T.M # 06 20-Aug-19
T.M # 12 10-Jun-19
T.M # 14 20-Mar-19
T.M # 17 6-Jul-19
T.M.20 10/10/19
T.M.22 10/10/2019
TM#01 8/9/2019
T.M.13
LOADER 650 B 10/6/2019
In Progress 5-Sep-19
Awaiting -
Decision
In Progress 20-Sep-19
In Progress 6-Sep-19
In Progress 15-Oct-19
In Progress 19-Oct-19
In Progress 9/10/2019
In Progress 10/20/2019
In Progress 10/18/2019
As per Noshad sb
(We should sell it)
07 TYRE ISSUE REPLACE
Lucky Paragon ReadyMix Limited
Plant, Machinery & Equipment Breakdown Report
Date:23-10-2019
LONG BREAK DOWN DETAILS:
Machineries & Equipment Status
Non
S#. Type Working Total
Working
1 Transit Mixers 20 8 28
2 Bulker 1 0 1
3 M.Concrete Pump s 3 0 3
4 Stationary Pump s 2 0 2
5 Plant 2 0 2
6 Loader 1 1 2
7 Cooling Tower 1 0 1
8 Generators 3 0 3
TOTAL NO OF ASSETS 42
TOTAL MACHINES BREAKDOWN 9
Non-Functional Machineries & Equipment
Equipment
Sr # Defect/Fault & Not Working Date Current Status
Machineries
5 kamani putta damage & Fuel injector T.M #19 10/10/19 In Progress
6 02 m3 Concrete Freeze T.M.22 10/10/2019 In Progress
7 Brake booster damage repair TM#01 8/9/2019 In Progress
2
Fuel Injector Serivec
CP#05 09:00Am
Estimated Date
Remarks (If any)
of Repair.
5-Sep-19
As per Noshad sb
- (We should sell it)
Work Shop In Time 4:30 Pm
AIRING PARTS
3:00 PM