Another Rocket Boomer L1 C-DH was
delivered to the Linwood Stone mine in
Iowa, USA for use in limestone with an
average compressive strength of 165 Mpa.
This rig is equipped with RCS using
ABC Basic software for assisted boom
positioning, collaring point, hole direction,
hole depth control, and statistics. A
Diarot study was conducted on this rig,
in order to calculate the correct settings for
the rock drill, without using trial and error.
Increased performance was obtained by
adjusting the rotation speed to 400+ rpm,
and using a newly developed button bit
from Secoroc, which features increased
button protrusion, and more and bigger
flushing holes.
The Rocket Boomer L1 C-DH is
achieving penetration rates of 3.5 to
56 FACE DRILLING
FD3/19 p55-59 29/3/04 7:29 am Page 57
NORTHERN HEMISPHERE
Di
p
Limestone
(The Steinvika formation)
approx. 40 m
ben chin
chin g
g
Silurian origin, which occur in a regular Hor
ison
tal p
bed of around 40 m-thickness. illar
8m drift
The limestone is located between a foot- Foot wall
(The Fossum formation)
wall of metamorphic rock and a hanging Dip
13 -
20 o
wall of sandstone, and the deposit is
dipping 15-20 degrees to the east, below
the Eidaneerfjord. The cement plant and
the community of Brevik sit right on top drilled in the fully automated mode. Section of mining layout at Dalen.
of the deposit, which comprises the largest When the top heading drifts are com-
underground operating mine in Norway. plete, they are followed by horizontal
The decision to purchase the Rocket benching, 14 m-wide and 6 m-high, to
Boomer L2 C rig was helped by Norcem’s achieve the full room dimension of 14 m x
positive experiences with its previous 14 m. Some 4-5 rounds of 1,500-1,600 t
23-year old Boomer H 132. are blasted each day consuming about
The Rocket Boomer is used both for 550 kg of explosives/round. Production is
developing new areas and for production switched between working faces in the
drilling, on two shifts/day, five days/week. mine, of which there can be up to 40 at any
Maintenance takes some 3-4 h/week, and given time. The 15 km/h tramming speed
rig availability has been close to 100%, of the Rocket Boomer L2 C between faces
with hardly any unplanned stops. The mine helps its overall high utilization.
gets a lot of work out of the rig, drilling Because of the non-abrasive nature of
282,000 m/year. the rock, and the rig’s ability to continu-
The Rocket Boomer L2 C rig was ously optimize drilling parameters, shank
specially fitted to Norcem’s requirements adapters and drill steel last for up to 8,000
with COP 1838 ME rockdrills, and the drillmetres, and the 48 mm Secoroc drill-
RCS and ABC Total automated boom bits last for around 2,200 drillmetres.
positioning and drilling system. The rig Conventional hydraulic rigs are now
was also equipped with an extra-wide expected to last for a million drillmetres/
boom console to increase the width of the boom, but the combination of self-
coverage area. adjusting rock drills and Norcem’s high
Norcem uses the software program maintenance standards could well double
Tunnel Manager Lite to design the drilling that figure for their Rocket Boomer L2 C.
plans, which are pre-programmed in the
office and transferred into the rig’s control Dolomite from Trier
panel by using a conventional PC card.
Drilling logs are also stored on the PC Alongside the German border with
card. Luxembourg at the Mosel river, southwest
Boom positioning and drilling of the of Trier, dolomite rock has been mined
pre-selected drill plan can be fully auto- ever since 1881.
mated or semi-automated with manual Josefstollen, the mine currently being
positioning. The cross section of the top operated, opened in 1964. Each year it pro-
headings is 14 m-wide and 8 m-high, and a duces some 600,000 t of raw dolomite,
Vee cut is used. Here the rounds consist of which is intended primarily for the build-
105 holes drilled to depths of 5.4 m at ing industry.
48 mm-diameter. Owner Winfried Meseke has been oper-
For the first crosscut round, where the ating the mine since 2002 under the name
face is not flat, about 65 holes tend to be TKDZ GmbH Wellen, which stands for
FACE DRILLING 57
FD3/19 p55-59 29/3/04 7:29 am Page 58
NORTHERN HEMISPHERE
58 FACE DRILLING
FD3/19 p55-59 29/3/04 7:29 am Page 59
NORTHERN HEMISPHERE
The mine is accessed by three adits on gypsum/anhydrite ratio, and the overall
the west side of the Neckar, positioned purity.
approximately 60 m above the river, and a An important safety factor in the mine
fourth adit is used for return ventilation. is the efficient scaling of the backs and the
Production is by room and pillar, in heading face. All exposed areas are cleared
which the first step is to expose sections using a telescopic scaling arm equipped
10 m-wide and approximately 5.5 m-high with an Atlas Copco MB800 (Krupp
by drilling and blasting. HM580) hammer.
In the next step, the computerized A conveyor system installed in one of
Rocket Boomer L1 C, equipped with RCS, the three adits brings the aggregate to sur-
drills a 4.5 m round of 60 off 45 mm blast- face, where it is loaded in trucks or directly
holes and 4 off 89 mm cut holes, which is onto barges on the River Neckar.
an optimized drill pattern to maximize the Of the 300,000 t/y output, 90% goes
pull per round. The Rocket Boomer is to the cement industry and 10% to the
equipped with a heavy-duty COP 1838 HF Neckarzimmern gypsum plant for the
rock drill. The hydraulic system and on- production of building gypsum.
board compressor are driven by a 75 kW
electric motor, while the diesel engine is Conclusions
used to move the rig around the mine. A
water tank with admixing device provides In all these mines, a single rig is handling
the flushing medium when drilling. the entire production requirement of up to
Given the very large variation in the 1 million t/y, mainly due to a combination
compressive strength of gypsum and anhy- of high performance with high availability.
drite, between 10 to 130 Mpa, penetration Where there is no suitable electricity
rates also vary significantly. A 4.5 m-long supply to the mining areas to power an
x 45 mm-diameter hole is drilled in 40 to electro-hydraulic rig, as at Auersmacher
75 seconds. The computerized drilling log and Linwood, the diesel-hydraulic rigs are
has recorded an average penetration rate upgrading mining efficiency without
of 3.23 m/min, including the cut holes, for excessive capital expenditure. At these
the 100,000 metres completed to date. mines, drilling rates have doubled with the
Taking into account the large variation in introduction of the Rocket Boomer L1 C-
rock strength and the chosen bit design, DH, and round depths have increased
an optimum rotation speed of 430 rpm has significantly. These machines, equipped
been established for drilling 45 mm holes. with water tanks and water mist flushing,
A pull of 4.5 m/round is achieved using operate efficiently despite the absence of
4 kg to 5 kg of explosives/t injected by a mains supplies of water and electricity.
charger mounted on a lifting platform. The They are also adaptable, performing on
blasted rock is crushed to an aggregate size both production and development, and
of 0-70 mm, then sorted by grades and handling rockbolt and ancillary drilling.
placed in rooms in an intermediate storage Efficiency and dependability are resulting
area. The main quality parameters are the in profitability. ■