Vous êtes sur la page 1sur 1

Company: Contractor:

Project No.
REVAMPING OF WASTE WATER TREATMENT FACILITY IN ETHYLENE PLANT AT
QAPCO

COMMENTS RESOLUTION SHEET

WWT-P06-23450-004_0- CRS PIPING GA FOR HIGH COD TANK SOUTH AREA- CRS Rev. 0

Sl. No QAPCO Comments Contractor Response QAPCO Reply

GENERAL COMMENTS
Changemark #01
Location of Instrument – LT 230901 is changed to Shell
P&ID (final and tie in), tie in schedule and instrument
1 Nozzle N16 as shown in Piping GA (WWT-P06-23450-005_0-
index are still showing the instrument (LT230901).
PIPING GA FOR HIGH COD TANK NORTH AREA). (P&ID
To be clarified and synchronized.
and Tie in), Tie in Schedule will be revised.

Page 1 of 1 443333723.doc