This document contains a daily welding report from July 31st to August 5th for the EPC gas pipeline project of PT. CITRA PANJI MANUNGAL. It lists the pipeline section, joint number, date, and outcome of the visual inspection and any necessary repair for each joint welded. All joints inspected from July 31st to August 5th received an "ACC" or acceptable rating, with the number of joints welded each day ranging from 10 to 24. In total, 118 joints were welded over the 6 day period.
This document contains a daily welding report from July 31st to August 5th for the EPC gas pipeline project of PT. CITRA PANJI MANUNGAL. It lists the pipeline section, joint number, date, and outcome of the visual inspection and any necessary repair for each joint welded. All joints inspected from July 31st to August 5th received an "ACC" or acceptable rating, with the number of joints welded each day ranging from 10 to 24. In total, 118 joints were welded over the 6 day period.
This document contains a daily welding report from July 31st to August 5th for the EPC gas pipeline project of PT. CITRA PANJI MANUNGAL. It lists the pipeline section, joint number, date, and outcome of the visual inspection and any necessary repair for each joint welded. All joints inspected from July 31st to August 5th received an "ACC" or acceptable rating, with the number of joints welded each day ranging from 10 to 24. In total, 118 joints were welded over the 6 day period.