Company: Contractor:

Project No.
REVAMPING OF WASTE WATER TREATMENT FACILITY IN ETHYLENE PLANT AT
QAPCO

COMMENTS RESOLUTION SHEET

WWT-P06-45450-009_A- CRS PIPING GA FOR CLARIFIER AREA- CRS Rev. A

Sl. No QAPCO Comments Contractor Response QAPCO Reply

GENERAL COMMENTS

Changemark #01
1.1 Please show a clear legend/symbol as shown on the Noted
drawing.

Changemark #02
Please differ new and existing lines with line
2.1 strength/boldness instead of colour. Noted and incorporated
Piping new and A/G New should be same symbol.
A/G and U/G shall be same boldness

Changemark #03
3.1 Key plan updated
Location of this drawing to be identified

Changemark #01 Comment incorporated.


Drawing scale shall be assigned generally for the
4.1 drawing. For special view or detail there may be different Submitted Piping GAs are in 1:50 scale meeting QAPCO
scale that shall be shown on the view. General scale for requirement. Three sheets are added now to include sections
piping GA shall not be less than 1:60. and details to provide more clarity as required by QAPCO.

Page 1 of 2 442783633.doc
Company: Contractor:

Project No.
REVAMPING OF WASTE WATER TREATMENT FACILITY IN ETHYLENE PLANT AT
QAPCO

COMMENTS RESOLUTION SHEET


This will require major revision on all piping GAs hence
1.2 Please draw line size 8" and larger with double line. deliverables will be delayed. Will revise the drawing to show
double lines for 12” and above as per normal practice.
1.3 Please draw piping lines bolder than accessory lines. Comment incorporated.

1.4 Please show all equipment tag no. Comment incorporated.


Show coordinate of equipment on the CL or a reference
Comment incorporated.
1.5 point. Deviation angle from normal co-ordinate lines
shall be shown.
Line numbers shall be shown on each edge of the line
(or at borderline), when any change in direction and Comment incorporated.
1.6
when interfere with other line. Or whenever needed to
show any unclear portion.
Pipe elevation shall be shown. For flat lines, BOP shall
be shown under the line number. For slope lines, WP Comment incorporated.
1.7
elevation shall be shown on every change in direction or
elevation and branches.
Deviation angle between true and Plant North shall be Comment incorporated.
1.8 shown.
Piping GA dedicated for pipe racks may be prepared if
1.9 there is no any piping connection to equipment (optional Separate piping GA shall be provided for pipe rack detail
to simplify/minimize drawings quantity).
Please apply comments on this drawing legends to all
1.10 piping GA. Noted