FD3/19 p55-59 29/3/04 7:29 am Page 55

NORTHERN HEMISPHERE

Efficient Underground Limestone


Production
Trading Costs For
Profit
Limestone is in such great demand,
both as high quality roadstone and as
the raw material for cement manufac-
ture, that its mining is frequently car-
ried out underground. Proximity to
the market or availability of a suitable
mineral deposit may be the driver,
but economic extraction is the decid-
ing factor. In essence, the under-
ground limestone mines are trading
off the savings in surface transporta-
tion costs by being closer to the point
of use, against the marginal differ-
ence in production costs between
surface and underground working.
Where these are approximately in
balance, an underground mine can be
profitable. Hence, the major charac-
teristic of a successful underground deposit, and the standard face is 5 m-high Atlas Copco Rocket Boomer L1 C-DH
limestone mining operation is its effi- and 6.5 m-wide. The length of a room plus drilling the face at Auersmacher
ciency, and the single greatest factor pillar is about 100 m, and some limestone limestone mine.
affecting this is the cost of drilling is left to form the roof.
and blasting. Atlas Copco drillrigs are
bringing down this cost by a combi- The mine uses a diesel-powered Atlas
nation of drilling speed and accuracy Copco Rocket Boomer L1 C-DH hydraulic
with low maintenance and longevity. drillrig, because there is no electricity
Matching the drillrig to the job supply installed to the faces. It is equipped
ensures that, whatever the mining with Rig Control System (RCS) and a COP
situation, economic long-term produc-
tion can be achieved, sometimes with 1838 rock drill with 22 kW output. As a
the whole operation dependent upon result, blast holes of 51 mm-diameter can
a single machine. The following case now be drilled to depths of 3.4 m at a rate
studies from five very different loca- of 6-8 m/min. Each V-cut round of 35
tions serve to underline this point. holes produces up to 340 t, and takes only
an hour to drill.
Aggregate from Auersmacher Since the Rocket Boomer rig started
operations, it has drilled entire daily pro-
Since 1936, almost 20 million t of lime- duction output of Auersmacher in a one-
stone have been produced at Auersmacher, shift operation, returning very favourable
a border town in Saarland, Germany. operating and wear costs. Mine output is
Mining activity has left a cavity of nearly now 350,000 t/year, and the rig is drilling
7.8 million cubic metres in the form of six rounds/day, working dayshift only. The
225 km of underground roadways. The rest of the mine works two 8 h shifts/day,
mining area covers almost 4 sq km, with 5 days/week, with a Saturday morning
overburden of approximately 50 m in thick- shift for non-production work if required.
ness and an average mining height of some Experience with the diesel hydraulic
6 m. The Triassic strata comprises a shelly unit has shown it to be economic on fuel,
limestone, which is excellently suited as an and to exhibit low exhaust gas emissions.
aggregate for the local steel industry. The Boomer L1 C-DH features a BF6M
The mine is working a room and pillar 1013 CP engine with EMR and catalyzer
system of extraction in the horizontal which consumes only about 19 litres of

FACE DRILLING 55
FD3/19 p55-59 29/3/04 7:29 am Page 56

NORTHERN HEMISPHERE

the operator: with too little water, it is


impossible to drill; with too much, the
cuttings become slurried.
The rotation speed has a profound effect
on penetration rate. In the limestone rock
at Auersmacher, the optimum speed is
400 rev/min. Dropping it to 300 rev/min
reduces the penetration rate by 2 m/min.
Drilling is carried out exclusively with
Atlas Copco shank adapters and drill rods,
and the very good dampening and anti-wear
properties of the equipment has resulted in
enormously long service lives, despite the
high work capacity. For example, the
approximate service life of drill bits is 3,200
drillmetres, rods 10,000 drillmetres, and
shank adapters, 18,500 drillmetres.
Secoroc shank adapters and steels are
used with a 51 mm ballistic bit. The mine
switched from 42 mm bits for a 2 m/min
improvement in penetration rate, with
View from the driver’s seat of the dieseline for each percussion drilling hour, accompanying gains in ANFO blast yield.
Rocket Boomer L1 C-DH. and can complete two shifts on a single At the start of each drilling shift, the
tank of fuel. The excellent exhaust emis- operator takes around 15 minutes to check
sion values are very important in under- the engine oil, feed hoses and grease
ground mining, where ventilation can be points. His training as a mechanic helps
costly. him to get the best out of the sophisticated
Due to the very good drilling and flush- engine. The servicing requirements have
ing characteristics using water mist, drill no negative impact on mine production.
rod losses are negligible. Water consump- High temperature greasing of the rock
tion varies from 2-5 lit/min depending drill gearbox is carried out every 40 hours,
Norcem Rocket Boomer L2 C drilling a upon rock conditions, and a full tank lasts or once a week.
top heading at Dalen, Norway. a week. The water mist mix is adjusted by The close support of the Atlas Copco
team has resulted in a collaborative
relationship that gets the best out of the
equipment.

Linwood, USA
Another Rocket Boomer L1 C-DH was
delivered to the Linwood Stone mine in
Iowa, USA for use in limestone with an
average compressive strength of 165 Mpa.
This rig is equipped with RCS using
ABC Basic software for assisted boom
positioning, collaring point, hole direction,
hole depth control, and statistics. A
Diarot study was conducted on this rig,
in order to calculate the correct settings for
the rock drill, without using trial and error.
Increased performance was obtained by
adjusting the rotation speed to 400+ rpm,
and using a newly developed button bit
from Secoroc, which features increased
button protrusion, and more and bigger
flushing holes.
The Rocket Boomer L1 C-DH is
achieving penetration rates of 3.5 to

56 FACE DRILLING
FD3/19 p55-59 29/3/04 7:29 am Page 57

NORTHERN HEMISPHERE

4.5 m/min, which is a doubling in output


Hanging wall
over the previous generation of drillrigs. (The Venstop formation)
e
Strik

Cement from Dalen

Di
p
Limestone
(The Steinvika formation)

A single Atlas Copco Rocket Boomer


L2 C with RCS and unparalleled reliability
produces an impressive 1 million t/year at cro
ssc
Dalen limestone mine, located on the ut cro
ssc
ut
drift
southern coast of Norway. Dalen limestone benc
h
benc
h

comprises sediments of Ordovician- ben

approx. 40 m
ben chin
chin g
g
Silurian origin, which occur in a regular Hor
ison
tal p
bed of around 40 m-thickness. illar
8m drift
The limestone is located between a foot- Foot wall
(The Fossum formation)
wall of metamorphic rock and a hanging Dip
13 -
20 o
wall of sandstone, and the deposit is
dipping 15-20 degrees to the east, below
the Eidaneerfjord. The cement plant and
the community of Brevik sit right on top drilled in the fully automated mode. Section of mining layout at Dalen.
of the deposit, which comprises the largest When the top heading drifts are com-
underground operating mine in Norway. plete, they are followed by horizontal
The decision to purchase the Rocket benching, 14 m-wide and 6 m-high, to
Boomer L2 C rig was helped by Norcem’s achieve the full room dimension of 14 m x
positive experiences with its previous 14 m. Some 4-5 rounds of 1,500-1,600 t
23-year old Boomer H 132. are blasted each day consuming about
The Rocket Boomer is used both for 550 kg of explosives/round. Production is
developing new areas and for production switched between working faces in the
drilling, on two shifts/day, five days/week. mine, of which there can be up to 40 at any
Maintenance takes some 3-4 h/week, and given time. The 15 km/h tramming speed
rig availability has been close to 100%, of the Rocket Boomer L2 C between faces
with hardly any unplanned stops. The mine helps its overall high utilization.
gets a lot of work out of the rig, drilling Because of the non-abrasive nature of
282,000 m/year. the rock, and the rig’s ability to continu-
The Rocket Boomer L2 C rig was ously optimize drilling parameters, shank
specially fitted to Norcem’s requirements adapters and drill steel last for up to 8,000
with COP 1838 ME rockdrills, and the drillmetres, and the 48 mm Secoroc drill-
RCS and ABC Total automated boom bits last for around 2,200 drillmetres.
positioning and drilling system. The rig Conventional hydraulic rigs are now
was also equipped with an extra-wide expected to last for a million drillmetres/
boom console to increase the width of the boom, but the combination of self-
coverage area. adjusting rock drills and Norcem’s high
Norcem uses the software program maintenance standards could well double
Tunnel Manager Lite to design the drilling that figure for their Rocket Boomer L2 C.
plans, which are pre-programmed in the
office and transferred into the rig’s control Dolomite from Trier
panel by using a conventional PC card.
Drilling logs are also stored on the PC Alongside the German border with
card. Luxembourg at the Mosel river, southwest
Boom positioning and drilling of the of Trier, dolomite rock has been mined
pre-selected drill plan can be fully auto- ever since 1881.
mated or semi-automated with manual Josefstollen, the mine currently being
positioning. The cross section of the top operated, opened in 1964. Each year it pro-
headings is 14 m-wide and 8 m-high, and a duces some 600,000 t of raw dolomite,
Vee cut is used. Here the rounds consist of which is intended primarily for the build-
105 holes drilled to depths of 5.4 m at ing industry.
48 mm-diameter. Owner Winfried Meseke has been oper-
For the first crosscut round, where the ating the mine since 2002 under the name
face is not flat, about 65 holes tend to be TKDZ GmbH Wellen, which stands for

FACE DRILLING 57
FD3/19 p55-59 29/3/04 7:29 am Page 58

NORTHERN HEMISPHERE

about half an hour. The dolomite does not


present itself as a continuously compact
formation, but exhibits soft and difficult-
to-drill formations throughout. This is
where the benefit of the RCS is felt, with
its extremely short and highly sensitive
response time for hammer and feed
control.
The Rocket Boomer L1 C-DH is
exceeding its planned output, leaving
plenty of scope for increased output when
required. Currently, most of the production
is obtained in one shift, with only part of
the second shift devoted to drilling.
The air-water mist flushing, with its
extremely small dosing of water for dust
control, is the perfect match for the mois-
ture-sensitive ANFO explosive used in the
mine.
Swellex rock reinforcement is used
throughout the mine, using a special
anchor platform equipped with water tank,
pump and generator.
Rocket Boomer L1 C-DH at TKDZ. Trierer Kalk-, Dolomit- und Zementwerke.
Mine reserves are around 40 million t of Anhydrite at Obrigheim
raw dolomite, enough for a further 40 years
of production at today’s rates. HeidelbergCement is one of the world’s
Trier dolomite, with an average com- leading producers of building materials.
pressive strength of 130 and 150 Mpa, is Founded in Heidelberg in 1873, the com-
used mainly for the building materials pany operated exclusively in the south of
industry. Its excellent quality, combined Germany until the end of the 1960s.
with optimized underground mining and Through international acquisitions, the
efficient preparation and processing stan- company has gained markets around the
dards, ensure it reaches the market at com- world, resulting in total 2002 sales of €6.6
petitive prices. billion, and employing some 37,000 people
Mining is carried out by conventional at its 1,500 sites in 50 countries.
room and pillar methods, at two gallery HeidelbergCement AG operates an
levels in the bottom and middle beds. Each underground mine in Obrigheim, Germany
mining area is opened up by horizontal producing gypsum and anhydrite using a
galleries, which are interconnected with Rocket Boomer L1 C drillrig since early
the individual beds via ramps. The room 2003. An extensive training programme
width is 5 m in the bottom bed and 5.5 m for drillrig operators was provided by
in the middle bed, and the rooms are 5 m Atlas Copco in all aspects of the equip-
to 5.5 m high. ment, drilling, system training and
For one pull, a total of 29 of 45 mm- maintenance. The result has been excellent
diameter holes are drilled to a depth of performance and high utilization.
3.3 m, with a Vee-cut to form the breaking The Obrigheim gypsum mine is located
face. With this combination, approximately on the West side of the river Neckar,
13 pulls/day are required to satisfy produc- between the villages of Obrigheim and
tion demands. Hochhausen, near the Mosbach administra-
Drilling is carried out by a diesel- tive centre.
hydraulic Rocket Boomer L1 C-DH Gypsum has been mined here since
mounting a COP 1838 HF rock drill with 1847, and HeidelbergCement AG has been
air-water mist flushing. The rock drill, operating the mine since 1905. Parts of the
with an 20 kW output and a speed of 500 lower sulphate deposit of the lacrustine
rpm, takes between 25 and 30 seconds to limestone are mined, using the lower
drill a 3.3 m hole, a penetration rate of 6.6- dolomite as level boundary. The deposit
7.9 m/min. The total time for one round is slopes approximately 2% to the south.

58 FACE DRILLING
FD3/19 p55-59 29/3/04 7:29 am Page 59

NORTHERN HEMISPHERE

Rocket Boomer L1 C at Obrigheim.

The mine is accessed by three adits on gypsum/anhydrite ratio, and the overall
the west side of the Neckar, positioned purity.
approximately 60 m above the river, and a An important safety factor in the mine
fourth adit is used for return ventilation. is the efficient scaling of the backs and the
Production is by room and pillar, in heading face. All exposed areas are cleared
which the first step is to expose sections using a telescopic scaling arm equipped
10 m-wide and approximately 5.5 m-high with an Atlas Copco MB800 (Krupp
by drilling and blasting. HM580) hammer.
In the next step, the computerized A conveyor system installed in one of
Rocket Boomer L1 C, equipped with RCS, the three adits brings the aggregate to sur-
drills a 4.5 m round of 60 off 45 mm blast- face, where it is loaded in trucks or directly
holes and 4 off 89 mm cut holes, which is onto barges on the River Neckar.
an optimized drill pattern to maximize the Of the 300,000 t/y output, 90% goes
pull per round. The Rocket Boomer is to the cement industry and 10% to the
equipped with a heavy-duty COP 1838 HF Neckarzimmern gypsum plant for the
rock drill. The hydraulic system and on- production of building gypsum.
board compressor are driven by a 75 kW
electric motor, while the diesel engine is Conclusions
used to move the rig around the mine. A
water tank with admixing device provides In all these mines, a single rig is handling
the flushing medium when drilling. the entire production requirement of up to
Given the very large variation in the 1 million t/y, mainly due to a combination
compressive strength of gypsum and anhy- of high performance with high availability.
drite, between 10 to 130 Mpa, penetration Where there is no suitable electricity
rates also vary significantly. A 4.5 m-long supply to the mining areas to power an
x 45 mm-diameter hole is drilled in 40 to electro-hydraulic rig, as at Auersmacher
75 seconds. The computerized drilling log and Linwood, the diesel-hydraulic rigs are
has recorded an average penetration rate upgrading mining efficiency without
of 3.23 m/min, including the cut holes, for excessive capital expenditure. At these
the 100,000 metres completed to date. mines, drilling rates have doubled with the
Taking into account the large variation in introduction of the Rocket Boomer L1 C-
rock strength and the chosen bit design, DH, and round depths have increased
an optimum rotation speed of 430 rpm has significantly. These machines, equipped
been established for drilling 45 mm holes. with water tanks and water mist flushing,
A pull of 4.5 m/round is achieved using operate efficiently despite the absence of
4 kg to 5 kg of explosives/t injected by a mains supplies of water and electricity.
charger mounted on a lifting platform. The They are also adaptable, performing on
blasted rock is crushed to an aggregate size both production and development, and
of 0-70 mm, then sorted by grades and handling rockbolt and ancillary drilling.
placed in rooms in an intermediate storage Efficiency and dependability are resulting
area. The main quality parameters are the in profitability. ■

FACE DRILLING 59