Vous êtes sur la page 1sur 1

Rubrics for Wreath (Grade 9 and 10)

Criteria 4 3 2 1
-Recycle Materials -All materials -1 to 3 materials -4 to 6 materials - 7 or more
used are used are not used are not materials used are
recyclable; recyclable; recyclable; not recyclable;
-Tools, Materials, -Complete set of - There are 1 to 3 -There are 4 to 6 - There are 7 or
and Equipment tools, materials, missing tools, missing tools, more missing
and equipment as materials, and materials, and tools, materials,
indicated on the equipment as equipment as and equipment as
project plan. indicated on the indicated on the indicated on the
project plan. project plan. project plan.
Product Size Followed the right Failed to follow Failed to follow Failed to follow
Diameter of ring and accurate the right and the right and the right and
(base) must be measurement as accurate accurate accurate
1m x 1m prescribed. measurement as measurement as measurement as
prescribed with prescribed with prescribed with
the given the given the given
guidelines guidelines guidelines
With .75m x .75m With .50m x .50m With .25 m x .25m
to .95m x .95m to .70m x .70m to .45m x .45m
Proper Use of All tools, There are 1 to 3 There are 4 to 6 7 or more tools,
Tools, materials materials, and tools, materials, tools, materials, materials, and
and equipment equipment are and equipment and equipment equipment are
properly and are not properly are not properly not properly and
safely used. and safely used. and safely used. safely used.

Creativity and The product The product The product The product
Originality design is unique, design is common design is unique design is common
original, and but appealing to but not appealing and not appealing
appealing to the the eye. to the eye. to the eye.
eye.
Cooperation All students Majority of the Majority of the Some of the
(Participation) cooperate and class (3/4 of the class (half of the students (¼ of the
participate. class) cooperate class) cooperate class) cooperate
and participate. and participate. and participate.
Time Frame Finished the Finished the Did not finish the Did not finish the
Decors must be product ahead of product on time product; 1 to 2 product on time;
placed on time and was able and was able to days late in 3 to 4 days late in
respective areas to place it on the place it on the placing the placing the
on October 31, designated area. designated area. product on its product on tis
2019 designated area. designated area.

Vous aimerez peut-être aussi