Upgradation Of Wardha-Hinganghat-Jam-Warora (Length - 35.

460 KM) Section Of NH-347A From KM 0+000


(Wardha) To KM 36+850 (Hinganghat) To Two Lanes With Paved Shoulder In The State Of Maharashtra.

Format No: CAL/F 11 Rev No: 0


Client National Highway Public Work Department Of Maharashtra
Contractor RPP Infra Project's Ltd
Authority Engineer Dhruv Consultancy pvt limited
CALIBRATION OF CONCRETE BATCHING PLANT( As Per MORTH)
Date of Calibration :02-07-2019 Due Date of Calibration:02-10-2019
Make of Plant : SIMEM Batch Capacity : 3cu.m
Plant Capacity 120 CU.M Calibrated By : Jointly
Location : 16+000
Calibration of Load Cell: Aggregate's

Applied Observed load (Kg) Applied Observed load (Kg)


SNo. % of Error SNo. % of Error
Load (Kg) Loading Unloading Avg. Load (Kg) Loading Unloading Avg.
1 0 0 0 0.0 0.0 40 2340 2340 2339 2339.5 0.02
2 60 60 60 60.0 0.00 41 2400 2400 2400 2400.0 0.00
3 120 120 120 120.0 0.00 42 2460 2460 2460 2460.0 0.00
4 180 180 180 180.0 0.00 43 2520 2520 2519 2519.5 0.02
5 240 239 240 239.5 0.21 44 2580 2580 2580 2580.0 0.00
6 300 301 300 300.5 -0.17 45 2640 2639 2640 2639.5 0.02
7 360 360 359 359.5 0.14 46 2700 2700 2700 2700.0 0.00
8 420 419 420 419.5 0.12 47 2760 2760 2760 2760.0 0.00
9 480 480 481 480.5 -0.10 48 2820 2820 2819 2819.5 0.02
10 540 540 540 540.0 0.00 49 2880 2880 2880 2880.0 0.00
11 600 600 600 600.0 0.00 50 2940 2940 2940 2940.0 0.00
12 660 660 659 659.5 0.08 51 3000 3000 3000 3000.0 0.00
13 720 720 721 720.5 -0.07 52 3060 3060 3061 3060.5 -0.02
14 780 781 780 780.5 -0.06 53 3120 3121 3120 3120.5 -0.02
15 840 840 839 839.5 0.06 54 3180 3181 3180 3180.5 -0.02
16 900 900 901 900.5 -0.06 55 3240 3241 3240 3240.5 -0.02
17 960 959 960 959.5 0.05 56 3300 3301 3300 3300.5 -0.02
18 1020 1020 1021 1020.5 -0.05 57 3360 3361 3360 3360.5 -0.01
19 1080 1080 1080 1080.0 0.00 58 3420 3421 3420 3420.5 -0.01
20 1140 1140 1140 1140.0 0.00 59 3480 3480 3481 3480.5 -0.01
21 1200 1201 1200 1200.5 -0.04 60 3540 3539 3540 3539.5 0.01
22 1260 1260 1260 1260.0 0.00 61 3600 3600 3600 3600.0 0.00
23 1320 1320 1320 1320.0 0.00 62 3660 3659 3660 3659.5 0.01
24 1380 1379 1380 1379.5 0.04 63 3720 3720 3720 3720.0 0.00
25 1440 1440 1440 1440.0 0.00 64 3780 3780 3780 3780.0 0.00
26 1500 1500 1501 1500.5 -0.03 65 3840 3840 3840 3840.0 0.00
27 1560 1560 1561 1560.5 -0.03 66 3900 3900 3901 3900.5 -0.01
28 1620 1620 1620 1620.0 0.00 67 3960 3959 3960 3959.5 0.01
29 1680 1680 1680 1680.0 0.00 68 4020 4019 4020 4019.5 0.01
30 1740 1740 1739 1739.5 0.03 69 4080 4079 4080 4079.5 0.01
31 1800 1800 1800 1800.0 0.00 70 4140 4139 4140 4139.5 0.01
32 1860 1860 1861 1860.5 -0.03 71 4200 4199 4200 4199.5 0.01
33 1920 1920 1920 1920.0 0.00 72 4260 4259 4260 4259.5 0.01
34 1980 1980 1981 1980.5 -0.03 73 4320 4320 4320 4320.0 0.00
35 2040 2040 2040 2040.0 0.00 74 4380 4381 4380 4380.5 -0.01
36 2100 2100 2100 2100.0 0.00 75 4440 4440 4440 4440.0 0.00
Format No: CAL/F 11 Rev No: 0
Client National Highway Public Work Department Of Maharashtra
Contractor RPP Infra Project's Ltd
Authority Engineer Dhruv Consultancy pvt limited
CALIBRATION OF CONCRETE BATCHING PLANT( As Per MORTH)
Date of Calibration :02-07-2019 Due Date of Calibration:02-10-2019
Make of Plant : SIMEM Batch Capacity : 3cu.m
Plant Capacity 120 CU.M Calibrated By : Jointly
Location : 16+000
Calibration of Load Cell: Aggregate's

Applied Observed load (Kg) Applied Observed load (Kg)


SNo. % of Error SNo. % of Error
Load (Kg) Loading Unloading Avg. Load (Kg) Loading Unloading Avg.
37 2160 2159 2160 2159.5 0.02 76 4500 4501 4500 4500.5 -0.01
38 2220 2220 2220 2220.0 0.00 77 4560 4560 4559 4559.5 0.01
39 2280 2280 2280 2280.0 0.00 78 4620 4620 4620 4620.0 0.00
% of Permissible tolerance limit = ± 2%

For Contractor(RPP) For Authority Engineer/ NHPWD


Name: Name
Designation: Designation
Date: Date
Upgradation Of Wardha-Hinganghat-Jam-Warora (Length - 35.460 KM) Section Of NH-347A From
KM 0+000 (Wardha) To KM 36+850 (Hinganghat) To Two Lanes With Paved Shoulder In The State
Of Maharashtra.
Format No: CAL/F 11 Rev No: 0
Client National Highway Public Work Department Of Maharashtra
Contractor RPP Infra Project's Ltd
Authority Engineer Dhruv Consultancy pvt limited
CALIBRATION OF BATCHING PLANT
Date of Calibration :02-07-2019 Due Date of Calibration :02-10-2019
Make of Plant : SIMEM Batch Capacity : 3cu.m
Plant Capacity : 120CU.m Calibrated By : Jointly
Location :16+000

Calibration of Load Cell: Cementitious Material


Observed load (Kg) Applied Observed load (Kg)
Applied
SNo. % of Error SNo. % of Error
Load (Kg)
Loading Unloading Avg. Load (Kg) Loading Unloading Avg.
1 0 0 0 0.0 0.00 27 520 520 520 520.0 0.00
2 20 20 20 20.0 0.00 28 540 541 540 540.5 -0.09
3 40 40 40 40.0 0.00 29 560 559 560 559.5 0.09
4 60 60 60 60.0 0.00 30 580 580 580 580.0 0.00
5 80 80 80 80.0 0.00 31 600 600 600 600.0 0.00
6 100 100 100 100.0 0.00 32 620 620 619 619.5 0.08
7 120 120 120 120.0 0.00 33 640 640 639 639.5 0.08
8 140 140 140 140.0 0.00 34 660 660 660 660.0 0.00
9 160 160 159 159.5 0.31 35 680 680 680 680.0 0.00
10 180 180 180 180.0 0.00 36 700 701 700 700.5 -0.07
11 200 200 200 200.0 0.00 37 720 720 720 720.0 0.00
12 220 220 219 219.5 0.23 38 740 740 740 740.0 0.00
13 240 240 239 239.5 0.21 39 760 760 760 760.0 0.00
14 260 260 260 260.0 0.00 40 780 780 779 779.5 0.06
15 280 280 280 280.0 0.00 41 800 800 800 800.0 0.00
16 300 299 300 299.5 0.17 42 820 820 819 819.5 0.06
17 320 320 320 320.0 0.00 43 840 840 840 840.0 0.00
18 340 340 340 340.0 0.00 44 860 860 860 860.0 0.00
19 360 360 360 360.0 0.00 45 880 880 881 880.5 -0.06
20 380 380 381 380.5 -0.13 46 900 900 889 894.5 0.61
21 400 400 400 400.0 0.00 47 920 920 920 920.0 0.00
22 420 420 420 420.0 0.00 48 940 940 939 939.5 0.05
23 440 440 441 440.5 -0.11 49 960 960 960 960.0 0.00
24 460 460 460 460.0 0.00 50 980 980 980 980.0 0.00
25 480 480 480 480.0 0.00 51 1000 1000 1000 1000.0 0.00
26 500 500 500 500.0 0.00 52 1020 1020 1020 1020.0 0.00

% of Permissible tolerance limit = ± 1%

For Contractor(RPP) For Authority Engineer/ NHPWD


Name: Name
Designation: Designation
Date: Date
Upgradation Of Wardha-Hinganghat-Jam-Warora (Length - 35.460 KM) Section Of NH-347A From
KM 0+000 (Wardha) To KM 36+850 (Hinganghat) To Two Lanes With Paved Shoulder In The State
Of Maharashtra.
Format No: CAL/F 11 Rev No: 0
Client National Highway Public Work Department Of Maharashtra
Contractor RPP Infra Project's Ltd
Authority Engineer Dhruv Consultancy pvt limited
CALIBRATION OF BATCHING PLANT
Date of Calibration :02-07-2019 Due Date of Calibration :02-10-2019
Make of Plant : SIMEM Batch Capacity : 3cu.m
Plant Capacity :120CU.M Calibrated By Jointly
Location :16+000
Calibration of Load Cell: Water
Applied Observed load (Kg) Applied Observed load (Kg)
SNo. % of Error SNo. % of Error
Load (Kg) Loading Unloading Avg. Load (Kg) Loading Unloading Avg.
1 0 0 0 0.0 0.0 17 320 320 320 320.0 0.0
2 20 20 20 20.0 0.00 18 340 340 340 340.0 0.0
3 40 40 40 40.0 0.00 19 360 360 360 360.0 0.0
4 60 60 60 60.0 0.00 20 380 380 380 380.0 0.0
5 80 80 80 80.0 0.00 21 400 401 400 400.5 -0.1
6 100 100 100 100.0 0.00 22 420 420 420 420.0 0.0
7 120 120 120 120.0 0.00 23 440 439 440 439.5 0.1
8 140 140 139 139.5 0.36 24 460 460 460 460.0 0.0
9 160 160 160 160.0 0.00 25 480 480 480 480.0 0.0
10 180 180 180 180.0 0.00 26 500 500 501 500.5 -0.1
11 200 200 200 200.0 0.00 27 520 520 520 520.0 0.0
12 220 220 221 220.5 -0.23 28 540 540 540 540.0 0.0
13 240 240 240 240.0 0.00 29 560 560 559 559.5 0.1
14 260 260 259 259.5 0.19 30 580 580 580 580.0 0.0
15 280 280 280 280.0 0.00 31 600 600 601 600.5 -0.1
16 300 299 300 299.5 0.17 32 620 620 620 620.0 0.0
% of Permissible tolerance limit = ±1%

For Contractor(RPP) For Authority Engineer/ NHPWD


Name: Name
Designation: Designation
Date: Date
Upgradation Of Wardha-Hinganghat-Jam-Warora (Length - 35.460 KM) Section Of NH-347A From KM
0+000 (Wardha) To KM 36+850 (Hinganghat) To Two Lanes With Paved Shoulder In The State Of
Maharashtra.
Format No: CAL/F 11 Rev No: 0
Client National Highway Public Work Department Of Maharashtra
Contractor RPP Infra Project's Ltd
Authority Engineer Dhruv Consultancy pvt limited
CALIBRATION OF BATCHING PLANT
Date of Calibration :02-07-2019 Due Date of Calibration :02-10-2019
Make of Plant : SIMEM Batch Capacity : 3cu.m
Plant Capacity : 120 CU.M Calibrated By : Jointly
RFI No. : Location :16+000
Calibration of Load Cell: Admixture
Applied Observed load (gm) Applied Observed load (gm)
SNo. % of Error SNo. % of Error
Load (gm) Loading Unloading Avg. Load (gm) Loading Unloading Avg.
1 0 0 0 0.0 0.00 15
2 1000 1010 1000 1005.0 -0.50 16
3 2000 2000 2000 2000.0 0.00 17
4 3000 3000 3000 3000.0 0.00 18
5 4000 4000 4010 4005.0 -0.13 19
6 5000 5000 5000 5000.0 0.00 20
7 6000 6000 6000 6000.0 0.00 21
8 7000 7000 7010 7005.0 -0.07 22
9 8000 8000 7990 7995.0 0.06 23
10 9000 9000 9000 9000.0 0.00 24
11 10000 10000 10000 10000.0 0.00 25
12 11000 11000 11010 11005.0 -0.05 26
13 12000 12000 12010 12005.0 -0.04 27
14 13000 13000 13000 13000.0 0.00 28
% of Permissible tolerance limit = ±1%

For Contractor(RPP) For Authority Engineer/ NHPWD


Name: Name
Designation: Designation
Date: Date