Project No.
REVAMPING OF WASTE WATER TREATMENT FACILITY IN ETHYLENE PLANT AT
QAPCO
GENERAL COMMENTS
Changemark #01
1.1 Please show a clear legend/symbol as shown on the Noted
drawing.
Changemark #02
Please differ new and existing lines with line
2.1 strength/boldness instead of colour. Noted and incorporated
Piping new and A/G New should be same symbol.
A/G and U/G shall be same boldness
Changemark #03
3.1 Key plan updated
Location of this drawing to be identified