

SLAB Ratio = 0.6034 < 1 OK!!!


C. Kolom

Ratio kolom 0.479 < 1


OK

© Handasa | December 9, 2015


ETABS NAPO

0.00 0.50 0.70 0.90 1.00

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 19:41


3-D View Column P-M-M Interaction Ratios (ACI 318-99) - KN-m Units
ETABS NAPO

0.00 0.50 0.70 0.90 1.00

ETABS v9.7.0 - File: sungaibaru pro cw - December 9,2015 19:37


Elevation View - 5 Column P-M-M Interaction Ratios (ACI 318-99) - KN-m Units
4. Attachment

© Handasa | December 9, 2015


Job: POLE 12M 18 Jun 2015
POLE 12M 10:02

Y
X
theta: 300 phi: 30

MStower [V6.02.011: ]
Job: POLE 12M 18 Jun 2015
POLE 12M 10:03

Design Ratios - % of Code Capacity:


<= 50
<= 95 -1.00
-1.00
<= 100
<= 105 0.01
<= 110
> 110
-1.00
-1.00

0.81

-1.00
-1.00

0.68

-1.00
-1.00

0.44

0.47 0.44
-1.00
-1.00

0.50

-1.00
-1.00
0.51

-1.00 -1.00
-1.00
0.61
-1.00
-1.00

0.68

-1.00
-1.00
0.42
0.57
0.47

-1.00
-1.00
0.41

0.43 -1.00
-1.00
-1.00 -1.00
-1.00
0.43

-1.00
-1.00

0.59

-1.00
-1.00 0.36

0.34
0.76

Y
X
theta: 300 phi: 30

MStower [V6.02.011: ]
Page 1 of 3
18 Jun 2015
10:03















































































MStower [V6.02.011: ]
Page 2 of 3
18 Jun 2015
10:03















































































MStower [V6.02.011: ]
Page 3 of 3
18 Jun 2015
10:03

























MStower [V6.02.011: ]
Page 1 of 4
18 Jun 2015
10:03













































































MStower [V6.02.011: ]
Page 2 of 4
18 Jun 2015
10:03















































































MStower [V6.02.011: ]
Page 3 of 4
18 Jun 2015
10:03















































































MStower [V6.02.011: ]
Page 4 of 4
18 Jun 2015
10:03







































MStower [V6.02.011: ]
Page 1 of 5
Job: POLE 12M 18 Jun 2015
POLE 12M 10:03






L O A D C A S E S




































































MStower [V6.02.011: ]
Page 2 of 5
Job: POLE 12M 18 Jun 2015
POLE 12M 10:03














L O A D C A S E S


























































MStower [V6.02.011: ]
Page 3 of 5
Job: POLE 12M 18 Jun 2015
POLE 12M 10:03
















































L O A D C A S E S
























MStower [V6.02.011: ]
Page 4 of 5
Job: POLE 12M 18 Jun 2015
POLE 12M 10:03













































































MStower [V6.02.011: ]
Page 5 of 5
Job: POLE 12M 18 Jun 2015
POLE 12M 10:03









































































MStower [V6.02.011: ]
Page 1 of 1
Job: POLE 12M 18 Jun 2015
POLE 12M 10:03

I N P U T / A N A L Y S I S R E P O R T

























N O D E D I S P L A C E M E N T S











MStower [V6.02.011: ]
RECEIVED BY PT. IBS

ISSUE: 1 STATUS: 07/Dec/15

Report

Hammer Test
Nama Site : Sungai Baru
Lokasi : Banjarmasin – Kalimantan Selatan
Prepared for PT. IBS
By PT. Handasa Konsultan (HANDASA)

© Handasa 2014 (unless Handasa has expressly agreed otherwise with the Client in writing).

This report has been prepared by Handasa on the specific Instructions of our Client. It is solely for our Client’s use for the purpose
which it is intended in accordance with the agreed scope of work. Any use or reliance by any person contrary to the above, to which
Handasa has not given its prior written consent, is at that person’s own risk.

KATA PENGANTAR
Laporan ini merupakan hasil pengujian kekuatan beton dengan alat Hammer Test pada
Site Sungai Baru, pada elemen struktur. Pengujian dilakukan pada tanggal 4 Desember 2015.
Laporan ini menyajikan hasil pengujian kuat beton dengan memanfaatkan kuat pantul dari beton
yang ditunjukan dengan alat Hammer Test sehingga dapat dilihat dalam bentuk angka kemudian
akan didapat estimasi nilai kuat tekan tersebut

Demikian yang dapat disampaikan, semoga laporan ini dapat bermanfaat. Atas perhatian dan
kerjasamanya diucapkan terimakasih

Depok, 7 December 2015

PT.HANDASA KONSULTAN

Muhammad Firdan

Project Engineering Manager

© Handasa | December 7, 2015


Daftar Isi

1. Pendahuluan

2. Tujuan Penyelidikan

3. Waktu Pelaksanaan

4. Metode Pengujian

5. Hasil Pengujian

Lampiran

© Handasa | December 7, 2015


1. Pendahuluan

Laporan ini merupakan laporan hasil pengujian Hammer Test pada Site Batu Nunggal
Indah, pengujian dilakukan atas dasar permintaan langsung dari PT. IBS Kepada PT. Handasa
Konsultan.
Dalam penyelidikan mutu beton (Hammer Test) di Sungai Baru Banjarmasin –
Kalimantan Selatan, adalah untuk mengetahui dan mendapatkan perkiraan kekerasan dan kuat
tekan beton, hasil-hasil penyelidikan kuat tekan beton (Hammer Test) diharapkan dapat
menjadi gambaran untuk perencanaan bangunan ini.

Gambar 1. Lokasi Site Sungai Baru

2. Tujuan Penyelidikan
Tujuan penyelidikan kuat tekan beton (Hammer Test) untuk memperoleh data kondisi
kuat tekan beton dan kualitas beton pada struktur. Pengujian Hammer Test ini, merupakan
salah satu jenis pengujian non destruktif pada permukaan struktur beton untuk mendeteksi
kuat tekan material beton.

3. Waktu Pelaksanaan
Pengujian di Site Sungai Baru dilakukan pada tanggal 4 Desember 2015 pada beberapa
elemen struktur bangunan dengan uraian sebagai berikut;

© Handasa | December 7, 2015


Tabel 1. Jumlah pengujian Hammer Test

Struktur Bangunan Jumlah pengujian

Kolom = 4 Titik

Balok = 4 Titik
Plat = 2 Titik
Jumlah = 10 Titik

Data-data hasil pengujian Hammer Test beserta analisa data untuk masing-masing komponen
struktur, selengkapnya seperti dilampirkan pada laporan ini.

4. Metode Pengujian
Metode kerja dari alat Hammer Test adalah berdasarkan beban tumbukan yang
diberikan pada permukaan beton dan besarnya reaksi yang timbul dinyatakan dengan nilai
Hammer Test yang dapat dibaca secara langsung pada grafik yang tertera pada alat tersebut.

Gambar 2. Grafik untuk pembacaan Hammer Rebound

© Handasa | December 7, 2015


Beberapa hal yang perlu diperhatikan dalam melaksanakan pengujian Hammer Test adalah:
a. Pemilihan lokasi yang akan di test
Lokasi titik yang ingin di uji Hammer Test serta jumlah titik pengujian untuk suatu
komponen struktur dipilih sedemikian rupa sehingga dapat mewakili kualiatas beton
pada komponen struktur tersebut. Lokasi yang ingin di test sebaiknya dipilih permukaan
yang rata. Bila diperlukan diberi tanda dengan cat pada titik yang diuji tersebut.

b. Persiapan titik pengujian


Sebelum dilakukan pengujian Hammer Test, permukaan beton terlebih dahulu
diratakan dengan menggunakan batu gerinda dan amplas serta dibersihkan dari kotoran
dan debu.Selanjutnya pada permukaan beton tersebut dibuat petak pengujian (grid)
yang terdiri dari 4x4 buah kotak kecil masing masing berukuran 3x3 cm berupa tabel
tempat melakukan Hammer test.

c. Pelaksanaan pengujian
Pengujian Hammer Test dilakukan pada setiap kotak kotak (grid) tersebut masing-
masing sebanyak satu kali pukulan. Arah pukulan Hammer Test terhadap titik yang diuji
benar-benar tegak lurus terhadap bidang yang diuji. Setelah itu angka pantul dicatat
untuk keperluan pembacaan kurva yang sesuai dengan arah pukulan. Data yang didapat
dari satu titik pengujian yang berdiri dari 12 kali pukulan Hammer Test selanjutnya
dievaluasi dengan mengguanakan kurva untuk mendapatkan nilai tekan. Kemudian dari
12 data kuat tekan tersebut dihitung nilai rata-rata sehingga didapatakan nilai kuat,
tekan beton pada titik tersebut.

© Handasa | December 7, 2015


Tabel 2. Skala pembacaan Hammer Test

Gambar kerja
Skala Pembacaan
Hammer Test
Sudut pantul A = ±0°
Kuat tekan beton = Mpa
Sudut pantulan A biasa digunakan
untuk struktur Kolom dan Balok

Sudut pantul B = +90°


Kuat tekan beton = Mpa
Sudut pantulan B biasa digunakan
untuk struktur Plat

Sudut pantul C = -90°

Kuat tekan beton = Mpa

Sudut pantulan A biasa digunakan


untuk struktur Balok dan Plat

5. Hasil Pengujian
Hasil pengujian hammer test masing-masing elemen struktur adalah sebagai berikut

Tabel 3. Hasil pengujian Hammer Test Site Sungai Baru.

Struktur Bangunan f'c (Mpa) f'c (Mpa) K225

Kolom 46.40 > 18.675

Balok 34.63 > 18.675


Plat 37.45 > 18.675

© Handasa | December 7, 2015


(UJI PALU BETON (HAMMER TEST )
(SNI 03-4430-1990/ASTM C. 805-97)
Laporan
Pemberi kerja : IBS
Nama Site : Sungai Baru
Lokasi : Banjarmasin - Kalsel
Tanggal Survey : 4 Desember 2015
Penguji : Rudi Cahyono

Kolom
Elemen Struktur
K1 K2 K3 K4
Sudut Pukulan A HASIL A HASIL A HASIL A HASIL
Lantai 1 (Mpa) 2 (Mpa) 3 (Mpa) 3 (Mpa)
1 48 54.17 44 46.66 46 50.37 46 50.37
2 51 60.06 38 36.11 47 52.26 47 52.26
3 42 43.05 42 43.05 43 44.84 43 44.84
4 43 44.84 40 39.53 46 50.37 46 50.37
5 43 44.84 39 37.81 46 50.37 46 50.37
Nilai Lenting 6 44 46.66 43 44.84 42 43.05 42 43.05
Palu Beton ( R ) 7 47 52.26 42 43.05 46 50.37 46 50.37
8 46 50.37 42 43.05 46 50.37 46 50.37
9 45 48.50 40 39.53 44 46.66 44 46.66
10 43 44.84 40 39.53 42 43.05 42 43.05
11 42 43.05 40 39.53 45 48.50 45 48.50
12 40 39.53 41 41.28 46 50.37 46 50.37
R Maksimum 51 60.06 44 46.66 47 52.26 47 52.26
R Minimum 40 39.53 38 36.11 42 43.05 42 43.05
R Rata-rata 44.50 47.68 40.92 41.16 44.92 48.38 44.92 48.38
R Rata-rata Hasil (Mpa) 46.40

Jumlah Pukulan
1 2 3 4 5 6 7 8 9 10 11 12
70.00

60.00

50.00
Kuat Beton (Mpa)

40.00

30.00

20.00

10.00

0.00

K1 K2 K3 K4 R Rata-Rata K-225

46.40 46.40 46.40 46.40 46.40 46.40 46.40 46.40 46.40 46.40 46.40

© Handasa | December 7, 2015


(UJI PALU BETON (HAMMER TEST )
(SNI 03-4430-1990/ASTM C. 805-97)
Laporan
Pemberi kerja : IBS
Nama Site : Sungai Baru
Lokasi : Banjarmasin - Kalsel
Tanggal Survey : 4 Desember 2015
Penguji : Rudi Cahyono

Balok
Elemen Struktur
B1 B2 B3 B4
Sudut Pukulan C HASIL C HASIL C HASIL C HASIL
Lantai 1 (Mpa) 2 (Mpa) 3 (Mpa) 3 (Mpa)
1 40 32.83 40 32.83 44 40.33 44 40.33
2 42 36.51 42 36.51 38 29.28 38 29.28
3 43 38.41 40 32.83 35 24.22 35 24.22
4 42 36.51 42 36.51 42 36.51 42 36.51
5 40 32.83 42 36.51 35 24.22 35 24.22
Nilai Lenting 6 39 31.04 42 36.51 38 29.28 38 29.28
Palu Beton ( R ) 7 40 32.83 41 34.66 37 27.56 37 27.56
8 40 32.83 39 31.04 43 38.41 49 50.48
9 41 34.66 39 31.04 49 50.48 43 38.41
10 42 36.51 40 32.83 45 42.30 45 42.30
11 40 32.83 42 36.51 45 42.30 45 42.30
12 40 32.83 41 34.66 41 34.66 41 34.66
R Maksimum 43 38.41 42 36.51 49 50.48 49 50.48
R Minimum 39 31.04 39 31.04 35 24.22 35 24.22
R Rata-rata 40.75 34.22 40.83 34.37 41.00 34.96 41.00 34.96
R Rata-rata Hasil (Mpa) 34.63

Jumlah Pukulan
1 2 3 4 5 6 7 8 9 10 11 12
60.00

50.00
Kuat Beton (Mpa)
40.00

30.00

20.00

10.00

0.00

B1 B2 B3 B4 R Rata-Rata K-225

34.63 34.63 34.63 34.63 34.63 34.63 34.63 34.63 34.63 34.63 34.63

© Handasa | December 7, 2015


(UJI PALU BETON (HAMMER TEST )
(SNI 03-4430-1990/ASTM C. 805-97)
Laporan
Pemberi kerja : IBS
Nama Site : Sungai Baru
Lokasi : Banjarmasin - Kalsel
Tanggal Survey : 4 Desember 2015
Penguji : Rudi Cahyono

Plat
Elemen Struktur
P1 P2 P3 P4
Sudut Pukulan B HASIL B HASIL B HASIL B HASIL
Lantai 3 (Mpa) 3 (Mpa) 2 (Mpa) 3 (Mpa)
1 42 47.04 42 47.04 22 16.26 28 24.66
2 43 48.79 43 48.79 22 16.26 28 24.66
3 40 43.61 40 43.61 22 16.26 24 18.98
4 54 69.35 54 69.35 22 16.26 28 24.66
5 41 45.32 41 45.32 32 30.65 30 27.62
Nilai Lenting 6 43 48.79 43 48.79 32 30.65 26 21.78
Palu Beton ( R ) 7 47 55.99 47 55.99 28 24.66 30 27.62
8 42 47.04 42 47.04 24 18.98 30 27.62
9 39 41.92 40 43.61 30 27.62 28 24.66
10 44 50.56 39 41.92 26 21.78 28 24.66
11 50 61.60 44 50.56 32 30.65 24 18.98
12 54 69.35 54 69.35 28 24.66 22 16.26
R Maksimum 54 69.35 54 69.35 32 30.65 30 27.62
R Minimum 39 41.92 39 41.92 22 16.26 22 16.26
R Rata-rata 44.92 52.45 44.08 50.95 26.67 22.89 27.17 23.51
R Rata-rata Hasil (Mpa) 37.45

Jumlah Pukulan
1 2 3 4 5 6 7 8 9 10 11 12
80.00

70.00

60.00 Kuat Beton (Mpa)

50.00

40.00

30.00

20.00

10.00

0.00

P1 P2 R Rata-Rata K-225

37.45 37.45 37.45 37.45 37.45 37.45 37.45 37.45 37.45 37.45 37.45

© Handasa | December 7, 2015


Dokumentasi Survey

© Handasa | December 7, 2015


5. DRAWING