Vous êtes sur la page 1sur 3

EXISTING ROOM ITEM DESCRIPTION

DIMENSIONS
LxWxH (mm)
WEIGHT
(kg)

1 GANTRY 2050x1039x1938 1810


2 PATIENT TABLE 650x2910x1047 505
3 POWER DISTRIBUTION BOX (PDB) 600x300x800 42
4 POWER DISTRIBUTION UNIT (PDU) 700x550x1062 370
5 INJECTOR ON PEDESTAL - -
6 OPERATOR CONSOLE 736x470x656 80
7 INJECTOR CONTROL - -
8 AURORA SWS TABLE 1300x850x850 40
9 ADVANTAGE WORKSTATION 1000x690 22

STRUCTURE - ACCORDING TO RECEIVED DRAWING


WALL - ACCORDING TO RECEIVED DRAWING

EXAM ROOM HEIGHT


FINISHED FLOOR TO SLAB HEIGHT 3.80m
FALSE CEILING HEIGHT 2.70m

1950
CONTROL ROOM
3490

1100 1200 2530

1250

4700
EXAM ROOM Rumah Sakit Puri Cinere
Jakarta
Indonesia
3160

Dadan Suandana
GE Healthcare
1300

1370

628118490553
Dadan.suandana@ge.com

REVOLUTION EVO
PRELIMINARY STUDY

4750 5150 A 10/MAY/2019 DC-96934: First issue drawing


REV DATE MODIFICATIONS
A mandatory component of this drawing set is the GE Healthcare Pre Installation manual.
Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.
Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning
GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete set of
final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused.
Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work due to scaling from these drawings.

Drawn by Verified by S.O. (GON) Concession PIM Manual Rev


HeeJin Park Soyun, Kim ---- - 5866663-1EN 10
Format Scale File Name Date Sheet
A3 1:50 CT-A144906-PRE-00.DWG 10/MAY/2019 01/03
EQUIPMENT LAYOUT ITEM DESCRIPTION
DIMENSIONS
LxWxH (mm)
WEIGHT
(kg)

1 GANTRY 2050x1039x1938 1810


2 PATIENT TABLE 650x2910x1047 505
3 POWER DISTRIBUTION BOX (PDB) 600x300x800 42
4 POWER DISTRIBUTION UNIT (PDU) 700x550x1062 370
5 INJECTOR ON PEDESTAL - -
6 OPERATOR CONSOLE 736x470x656 80
7 INJECTOR CONTROL - -
8 AURORA SWS TABLE 1300x850x850 40
9 ADVANTAGE WORKSTATION 1000x690 22

STRUCTURE - ACCORDING TO RECEIVED DRAWING


WALL - ACCORDING TO RECEIVED DRAWING

EXAM ROOM HEIGHT


FINISHED FLOOR TO SLAB HEIGHT 3.80m
FALSE CEILING HEIGHT 2.70m
7 6
CONTROL ROOM

1950
8
9
3490

1100
1200 2530
969

4 3
1250 5
2
6
152

4700
1 Rumah Sakit Puri Cinere
EXAM ROOM Jakarta
Indonesia

25°
3160

199 Dadan Suandana


GE Healthcare

2022(ISO)
1300

1370

628118490553
Dadan.suandana@ge.com

REVOLUTION EVO
866

PRELIMINARY STUDY

2117(ISO)

3900 6000 A 10/MAY/2019 DC-96934: First issue drawing


REV DATE MODIFICATIONS
A mandatory component of this drawing set is the GE Healthcare Pre Installation manual.
Failure to reference the Pre Installation manual will result in incomplete documentation required for site design and preparation.
Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning
GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete set of
final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused.
Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work due to scaling from these drawings.

Drawn by Verified by S.O. (GON) Concession PIM Manual Rev


HeeJin Park Soyun, Kim ---- - 5866663-1EN 10
Format Scale File Name Date Sheet
A3 1:50 CT-A144906-PRE-00.DWG 10/MAY/2019 02/03
TEMPERATURE AND HUMIDITY SPECIFICATIONS POWER REQUIREMENTS
IN-USE CONDITIONS
EXAM ROOM CONTROL ROOM 3 PHASES+G
Min Recommended Max Min Recommended Max POWER SUPPLY
Temperature 18°C 22°C 26°C 18°C 22°C 26°C FREQUENCIES
64°F 72°F 79°F 64°F 72°F 79°F MAXIMUM POWER DEMAND 100kVA
Temperature gradient AVERAGE (CONTINUOUS) POWER DEMAND 20kVA
F/h F/h POWER FACTOR 0.85
Relative humidity (1) 30% to 60% 30% to 60%
Humidity gradient 5%/h 5%/h
· Power supply should come into a man disconnect panel (MDP) containing the protective units and controls.
STORAGE CONDITIONS · The section of the supply cable should be calculated in accordance with its length and the maximum
permissible voltage drops.
0°C to +30°C · There must be discrimination between supply cable protective device at the beginning of the installation
Temperature
32°F to +86°F (main low-voltage transformer side) and the protective devices in the PDB.
Temperature gradient
F/h SUPPLY CHARACTERISTICS
Relative humidity (1) up to 70% · Power input must be separate from any others which may generate transients (elevators, air conditioning,
Humidity gradient 5%/h radiology rooms equipped with high speed film changers...).
· All equipment (lighting, power outlets, etc...) installed with GE system components must be powered
Storage longer than 6 months is not recommended. separately.
(1) Non-condensing · Phase imbalance 2% maximum.
· Transients must be less than 1500V peak. (on a 400V line)
AIR RENEWAL
According to local standards.
NOTE
In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to
take measures to protect the equipment from dropping water.

DELIVERY DISCLAIMER

THE CUSTOMER/CONTRACTOR SHOULD: This drawing is a preliminary drawing. Site conditions and/or equipment configuration may have a significant
impact on room layout and site preparation. Final study must be done before installation of the GE equipment. GE
· Provide an area adjacent to the installation site for delivery and unloading of the GE equipment. cannot accept any responsibility for errors due to lack of information.
· Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the
movement of GE equipment from the delivery area into the definitive installation room. The room dimensions used to create the equipment layout may originate from a previous layout and may not be
· Ensure that access routes for equipment will accommodate the weights of the equipment and any accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to lack of
transportation, lifting and rigging equipment. information.
· Ensure that all necessary arrangements for stopping and unloading on public or private property not
belonging to the customer have been made. It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the final
drawings. These drawings are not to be used for actual construction purposes. The company cannot take
responsibility for any damage resulting therefrom.

The customer must ensure the floor strength is sufficient to support the fixings as required. A qualified structural
DIMENSIONS OF DELIVERY WITH DOLLY TRANSPORT EQUIPMENT engineer must be consulted and all work carried out according to his specifications.

Suitable radiological protection must be determined by a qualified radiological physicist in conformation with local
EQUIPMENT DIMENSIONS WEIGHT

LENGTH 2810 mm [110.6 in] regulations. GE does not take responsibility for the specification or provision of radio-protection.
GANTRY WIDTH 1290 mm [50.8 in] 2050 kg 4520 lbs
HEIGHT 2000 mm [78.7 in]
LENGHT 2997 mm [118 in]
VT2000 TABLE WIDTH 762 mm [30 in] 632 kg 1393 lbs
THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.
HEIGHT 1143 mm [45 in]

DATE NAME SIGNATURE

Rumah Sakit Puri Cinere REVOLUTION EVO CT-A144906-PRE-00.DWG Rev A Date 10/MAY/2019 Details 03/03