GENERATOR:
Shutdown Maintenance of Gas turbine and its auxiliaries Motors,
GEP , GCPP Panel
Annually inspec on of Generator Bearings.
Knowledge of Load Shedding scheme according to plant load & power
genera on capacity.
Replacement of Damage PMG Stator Winding.
PM of Gas Turbine Auxiliaries Motor & its Motor Control Center.
Inspec on of Generator PMG, Exciter, Diode Assembly, Line & Neutral Cubicles.
SWITCH GEAR:
PM/CM of 440 V,690 V Circuit Breakers & 3.3 kV,6.6 kV, 11 kV Vacuum/Air
Blast Circuit Breakers make GE, ABB, SIEMENS, AREVA.
Control wiring tes ng and modifica on in MV switch gear.
Inspec on and hot ghtening of MV Switch gear.
Incomer & Feeder CT/VT Inspec on carried out during shut down.
Trouble Shoo ng of MV/LV Incomers, Bus Tie & Feeder Breakers Circuit.
TRANSFORMERS:
PM/CM Of 2.4/.440 kV,6.6/11 kV,11/3.3 kV,11/0.690 kV Transformers.
Perform Oil Die Electric test, Transformer Inspec on, Oil Replacement.
Tes ng of Buchloz Relay, Pressure relieve valve, oil over
temperature, oil level Devices.
Installa on of Transformer Oil Online Filtra on unit for improvement
of Oil Die Electric Strength.
Trouble shoo ng & Fault finding of transformer control circuit.
MOTORS:
PM/CM & Overhauling of MV/LV Motors up to 4 MW.
Trouble shoo ng of different interlocking circuit (auto cut in, cut
out, level, pressure, speed & vibra on.
Bearing replacement, greasing & insula on test of motors.
Motor field servicing, inspec on & Temperature monitoring.
PROTECTION RELAY:
Communica on, File up loading/downloading & CPU Replacement
of GE Relay G60, T60, M60.
Communica on, File up loading/downloading of ABB Relay
REF 542. Fault finding according to the Relay logic.
Relay Backup data downloading from Switch gear.
knowledge about 24,27,32,40,49,50,51,59,64,86,87 protec on func on.
OVERHEAD CRANES:
Maintenance and fault troubleshoo ng of Overhead Crane up to 35 Ton.
CABLES:
Knowledge of Cable selec on, underground cable laying.
Cable Termina on, Cable gland, Insula on & Con
nuity test. MV Cable Termina on HI POT Tes ng.
MEASURING EQUIPMENT:
Knowledge to use the following measuring equipment’s.
INSULATOR TESTER, HI POT TESTER, PHASE SEQUENCE METER,
CURRENT INJECTOR, TRANSFORMER OIL TESTER, BEARING HEATER,
MILI AMPERE SOURCE, DIGITAL EARTH TESTER & MILI OHM METER.
AREA CLASSIFICATION:
Knowledge about area classifica on and implementa on of
different standards.
SPECIAL ACHIEVEMENT:
Par cipated in successful commissioning and startup of
Ammonia/Urea complexes for electrical & Fire alarm systems.