Boring Report (IS 4404-1998)

Sardarpur
Contractor:- M/S KGGIPL JV KE Total Depth:-6.00
Project:- Construction of bridge across Mahi River on
sardarpur Rajgad road Dist. Dhar (M.P)
Hole No.:- BH-A-1 Location:-A-1 Ground water table Elevation:-
Collar elevation: NA Date of Starting:-07/09/2019
Type of Bit used: Diamond Cutter GL RL:-00.00 Completion date:- 08/09/2019

Elevati Structural
Size of Core Piles Percentage of recovery Water loss Special
on RL Lithology condition
Size of Casing observations
to RL description of Log
Less than 100 mm 20 % 75 % 90 % 100 % hole pipe 0 20 40 60 &
in strata Description 0
100 mm to above above above above above % % % % interpolations
meters
0 .00
4.30,4.10 100
to Rock
4.20,3.10 mm
1.50
1.50 5.30,6.10
to Rock 5.90,7.10
3.00 4.40
3.00
to Rock 5.90 44.30
4.50
4.50 13.40
to Rock 16.30
6.00 33.40
Boring Report (IS 4404-1998)
Sardarpur
Contractor:- M/S KGGIPL JV KE Total Depth:- 4.50
Project:- Construction of bridge across Mahi River on
sardarpur Rajgad road Dist. Dhar (M.P)
Hole No.:- BH-A-2 Location:-A-2 Ground water table Elevation:-
Collar elevation: NA Date of Starting:-07/09/2019
Type of Bit used: Diamond Cutter GL RL:-00.00 Completion date:- 08/09/2019

Elevati Structural
Size of Core Piles Percentage of recovery Water loss Special
on RL Lithology condition
Size of Casing observations
to RL description of Log
Less than 100 mm 20 % 75 % 90 % 100 % hole pipe 0 20 40 60 &
in strata Description 0
100 mm to above above above above above % % % % interpolations
meters
0 .00
100
to BC Soil
mm
0.50
Mix
0.50
Boulder 2.40,4.30
to
With 4.20,2.20
1.50
Rock
3.20,7.20
1.50
5.20,4.10
to Rock 15.30
2.60,3.90
3.00
7.90
3.00 10.50,
9.50,4.60
to Rock 11.20
2.60,3.90
4.50 10.10
Boring Report (IS 4404-1998)
Manawar
Contractor:- M/S KGGIPL JV KE Total Depth:- 10.50
Project:- Construction of bridge River on
Manawar road Dist. Dhar (M.P))
Hole No.:- BH-A-1 Location:-A-1 Ground water table Elevation:-
Collar elevation: NA Date of Starting:-07/09/2019
Type of Bit used: Diamond Cutter GL RL:-00.00 Completion date:- 08/09/2019

Elevati Structural
Size of Core Piles Percentage of recovery Water loss Special
on RL condition
Lithology description Size of Casing observations
to RL Log
of strata Less than 100 mm 20 % 75 % 90 % 100 % hole pipe 0 20 40 60 &
in Description 0
100 mm to above above above above above % % % % interpolations
meters
0 .00
Weathered 100
to
Rock mm
1.50
1.50
Weathered
to
Rock
3.00
3.00
3.80,7.50
to Rock
4.70,3.70
4.50
4.50 Rock 8.50,9.40
to
6.00
6.00 Rock 7.90,6.90 17.70
to
7.50
7.50 Rock 5.30 10.30
to 12.30
9.00
9.00 Rock 32.10
to 10.10
10.50 15.80
Boring Report (IS 4404-1998)
Manawar
Contractor:- M/S KGGIPL JV KE Total Depth:- 12.00
Project:- Construction of bridge across River on
Manawar road Dist. Dhar (M.P)
Hole No.:- BH-A-2 Location:-A-2 Ground water table Elevation:-
Collar elevation: NA Date of Starting:-07/09/2019
Type of Bit used: Diamond Cutter GL RL:-00.00 Completion date:- 08/09/2019

Elevati Structural
Size of Core Piles Percentage of recovery Water loss Special
on RL condition
Lithology description Size of Casing observations
to RL Log
of strata Less than 100 mm 20 % 75 % 90 % 100 % hole pipe 0 20 40 60 &
in Description 0
100 mm to above above above above above % % % % interpolations
meters
0 .00
Weathered 100
to
Rock mm
1.50
1.50
Weathered
to
Rock
3.00
3.00
Weathered
to
Rock
4.50
4.50
Weathered
to
Rock
6.00
6.00 4.80,4.90
to Rock 3.80,1.80
7.50
7.50
11.70
to Rock 6.10
14.20
9.00
9.00 9.80 16.70
to Rock 15.60
10.50
10.50 Rock 7.70 26.30
to 15.70
12.00
Boring Report (IS 4404-1998)
Semliya Chau
Contractor:- M/S KGGIPL JV KE Total Depth:- 12.00
Project:- Construction of bridge across River on
Semliya Chau road Dist. Dhar (M.P)
Hole No.:- BH-A-1 Location:-A-1 Ground water table Elevation:-
Collar elevation: NA Date of Starting:-07/09/2019
Type of Bit used: Diamond Cutter GL RL:-00.00 Completion date:- 08/09/2019

Elevati Structural
Size of Core Piles Percentage of recovery Water loss Special
on RL condition
Lithology description Size of Casing observations
to RL Log
of strata Less than 100 mm 20 % 75 % 90 % 100 % hole pipe 0 20 40 60 &
in Description 0
100 mm to above above above above above % % % % interpolations
meters
0 .00
Yellow 100
to
Color Soil mm
1.50
1.50 Yellow
to Color With
3.00 Kankar Soil
3.00 Yellow
to Color With
4.50 Kankar Soil
4.50 Yellow
to Color With
6.00 Kankar Soil
6.00 Murrum
to Mix
7.50 Boulders
7.50
4.10,3.70
to Rock
5.10,4.10
9.00
9.00
to Rock 4.20,8.40 10.30
10.50
10.50 Rock 9.90 10.20
to 10.90
12.00
Boring Report (IS 4404-1998)
Semliya Chau
Contractor:- M/S KGGIPL JV KE Total Depth:- 10.50
Project:- Construction of bridge across River on
Semliya Chau road Dist. Dhar (M.P)
Hole No.:- BH-A-2 Location:-A-2 Ground water table Elevation:-
Collar elevation: NA Date of Starting:-07/09/2019
Type of Bit used: Diamond Cutter GL RL:-00.00 Completion date:- 08/09/2019

Elevati Structural
Size of Core Piles Percentage of recovery Water loss Special
on RL condition
Lithology description Size of Casing observations
to RL Log
of strata Less than 100 mm 20 % 75 % 90 % 100 % hole pipe 0 20 40 60 &
in Description 0
100 mm to above above above above above % % % % interpolations
meters
0 .00 B.C. Soil
100
to High Plastic
mm
0.50 Clay
0.50 Yellow
to Color With
1.50 Kankar Soil
1.50 Yellow
to Color With
3.00 Kankar Soil
3.00
to Fine Sand
4.50
4.50 Fine Sand
to Mix
6.00 Boulders
6.00
7.30,3.40
to Rock
2.40,2.40
7.50
7.50
to Rock 7.30,6.20 40.00
9.00
9.00 8.80,6.30 12.10
to Rock 2.30
10.50
Boring Report (IS 4404-1998)
Sawer Depalpur
Contractor:- M/S KGGIPL JV KE Total Depth:- 10.50
Project:- Construction of bridge across River on
Sawer Depalpur road Dist. Dhar (M.P)
Hole No.:- BH-A-1 Location:-A-1 Ground water table Elevation:-
Collar elevation: NA Date of Starting:-07/09/2019
Type of Bit used: Diamond Cutter GL RL:-00.00 Completion date:- 08/09/2019

Elevati Structural
Size of Core Piles Percentage of recovery Water loss Special
on RL condition
Lithology description Size of Casing observations
to RL Log
of strata Less than 100 mm 20 % 75 % 90 % 100 % hole pipe 0 20 40 60 &
in Description 0
100 mm to above above above above above % % % % interpolations
meters
0 .00
Field Up 100
to
Material mm
1.50
1.50
Field Up
to
Material
3.00
3.00 Silty Clay
to Mix
4.50 Morrum
4.50
Weathered
to
Rock
6.00
6.00
Weathered
to
Rock
7.50
7.50
4.70,5.80
to Rock
6.20,9.80
9.00
9.00 7.20,7.90 13.30
to Rock 18.20
10.50
Boring Report (IS 4404-1998)
Sawer Depalpur
Contractor:- M/S KGGIPL JV KE Total Depth:- 10.50
Project:- Construction of bridge across River on
Sawer Depalpur road Dist. Dhar (M.P)
Hole No.:- BH-A-2 Location:-A-2 Ground water table Elevation:-
Collar elevation: NA Date of Starting:-07/09/2019
Type of Bit used: Diamond Cutter GL RL:-00.00 Completion date:- 08/09/2019

Elevati Structural
Size of Core Piles Percentage of recovery Water loss Special
on RL condition
Lithology description Size of Casing observations
to RL Log
of strata Less than 100 mm 20 % 75 % 90 % 100 % hole pipe 0 20 40 60 &
in Description 0
100 mm to above above above above above % % % % interpolations
meters
0 .00
Field Up 100
to
Material mm
0.50
0.50
Field Up
to
Material
1.50
1.50
Silty Clay
to
Mix Kakars
3.00
3.00
Silty Clay
to
Mix Kakars
4.50
4.50
Weathered
to
Rock
6.00
6.00
9.70,9.70
to Rock
4.10
7.50
7.50 7.20 16.20
to Rock
9.00