Vous êtes sur la page 1sur 22

SCFT - GSM

Site ID: KBK001 Site Name: KUMBHKOT Cell ID: KBK0011,KBK0012,KBK0013


New Site: Site Connected to BSC: RJBUD06
Others: Last Drive Performed:
No. Activity/Process cell 1 cell 2 cell 3 Remarks
Check Check Check
1 MNC 70 70 70
2 MCC 404 404 404
Idle
3 LAC 88 88 88
4 BCCH 8 5 13
5 Call Setup Success rate 100% 100% 100%
6 Call Setup Time 5.63 5.71 5.67
Connection 7 MOS
8 Call Completion Success Rate 100% 100% 100%
9 Mute Call 0% 0% 0%
Handover 10 Handover Success rate 100% 100% 100%

Remarks (Comments):

SP Signature Bharti Signature:

OSS KPI OSS Kpi-Targets


UL Quality >= Avg of first tier Nbr Cells
DL Quality >= Avg of first tier Nbr Cells
RACH Success Rate >= Avg of first tier Nbr Cells
SD Blocking >= Avg of first tier Nbr Cells
SD Drop >= Avg of first tier Nbr Cells
TCH Blocking >= Avg of first tier Nbr Cells
TASR >= Avg of first tier Nbr Cells
TCH Drop >= Avg of first tier Nbr Cells
HOSR >= Avg of first tier Nbr Cells

Drive test KPIs are only for reporting purpose, No Targets


OSS KPIs must be >= "Avg of First Tier Nbr Cells" for Target Site.
POST DR

BCCH-8,5

CELLID
RXLEVE
RXQUALI

HANDOV
POST DRIVE

BCCH-8,5,13

CELLID
RXLEVEL
RXQUALITY

HANDOVER
GOOGLE MAP
2G Site Id 2G Cell Id Latitude Longitude Tower Ht Building Ht Azimuth PRE Azimuth POST Antenna Ht
KBK001 KBK0011 24.61561 75.99783 40 NA 120 100 38
KBK002 KBK0012 24.61561 75.99783 40 NA 200 210 38
KBK003 KBK0013 24.61561 75.99783 40 NA 340 330 38
Antenna Shared with 4G (Yes/No Antenna Tilt-Mechanical pre Antenna Tilt-Electrical pre
YES 2 NA
YES 2 NA
YES 2 NA
Antenna Tilt-Mechanical POST Tilt-Electrical POST
2 NA
2 NA
2 NA
TOTAL TRAFFIC
PRE
G900 Pre Drive
Row Labels MO BSC 7-Jul 8-Jul 9-Jul 10-Jul AVERAGE
Date
DDLI01 DDLI01
DDLI01 DDLI01
DDLI01 DDLI01
TOTAL TRAFFIC
POST PRE

11-Jul 12-Jul 13-Jul 14-Jul 15-Jul AVERAGE Delta(Pre-Post) 7-Jul 8-Jul 9-Jul
SD BLOCKING(<=0)
PRE POST PRE

10-Jul Aeging 11-Jul 12-Jul 13-Jul 14-Jul 15-Jul Aeging 7-Jul 8-Jul
TCH BLOCKING(<=0)
PRE POST PRE

9-Jul 10-Jul Aeging 11-Jul 12-Jul 13-Jul 14-Jul 15-Jul Aeging 7-Jul
HO Succ. Rate (>=95 %)
PRE POST

8-Jul 9-Jul 10-Jul Aeging 11-Jul 12-Jul 13-Jul 14-Jul 15-Jul Aeging
TN DROP
PRE POST

7-Jul 8-Jul 9-Jul 10-Jul Aeging 11-Jul 12-Jul 13-Jul 14-Jul 15-Jul
Rxqual
PRE

Aeging 7-Jul 8-Jul 9-Jul 10-Jul Aeging 11-Jul 12-Jul 13-Jul 14-Jul
15-Jul Aeging

Vous aimerez peut-être aussi