Vous êtes sur la page 1sur 14

Lucky Paragon ReadyMix Limited

Plant, Machinery & Equipment Breakdown Report


Date: 12-10-2019
LONG BREAK DOWN DETAILS:
Machineries & Equipment Status
S#. Type Working
1 Transit Mixers 21
2 Bulker 1
3 M.Concrete Pump s 3
4 Stationary Pump s 2
5 Plant 2
6 Loader 1
7 Cooling Tower 1
8 Generators 3
TOTAL NO OF ASSETS
TOTAL MACHINES BREAKDOWN
Non-Functional Machineries & Equipment
Sr # Defect/Fault

MAJOR BREAK DOWN LIST


1 Plentary Bearing Damage

2 Chasis not Aligned after accident


3 05 m3 Concrete Freeze
4 Injector Problem
5 02 m3 Concrete Freeze
6 02 m3 Concrete Freeze

7 Brake booster damage repair

8 ENGINE BLOCK BRUST ENGINE OVER


9 Hydraulic System elec & brake system

Replacement of tyres carried out due tr heav


1/3/2019 Two tire TM#26
1/8/2019 one Tire TM#28
1/20/2019 Two tire TM#10
1/26/2019 Two tire TM#17
1/30/2019 Two tire TM#24
2/1/2019 one Tire TM#23
2/10/2019 Two tire TM#19
2/17/2019 one Tire TM#28
2/18/2019 one Tire TM#29
2/22/2019 one Tire MCP#05
2/28/2019 Two tire TM#10
3/1/2019 One tire TM#17
3/1/2019 Two tire TM#26
3/1/2019 One tire TM#28

Total 21 Tire s
Total 21 Tire s
kdown Report

hineries & Equipment Status


Non Total
Working
7 28
0 1
0 3
0 2
0 2
1 2
0 1
0 3
TOTAL NO OF ASSETS 42
OTAL MACHINES BREAKDOWN 8
Non-Functional Machineries & Equipment
Equipment & Not Working Date
Machineries

T.M # 06 20-Aug-19

T.M # 12 10-Jun-19
T.M # 14 20-Mar-19
T.M # 17 6-Jul-19
T.M.20 10/10/19
T.M.22 10/10/2019

TM#01 8/9/2019

T.M.13
LOADER 650 B 10/6/2019

Replacement of tyres carried out due tr heavy brustage from


ipment
Estimated Date of
Current Status Repair.

In Progress 5-Sep-19
Awaiting -
Decision
In Progress 20-Sep-19
In Progress 6-Sep-19
In Progress 15-Oct-19
In Progress 19-Oct-19

In Progress 9/10/2019

In Progress 10/20/2019
In Progress 10/18/2019

ue tr heavy brustage from


Remarks (If any)

As per Noshad sb
(We should sell it)
07 TYRE ISSUE REPLACE
Lucky Paragon ReadyMix Limited
Plant, Machinery & Equipment Breakdown Report
Date:23-10-2019
LONG BREAK DOWN DETAILS:
Machineries & Equipment Status

Non
S#. Type Working Total
Working

1 Transit Mixers 20 8 28
2 Bulker 1 0 1
3 M.Concrete Pump s 3 0 3
4 Stationary Pump s 2 0 2
5 Plant 2 0 2
6 Loader 1 1 2
7 Cooling Tower 1 0 1
8 Generators 3 0 3
TOTAL NO OF ASSETS 42
TOTAL MACHINES BREAKDOWN 9
Non-Functional Machineries & Equipment

Equipment
Sr # Defect/Fault & Not Working Date Current Status
Machineries

MAJOR BREAK DOWN LIST


1 Plentary Bearing Damage T.M # 06 20-Aug-19 In Progress
2 Chasis not Aligned after accident T.M # 12 10-Jun-19 Awaiting Decision
2 Clutch Plate Leather Damage T.M#14 23-Oct-19 In Progress

5 kamani putta damage & Fuel injector T.M #19 10/10/19 In Progress
6 02 m3 Concrete Freeze T.M.22 10/10/2019 In Progress
7 Brake booster damage repair TM#01 8/9/2019 In Progress

8 ENGINE BLOCK BRUST ENGINE OVER T.M.13 In Progress

10 Brake service & kamani Putta Damage T.M.15 10/14/2019 In Progress

DAILY NEW PARTS CHANGE & REPAIRING PARTS

2
Fuel Injector Serivec
CP#05 09:00Am
Estimated Date
Remarks (If any)
of Repair.

5-Sep-19
As per Noshad sb
- (We should sell it)
Work Shop In Time 4:30 Pm

16-Oct-19 (OK) Shoot Repairing


21-Oct-19
9/10/2019 07 TYRE ISSUE REPLACE

10/20/2019 engine remove For Replaceemanit Tm#12

10/20/2019 TYRE ISSUE

AIRING PARTS

3:00 PM

Vous aimerez peut-être aussi