NO DESCRIPTION OF WORK UNIT


EXCAVATION

Excavation & backfilling in all types of soils for the following surfaces
Rate
and Depths. Including 2 ducts of 40mm Duct including 6mm Rope

Trenching in WBM, Gravel surfaces, Footpaths (without Re-laying of


1
Footpath Tiles).
1.1 Trench width 0.3 m and Depth upto 0.6 m m
1.2 Trench width 0.3 m and Depth upto 1.2 m m
1.3 Trench width 0.5 m and Depth upto 0.6 m m
1.4 Trench width 0.5 m and Depth upto 1.2 m m
1.5 Trench width 0.5 m and Depth upto 1.5 m m
2 Trenching in Asphalt roads.
2.1 Trench width 0.3 m and Depth upto 0.6 m m
2.2 Trench width 0.3 m and Depth upto 1.2 m m
2.3 Trench width 0.5 m and Depth upto 0.6 m m
2.4 Trench width 0.5 m and Depth upto 1.2 m m
2.5 Trench width 0.5 m and Depth upto 1.5 m m
3 Trenching in Concrete roads.
3.1 Trench width 0.3 m and Depth upto 0.6 m m
3.2 Trench width 0.3 m and Depth upto 1.2 m m
3.3 Trench width 0.5 m and Depth upto 0.6 m m
3.4 Trench width 0.5 m and Depth upto 1.2 m m
3.5 Trench width 0.5 m and Depth upto 1.5 m m

4 Pit Excavation, not exceeding 10mts in length & width limited to 0.5mts

4.1 Removal of top surface


4.2 Removal of Asphalt upto a thickness of 250mm sqm
4.3 Removal of Concrete upto 250mm thickness. sqm
4.4 Removal of Asphalt / Concrete above 250mm thickness. sqm
Pit Excavation in normal soil up to the required depth as specified, for
4.5 stretches of length less than 10mts in any dimension in a location cum
(excluding Top surface removal)
5 Hard Rock Excavation
5.1 Rock Excavation in Trenches / Pits. (Measured Extra to excavation) cum
Horizontal Directional Drilling (HDD). Rate includes making of pits,making
6 bore,pulling ducts,supply and laying rope in 110mm ducts,duct entry in
HH/MH and Duct Integrated Test (DIT)
Horizontal Directonal Drilling (H.D.D.) Including 2 ducts of 40mm Duct
6.1
including 6mm Rope
6.2 150mm Mtr.
6.3 200mm Mtr.
Moling. Rate includes making of pits,making bore,pulling ducts,supply
and laying rope in 110mm ducts,duct entry in HH/MH and Duct
7
Integrated Test (DIT)Including 2 ducts of 40mm Duct including 6mm
Rope
7.1 100mm Mtr.
1.2 150mm Mtr.
Conduit Laying/ Clamping
Clamping of Rigid pipes on Trays,racks,walls,columns,beams including
8
supply and fixing of clamps bolts and ties.
8.1 50mm dia m
8.2 110mm dia m
9 Laying of Flexible Pipes (in bundles)
Duct structure laying(DWC / HDPE bundles) in pre excavated trench as
9.1 specified, including fixing of coupler's and end plugs.(Quantity measured as
no of ducts multiplied by length).
9.2 75mm dia m
9.3 100mm dia m
9.4 125mm dia m
Clamping of Flexible pipes( in bundles) on trays, racks, walls, columns,
9.5
beams including supply and fixing of clamps bolts and ties.
9.6 75mm dia m
9.7 100mm dia m
9.8 125mm dia m
10 Duct Sealing by Birla 3M (including material) each
11 Duct Sealing by Raychem Seals(including material) each
Supply & Erection of Structures. Included I&C
12 Supply & erection Conical Manhole (1.2 mtr) each
13 Supply & erection Conical Manhole (1.5 mtr) each
14 Supply & erection Hand Holes - Single Lid 1.2 mtrs each
14.1 Supply & erection Hand Holes - Double Lid 1.2 mtrs
15 Supply & erection Splice Chamber - 1.0 mts Dia with installtion each
Supply and Erection of RCC route Markers,including excavation,placing
16 each
concrete,backfilling and painting as specified.
Supply & Laying
Supply and laying / Clamping of pipe on wall including all fixtures like
17 coupling, bends tees etc providing all reqd. brackets, clamping material,
scaffolding, labour, tools, equipment etc. complete
17.1 GI Pipe B class ISI.
17.2 50mm Dia m
17.3 75mm Dia m
17.4 100mm Dia m
17.5 PVC Pipe as per ISI-9537
17.6 63mm OD with wall thickness of 3mm Rmt
17.7 50mm OD with wall thickness of 2.75mm Rmt

18 Supply and Fixing of Corrugated Flexible GI Braced pipe with jublee clip, m

18.1 25MM
18.2 32MM
18.3 63MM
19 Supply and installationof Flex GI flexible pipe, with clamp m
19.1 40MM m
19.2 60-65MM m
20 Supply and fixing of Cable Ties
20.1 12 " each
20.2 16" each
20.3 24" each
Miscellaneous / Restoration works:
21 Trench restoration on Footpaths / road side:

Including removing of shabad stone tiles,chequerred tiles without breaking


21.1 for excavation and after backfilling, replace the same in good sqm
condition.Cost includes replacement of damaged tiles at no cost to TTL.

21.2 Restoration of Surfaces


21.3 Concrete restoration upto 100 mm thick, Mix design 1:2:4 Sq. Mt
21.4 Asphalt restoration upto 100 mm thick Sq. Mt
21.5 Providing & Fixing Tiles in cement mortar1:4 for Restoration work Sq. Mt
21.6 Restoration with Chequered Tiles Sq. Mt
21.7 Restoration with Red Stone Sq. Mt
21.8 Restoration with Glazed or interlocking Tiles Sq. Mt
21.9 Kota stone Sq. Mt
22 Supply and Laying of Shabad Stone of size 20mm thick and 300mm width. m
22.1 Supply and Laying of Warning Tape as specified. m
22.2 Supply and Laying of PCC M10 mix with 12mm down aggregate. cum
22.3 Supply and Laying of PCC M20 mix with 20mm down aggregate. cum
22.4 Supply and Laying of PCC 1:4:8 mix with 40mm down aggregate. cum
23 Dewatering of Manhole / Handhole's - Manually each
23.1 Dewatering of Manhole / Handhole's - using Diesel / Electric pumps each
Duct Integration Testing(for the ducts done by others earlier) per duct,
23.2 m
using Duct rod, supplied by supplier.
24 Drilling and Reinstatement
Drilling of RCC slabs upto 200mm thick upto 40mm dia and
24.1 each
reinstatement of the same after putting of GI/PVC pipes as per TTL
Working through False ceiling, the contractor shall make good any
24.2 damage done to the False ceiling while execution without any extra
cost to TTSL.
24.3 Laying/Fixing/Clamping of PVC/ G.I pipe Through False ceiling Mts
FIBER cable WORKS
25 Cable Placing
Placing fibre optic cables as per manufactures recommendation, including
its protection during site storage & laying, cleaning of ducts before pulling
25.1
through the ducts, identification tags to cables at all splice chambers,
manhole, handhole and after bl
25.2 Upto 500 m m
25.3 Above 500 m m
26 Routing of Cables
Routing of Fiber optic cable loops in Mh's, Hh's and splice chamber placed
26.1 through 32mm / 63mm flex pipe, includes supply of Flex pipe and clamps m
etc.
26.2 Routing of Fiber optic cables on existing Cable Tray and Racks. m
Clamping of Fiber optic cable placed through 32mm flex pipe to
26.3 Walls,Columns,Beams and Trays including supply of Flex pipe and clamps m
etc.

Fuse fibres including compliance to the specifications of splice loss


27 testing (OTDR) and testing end to end from concentrator to
concentrator/concentrator to switch/switch to switch.
27.1 Fusing of Single fiber. each
27.2 Fusing set of 4 fibers. each set
27.3 Fusing set of 6 fibers. each set
27.4 Fusing set of 8 fibers. each set
27.5 Fusing set of 12 fibers each set
27.6 Fusing set of 24 fibers each set
27.7 Fusing set of 48 fibers each set
27.8 Fusing set of 72 fibers each set
27.9 Fusing set of 96 fibers. each set
28 Installation of the following:
28.1 Fiber Termination box of all sizes Each
29 Miscellaneous
29.1 Back pulling of Fiber optic cables m

29.2 Blowing of Fiber cables of all sizes through the HDPE ducts with Cable Jets. m

Removal of sand in handholes & refilling of sand after all work is


29.3 completed. (Sand shall be carted away & brought back for refilling in case Each
if stacking is not permissible near by the hand hole.
30 Suppling & Laying of red stone slab ( Rough) of 400mmx300mmx25m mtrs
31 As Built Drawing in Triplicate & Soft Copy with lat log of all pits & chambers K. Mtr.
32 Brick Chamber 1x1x1 I.D. with G.I. Fram & C.C. Cover each
Survey
Charges for Survey & Design of the Cable routes clearly indicating the
length and type of connectivity like open cut conventional.shallow,DBC,
33 pole to pole / Building to Building, Building approaches etc. All complete Mtr.
as per the requirement, specification Route survey route , Video before &
after

MAP Based Details coordinates of start and end point chamber locations
33.1
( with KML file )
33.2 Route survey as per our plan
33.3 Route starta (road surface like Gravel, bitumen, cc , ILT etc. )
space availability for fiber laying with ofset from center of road. Route
33.4
alignment etc.
33.5 esidential and commercial area mapping 
suitable chamber placing at average of 200mtrs in running lengths on
33.6
residential areas and 100mtrs in commercial areas
landbase utility inputs like gas pipe line , ug power line , railway crossing ,
33.7 rob crossing , major road crossing , bridge crossing , offset from severage
pipe line and other operator ofc etc.r
33.8 Laying methodology possibility of opt , hdd Or MB. 
33.9 inputs of proposed metro and utility works.
route authority inputs name  and their office location where row can be
33.10
applied. 