1. PRELIMINARES
1. 1. LOCALIZACION Y REPLANTEO M2
area= ((15,82+17,45)*27,9)/2
area= 464.1165 Area= 464.12
area= 464.12
h prom= 0.3
vol = 139.24 Excavación= 139.24
area= 464.12
h prom= 0.7
vol = 324.88 Relleno= 324.88
3. ACABADOS
Long= 15,82+17,45+27,9+27,9
Long= 89.07 Sardinel= 89.07
4. TRANSPORTE
PRESUPUESTO GENERAL
ARQUITECTO
MUNICIPIO DE PUERTO SANTANDER,
SANTANDER”
RAL
Vr. PARCIAL
6,263,900.54 1.10 1.05
236,598.10 2,673.62 2,940.98 2,807.30
1,457,233.62
3,054,334.88 52,761.50 58,037.65 55,399.58
1,515,733.95
343,903.70
280,079.61 12,461.90 13,708.09 13,085.00
63,824.09 6,580.91 7,239.00 6,909.96
2,573,718.76
111,706.41
2,058,237.11 293,207.01 322,527.71 307,867.36
128,821.88
4,206.67
3,266.67 1,250.00 1,312.50 1,375.00
940.00
69,371,116.95
60,125,726.22
230,320.42
1,762,094.97
5,049,244.10 875,407.34
846,689.79
803,419.06 404,230.22
338,190.93
215,431.46 13,719.00
78,556,846.61
7,855,684.66
785,568.47
3,142,273.86
11,783,526.99
90,340,374.00
217,765,255.00
127,424,881.00
PROYECTO “CONSTRUCCION DE PATINODROMO EN EL BARRIO EL PORVENIR, MUNICIPIO DE PUERTO SA
DEPARTAMENTO NORTE DE SANTANDER”
Equipos:
Mezcladora 1 bulto Und/d 60,000.00 3.00
Herramienta Menor % 0.10
____________ ______________________________________
Equipos:
Mezcladora 1 bulto Und/d 60,000.00 3.00
Herramienta Menor % 0.10
____________ ______________________________________
ARQUITECTO
Personal:
Cuadrilla de construccion 1*4 Día 40,093.20 0.45
Equipos:
Mezcladora 1 bulto Und/d 60,000.00 3.00
Herramienta Menor % 0.50
____________ ______________________________________
Equipos:
Mezcladora 1 bulto Und/d 60,000.00 3.00
Herramienta Menor % 0.50
____________ ______________________________________
ARQUITECTO
EN EL BARRIO EL PORVENIR, MUNICIPIO DE PUERTO SANTANDER,
ENTO NORTE DE SANTANDER”
V_PARCIAL V_UNITARIO
427,238.39
202,500.00
25,577.50
43,520.00
123,309.90
20,000.00
12,330.99
401,423.39
175,500.00
21,642.50
48,640.00
123,309.90
20,000.00
12,330.99
EN EL BARRIO EL PORVENIR, MUNICIPIO DE PUERTO SANTANDER,
ENTO NORTE DE SANTANDER”
452,696.50
253,800.00
45,252.50
89,096.00
20,000.00
44,548.00
509,934.93
253,800.00
45,252.50
98,400.00
61,654.95
20,000.00
30,827.48
ANALISIS DE PRECIOS UNITARIOS-SALON COMUNAL CUCUTA
Personal:
Cuadrilla de construccion 0*1 Día 40,093.20
Equipos:
Herramienta Menor %
____________ ______________________________________
1. 4. . . LOCALIZACION Y REPLANTEO M3
Materiales:
Personal:
Cuadrilla de construccion 0*1 Día 40,093.20
Equipos:
Volqueta 5m3 200,000.00
Herramienta Menor %
____________ ______________________________________
2. EXCAVACIONES
2. 1. . . EXCAVACION MANUAL M2
Materiales:
Base granular tama±o maximo 1 1/2" m3 36,100.00
Personal:
Cuadrilla de construccion 0*1 Día 40,093.20
Equipos:
Motoniveladora Hm 160,000.00
Vibrocompactador Hm 130,000.00
Carrotanque de agua Dm 350,000.00
Herramienta Menor %
____________ ______________________________________
2. 2. . . RETIRO DE SOBRANTES h < 2m M2
Materiales:
Base granular tama±o maximo 1 1/2" m3 36,100.00
Personal:
Cuadrilla de construccion 0*1 Día 40,093.20
Equipos:
Motoniveladora Hm 160,000.00
Vibrocompactador Hm 130,000.00
Carrotanque de agua Dm 350,000.00
Herramienta Menor %
____________ ______________________________________
ING CIVIL
2. 3. . . Err:509 M2
Materiales:
Concreto 21 MPA m3 427,238.39
Antisol kg 5,000.00
Malla electrosoldada 4mm 15*15 m2 6,200.00
Personal:
Cuadrilla de construccion 1*3 Día 206,526.60
Equipos:
Formaleta metalica sadineles Du 1,000.00
Vibrador (Gas/Elec) hM 55,000.00
Herramienta Menor %
____________ ______________________________________
2. 4. . . Err:509 ML
Materiales:
Concreto 17 MPA m3 401,423.39
piedra m3 35,000.00
Personal:
Cuadrilla de construccion 1*4 Día 246,619.80
Equipos:
Formaleta metalica 1*1 Du 1,500.00
Vibrador (Gas/Elec) hM 55,000.00
Herramienta Menor %
____________ ______________________________________
2. 5. . . Err:509 ML
Materiales:
Concreto 17 MPA m3 401,423.39
piedra m3 35,000.00
Personal:
Cuadrilla de construccion 1*4 Día 246,619.80
Equipos:
Formaleta metalica 1*0,6 Du 1,500.00
Vibrador (Gas/Elec) hM 55,000.00
Herramienta Menor %
____________ ______________________________________
ING CIVIL
ING CIVIL
Personal:
Cuadrilla de construccion 1*1 Día 126,340.20
Herramienta Menor %
Equipos:
Formaleta metalica sardineles Dm 1,000.00
Vibrador (Gas/Elec) hM 55,000.00
Herramienta Menor %
____________ ______________________________________
3. 5. . . Err:509 M2
Materiales:
Concreto normal 17.5 MPa TM 1 1/2" y 1" m3 401,423.39
Varilla 3/8" kg 3,600.00
Espaldar und 230,000.00
Personal:
Cuadrilla de construccion 1*1 Día 126,340.20
Herramienta Menor %
____________ ______________________________________
3. 6. . . Err:509 ML
Materiales:
Codo D 2" und 15,000.00
Tubo D=2" m 42,300.00
Barrera de protección en tabla zapan 2x18cm ml 17,500.00
Personal:
Cuadrilla de construccion 1*3 Día 206,526.60
Herramienta Menor %
____________ ______________________________________
ING CIVIL
3. 8. . . Err:509 ML
Materiales:
Pintura trafico gal 98,700.00
Brocha 3" und 9,500.00
Personal:
Cuadrilla especializada 1*0 Día 97,902.00
Herramienta Menor %
____________ ______________________________________
3. 9. . . Err:509 UND
Materiales:
Ladrillo prensado 7x12x25 und 650.00
Mortero 1:3 m3 452,696.50
Arbol Nim und 60,000.00
Personal:
Cuadrilla de construcción 1x1 Día 126,340.20
Herramienta Menor %
____________ ______________________________________
ING CIVIL
PROYECTO “CONSTRUCCION DE PATINODROMO EN EL BARRIO EL PORVENIR, MUNICIPIO DE PUERTO SANT
DEPARTAMENTO NORTE DE SANTANDER”
Transporte:
Volqueta 5m3 Vje 200,000.00
Personal:
Herramienta Menor %
____________ ______________________________________
Personal:
Cuadrilla especializada 1*3 Día 241,957.80
Técnico Día 107,226.00
Herramienta Menor %
____________ ______________________________________
5. 2. . . Err:509 UND
Materiales:
Caja paso electrica con tapa und 35,000.00
Personal:
Cuadrilla especializada 1*3 Día 241,957.80
Técnico Día 107,226.00
Herramienta Menor %
____________ ______________________________________
ING CIVIL
Personal:
Cuadrilla especializada 1*3 Día 241,957.80
Técnico Día 107,226.00
Herramienta Menor %
____________ ______________________________________
Personal:
Cuadrilla especializada 1*1 Día 145,920.60
Técnico Día 107,226.00
Herramienta Menor %
____________ ______________________________________
5. 5. . . Err:509 ML
Materiales:
Ducto galvanizado D=1/2" x 3mts und 16,500.00
Cable encauchetado # 12 THHN ml 5,500.00
Personal:
Cuadrilla especializada 1*1 Día 145,920.60
Técnico Día 107,226.00
Herramienta Menor %
____________ ______________________________________
ARQUITECTO
Personal:
Cuadrilla especializada 1*3 Día 241,957.80
Técnico Día 107,226.00
Herramienta Menor %
____________ ______________________________________
5. 7. . . PISO UND
Materiales:
Poste de concreto de 12 mts x 510 kg und 796,000.00
Transporte:
Para Poste de concreto de 12 mts x 510 kg viaje 250,000.00
Personal:
Cuadrilla especializada 1*3 Día 241,957.80
Técnico Día 107,226.00
Herramienta Menor %
____________ ______________________________________
Personal:
Cuadrilla especializada 1*3 Día 241,957.80
Técnico Día 107,226.00
Herramienta Menor %
____________ ______________________________________
ARQUITECTO
Personal:
Cuadrilla especializada 1*1 Día 145,920.60
Técnico Día 107,226.00
Herramienta Menor %
____________ ______________________________________
5. 10. . . ANILLADO DE POSTE DE CONCRETO UND
Materiales:
Anillado und 31,000.00
Personal:
Cuadrilla especializada 1*1 Día 145,920.60
Técnico Día 107,226.00
Herramienta Menor %
____________ ______________________________________
Personal:
Cuadrilla especializada 1*1 Día 145,920.60
Técnico Día 107,226.00
Herramienta Menor %
____________ ______________________________________
ARQUITECTO
CANT./REND. V_PARCIAL V_UNITARIO
2,628.87
0.05 500.00
0.01 25.00
0.04 432.00
400.00 364.80
400.00 899.77
6,400.00 344.07
0.05 63.23
32,382.97
1.30 30,840.92
0.05 1,542.05
67,874.11
1.25 47,000.00
2.40 16,705.50
18.00 3,333.33
0.05 835.28
CANT./REND. V_PARCIAL V_UNITARIO
16,841.49
12.00 3,341.10
15.00 13,333.33
0.05 167.06
16,283.70
0.27 9,747.00
45.00 890.96
70.00 2,285.71
70.00 1,857.14
240.00 1,458.33
0.05 44.55
11,410.20
0.14 4,873.50
45.00 890.96
70.00 2,285.71
70.00 1,857.14
240.00 1,458.33
0.05 44.55
101,518.94
0.16 68,358.14
0.25 1,250.00
1.10 6,820.00
9.00 22,947.40
5.71 175.13
67.00 820.90
0.05 1,147.37
2.50 98,647.92
1.00 1,500.00
15.00 3,666.67
0.05 4,932.40
0.12 48,170.81
8.10 27,540.00
5.66 19,230.40
0.50 1,900.00
0.23 1,495.00
1.10 38,500.00
8.00 20,804.18
1.00 900.00
0.05 1,040.21
490,056.45
0.21 84,298.91
0.17 86,688.94
9.90 24,750.00
125.00 50,000.00
10.47 177,990.00
2.00 63,170.10
0.05 3,158.51
73,615.36
14.00 9,100.00
0.01 2,263.48
0.10 40,142.34
6.00 21,056.70
0.05 1,052.84
49,967.27
7.00 18,048.60
0.05 902.43
0.83 1,204.82
33.00 1,666.67
0.05 45.12
274,635.85
4.00 60,000.00
4.00 169,200.00
1.10 19,250.00
5.00 41,305.32
0.10 4,130.53
21,029.71
1.05 1,890.00
0.04 3,140.00
0.02 420.00
0.05 2,800.00
10.00 9,790.20
10.00 2,500.00
0.05 489.51
10,764.14
0.03 2,961.00
0.10 950.00
15.00 6,526.80
0.05 326.34
319,780.79
112.00 72,800.00
0.12 54,323.58
1.00 60,000.00
1.00 126,340.20
0.05 6,317.01
CIPIO DE PUERTO SANTANDER,
ANTANDER”
1,333.33
150.00 1,333.33
0.05 -
517,433.10
1.00 220,000.00
0.50 90,000.00
1.80 134,421.00
1.80 59,570.00
0.10 13,442.10
128,344.90
1.00 35,000.00
4.00 60,489.45
4.00 26,806.50
0.10 6,048.95
CIPIO DE PUERTO SANTANDER,
ANTANDER”
230,320.42
1.00 140,000.00
4.00 60,489.45
4.00 26,806.50
0.05 3,024.47
19,578.83
1.03 2,060.00
0.30 360.00
0.30 114.00
3.30 5,445.00
20.00 7,296.03
30.00 3,574.20
0.10 729.60
41,774.24
0.35 5,775.00
3.30 18,150.00
15.00 9,728.04
15.00 7,148.40
0.10 972.80
565,079.40
1.00 10,152.90
1.00 25,051.20
1.00 275,000.00
1.00 122,000.00
2.81 86,105.98
2.81 38,158.72
0.10 8,610.60
1,262,311.02
1.00 796,000.00
1.15 217,391.30
1.50 161,305.20
1.50 71,484.00
0.10 16,130.52
846,689.79
1.00 380,000.00
1.00 280,000.00
2.00 120,978.90
2.00 53,613.00
0.10 12,097.89
401,709.53
1.00 250,000.00
1.00 50,008.00
2.00 72,960.30
5.00 21,445.20
0.10 7,296.03
84,547.73
1.00 31,000.00
78,381.00
5.00 29,184.12
5.00 21,445.20
0.10 2,918.41
17,952.62
1.00 9,028.00
30.00 4,864.02
30.00 3,574.20
0.10 486.40
2,011.00 2,012.00 2,018 2,019
DESCRIPCION UNIDAD CON P.S. 1.05
Ayudante de Construcción Día $ 38,184.00 $ 40,093.20 $ 54,166.00 $ 57,415.00
Ayudante de Especialidad Día $ 45,732.00 $ 48,018.60
Oficial de Construcción Día $ 82,140.00 $ 86,247.00 $ 81,249.00 $ 86,123.00
Oficial de Especialidad Día $ 93,240.00 $ 97,902.00
Técnico de Construcción Día $ 102,120.00 $ 107,226.00
Maestro de Construcción Día $ 122,100.00 $ 128,205.00 $ 157,250.00 $ 166,685.00
Cuadrilla de construcción 0*1 Día $ 38,184.00 $ 40,093.20
Cuadrilla de construcción 0*10 Día $ 381,840.00 $ 400,932.00
Cuadrilla de construcción 1*0 Día $ 82,140.00 $ 86,247.00
Cuadrilla de construcción 1*1 Día $ 120,324.00 $ 126,340.20 ayudante +oficial
Cuadrilla de construcción 1*2 Día $ 158,508.00 $ 166,433.40
Cuadrilla de construcción 1*3 Día $ 196,692.00 $ 206,526.60
Cuadrilla de construcción 1*4 Día $ 234,876.00 $ 246,619.80
Cuadrilla de construcción 1*5 Día $ 273,060.00 $ 286,713.00
Cuadrilla de construcción 1*6 Día $ 311,244.00 $ 326,806.20
Cuadrilla de construcción 1*7 Día $ 349,428.00 $ 366,899.40
Cuadrilla de construcción 1*8 Día $ 387,612.00 $ 406,992.60
Cuadrilla de construcción 1*9 Día $ 425,796.00 $ 447,085.80
Cuadrilla de construcción 2*0 Día $ 164,280.00 $ 172,494.00
Cuadrilla de construcción 2*1 Día $ 202,464.00 $ 212,587.20
Cuadrilla de construcción 2*2 Día $ 240,648.00 $ 252,680.40
Cuadrilla de construcción 2*3 Día $ 278,832.00 $ 292,773.60
Cuadrilla de construcción 2*4 Día $ 317,016.00 $ 332,866.80
Cuadrilla de construcción 2*5 Día $ 355,200.00 $ 372,960.00
Cuadrilla especializada 1*0 Día $ 93,240.00 $ 97,902.00
Cuadrilla especializada 1*1 Día $ 138,972.00 $ 145,920.60
Cuadrilla especializada 1*2 Día $ 184,704.00 $ 193,939.20
Cuadrilla especializada 1*3 Día $ 230,436.00 $ 241,957.80
Cuadrilla de topografia 1*2*2 Día $ 342,768.00 $ 359,906.40
ARQUITECTO
T.P. No. A68092009-88034648
ENIR, MUNICIPIO DE PUERTO SANTANDER, DEPARTAMENTO NORTE DE SANTANDER”
AMACION DE OBRA
MES 3 MES 4
SEM 4 SEM 1 SEM 2 SEM 3 SEM 4
PROGRAMACION DE OBRA DEL PROYECTO “CONSTRUCCION DE PATINOD
MES 1
ITEM DESCRIPCION ITEM VR/PARCIAL SEM 1 SEM 2 SEM 3
1 PRELIMINARES
1.1 LOCALIZACION Y REPLANTEO 236,598.10 236,598.10
1.2 EXCAVACION MANUAL SIN CLASIFICAR PARA NIVELACION 3,054,334.88 1,527,167.44 1,527,167.44
1.3 RELLENO RECEBO/VIBROCOMPAC. MANUAL 1,457,233.62 1,457,233.62
1.4 RETIRO DE MATERIAL SOBRANTE 1,515,733.95 1,515,733.95
2 ESTRUCTURA
2.1 BASE GRANULAR e=0.20 280,079.61
2.2 BASE GRANULAR e=0.10 63,824.09 31,912.04 31,912.04
2.3 PAVIMENTO EN CONCRETO e=0.15 Err:509
2.4 MURO EN CONCRETO CICLOPEO H=1,0 M Err:509 Err:509 Err:509 Err:509
2.5 MURO EN CONCRETO CICLOPEO H=0.60 M Err:509 Err:509 Err:509
3 ACABADOS
CUNETA DE AGUAS LLUVIAS (0,40 x 0,50) EN CCTO REFORZADO Y CON
3.1 REJILLA METALICA 111,706.41
3.2 CAJAS DE INSPECCION ALL EN LADRILLO 70X70 2,058,237.11
3.3 PISO ANDEN EN COMPOSICION (BORDE LADRILLO) 274,953.36
3.4 SARDINEL EN COCNCRETO H=0,40 M 128,821.88
3.5 BANCAS EN CCTO CON ESPALDAR METALICO Err:509
3.6 BARANDA METALICA TUBO 2" Err:509
3.7 PINTURA ESMALTE BARANDA Err:509
3.8 DEMARCACION PISTA DE PATINAJE Err:509
3.9 JARDINERAS 1x1x0,5 LADRILLO A LA VISTA INC SIEMBRA DE ARBOL Err:509
4 TRANSPORTE
4.1 TRANSPORTE MAT DE BASE 3,266.67 1,633.33
4.2 TRANSPORTE MAT TRITURADO 940.00 156.67 156.67
5 INSTALACIONES ELECTRICAS
5.1 REFLECTOR METAL HALIDE DE 400W 220V INCLUYE HERRAJES 60,125,726.22
5.2 CAJA PASO ELECTRICA CON TAPA DE 30 X 30 CM Err:509
5.3 PUESTA A TIERRA CON VARILLA DE COBRE DE 5/8" X 2,40 MT 230,320.42
5.4 CANALIZACION EN TIERRA Y TENDIDO DE RED EN 3 # 10THHN D=1" 1,762,094.97
BAJANTE DE POSTE EN DUCTO GALVANIZADO DE D=1/2" X 9 MT Y
5.5 ACOMETIDA EN CABLE ENCAUCHETADO 3# 12 THHN Err:509
5.6 SISTEMA FOTOELECTRICO Err:509
5.7 POSTE DE CONCRETO DE 12 METROS X 510 KG 5,049,244.10
5.8 ESTRUCTURA PARA ACOMETIDA Y SISTEMA DE MEDIDA 846,689.79
5.9 MEDIDOR TRIFILAR REVISADO, SELLADO E INSTALADO POR CENS 803,419.06
5.10 ANILLADO DE POSTE DE CONCRETO 338,190.93
5.11 CABLE CONCENTRICO 3X8 AWG 215,431.46
INVERSION SEMANAL DEL COSTO DIRECTO 78,556,846.61 Err:509 Err:509 Err:509
ADMINISTRACION 7,855,684.66 490,980.29 490,980.29 490,980.29
IMPREVISTOS 785,568.47 49,098.03 49,098.03 49,098.03
UTILIDAD 3,142,273.86
COSTOS INDIRECTOS 11,783,526.99
COSTO TOTAL DEL PROYECTO 90,340,374.00
ARQUITECTO
T.P. A68092009-88034648
CONSTRUCCION DE PATINODROMO EN EL BARRIO EL PORVENIR, MUNICIPIO DE PUERTO SANTANDER, DEPARTAMENTO NORTE DE SANTANDER”
140,039.81 140,039.81
Err:509
55,853.21 55,853.21
2,058,237.11
91,651.12 91,651.12 91,651.12
64,410.94 64,410.94
Err:509 Err:509
Err:509
Err:509 Err:509
1,633.33
156.67 156.67 156.67 156.67
Err:509
881,047.49
MES 3 MES 4
SEM 4 SEM 1 SEM 2 SEM 3 SEM 4
236,598.10
3,054,334.88
1,457,233.62
1,515,733.95
-
280,079.61
63,824.09
Err:509
Err:509
Err:509
-
111,706.41
2,058,237.11
274,953.36
128,821.88
Err:509
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
-
3,266.67
940.00
-
30,062,863.11 30,062,863.11 60,125,726.22
Err:509
230,320.42 230,320.42
881,047.49 1,762,094.97
piedra M3 35000
Recebo M3 37600
sika 3 KG 8200
Antisol KG 5000
Alambre KG 3800
plastocrete KG 6500
Anticorrosivo GL 56000